CN2751072Y - 塔吊基础就位框 - Google Patents
塔吊基础就位框 Download PDFInfo
- Publication number
- CN2751072Y CN2751072Y CN 200420115928 CN200420115928U CN2751072Y CN 2751072 Y CN2751072 Y CN 2751072Y CN 200420115928 CN200420115928 CN 200420115928 CN 200420115928 U CN200420115928 U CN 200420115928U CN 2751072 Y CN2751072 Y CN 2751072Y
- Authority
- CN
- China
- Prior art keywords
- steel
- positioning
- steel plate
- tower crane
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种塔吊基础就位框,该就位框为矩形,在四角是四块定位钢板,四边是四根定位钢梁,定位钢板与定位钢梁固定连接成钢框,在定位钢板和定位钢梁的连接部位穿有定位销孔,定位钢板上分布有地脚螺栓孔。上述定位钢梁与定位钢板之间垫有矩形钢垫片或C字形钢垫片,上述定位钢梁是槽钢、角钢或钢管。本实用新型大大节省了机械安装时间,提高了塔式起重机的利用率,节省汽车吊和半挂车的机械费用,并保证地脚螺栓准确的固定于钢筋混凝土中,使塔式起重机迅速精确就位。
Description
(一)技术领域
本实用新型涉及一种建筑安装用的预制基础构件。
(二)背景技术
现有塔式起重机是在固定式塔基上就位,这个过程首先需要用汽车吊将四个地脚与一标准节相连,以保证各地脚之间的相对位置;然后放到上层钢筋网上,用水准仪逐一调整地脚的水平度,要求偏差不得大于2mm。通常四个地脚装有32条高强度螺栓,需要调整很长时间,地脚水平度调整完后,最后灌入钢筋混凝土,将32条高强度螺栓埋入里面,固定式塔基制作即完成。上述过程复杂而缓慢,在工期紧急时,还容易出现定位不精确的问题,急需改进。
(三)实用新型内容
本实用新型的目的是提供一种塔吊基础就位框,解决塔吊基础迅速精确就位的技术问题。
本实用新型的技术方案:这种塔吊基础就位框,其特征在于:该就位框为矩形,在四角是四块定位钢板,四边是四根定位钢梁,定位钢板与定位钢梁固定连接成钢框,在定位钢板和定位钢梁的连接部位穿有定位销孔,定位钢板上分布有地脚螺栓孔。
上述定位钢梁与定位钢板之间垫有矩形钢垫片或C字形钢垫片。
上述定位钢梁与定位钢板由螺栓连接或焊接。
上述定位钢板为正方形钢板或长方形钢板。
上述定位钢梁是槽钢、角钢或钢管。
本实用新型的有益效果:在施工中,直接将塔吊基础就位框放在基础的钢筋笼上,将地脚螺栓穿过定位钢板上的地脚螺栓孔,然后灌注混凝土。大大节省了机械安装时间,提高了塔式起重机的利用率,节省汽车吊和半挂车的机械费用,并保证地脚螺栓准确的固定于钢筋混凝土中,使塔式起重机迅速精确就位。
(四)附图说明
图1是本实用新型的塔吊基础就位框结构示意图;
图2是图1的侧视图。
图中:1-定位钢板、2-定位钢梁、3-连接螺栓、4-定位销孔、5-地脚螺栓孔、6-钢垫片。
(五)具体实施方式
实施例参见图1、2,这种塔吊基础就位框为矩形,在四角有四块正方形的定位钢板1,四边是四根定位钢梁2,定位钢板1与定位钢梁2之间垫有C形钢垫片6,固定连接成矩形钢框。定位钢梁2与C形钢垫片6焊接,C形钢垫片6与定位钢板1之间由连接螺栓3连接,钢垫片6的两边各开有一个定位销孔4,每块定位钢板上分布有八个地脚螺栓5。上述定位钢梁选择槽钢、角钢或钢管均可。
Claims (7)
1、一种塔吊基础就位框,其特征在于:该就位框为矩形,在四角是四块定位钢板,四边是四根定位钢梁,定位钢板与定位钢梁固定连接成钢框,在定位钢板和定位钢梁的连接部位穿有定位销孔,定位钢板上分布有地脚螺栓孔。
2、根据权利要求1所述的塔吊基础就位框,其特征在于:上述定位钢梁与定位钢板之间垫有矩形钢垫片或C字形钢垫片。
3、根据权利要求1所述的塔吊基础就位框,其特征在于:上述定位钢梁与定位钢板由螺栓连接或焊接。
4、根据权利要求2所述的塔吊基础就位框,其特征在于:上述定位钢梁与定位钢板由螺栓连接或焊接。
5、根据权利要求1所述的塔吊基础就位框,其特征在于:上述定位钢板为正方形钢板或长方形钢板。
6、根据权利要求2或3或4所述的塔吊基础就位框,其特征在于:上述定位钢板为正方形钢板或长方形钢板。
7、根据权利要求1或2或3或4或5所述的塔吊基础就位框,其特征在于:上述定位钢梁是槽钢、角钢或钢管。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420115928 CN2751072Y (zh) | 2004-11-29 | 2004-11-29 | 塔吊基础就位框 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200420115928 CN2751072Y (zh) | 2004-11-29 | 2004-11-29 | 塔吊基础就位框 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2751072Y true CN2751072Y (zh) | 2006-01-11 |
Family
ID=35932249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200420115928 Expired - Fee Related CN2751072Y (zh) | 2004-11-29 | 2004-11-29 | 塔吊基础就位框 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2751072Y (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101413271B (zh) * | 2006-06-09 | 2011-03-16 | 赵正义 | 桅杆式机械设备组合基础的垂直定位连接构造 |
CN101413272B (zh) * | 2006-06-09 | 2011-03-16 | 赵正义 | 桅杆式机械设备组合基础的垂直定位连接构造 |
CN102561383A (zh) * | 2011-06-23 | 2012-07-11 | 中冶建工集团有限公司 | 塔吊底座安装方法 |
CN103967040A (zh) * | 2014-05-19 | 2014-08-06 | 中国建筑第八工程局有限公司 | 塔吊基础结构及其施工方法 |
CN105317052A (zh) * | 2014-07-15 | 2016-02-10 | 五冶集团上海有限公司 | 一种塔吊基础螺栓固定方法 |
-
2004
- 2004-11-29 CN CN 200420115928 patent/CN2751072Y/zh not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101413271B (zh) * | 2006-06-09 | 2011-03-16 | 赵正义 | 桅杆式机械设备组合基础的垂直定位连接构造 |
CN101413272B (zh) * | 2006-06-09 | 2011-03-16 | 赵正义 | 桅杆式机械设备组合基础的垂直定位连接构造 |
CN102561383A (zh) * | 2011-06-23 | 2012-07-11 | 中冶建工集团有限公司 | 塔吊底座安装方法 |
CN102561383B (zh) * | 2011-06-23 | 2015-02-18 | 中冶建工集团有限公司 | 塔吊底座安装方法 |
CN103967040A (zh) * | 2014-05-19 | 2014-08-06 | 中国建筑第八工程局有限公司 | 塔吊基础结构及其施工方法 |
CN103967040B (zh) * | 2014-05-19 | 2015-12-02 | 中国建筑第八工程局有限公司 | 塔吊基础结构及其施工方法 |
CN105317052A (zh) * | 2014-07-15 | 2016-02-10 | 五冶集团上海有限公司 | 一种塔吊基础螺栓固定方法 |
CN105317052B (zh) * | 2014-07-15 | 2017-04-19 | 五冶集团上海有限公司 | 一种塔吊基础螺栓固定方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201943191U (zh) | 新型冷弯矩形钢管柱装配式柱脚 | |
CN102127966B (zh) | 一种现浇钢筋混凝土柱模板固定装置 | |
CN209114332U (zh) | 一种长悬挑大截面盖梁托架体系 | |
CN206204766U (zh) | 独柱墩桥梁抗倾覆斜撑加固装置 | |
CN2751072Y (zh) | 塔吊基础就位框 | |
CN105821962B (zh) | 装配整体式预制预应力钢筋混凝土梁与框架柱连接构造 | |
CN202787512U (zh) | 一种h型钢柱柱脚连接结构 | |
CN205171381U (zh) | 预制装配桥梁盖梁定位装置 | |
CN202265906U (zh) | 埋入式钢管混凝土柱脚锚栓固定装置 | |
CN202266034U (zh) | 埋入式菱形钢骨混凝土柱脚锚栓固定装置 | |
CN217975378U (zh) | 简支梁装配式现浇板模板支撑装置 | |
CN208934394U (zh) | 一种可周转式液压爬模附墙装置 | |
CN211947965U (zh) | 现浇连续箱梁内模 | |
CN209585427U (zh) | 一种装配式钢管束预应力混凝土组合梁 | |
CN202007527U (zh) | 一种现浇钢筋混凝土柱模板固定装置 | |
CN203113908U (zh) | 围墙与广告牌合一全装配结构 | |
CN221168782U (zh) | 一种型钢柱用固定支架 | |
CN206846097U (zh) | 一种门刚与框架分装式管道支架结构 | |
CN220504613U (zh) | 一种砌体建筑物构造柱加固结构 | |
CN214462572U (zh) | 一种混凝土施工用支撑架 | |
CN220301881U (zh) | 一种bipv光伏车棚 | |
CN210736042U (zh) | 一种新型塔吊基础结构 | |
CN114607152B (zh) | 钢结构调整柱网间距的施工方法 | |
CN219045304U (zh) | 一种装配式立柱通用底膜板 | |
CN220927943U (zh) | 一种地下车站型钢柱锚固支座结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |