CN2167147Y - Scaffold attached to the out wall of a build - Google Patents

Scaffold attached to the out wall of a build Download PDF

Info

Publication number
CN2167147Y
CN2167147Y CN 93219468 CN93219468U CN2167147Y CN 2167147 Y CN2167147 Y CN 2167147Y CN 93219468 CN93219468 CN 93219468 CN 93219468 U CN93219468 U CN 93219468U CN 2167147 Y CN2167147 Y CN 2167147Y
Authority
CN
China
Prior art keywords
scaffold
unit
exterior wall
mentioned
suspension ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93219468
Other languages
Chinese (zh)
Inventor
梁焯彬
胡建新
沈绍榛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Prov Construction Tech Development Co
Original Assignee
Guangdong Prov Construction Tech Development Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Prov Construction Tech Development Co filed Critical Guangdong Prov Construction Tech Development Co
Priority to CN 93219468 priority Critical patent/CN2167147Y/en
Application granted granted Critical
Publication of CN2167147Y publication Critical patent/CN2167147Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a mutually elevated scaffold attached to an outer wall, which is used for climbing operation for high-rise buildings, towering buildings, common building and civil engineering structures and decoration construction. The utility model is composed of scaffolds (1), a suspension ring (3), a hanger and horizontal bracings, wherein, the scaffold (1) of each unit is suspended and fixed on the suspension ring (3) preassembled on a building through the hanger and is provided with the horizontal bracing. One end of each horizontal bracing is connected with each scaffold (1) and the other end is connected with the building. The utility model has the advantages of reasonable stress, high stability, strong versatility, flexible elevation, safety, reliability, material saving and convenient operation.

Description

Scaffold attached to the out wall of a build
The utility model is a kind of ascend operation equipment that is used for highrise building, towering structure and general building and civil engineering structures and decoration construction.
Bushing type lifting false work of the prior art is because of the structure reason, its heave amplitude and set up the number of plies and be restricted, and less stable.Chinese patent application number is CN2128653Y for the 92215913.0(notification number) in a kind of multi-functional mutual lifting false work is disclosed, its uses door frame to assemble, and attached wall support and spacing slide bar are arranged.Above-mentioned two kinds of lifting false works all adopt special-purpose member, and versatility is poor, and all guiding device are arranged on (track), and materials are many, complex structure.
The purpose of this utility model is to overcome above-mentioned shortcoming and a kind of stability height, highly versatile are provided, set up the unrestricted mutual lifting exterior wall scaffold of hanging that draws of the number of plies.
Structure of the present utility model as shown in drawings, form by scaffold (1), suspension ring (3), suspender member, horizontal support, scaffold (1) is made up of the unit by the several layers operating platform that cross bar, montant, brace, scaffold floor combine several, each unit scaffold (1) is provided with the erecting by overhang of being made up of suspension ring (3) and suspender member, wherein suspension ring (3) are contained on the building in advance, suspender member one end connects with scaffold (1), and the other end connects with suspension ring (3); Each unit scaffold (1) is provided with horizontal support, and an end of this horizontal support connects with scaffold (1), and the other end connects with building.Because the triangle force structure that the utility model scaffold (1) adopts suspender member and horizontal support to combine, it is stressed rationally, stability is high, safe and reliable, and only depend on gravitational equilibrium to need not during lifting,, can get around lifting by the manpower guiding as ridges such as platforms by lifting rail, so flexibility is good, thereby realize the purpose of this utility model.
Above-mentioned each unit scaffold (1) preferably is provided with the erecting by overhang that two groups or more is made up of suspension ring (3) and suspender member.Suspender member can be wire rope (4) or reinforcing pull rod or chain cable wire.The set horizontal support of scaffold (1) can be spike (6), and spike (6) one ends are the straight-bar that has several notches, and straight-bar is inserted in the cross bar of scaffold (1), snaps in corresponding notch with connector, and spike (6) is connected with scaffold (1); Spike (6) other end is a base plate, and it directly or indirectly connects with building by connector.The set horizontal support of scaffold (1) can also be girt (2), and girt (2) one ends are to have connecting through hole and be hinged with to connect with scaffold (1) by connector around the arc buckle (21) of pin joint rotation; Girt (2) other end is the channel-section steel that has connecting through hole, connects with the suspension ring (3) that are contained in advance on the building by connector (22).
For guaranteeing the safety of scaffold (1) lifting, between each unit of scaffold (1), be provided with the insurance rope.The insurance rope can be wire rope (10) or chain cable wire.
For making each unit scaffold (1) form an integral body, between each unit of scaffold (1), be provided with the connection fastener, connect fastener for connecting button (7), connect button (7) two ends and all be that have connecting through hole and be hinged with can be around the arc buckle (71) of pin joint rotation.
The utlity model has following advantage: 1. adopt and hang and support the triangle force structure that combines, and be trackless lifting, it is stressed rationally, and stability is high, highly versatile, and lifting is flexible, and is safe and reliable.2. adopt general steel pipe scaffold material, set up, convenient disassembly, and materials are few, from heavy and light.3. flexible and changeable, applicability is strong, and easy and simple to handle.
Fig. 1 hangs the schematic diagram of state for the utility model scaffold.
Fig. 2 is the structural representation of spike.
Fig. 3 is the structural representation of girt.
Fig. 4 is a scaffold lifting schematic diagram.
Fig. 5 is for connecting the structural representation of button.
Fig. 6 arranges schematic diagram for each scaffold unit.
The utility model is by scaffold (1), suspension ring (3), wire rope (4), horizontal support is formed, scaffold (1) by several by cross bar, montant, brace, the unit by the several layers operating platform that scaffold floor combines is formed, each unit scaffold (1) is provided with two groups of erectings by overhang of being made up of suspension ring (3) and wire rope (4), one group of bottom that is arranged on scaffold (1), one group of top that is arranged on scaffold (1), every group of erecting by overhang is provided with four wire rope (4), each wire rope (4) one end connects with four corners of scaffold (1) with one deck respectively, and the other end connects with the suspension ring (3) that are contained in advance on the building; The adjusting gaily decorated basket (5) of adjusting and locking effect has been housed, as shown in Figure 1 on the wire rope (4).Device is spike (6) at the set horizontal support of erecting by overhang of scaffold (1) bottom, spike (6) one ends are the straight-bar that has several notches, as shown in Figure 2, straight-bar is inserted in the cross bar of scaffold (1), snap in corresponding notch with connector (61), spike (6) is connected with scaffold (1); Spike (6) other end is a base plate, and it connects with the gusset piece that is contained in advance on the building by connector.Device is girt (2) at the set horizontal support of erecting by overhang on scaffold (1) top, girt (2) one ends are to have connecting through hole and be hinged with the arc buckle (21) that can rotate around pin joint, as shown in Figure 3, connect with scaffold (1) by connector; Girt (2) other end is the channel-section steel that has connecting through hole, connects with suspension ring (3) by connector.Except that above-mentioned two groups were supported, each unit scaffold (1) also was provided with many group additional levels and supports, to guarantee the stability of scaffold (1).By connecting button (7), as shown in Figure 4, connect button (7) two ends and all be that have connecting through hole and be hinged with can be around the arc buckle (71) of pin joint rotation, as shown in Figure 5 between each unit scaffold (1) adjacent two unit scaffold (1) fastenings.During connection, buckle (71) fastening scaffold (1) is all used at two ends, two ends is connected with connector by connecting through hole then, can be adjacent two scaffolds (1) fastening; Can lay break joint plate (8) between the same layer operation platform in each unit of scaffold (1), as shown in Figure 6, break joint plate (8) can be made and dredge the window formula, can connect break joint plate (8) with scaffold (1) by dedicated fastener or iron wire.Be provided with two insurance ropes between each unit, scaffold (1) bottom, this insurance rope is wire rope (10), and wire rope (10) one ends connect with the corner of scaffold unit a, and the other end connects with the corner of scaffold unit b.
When mutual lifting false work needs to promote a height in the work of finishing certain height, shown in Fig. 4-(1), operating personnel withdraw to being fixed on the scaffold unit a on the building with adjacent the hanging of scaffold unit b that is raised, by the strong point on the scaffold unit 9 suspension hook manual or electric block control is hooked the scaffold unit b that is raised, and unclamp the connector that girt (2) connects with suspension ring (3), unclamp the adjusting gaily decorated basket (5) of scaffold (1) with wire rope (4) fastening, unclamp the connector that spike (6) connects with the gusset piece that is contained in advance on the building, unclamp the connection button (7) between each unit of scaffold (1) and start break joint plate (8), gradually scaffold unit b is risen to required height, subsequently girt (2) is connected by connector with suspension ring (3), wire rope (4) hung be fixed on that suspension ring (3) are gone up and by regulating that the gaily decorated basket (5) is regulated the length of wire rope (4) and scaffold (1) and wire rope (4) fastening, spike (6) is connected by connector with the gusset piece that is contained in advance on the building, shown in Fig. 4-(2), operating personnel withdraw to scaffold unit b then, in the same way scaffold unit a is promoted to the sustained height with scaffold unit b, and be fixed, after the lifting for the treatment of whole layer scaffold is all finished, adjacent two scaffold units are fixed with connecting button (7) snapping, and the break joint plate (8) between the same layer operation platform in each unit of scaffold (1) put down and connect, shown in Fig. 4-(3), so mutual lifting scaffold can have been worked in new altitude range.
After construction is all finished, when scaffold need descend, only need to operate by the order opposite with above-mentioned steps, scaffold is descended gradually, so that carry out the exterior decoration construction, and finally make scaffold drop to ground.
The utility model scaffold (1) can also be the pattern that totally-enclosed all round victory is set up.

Claims (10)

1, a kind of mutual lifting exterior wall scaffold, it is characterized in that forming by scaffold (1), suspension ring (3), suspender member, horizontal support, scaffold (1) is made up of the unit by the several layers operating platform that cross bar, montant, brace, scaffold floor combine several, each unit scaffold (1) is provided with the erecting by overhang of being made up of suspension ring (3) and suspender member, wherein suspension ring (3) are contained on the building in advance, suspender member one end connects with scaffold (1), and the other end connects with suspension ring (3); Each unit scaffold (1) is provided with horizontal support, and an end of this horizontal support connects with scaffold (1), and the other end connects with building.
2, mutual lifting exterior wall scaffold according to claim 1 is characterized in that above-mentioned suspender member is wire rope (4) or reinforcing pull rod or chain cable wire.
3, mutual lifting exterior wall scaffold according to claim 2 is characterized in that being equipped with on above-mentioned wire rope (4) or the reinforcing pull rod and regulates and the adjusting gaily decorated basket (5) of locking effect.
4, mutual lifting exterior wall scaffold according to claim 1, it is characterized in that above-mentioned each unit scaffold (1) is provided with two groups of erectings by overhang of being made up of suspension ring (3) and suspender member, one group of bottom that is arranged on scaffold (1), one group of top that is arranged on scaffold (1), and two groups of erectings by overhang are equipped with horizontal support.
5, according to claim 1 or 4 described mutual lifting exterior wall scaffolds, it is characterized in that the set horizontal support of above-mentioned scaffold (1) is spike (6), spike (6) one ends are the straight-bar that has several notches, straight-bar is inserted in the cross bar of scaffold (1), snap in corresponding notch with connector (61), spike (6) is connected with scaffold (1); Spike (6) other end is a base plate, and it directly or indirectly connects with building by connector.
6, according to claim 1 or 4 described mutual lifting exterior wall scaffolds, it is characterized in that the set horizontal support of above-mentioned scaffold (1) is girt (2), girt (2) one ends are to have connecting through hole and be hinged with to connect with scaffold (1) by connector around the arc buckle (21) of pin joint rotation; Girt (2) other end is the channel-section steel that has connecting through hole, connects with the suspension ring (3) that are contained in advance on the building by connector (22).
7, mutual lifting exterior wall scaffold according to claim 1 is characterized in that between each unit of above-mentioned scaffold (1) by connecting fastener adjacent two unit scaffold (1) fastenings.
8, mutual lifting exterior wall scaffold according to claim 7 is characterized in that above-mentioned connection fastener for connecting button (7), connects button (7) its two ends and all be that have connecting through hole and be hinged with can be around the arc buckle (71) of pin joint rotation.
9, mutual lifting exterior wall scaffold according to claim 1 is characterized in that being provided with break joint plate (8) between the same layer operation platform in each unit of above-mentioned scaffold (1).
10, mutual lifting exterior wall scaffold according to claim 1 is characterized in that being provided with the insurance rope between each unit of above-mentioned scaffold (1).
CN 93219468 1993-07-21 1993-07-21 Scaffold attached to the out wall of a build Expired - Fee Related CN2167147Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93219468 CN2167147Y (en) 1993-07-21 1993-07-21 Scaffold attached to the out wall of a build

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93219468 CN2167147Y (en) 1993-07-21 1993-07-21 Scaffold attached to the out wall of a build

Publications (1)

Publication Number Publication Date
CN2167147Y true CN2167147Y (en) 1994-06-01

Family

ID=33798847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93219468 Expired - Fee Related CN2167147Y (en) 1993-07-21 1993-07-21 Scaffold attached to the out wall of a build

Country Status (1)

Country Link
CN (1) CN2167147Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510694A (en) * 2012-06-29 2014-01-15 姚磊 Externally-hung protective frame
CN112370679A (en) * 2020-11-05 2021-02-19 国网河南省电力公司武陟县供电公司 Special stores pylon of outdoor 35kV circuit breaker aerial work safety belt
CN113982236A (en) * 2021-11-05 2022-01-28 浙吉建筑新材料科技(苏州)有限公司 External hanging type operation frame system with novel structure for building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510694A (en) * 2012-06-29 2014-01-15 姚磊 Externally-hung protective frame
CN112370679A (en) * 2020-11-05 2021-02-19 国网河南省电力公司武陟县供电公司 Special stores pylon of outdoor 35kV circuit breaker aerial work safety belt
CN112370679B (en) * 2020-11-05 2022-02-01 国网河南省电力公司武陟县供电公司 Special stores pylon of outdoor 35kV circuit breaker aerial work safety belt
CN113982236A (en) * 2021-11-05 2022-01-28 浙吉建筑新材料科技(苏州)有限公司 External hanging type operation frame system with novel structure for building

Similar Documents

Publication Publication Date Title
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN105888230B (en) A kind of lowering or hoisting gear and its construction method for building curtain wall construction
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN107575032A (en) A kind of bolt-ball net frame roofing installation method
CN2167147Y (en) Scaffold attached to the out wall of a build
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN105776092B (en) A kind of extended position nacelle device
CN202441045U (en) Rail-type electric attached lifting scaffold
CN2209702Y (en) Saffold
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN2578461Y (en) Liftable scaffold
CN108035530A (en) A kind of inner wall of oil tank construction hanging basket
CN107035037A (en) High building top layer curtain wall frame and its installation method
CN209583455U (en) A kind of outdoor handling machine for building
CN207499419U (en) For the monolithic climbing form system of huge column construction
CN206844417U (en) A kind of high building top layer curtain wall frame
CN212613654U (en) Curtain wall construction system suitable for high-rise building with special-shaped giant columns
CN210857952U (en) Novel attached lifting scaffold
CN2435463Y (en) Integral climbing and split lowering scaffold
CN2177059Y (en) Top lifting adhesive double stretching arm outer scaffold
CN218406382U (en) A operation platform that encorbelments for construction of roofing overlength structure of encorbelmenting
CN217027998U (en) Heightened hanging basket suspension structure
CN2642925Y (en) Auxiliary beam type raise scaffold for highrise building
CN217627285U (en) Tool type tower crane driver channel
CN2350472Y (en) All assembly-type cradle track lifting scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee