CN2596170Y - Positioning rack of pre-buried ground bolt - Google Patents

Positioning rack of pre-buried ground bolt Download PDF

Info

Publication number
CN2596170Y
CN2596170Y CN02270506U CN02270506U CN2596170Y CN 2596170 Y CN2596170 Y CN 2596170Y CN 02270506 U CN02270506 U CN 02270506U CN 02270506 U CN02270506 U CN 02270506U CN 2596170 Y CN2596170 Y CN 2596170Y
Authority
CN
China
Prior art keywords
ground bolt
channel
utility
model
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN02270506U
Other languages
Chinese (zh)
Inventor
隋长征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Iron and Steel Group Co Ltd
Original Assignee
Laiwu Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laiwu Iron and Steel Group Co Ltd filed Critical Laiwu Iron and Steel Group Co Ltd
Priority to CN02270506U priority Critical patent/CN2596170Y/en
Application granted granted Critical
Publication of CN2596170Y publication Critical patent/CN2596170Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an accurate positioning rack of pre-buried ground bolt used in a bulk mass concrete foundation construction, which belongs to the technical field of construction material. The technical problem to solve is to provide a positioning rack of a pre-buried ground bolt which can accurately position the ground bolt and can not produce displacement or inclination at the time of pouring the concrete. The utility model is characterized in that an upright standing post 1 and a cross arm 2 connected with the standing post 1 constitute the main body of the positioning rack of s pre-buried ground bolt. A fixing channel bar 3 is in lap joint between the cross arms 2, and the channel bar 3 is distributed with a positioning hole 5 corresponding to a ground bolt 4. The utility model has the advantages that the positioning is quick and accurate and the position of the ground bolt isn't easy to change with high success ratio, so the construction period can be shortened. The cross arm and the channel steel on the rack can be used repeatedly, so steel products are saved.

Description

The pre-embedded anchoring bolts locating support
Affiliated technical field
The utility model discloses a kind of prevention of mass concrete foundation construction that is used for, accurately the locating support of pre-embedded anchoring bolts belongs to construction equipment technical field.
Background technique
Before the utility model was made, in the prevention of mass concrete foundation construction, accurately pre-embedded anchoring bolts, especially large foundation bolt were the technical barriers of construction always rapidly.Can make the stone bolt that is welded on the reinforcing bar produce displacement or inclination when reason is pour concrete, make it depart from desired location, cause the loss of doing over again.
Summary of the invention
The technical problems to be solved in the utility model provides a kind of can accurately the location stone bolt, can not produce the pre-embedded anchoring bolts locating support of displacement or inclination when pour concrete.
Technical characteristics of the present utility model is to adopt vertical column and the cross-arm that is connected column to constitute the main body of pre-embedded anchoring bolts locating support, overlaps channel-section steel between cross-arm, is distributed with on the channel-section steel and the stone bolt corresponding positioning hole.
Below introduce structure of the present utility model in detail: a kind of pre-embedded anchoring bolts locating support, it is characterized in that constituting the main body of pre-embedded anchoring bolts locating support by vertical column and the cross-arm that is connected with column, between cross-arm, overlap fixedly channel-section steel, be distributed with on the channel-section steel and the stone bolt corresponding positioning hole.
When the utility model uses, column is with to bury the horizontal ironware welding of applying in cushion layer concrete fixing, determine the height of cross-arm according to the size of the bolt that designs, the position overlap joint that distributes according to stone bolt fixes channel-section steel, positioning hole is driven in the position corresponding with stone bolt on channel-section steel then, the stone bolt that the center, top is equipped with the location thimble is sling, the location thimble of stone bolt penetrates the positioning hole on the channel-section steel from bottom to top, the silk of stone bolt leans at the bottom of the tight channel-section steel, will locate thimble and the channel-section steel firm welding gets final product.In case of necessity, the stone bolt bottom can be used reinforcing bar and column or ironware welding fixing.When the intensity of pour concrete is above above 70%, remove concrete form, with the column of gas welding except that being exposed at concrete, cut off the location thimble column, cross-arm, channel-section steel are removed.
Advantage of the present utility model location is accurate rapidly, and the stone bolt position is difficult for being varied to the power height, can shorten the construction period.Top cross-arm, the channel-section steel of support can be repeatedly used, and save steel.
Description of drawings
Figure of description 1 is a structural representation of the present utility model; Fig. 2 is the side view of Fig. 1.
Embodiment
Embodiment of the present utility model is referring to accompanying drawing: a kind of pre-embedded anchoring bolts locating support, it is characterized in that constituting the main body of pre-embedded anchoring bolts locating support by vertical column 1 and the cross-arm 2 that is connected with column 1, between cross-arm 2, overlap fixedly channel-section steel 3, be distributed with on the channel-section steel 3 and stone bolt 4 corresponding positioning hole 5.
Column 1, cross-arm 2 can adopt L63 * 6 angle steel to constitute.
Channel-section steel 3 can adopt [the channel-section steel formation of 8-[10.
Positioning hole 5 is generally φ 6-12mm.
Can adopt welding manner to connect and compose between column 1 and cross-arm 2, cross-arm 2 and the channel-section steel 3.

Claims (4)

1, a kind of pre-embedded anchoring bolts locating support, it is characterized in that constituting the main body of pre-embedded anchoring bolts locating support by vertical column (1) and the cross-arm (2) that is connected with column (1), between cross-arm (2), overlap fixedly channel-section steel (3), be distributed with on the channel-section steel (3) and stone bolt (4) corresponding positioning hole (5).
2, pre-embedded anchoring bolts locating support according to claim 1 is characterized in that column (1), cross-arm (2) can adopt L63 * 6 angle steel to constitute.
3, pre-embedded anchoring bolts locating support according to claim 1 is characterized in that channel-section steel (3) can adopt [the channel-section steel formation of 8-[10.
4, pre-embedded anchoring bolts locating support according to claim 1 is characterized in that positioning hole (5) is generally φ 6-12mm.
CN02270506U 2002-10-30 2002-10-30 Positioning rack of pre-buried ground bolt Expired - Fee Related CN2596170Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN02270506U CN2596170Y (en) 2002-10-30 2002-10-30 Positioning rack of pre-buried ground bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN02270506U CN2596170Y (en) 2002-10-30 2002-10-30 Positioning rack of pre-buried ground bolt

Publications (1)

Publication Number Publication Date
CN2596170Y true CN2596170Y (en) 2003-12-31

Family

ID=33735555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN02270506U Expired - Fee Related CN2596170Y (en) 2002-10-30 2002-10-30 Positioning rack of pre-buried ground bolt

Country Status (1)

Country Link
CN (1) CN2596170Y (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806069A (en) * 2010-04-16 2010-08-18 天津二十冶建设有限公司 Integrated fixation and installation method for bolt
CN101266011B (en) * 2008-04-22 2010-10-06 中冶天工建设有限公司 Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
CN101413272B (en) * 2006-06-09 2011-03-16 赵正义 Vertical positioning connection structure of mast type mechanical equipment composite base
CN101413271B (en) * 2006-06-09 2011-03-16 赵正义 Vertical positioning connection structure of mast type mechanical equipment composite base
CN102095052A (en) * 2010-11-25 2011-06-15 华锐风电科技(集团)股份有限公司 Installing method of foundation bolt anchoring system and method for installing industrial equipment
CN101532660B (en) * 2008-03-12 2012-05-23 贵阳铝镁设计研究院有限公司 Method and structure for connecting boiler pillars and pillar footing
CN102704697A (en) * 2012-07-06 2012-10-03 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102995653A (en) * 2012-11-30 2013-03-27 成都市工业设备安装公司 Side-type high-precision rapid locator for foundation bolts
CN103074904A (en) * 2013-02-05 2013-05-01 广东省工业设备安装公司 Method for installing oblique foundation bolts through combined-type sizing stock
CN103866865A (en) * 2012-12-17 2014-06-18 中冶天工集团有限公司 Pre-embedding and fixing method for foundation bolt with diameter of 48mm
CN105040717A (en) * 2015-07-24 2015-11-11 中国十九冶集团有限公司 Foundation bolt fixing support and mounting method
US9909329B2 (en) 2015-09-10 2018-03-06 Gerald A. LaLiberte, JR. Anchor device positioning and plumbing tool and methods related thereto
CN110761319A (en) * 2019-11-27 2020-02-07 广东电网有限责任公司 Pre-buried positioning tool of concrete rag bolt
CN113338328A (en) * 2021-06-19 2021-09-03 中国二十二冶集团有限公司 Embedding structure and embedding method for convex foundation surface bracket for fixing embedded bolt

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413272B (en) * 2006-06-09 2011-03-16 赵正义 Vertical positioning connection structure of mast type mechanical equipment composite base
CN101413271B (en) * 2006-06-09 2011-03-16 赵正义 Vertical positioning connection structure of mast type mechanical equipment composite base
CN101532660B (en) * 2008-03-12 2012-05-23 贵阳铝镁设计研究院有限公司 Method and structure for connecting boiler pillars and pillar footing
CN101266011B (en) * 2008-04-22 2010-10-06 中冶天工建设有限公司 Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
CN101806069B (en) * 2010-04-16 2011-07-06 天津二十冶建设有限公司 Integrated fixation and installation method for bolt
CN101806069A (en) * 2010-04-16 2010-08-18 天津二十冶建设有限公司 Integrated fixation and installation method for bolt
CN102095052B (en) * 2010-11-25 2013-06-12 华锐风电科技(集团)股份有限公司 Installing method of foundation bolt anchoring system and method for installing industrial equipment
CN102095052A (en) * 2010-11-25 2011-06-15 华锐风电科技(集团)股份有限公司 Installing method of foundation bolt anchoring system and method for installing industrial equipment
CN102704697B (en) * 2012-07-06 2014-06-18 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102704697A (en) * 2012-07-06 2012-10-03 平煤神马建工集团有限公司土建处 Assembled bolt group mold
CN102995653A (en) * 2012-11-30 2013-03-27 成都市工业设备安装公司 Side-type high-precision rapid locator for foundation bolts
CN103866865A (en) * 2012-12-17 2014-06-18 中冶天工集团有限公司 Pre-embedding and fixing method for foundation bolt with diameter of 48mm
CN103866865B (en) * 2012-12-17 2016-12-28 中冶天工集团有限公司 The pre-buried fixing means of a diameter of 48mm foundation bolt
CN103074904A (en) * 2013-02-05 2013-05-01 广东省工业设备安装公司 Method for installing oblique foundation bolts through combined-type sizing stock
CN105040717A (en) * 2015-07-24 2015-11-11 中国十九冶集团有限公司 Foundation bolt fixing support and mounting method
US9909329B2 (en) 2015-09-10 2018-03-06 Gerald A. LaLiberte, JR. Anchor device positioning and plumbing tool and methods related thereto
CN110761319A (en) * 2019-11-27 2020-02-07 广东电网有限责任公司 Pre-buried positioning tool of concrete rag bolt
CN113338328A (en) * 2021-06-19 2021-09-03 中国二十二冶集团有限公司 Embedding structure and embedding method for convex foundation surface bracket for fixing embedded bolt
CN113338328B (en) * 2021-06-19 2024-05-14 中国二十二冶集团有限公司 Embedding structure and embedding method for protruding foundation surface support for fixing embedded bolt

Similar Documents

Publication Publication Date Title
CN2596170Y (en) Positioning rack of pre-buried ground bolt
CN105421245B (en) Bent cap is without support steel hoop method construction technology
CN201053123Y (en) Deep foundation ditch tower crane platform base frame
CN205857032U (en) The toughened internal stress Construction Support device that a kind of floor stand combines with shelf bracket
CN112127641A (en) Accurate fixing method for anchor plate foundation bolt
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN108726348A (en) A kind of prefabricated overturning and hoisting method of piping lane segment prostrate
CN209194353U (en) It is a kind of to ride integral type bracket suitable for the construction of Bridge High-pier 0# block
CN207714155U (en) A kind of bent cap holder
CN109578011A (en) Supporting construction and its construction method in a kind of municipal tunnel
CN102296600A (en) Method for positioning middle pile of spread built subway station
CN205100235U (en) Antidumping formula street lamp foundation structure suitable for bridge
CN103882808A (en) Ramp bridge and main bridge connecting and erecting prefabricated beam supply system and construction method thereof
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN108661301A (en) Derrick stand modularization assembling platform and application method
CN215593656U (en) Frame pier structure with one end fixedly connected and one end movable
CN208618771U (en) A kind of derrick stand modularization assembling platform
CN212271808U (en) Movable encloses fender device
CN208907253U (en) A kind of special-shaped steel structure pier stud suspension column pre-embedded bolt 3 D locating device
CN106088635A (en) Artifact upright stone tablet building building is in the protection device of Under-cross tunnel blast working vibration
CN209703317U (en) Draw counter-force seat
CN102797224B (en) Paving method and template supporting device of bridge deck slab
CN207331733U (en) A kind of concrete column leg structure
CN109505254A (en) A kind of temporary consolidation construction method suitable for large-span continuous girder bridges
CN209368691U (en) A kind of temporary consolidation constructing device suitable for large-span continuous girder bridges

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee