CN2723409Y - Special clamp for loading and unloading 8 ton aluminium ingot - Google Patents

Special clamp for loading and unloading 8 ton aluminium ingot Download PDF

Info

Publication number
CN2723409Y
CN2723409Y CN 200420029536 CN200420029536U CN2723409Y CN 2723409 Y CN2723409 Y CN 2723409Y CN 200420029536 CN200420029536 CN 200420029536 CN 200420029536 U CN200420029536 U CN 200420029536U CN 2723409 Y CN2723409 Y CN 2723409Y
Authority
CN
China
Prior art keywords
shears
cultrating
crotch
clamp
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420029536
Other languages
Chinese (zh)
Inventor
纪鸿恩
杨加永
井伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Original Assignee
TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HARBOUR FIRST STEVEDORING CO Ltd filed Critical TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Priority to CN 200420029536 priority Critical patent/CN2723409Y/en
Application granted granted Critical
Publication of CN2723409Y publication Critical patent/CN2723409Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a special clamp for loading and unloading 8 ton aluminium ingot, comprising two parallel main body plates of the clamp. The outsides of the two parallel main body plates of the clamp are respectively connected with the shears mouths of two pairs of shears-type fork frames. The middle of the fork body of each pair of the shears-type fork frames is provided with shears-type fork frame shaft. The other end of each shears-type fork frame is connected with a clamp link rod by a clamp hinged shaft. The other ends of each pair of the clamp link rods are connected by a link rod shaft. Two link rod shafts are respectively connected with connecting shackles. A supporting beam is connected between the connecting shackles on the two ends. The two ends of the supporting beam are upward connected with the connecting shackles. The upward connecting shackles on the two ends of the supporting beam are respectively connected with steel cable hanging ropes. The link rod shafts of the shears-type fork frame on the same ends of each pair of the shears-type fork frames are respectively connected with an automatic unhooking rod. The other ends of the two automatic unhooking rods are provided with long holes. The long holes penetrate the clamp hinged shafts. The utility model is characterized in the adoption of the design and structure of the double shears type, and has the advantages of light self-weight, high intensity, flexible hinging, tight clamping force, durability, easy operation, and safe and reliable quality.

Description

8 tons of aluminium ingot loading and unloading operation unit clamps
Technical field
The utility model belongs to the loading and unloading operation anchor clamps, particularly a kind of 8 tons of aluminium ingot loading and unloading operation unit clamps.
Background technology
Aluminium ingot goods class is one of main goods class of my company's foreign export, accounts for the aluminium ingot of the overall situation more than 90% in my Ji Gang of company shipment outlet, and only the whole of last year just reaches 400,000 tons approximately.But for a long time, the aluminium ingot ship-loading operation uses rope coil to hang operation all the time, and not only efficient is low, and the steel rope waste is big, and potential safety hazard is big, and quality is unsecured.
Summary of the invention
Technical problem to be solved in the utility model is: a kind of 8 tons of aluminium ingot loading and unloading operation unit clamps are provided.Solution efficient is low, and the steel rope waste is big, and potential safety hazard is big, the unsecured problem of quality.
The technical solution of the utility model is:
A kind of 8 tons of aluminium ingot loading and unloading operation unit clamps, it is characterized in that: two parallel chuck body plates are arranged, two parallel chuck body plates respectively connect the clip of two pairs of crotch of cultrating outward, the middle crotch axle of cultrating of the fork body of the every pair of crotch of cultrating, each crotch other end of cultrating is by anchor clamps jointed shaft jockey pipe link, the other end of every pair of anchor clamps pipe link is connected by pitman shaft, two pitman shafts connect joining shackle respectively, connect support beam between the joining shackle at two ends, the two ends of support beam upwards connect joining shackle, and the joining shackle that the two ends of support beam make progress connects steel rope respectively and hangs and be.
Between the fork body of two pairs of crotch of cultrating strut bar is arranged.
Connect an automatic releasing hook bar on the anchor clamps jointed shaft of the crotch of cultrating of the every pair of same end of crotch of cultrating, two automatic releasing hook bar other ends have slotted hole, and slotted hole is through on the anchor clamps jointed shaft of the other end.
The utility model effect is:
Advantages such as 8 tons of aluminium ingot ship-loading operation unit clamps are taked double shear formula project organization, and select for use 16MnN steel plate Combination Welding to become the casing jig arm, have from heavy and light, intensity height, and are hinged flexible, and gripping power is big, and is not fragile, easy and simple to handle, that safe mass is reliable.The automatic releasing hook device that particularly is equipped with on the suspender, more make operating worker reduce flow chart, every lines can reduce operating worker quantity 2-3 name, has alleviated labor strength and has reached 50%, and make ship-loading operation efficient improve about 2 times, save about 60,000 yuan/year of steel rope and processing charges simultaneously.During the empty hook operation of this suspender, should earlier 2 steel ropes be hung nose and be hung on the hoisting crane gib head, then anchor clamps are opened to deployed position automatically, and aligning can loose hook behind the center of 6 bundle aluminium ingots.During lifting cargo, should earlier the automatic releasing hook handle be mentioned, along with suspension hook hoists, suspender body biside plate automatically inwardly clamps goods, and goods is stressed and the friction force effect can rise and winches to assigned address, finishes the whole operation process.
Description of drawings.
Fig. 1 is 8 tons of aluminium ingot loading and unloading operation unit clamp scheme drawings
Fig. 2 is 8 tons of aluminium ingot loading and unloading operation unit clamp running condition figure
The specific embodiment
A kind of 8 tons of aluminium ingot loading and unloading operation unit clamps shown in Figure 1, two parallel chuck body plates 8 are arranged, two parallel chuck body plates respectively connect the clip 9 of two pairs of crotch of cultrating outward, the fork body 10 middle crotch axles 11 of cultrating of the every pair of crotch of cultrating, each crotch other end of cultrating is by anchor clamps jointed shaft 6 jockey pipe links 5, the other end of every pair of anchor clamps pipe link is connected by pitman shaft 12, two pitman shafts connect joining shackle 4 respectively, connect support beam 3 between the joining shackle at two ends, the two ends of support beam upwards connect joining shackle 2, and it is 1 that the joining shackle that the two ends of support beam make progress connects respectively that steel rope hangs.
Between the fork body of two pairs of crotch of cultrating strut bar 13 is arranged.
Connecting 1516, two automatic releasing hook bars of automatic releasing hook bar other end on the anchor clamps jointed shaft 14 of the crotch of cultrating of the every pair of same end of crotch of cultrating has slotted hole, and slotted hole is through on the anchor clamps jointed shaft 6 of the other end.

Claims (3)

1, a kind of 8 tons of aluminium ingot loading and unloading operation unit clamps, it is characterized in that: two parallel chuck body plates are arranged, two parallel chuck body plates respectively connect the clip of two pairs of crotch of cultrating outward, the middle crotch axle of cultrating of the fork body of the every pair of crotch of cultrating, each crotch other end of cultrating is by anchor clamps jointed shaft jockey pipe link, the other end of every pair of anchor clamps pipe link is connected by pitman shaft, two pitman shafts connect joining shackle respectively, connect support beam between the joining shackle at two ends, the two ends of support beam upwards connect joining shackle, and the joining shackle that the two ends of support beam make progress connects steel rope respectively and hangs and be.
2,8 tons of aluminium ingot loading and unloading operation unit clamps according to claim 1 is characterized in that: between the fork body of two pairs of crotch of cultrating strut bar is arranged.
3,8 tons of aluminium ingot loading and unloading operation unit clamps according to claim 1, it is characterized in that: on the anchor clamps jointed shaft of the crotch of cultrating of the every pair of same end of crotch of cultrating, connect an automatic releasing hook bar, two automatic releasing hook bar other ends have slotted hole, and slotted hole is through on the anchor clamps jointed shaft of the other end.
CN 200420029536 2004-08-16 2004-08-16 Special clamp for loading and unloading 8 ton aluminium ingot Expired - Fee Related CN2723409Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420029536 CN2723409Y (en) 2004-08-16 2004-08-16 Special clamp for loading and unloading 8 ton aluminium ingot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420029536 CN2723409Y (en) 2004-08-16 2004-08-16 Special clamp for loading and unloading 8 ton aluminium ingot

Publications (1)

Publication Number Publication Date
CN2723409Y true CN2723409Y (en) 2005-09-07

Family

ID=35037039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420029536 Expired - Fee Related CN2723409Y (en) 2004-08-16 2004-08-16 Special clamp for loading and unloading 8 ton aluminium ingot

Country Status (1)

Country Link
CN (1) CN2723409Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100503415C (en) * 2007-03-30 2009-06-24 沈阳铝镁设计研究院 Ingot fetching device for large aluminum ingot
CN103303787A (en) * 2013-07-10 2013-09-18 洛阳双瑞风电叶片有限公司 Clamping device for lifting assembled shear web plates in wind turbine blade
CN104405062A (en) * 2014-10-19 2015-03-11 张领然 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN106219396A (en) * 2016-07-01 2016-12-14 江苏星火特钢有限公司 A kind of high temperature billet steel automatic hanging dismounting fixture
CN106629382A (en) * 2016-09-30 2017-05-10 包头中创节能装备科技有限公司 Special hoisting tool for bundled aluminum ingots
CN106698189A (en) * 2017-01-19 2017-05-24 广西利升石业有限公司 Suspension clamp special for raw engineered stone
CN106735112A (en) * 2017-04-12 2017-05-31 江苏万力机械股份有限公司 Casting lifts by crane human assistance claw automatic clamping device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100503415C (en) * 2007-03-30 2009-06-24 沈阳铝镁设计研究院 Ingot fetching device for large aluminum ingot
CN103303787A (en) * 2013-07-10 2013-09-18 洛阳双瑞风电叶片有限公司 Clamping device for lifting assembled shear web plates in wind turbine blade
CN103303787B (en) * 2013-07-10 2015-02-11 洛阳双瑞风电叶片有限公司 Clamping device for lifting assembled shear web plates in wind turbine blade
CN104405062A (en) * 2014-10-19 2015-03-11 张领然 Integrated column-equipped heat preservation wallboard, production and building techniques and matched equipment
CN106219396A (en) * 2016-07-01 2016-12-14 江苏星火特钢有限公司 A kind of high temperature billet steel automatic hanging dismounting fixture
CN106629382A (en) * 2016-09-30 2017-05-10 包头中创节能装备科技有限公司 Special hoisting tool for bundled aluminum ingots
CN106698189A (en) * 2017-01-19 2017-05-24 广西利升石业有限公司 Suspension clamp special for raw engineered stone
CN106735112A (en) * 2017-04-12 2017-05-31 江苏万力机械股份有限公司 Casting lifts by crane human assistance claw automatic clamping device

Similar Documents

Publication Publication Date Title
CN205932941U (en) A device for handling of precast box girder template
CN214167082U (en) Special lifting device for pressure vessel
CN2723409Y (en) Special clamp for loading and unloading 8 ton aluminium ingot
CN205575386U (en) Lift by crane subassembly
CN210528252U (en) Novel crane hook structure
CN203128025U (en) Special hanger for loading and unloading work of glass packed in box
CN208200138U (en) A kind of X-type I-steel hoisting clamp
CN202625622U (en) Lifting appliance for loading and unloading concrete electric pole
CN206288881U (en) A kind of tower crane counter-jib dumping device
CN210710350U (en) Hoist is fixed to copper line drum
CN203946779U (en) Loose steel pipe operation combined sling
CN200949006Y (en) Square steel loading and unloading sling
CN209618679U (en) Claw and boom hoisting
CN210558996U (en) Assembled building model platform double-limb column lifting appliance
CN207537004U (en) A kind of steel billet hanging device
CN201236104Y (en) Special slings for loading and unloading heavy steel tube
CN208200146U (en) A kind of I-beam wheel grabbing device with pneumatic clamper
CN203143924U (en) Sling for hoisting steel crane girder
CN208249679U (en) A kind of vehicle bridge master subtracts shell automatic turning suspender
CN211141278U (en) Hoisting device for radiator of diesel locomotive
CN201647809U (en) Oil drum hoisting self-locking hook
CN202358831U (en) Clamp for crucible
CN211687898U (en) Automatic unhooking device for hoisting ton bags
CN202054525U (en) Crane manipulator
CN204778327U (en) Leaf spring hoist

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050907

Termination date: 20120816