CN2496682Y - Artificial mountain karst cave structural member - Google Patents

Artificial mountain karst cave structural member Download PDF

Info

Publication number
CN2496682Y
CN2496682Y CN 01251844 CN01251844U CN2496682Y CN 2496682 Y CN2496682 Y CN 2496682Y CN 01251844 CN01251844 CN 01251844 CN 01251844 U CN01251844 U CN 01251844U CN 2496682 Y CN2496682 Y CN 2496682Y
Authority
CN
China
Prior art keywords
utility
model
solution cavity
solution hole
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01251844
Other languages
Chinese (zh)
Inventor
杨林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01251844 priority Critical patent/CN2496682Y/en
Application granted granted Critical
Publication of CN2496682Y publication Critical patent/CN2496682Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The utility model relates to an artificial mountain stone solution hole component which comprises one to three fiber composite layer (s) and an emulation layer which can have the same shape with the solution hole component base layer, and on which the mushy mixture of magnesium chloride, filling material and water are coated on the surface. For the large solution hole component, the utility model adopts sand, broken stone and various waste substances on the base layer, and for the small components such as stalagmites, and rock pillars, the utility model adopts wood, plastic foam, paper to form. The price of the raw material of the utility model is inexpensive, and the cost is low; the shape of the base layer of the solution hole component is formed by objects which forming is easy, the modeling is vivid and fine; the component is cut first, and assembled on the spot, and the transportation and the installment are convenient. The weight of the component of the utility model is light, which can reflect the design concept of the designer exactly, and the real outlook of the complex mountain stone solution hole of various sizes can be represented, to enable a person to have the veritable feeling.

Description

A kind of artificial karst cave member
Technical field
The utility model relates to a kind of karst cave member.
Background technology
In order to produce the solution cavity environment, need produce artificial karst cave in non-solution cavity place." artificial karst cave and karst features manufacture craft " (notification number 1072632), disclose a kind of method of making artificial karst cave, it is by certain shape-designing, makes skeleton with metal rod, on metallic framework, mould the solution cavity member with the dynamical cure material by certain technological process, be assembled into solution cavity again.There is following problem in this manufacture method:
1, make molding body with metallic framework, can not reflect designer's design philosophy heartily, all kinds of personages in the solution cavity, vegeto-animal model are difficult for making, and can not make big solution cavity environment;
Though 2, to be coated with thing lighter than armored concrete in the metallic framework moulding, metallic rod itself is still heavy, so moulding can only be limited to ground, metope, can not install on the roof, because of the end face holding capacity is little, can't makes like this to hang and hang the solution cavity landscape, does not reflect the solution cavity overall picture;
3, complex process, metallic rod and dynamical cure material cost height, total manufacturing cost height;
4, handle with " various coating colouring or surface plastic spraying " thin portion modification of surfaces the back of moulding, and simulated effect is poor.
Summary of the invention
The purpose of this utility model aims to provide that a kind of cost is low, production technology is simply quick, construction weight is light, can pacify throughout, assembly unit, can reflect designer's design philosophy heartily, reproduce the artificial karst cave member of all size, complicated karst cave true appearance.。
The implementation of the utility model purpose is, a kind of artificial karst cave member, the 1-3 layer identical with solution cavity member basic unit 1 shape, surperficial coated has the fiber cloth composite bed of pasty mixture and outer simulation layer 7 thereof to constitute.Pasty mixture is the mixture of magnesium chloride, inserts and water, 196 resins, styrene, curing agent mixture or epoxy resin, inserts, ethylenediamine, acetone mixture.
For large-area cavern members such as the hole wall 8 in the accompanying drawing, tops, hole, basic unit adopts shapings such as sand, rubble, all kinds of refuses.Its manufacturing process is to be piled into the required member shape of solution cavity on ground with sand, rubble, all kinds of refuses etc., then spreads layer of glass fiber fabric, and coated one deck pasty mixture then repaves, is applied to the required number of plies, and a people can produce 100m in one day 2More than, cutting back assembly unit, 0.1 of not enough metallic framework moulding in man-hour, production cost is low, high efficiency.
For little solution cavity members such as the stalagmite in the accompanying drawing 9, stone column 10, designs 11, basic unit adopts timber, plastic foam, stationery to be shaped.Its manufacturing process is to be bundled into the required member shape of solution cavity with timber, useless cloth, paper, plastic foam class waste material, then its outer cover glass cloth etc., brushing pasty mixture again.To need one decks such as stalagmite little, the suspention roof, and integral body is taken off.To big as stone column, various moulders etc., then by the required cover of intensity, be coated with layer 2-3, block-by-block assembly unit is again opened in cutting then separately back block-by-block.The stalactite moulding and the design of the suspention shown in the utility model member drawings attached, they can reflect designer's design philosophy heartily, this with steel skeleton do less than.
The utility model member is hollow body, and is in light weight, can both install anywhere, assembly unit, and can reproduce objects all in the solution cavity.Then at body surface coated pasty mixture again, and it is approximate to take advantage of wet spray and the solution cavity component surface color done, the simulation layer 7 that constitutes by green stone, quartz sand of all kinds, so promptly use soon, touching with hand all has real sensation, can reproduce the true appearance of the karst cave of coming out of retirement and taking up an official post, make that the people is tangible godlikely really to be felt.
The utility model makes solution cavity member shape with sand, rubble, timber, paper etc., repaves glass cloth 1-3 layer, every laminar surface coated pasty mixture, the particularly mixture of coated magnesium chloride, inserts and water, and cost of material is cheap, construction weight is light; Constitute solution cavity member base shape with various easy shaping things, moulding is lively, meticulous; Member cutting back on-site consolidation, transportation, easy for installation, low, the high efficiency of production cost; The assembly unit rear surface is coated with simulation layer, and simulated effect is good.The utility model can be done hall and outdoor solution cavity moulding such as hotel, restaurant.
Description of drawings
Fig. 1 the utility model cutting pre-structure schematic diagram
The solution cavity moulding that Fig. 2,3,4 usefulness the utility model form
Among Fig. 1,2,4,6 is the fiber layer of cloth, and 3,5 is the pasty mixture coating, 7 simulation layers for band pasty mixture coating.

Claims (4)

1, a kind of artificial karst cave member, it is characterized in that the 1-3 layer identical with solution cavity member basic unit (1) shape, surperficial coated has the fiber cloth composite bed of pasty mixture and outer simulation layer (7) thereof to constitute.
2, solution cavity member according to claim 1 is characterized in that pasty mixture is the mixture of magnesium chloride, inserts and water, 196 resins, styrene, curing agent mixture or epoxy resin, inserts, ethylenediamine, acetone mixture.
3, solution cavity member according to claim 1 is characterized in that the cavern member, and basic unit adopts shapings such as sand, rubble, all kinds of refuses.
4, solution cavity member according to claim 1 is characterized in that little solution cavity member, and basic unit adopts timber, plastic foam, stationery to be shaped.
CN 01251844 2001-09-12 2001-09-12 Artificial mountain karst cave structural member Expired - Fee Related CN2496682Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01251844 CN2496682Y (en) 2001-09-12 2001-09-12 Artificial mountain karst cave structural member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01251844 CN2496682Y (en) 2001-09-12 2001-09-12 Artificial mountain karst cave structural member

Publications (1)

Publication Number Publication Date
CN2496682Y true CN2496682Y (en) 2002-06-26

Family

ID=33661679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01251844 Expired - Fee Related CN2496682Y (en) 2001-09-12 2001-09-12 Artificial mountain karst cave structural member

Country Status (1)

Country Link
CN (1) CN2496682Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101871243A (en) * 2010-06-25 2010-10-27 天津港保税区佳辰国际贸易有限公司 Cavern-shaped molding board for salt treatment house roof
CN101574889B (en) * 2009-05-19 2012-11-28 高智勇 Mosaic craft preparation method
CN105155847A (en) * 2015-09-18 2015-12-16 上海市园林工程有限公司 Construction method of cave-imitating decorative surface
CN110043062A (en) * 2019-05-14 2019-07-23 贵州省山地资源研究所 A kind of sampling stalagmite restorative procedure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101574889B (en) * 2009-05-19 2012-11-28 高智勇 Mosaic craft preparation method
CN101871243A (en) * 2010-06-25 2010-10-27 天津港保税区佳辰国际贸易有限公司 Cavern-shaped molding board for salt treatment house roof
CN105155847A (en) * 2015-09-18 2015-12-16 上海市园林工程有限公司 Construction method of cave-imitating decorative surface
CN105155847B (en) * 2015-09-18 2017-06-30 上海市园林工程有限公司 The construction method of imitative cave architectural surface
CN110043062A (en) * 2019-05-14 2019-07-23 贵州省山地资源研究所 A kind of sampling stalagmite restorative procedure
CN110043062B (en) * 2019-05-14 2020-10-27 贵州省山地资源研究所 Sampled stalagmite restoration method

Similar Documents

Publication Publication Date Title
CN104652693B (en) Beautiful color composite reinforced board
US10519291B2 (en) Material and method for an artificial rock
CN108972975A (en) The type cavity mould manufacturing method of landscape sculpture
CN110509570A (en) A kind of new energy car battery carton and crate body carbon fiber prepreg laying forming method
CN2496682Y (en) Artificial mountain karst cave structural member
KR100732252B1 (en) Manufacture Method of Flexible Form for Theme Building using Miniature Model-Surface divide Type
CN101475738B (en) Glass fibre reinforced plastic and leisure seat made thereof
CN109760462A (en) Armored concrete assembly type multifunctional landscape goods of furniture for display rather than for use and preparation method thereof
CN201288379Y (en) Plastics base hollow section bar filled with cement base foam material
CN111485689A (en) 3d printing customized relief wall decoration plate and method for building large relief wall by same
CN100581843C (en) Manufacturing technology of large rockwork rock
CN214220433U (en) Polyurethane composite floor
CN1686699A (en) Fortified polyurethane foamed body and its manufacturing method
CN1115257C (en) Artificial Karst cave and its making method
CN101054042A (en) Technology for studding shell to marble
CN109514692B (en) Reinforced concrete landscape lamp post and manufacturing method thereof
CN209683318U (en) Armored concrete assembly type multifunctional landscape goods of furniture for display rather than for use
CN109455038A (en) Functional steel reinforced concrete landscape goods of furniture for display rather than for use and preparation method thereof
CN211195667U (en) Luminous stone carving animal
CN218750073U (en) Imitative lava sculpture stone can give out light in
CN2451652Y (en) Imitation white marble railing
TWM657571U (en) Building material structure based on stone recycling
CN207211635U (en) A kind of EPS basic modes GRG applied to hotel synthesizes lines
KR101217923B1 (en) A manufacturing method of moulding for landscape and ornamental article
CN202416683U (en) Glass fiber composite wood

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee