CN2642925Y - Attached beam type lifting scaffold for high-rise building - Google Patents

Attached beam type lifting scaffold for high-rise building Download PDF

Info

Publication number
CN2642925Y
CN2642925Y CN 03279315 CN03279315U CN2642925Y CN 2642925 Y CN2642925 Y CN 2642925Y CN 03279315 CN03279315 CN 03279315 CN 03279315 U CN03279315 U CN 03279315U CN 2642925 Y CN2642925 Y CN 2642925Y
Authority
CN
China
Prior art keywords
node
side direction
saddle
stock
stocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03279315
Other languages
Chinese (zh)
Inventor
王卫星
施晓红
成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03279315 priority Critical patent/CN2642925Y/en
Application granted granted Critical
Publication of CN2642925Y publication Critical patent/CN2642925Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses constitute the guide frame by side direction guide frame (1) and guide frame transverse link rod (2) etc. and constitute the cover frame by side direction cover frame (3) and cover frame transverse link rod (4) etc. and can slide relatively between cover frame and the guide frame. The frame nodes on the two sides of the guide frame and the sleeve frame are respectively and fixedly connected with the auxiliary beam duplex node fixed on the boundary beam of the high-rise building. And a steady piece (23) which can ensure the safety and convenient lifting of the scaffold and a building floor height change adjusting piece (25) are also arranged. The scaffold is suitable for the construction of high-rise buildings with vertical discontinuous beam structure parts (such as boundary beams) and can be lifted as required. The tower crane saves material and working days, does not occupy a tower crane, reduces the labor intensity of a scaffold worker, and is safe and reliable to use.

Description

Highrise building attaching beam formula lifting false work
The utility model relates to the suspended scaffold by the house supporting that the building operations personnel use, and specifically is meant a kind of highrise building attaching beam formula lifting false work.
At present, the general external scaffolding of using in the high-building construction, mainly contain console mode fastener steel tube frame, segmentation steel pipe frame, door frame, hanger---the hanging basket system etc. of encorbelmenting, although it is various informative, the material consumption amount is big, holding time long, consume the worker, scaffolder's high-altitude application environment is abominable but all exist to some extent, problems such as contingency accident easily take place, and make the outrigger engineering become headachy one difficulty in the high-building construction.A kind of wall-attached (shear wall) liftable out-mould scaffold pin of lifting had appearred carrying out according to the principle of climbing of creeping formwork in recent years in China's some areas high-building construction, it is compared with traditional console mode scaffold, save the frame material more than 90%, save work day more than 50%, neither take tower crane, reduced scaffolder's labour intensity again, improved operating environment, safe and reliable, solved the shelf pass difficult problem that the highrise building shear wall is partly constructed breakthroughly.But, in highrise building, account for the frame part and the balcony part of significant proportion, promptly be vertically to be discontinuous plate and girder construction part, in construction, still adopt traditional external scaffolding, spacious sick a lot of.
The purpose of this utility model is on the basis of existing wall-attached (shear wall) liftable external scaffolding, provides a kind of for vertically being the highrise building attaching beam formula lifting false work that discontinuous girder construction is partly constructed.
Solution of the present utility model is, still as existing wall-attached (shear wall) liftable external scaffolding, have two upright side direction saddles, the saddle transverse brace that between two side direction saddles, has several groups of differing heights that two ends are connected mutually with two side direction saddles respectively, go up most one group of saddle transverse brace below, have two upright side direction stocks, the upright loop bar of these two side direction stocks sliding sleeve respectively is combined in outside the upright guide rod of two side direction saddles, have between two side direction stocks two ends respectively with two side direction stocks be connected mutually on, following two groups of stock transverse braces, on two side direction saddles and two side direction stocks, be fixed with respectively and be used for the shelf lifting, following two saddle suspension ring and last, following two stock suspension ring have the front rail handrail that is connected mutually with it respectively in the outside of lateral guide top of the trellis and bottom.Feature part of the present utility model is, both sides also have respectively the upright auxiliary rod that is connected mutually with the side direction saddle, has the transverse brace that two ends are connected mutually with auxiliary rod respectively between the auxiliary rod; On two side direction saddles below two side direction stocks, all have node and saddle lower node on the saddle successively, have node on stock lower node and the stock respectively, on above-mentioned node, all have and the latch connecting hole in two side direction stock bottoms and top; Attaching beam duplex node with eight same structures, the structure of each attaching beam duplex node is, has a π type duplex node accessory, the mainboard central authorities of duplex node accessory have the strip through hole, long bolt and nut component is housed in the hole, all have upper and lower two pin holes on two side plates of duplex node accessory, a latch respectively is housed in the hole, an end of latch is fixed with cottor pin; Have two firmwares that are connected mutually and form by standard scaffold tubes and firmware node, have on the firmware node and the latch connecting hole.
This practical firewood type with said structure is when concrete the use, should hang in the high-rise building side that the side bar structure is arranged by its attaching beam duplex node, its specifically the method for hanging be, both sides all have preformed hole on the side bar in four adjacent from the bottom up floor rooms, pass preformed hole with the bolt and nut component on the attaching beam duplex node, respectively eight attaching beam duplex nodes are close to and are fixed on the side bar side (if the side bar of the 4th floor is not constructed from the bottom up, then treat construction good after fixing attaching beam duplex node again), again node on the saddle lower node of two side direction saddles and the saddle is locked with the latch of first floor and second layer building attaching beam duplex node from the bottom up respectively with the latch connecting hole mutually by it and connected, node on the stock lower node of two side direction stocks and the stock is locked company with the latch of the attaching beam duplex node of the second layer and three-storey building from the bottom up by it respectively mutually with the latch connecting hole.By above-mentioned connection, just can make whole scaffold be fixed on side of buildings firmly.The constructor stands on saddle transverse brace and the stock transverse brace, just can carry out constructing operation.When need promote the first floor height with side direction stock and stock transverse brace, respectively increase for two lateral guide top of the trellis and connect a firmware, to prevent the unstability of long vertical rod in the saddle.Available fastener is connected between the standard scaffold tubes of firmware and the saddle, and locking mutually with the latch connecting hole and the latch of the duplex node in the 4th floor room from the bottom up on the firmware node connects.Then jack is tensioned between uppermost saddle suspension ring and the stock suspension ring, again with node on two stock lower nodes and two stocks respectively with the latch of attached beam duplex node be separated, the pulling jack, just side direction stock and stock transverse brace upwards can be promoted, after promoting the first floor height, its node is retightened on the attaching beam duplex node of floor of living in, remove jack, just finish lifting, thereby can carry out the constructing operation of desired area.When needs promote the first floor height with side direction saddle and saddle transverse brace etc., jack is tensioned between nethermost saddle suspension ring and the stock suspension ring, and all the other operating procedures are identical with the operating procedure that above-mentioned side direction stock and stock transverse brace rise basically.This scaffold is by above-mentioned twice lifting, returns to the state before promoting again, and the climbed height of first floor of whole scaffold carries out so repeatedly, and scaffold just can constantly raise.Letdown procedure is just in time opposite with climb procedure.
The utility model is except that possessing all advantages that aforementioned wall-attached (shear wall) liftable external scaffolding had, also has following advantage: 1. the crane scope of application is partly constructed from single highrise building shear wall and develop into the construction of the highrise building that vertically is discontinuous girder construction part (as side bar), widened the scope that crane is used widely; 2. attaching beam duplex joint structure is light and handy, reasonable in design, connects and simple and direct, the rapid convenience of dismantling operation, and is safe and reliable, still can adapt under building preformed hole situation devious and normal the use; 3. the employing of firmware makes the scaffold rising and descends safer reliable; 4. all members can be gathered materials on the spot, and process easily and promote the use.
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is that a kind of concrete structure of the present utility model is contained in the side schematic view on the highrise building;
Fig. 2 is the state diagram after the stock among Fig. 1 upwards promotes the first floor height;
Fig. 3 is Fig. 1 amplification assumption diagram at first floor building attaching beam duplex node place from the bottom up;
Fig. 4 is the vertical view of Fig. 3;
Fig. 5 is the structure chart of π type duplex node accessory;
Fig. 6 and Fig. 7 are respectively Fig. 1 amplification assumption diagram at the second layer and three-storey building attaching beam duplex node place from the bottom up;
Fig. 8 is the vertical view of Fig. 7;
Fig. 9 is Fig. 2 amplification assumption diagram at attaching beam duplex node place, the 4th floor room from the bottom up;
Figure 10 and Figure 11 are respectively elevation and the left view that floor height changes adjustment part;
Figure 12 is the structure chart of firmware.
Reference numeral among the above-mentioned figure is: 1, side direction saddle, 2, the saddle transverse brace, 3, the side direction stock, 4, stock transverse brace, 5, the saddle suspension ring, 6, the stock suspension ring, 7, front rail handrail, 8, auxiliary rod, 9, transverse brace, 10, node on the saddle, 11, saddle lower node, 12, stock lower node, 13, node on the stock, 14, with the latch connecting hole; 15, π type duplex node accessory, 16, the strip through hole, 17, bolt and nut component; 18, pin hole, 19, latch, 20, cottor pin, 21, firmware, 22, the standard scaffold tubes, 23, firmware node, 24, with latch connecting hole, 25, floor height changes adjustment part, 26, pin hole, 27, connecting hole, 28, the building side bar, 29, prepare the side bar of construction, 30, masonry.
Referring to Fig. 1, between saddle transverse brace (2) and the side direction saddle (1), and between stock transverse brace (4) and the side direction stock (3), all connect with fastener.Referring to Fig. 3, rounded on the saddle lower node (11) with latch connecting hole (14).Referring to Fig. 6, be Long Circle with latch connecting hole (14) on the node on the saddle (10), rounded on the stock lower node (12) with latch connecting hole (14).Referring to Fig. 7, be Long Circle with latch connecting hole (14) on the node on the stock (13).
Referring to Figure 10 and Figure 11, the utlity model has several floor height variation adjustment parts (25) that can be matched with π type duplex node accessory (15), each adjustment part (25) both sides, top all have, following two pin holes (26), two of bottoms all have a connecting hole (27), in the utility model lifting process, if the building floor height changes, the connecting hole (27) of this part can be connected by bolt mutually with the pin hole (18) of π type duplex node accessory (15), replace pin hole (18) with pin hole (26), the position that is equivalent to reduction or raise pin hole (18), the normal lifting of shelf when changing to satisfy the building floor height.
When the supporting capacity of side bar (28) can not satisfy the load that the utility model transmits, can be on beam pre-buried suspension ring, connect the oblique flexibility of being made up of reinforcing bar or wire rope, wire tensioner again and reinforce pull bar temporarily on suspension ring, this pull bar other end is fixed in the building structure that can be enough to load.

Claims (3)

1, a kind of highrise building attaching beam formula lifting false work, have two upright side direction saddles (1), the saddle transverse brace (2) that between two side direction saddles (1), has several groups of differing heights that two ends are connected mutually with two side direction saddles (1) respectively, in the below of going up one group of saddle transverse brace (2) most, have two upright side direction stocks (3), the upright loop bar of these two side direction stocks (3) sliding sleeve respectively is combined in outside the upright guide rod of two side direction saddles (1), have between two side direction stocks (3) two ends respectively with two side direction stocks (3) be connected mutually on, following two groups of stock transverse braces (4), on two side direction saddles (1) and two side direction stocks (3), be fixed with respectively, following two saddle suspension ring (5) and last, following two stock suspension ring (6), have the front rail handrail (7) that is connected mutually with it respectively in the outside of side direction saddle (1) top and bottom, it is characterized in that:
A) both sides have respectively the upright auxiliary rod (8) that is connected mutually with side direction saddle (1), have the transverse brace (9) that two ends are connected mutually with auxiliary rod (8) respectively between the auxiliary rod (8);
B) on two side direction saddles (1) of two side direction stocks (3) below, all have node on the saddle (10) and saddle lower node (11) successively, have node (13) on stock lower node (12) and the stock respectively in two side direction stocks (3) bottom and top, on above-mentioned node, all have and latch connecting hole (14);
C) has the attaching beam duplex node of eight same structures, attaching beam duplex node has a π type duplex node accessory (15), the mainboard central authorities of duplex node accessory (15) have strip through hole (16), bolt and nut component (17) is housed in the hole, all have upper and lower two pin holes (18) on two side plates of duplex node accessory (15), a latch (19) respectively is housed in the hole, and an end of latch (19) is fixed with cottor pin (20);
D) have two firmwares (21) that are connected mutually and form by standard scaffold tubes (22) and firmware node (23), have on the firmware node (23) and latch connecting hole (24).
2, scaffold as claimed in claim 1, it is characterized in that, all rounded with latch connecting hole (14) on saddle lower node (11) and the stock lower node (12) all is Long Circle with latch connecting hole (14) on node on the saddle (10) and the stock on the node (13).
3, as claim 1,2 described scaffolds, it is characterized in that, have and severally can change adjustment parts (25) with the matched floor height of π type duplex node accessory (15), each adjustment part (25) both sides, top all have upper and lower two pin holes (26), and the both sides, bottom all have a connecting hole (27).
CN 03279315 2003-09-15 2003-09-15 Attached beam type lifting scaffold for high-rise building Expired - Fee Related CN2642925Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03279315 CN2642925Y (en) 2003-09-15 2003-09-15 Attached beam type lifting scaffold for high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03279315 CN2642925Y (en) 2003-09-15 2003-09-15 Attached beam type lifting scaffold for high-rise building

Publications (1)

Publication Number Publication Date
CN2642925Y true CN2642925Y (en) 2004-09-22

Family

ID=34303398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03279315 Expired - Fee Related CN2642925Y (en) 2003-09-15 2003-09-15 Attached beam type lifting scaffold for high-rise building

Country Status (1)

Country Link
CN (1) CN2642925Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652803A (en) * 2015-02-02 2015-05-27 成军 Attached scaffold for electric lifting guide rails

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652803A (en) * 2015-02-02 2015-05-27 成军 Attached scaffold for electric lifting guide rails

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN115538792A (en) Residential building machine installation construction method and structure
CN214195484U (en) All-steel attached lifting scaffold
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN2642925Y (en) Attached beam type lifting scaffold for high-rise building
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN201502170U (en) Horizontal supporting device of building external frame
CN215564320U (en) A construction platform for encorbelmenting structure curtain installation
CN2597606Y (en) plate-attached lifting scaffold for high-rise building
CN2122191U (en) Lifting scaffold with auxiliary beam for high building
CN2276046Y (en) Divided multistage automatic climbing external scaffold
CN2120841U (en) Plate-attached lift scaffold for high-storey building
CN2692260Y (en) Column hoop type lifting scaffold for high-rise building
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN209924409U (en) Wall-attached self-climbing electric lifting platform
CN2683758Y (en) High-rise building column bolt type lifting scaffold
CN219931561U (en) Integral lifting type elevator shaft operation platform
CN2385026Y (en) Full-assembled lower-bearing bridged guide lifting framing scaffold
CN2175805Y (en) Integrated lifting scaffold capable of being segmented
CN218406382U (en) A operation platform that encorbelments for construction of roofing overlength structure of encorbelmenting
CN2167147Y (en) Scaffold attached to the out wall of a build
CN2563239Y (en) Plug rod type lift scaffold for high rised balcong
CN219118718U (en) Climbing frame horizontal protection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee