CN2448508Y - Auxiliary butt joint device for offshore welding of submarine pipeline - Google Patents

Auxiliary butt joint device for offshore welding of submarine pipeline Download PDF

Info

Publication number
CN2448508Y
CN2448508Y CN 00256424 CN00256424U CN2448508Y CN 2448508 Y CN2448508 Y CN 2448508Y CN 00256424 CN00256424 CN 00256424 CN 00256424 U CN00256424 U CN 00256424U CN 2448508 Y CN2448508 Y CN 2448508Y
Authority
CN
China
Prior art keywords
positioning splint
mouthpart
adjusting screw
welding
axial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00256424
Other languages
Chinese (zh)
Inventor
钱孟祥
韩清国
王涛
张子国
刘万海
张金波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengli Petroleum Administration Engineering Construction No1 Co No3 Branch
Original Assignee
Shengli Petroleum Administration Engineering Construction No1 Co No3 Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengli Petroleum Administration Engineering Construction No1 Co No3 Branch filed Critical Shengli Petroleum Administration Engineering Construction No1 Co No3 Branch
Priority to CN 00256424 priority Critical patent/CN2448508Y/en
Application granted granted Critical
Publication of CN2448508Y publication Critical patent/CN2448508Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Arc Welding In General (AREA)

Abstract

The utility model relates to a submarine pipeline marine welding is supplementary to mouthpart belongs to and lays steel pipe way circumferential weld and to mouthful and clamping device. Mainly comprises a left group of positioning splints, a right group of positioning splints, an upper adjusting screw and a lower adjusting screw. Each group of positioning clamping plates consists of an upper semi-annular steel plate and a lower semi-annular steel plate which are the same in shape, a fastening lug is welded on the excircle of each of the two ends of the flat opening of each positioning clamping plate, and a fastening bolt is arranged in a threaded hole on the lug. Two ends of the upper and lower adjusting screw rods are respectively arranged in threaded holes of the left and right groups of positioning clamping plates, one end of each adjusting screw rod is a right buckle, and the other end of each adjusting screw rod is a left buckle. The influence of wind waves can be overcome, and the quick butt welding of pipelines on the sea can be realized.

Description

The marine welding of submarine pipeline is auxiliary to mouthpart
The utility model relates to lays steel pipeline circular weld counterpart and clamping and fixing device, particularly is that the marine welding of a kind of submarine pipeline that is exclusively used in the undersea pipe-laying construction is assisted mouthpart.
In the steel pipeline laying construction, its mouth of pipe girth welding is to the mouthpart special-purpose machines and tools that are absolutely necessary.The weld seam of steel pipeline special use is laid to the existing polytype of mouthpart in the land, can be divided into pipe external clamp and pipe internal clamp two big classes.Two long tube section counterpart welding must be used external clamp, generally all cooperate the counterpart weld job by lifting appliance.Land pipeline laying construction characteristics are that soldered pipe or long tube section all placed on the ground, be easy to carry out the counterpart gap adjustment, and the circumferential weld gap that regulates are difficult for change.For example, the relevant patent documentation that has retrieved has two pieces: the outer shaping of portable pipeline is to mouthpart (87209238), and light hydraulic type pipe external clamp (92236722) all can only be used for land pipeline laying construction.Undersea pipe-laying, especially the undersea pipe-laying of beach Hai Jiqianshuiqu, the long tube section prefabricated welding on land earlier one by one, it is in place to send the haul of plunging into the commercial sea again, with the boat-carrying suspender two ends of adjacent long tube section are hung out the seawater face simultaneously at sea then, and be horizontal substantially, carry out the counterpart weld job by rule of thumb.Because wind-engaging, wave, the influence of flowing, gushing, pipeline section, boats and ships and suspender are all ceaselessly swung, are rocked, and counterpart and welding difficulty are very big, and not only work efficiency is low, and is difficult to guarantee welding quality.
The purpose of this utility model just is at the undersea pipe-laying construction characteristic, provide the marine welding of a kind of submarine pipeline auxiliary to mouthpart, overcome above-mentioned unfavorable factor influence, can improve counterpart welding work efficiency, can guarantee the counterpart welding quality again, satisfy China's Tan Hai oil field undersea pipe-laying construction and be badly in need of.
Above-mentioned purpose is realized by following technical proposals
The marine welding of submarine pipeline is auxiliary to be made up of positioning splint, fastening bolt ear, clamping bolt, adjusting leading screw, adjusting turning handle and axial baffle mouthpart.Positioning splint is left and right respectively one group, and every group of positioning splint all is made up of upper and lower two block-shaped identical semi-circular steel plates.Weld a fastening bolt ear on the cylindrical at the every flat Kou Chu of semi-circular positioning splint two ends.On the fastening bolt ear bolt hole is arranged, clamping bolt is installed in this bolt hole.Respectively there is an axial screw thread hole at the middle part of upper and lower positioning splint, and the two ends of upper and lower two adjusting leading screws are installed in respectively in four axial screw thread holes of left and right positioning splint.The middle part of the two adjusting leading screws adjusting turning handle vertical of respectively burn-oning with leading screw.Two axial baffles spot weld respectively on the counterpart pipeline section cannula tip cylindrical.
Above-mentioned auxiliary axial screw thread hole to left and right both sides positioning splint in the mouthpart, Yi Bian be plus thread, another side is a left-hand thread.
Above-mentioned auxiliary left and right two ends screw rod one end to upper and lower two adjusting leading screws in the mouthpart is a plus thread, and the other end is a left-hand thread.
Turn to when pulling upper and lower two adjusting turning handles simultaneously when same, upper and lower two adjusting leading screws promptly draw left and right positioning splint to draw close (or leaving mutually) mutually simultaneously.
Should auxiliary can cooperate the integration of operation of boat-carrying suspender to mouthpart.Its left and right both sides positioning splint spacing is rapid adjustment at any time, and the adjacent two pipe ends maintenance that pressure is sling with one heart, to adapt to the counterpart requirement.The influence of extraneous factor such as can overcome wind, wave, flow, gush can increase stability, makes good weld seam is difficult for change, can shorten the counterpart time again, improves work efficiency, can also further improve welding quality.It is than existing simple in structure to mouthpart, and cost is low.
Accompanying drawing 1 is that the utility model is being used the state schematic side view.
Accompanying drawing 2 is that the A of accompanying drawing 1 is to schematic representation.
In conjunction with the accompanying drawings enforcement of the present utility model is described below:
In the accompanying drawing, the 1st, positioning splint, the 2nd, the fastening bolt ear, the 3rd, clamping bolt, the 4th, regulate leading screw, the 5th, regulate turning handle, the 6th, axial baffle.B is interior pipe, and C is an outer sleeve, and D is special-purpose weld bond internal lining pipe, and E is the counterpart circumferential weld.
By accompanying drawing as seen, this auxiliary to mouthpart by left and right two groups of positioning plates 1, four groups of eight fastening bolt ears 2, four tightly with bolt 3, two adjusting leading screws 4, two adjusting turning handles 5 and left and right two axial baffles 6 are formed up and down.Fastening bolt ear 2 of weldering on the cylindrical at the every flat Kou Chu of semi-circular positioning splint two ends.Clamping bolt 3 is installed in the tapped hole on the fastening bolt ear 2.Respectively there is an axial screw thread hole at the middle part of positioning splint 1 up and down, and the two ends of two adjusting leading screws 4 are installed in respectively in four axial screw thread holes of left and right positioning splint 1 up and down.The middle part of the two adjusting leading screws 4 adjusting turning handle 5 vertical of respectively burn-oning with leading screw.Two axial baffles 6 spot weld the end of counterpart pipeline section outer sleeve B respectively.
Manned every long tube section on sea bed, because specific (special) requirements, each pipe end all is prefabricated into the CONCENTRIC REDUCER mouth of pipe, a special internal lining pipe D will pack into earlier before the counterpart welding, see shown in the accompanying drawing 1, also on sea bed, all can not axially drag owing to the long tube section, can not be with the way that moves radially counterpart welding under water, can only adjacent ends of tubes be hung out the water surface simultaneously with the boat-carrying suspender, the internal lining pipe D that packs into earlier, counterpart welding again is also because of influences such as stormy waves, the pipe of being sling ceaselessly rocks, so more much bigger than land counterpart welding difficulty.Auxiliary can plaing well mouthpart acts on.Its operating process is: earlier two pipe ends are hung out the water surface simultaneously, half inserts one of them pipe end with internal lining pipe D again, loads onto and assists mouthpart, and another pipe end is inserted in the other end of internal lining pipe D.When the pipe that is hung slowly falls then, together pull two turning handles 5 to mouthpart, two groups of positioning plates 1 are drawn close mutually about making, and counterpart circumferential weld E is also just more and more narrow, and second half of internal lining pipe D also just inserts another mouth of pipe gradually, until reaching the counterpart requirement.
Owing to be subjected to the mandatory clamping of left and right positioning splint 1, make adjacent pipe end keep coaxial line, can comparatively fast finish radially counterpart.Spot welding was at once fixed when counterpart reached requirement, immediately circumferential weld was welded.The mouth of pipe of pipe B is buckled the mouth of pipe of managing watt solder mask pipe C again in having welded.After the completion of one weld bond, unload to mouthpart again counterpart weld another road mouth of pipe, reusable.
The effect of left and right two axial baffles 6 is to prevent in the counterpart process because of influenced by external force, pipeline section axial motion and breaking away from mouthpart.This axial baffle can be stayed on the pipeline, also can cut off repeated use.Also can make 3-4 little block into, spot weld the outer rounded ends of sleeve pipe.

Claims (3)

1. the marine welding of submarine pipeline is auxiliary to mouthpart, by positioning splint, the fastening bolt ear, clamping bolt, regulate leading screw, regulating turning handle and axial baffle forms, it is characterized in that a positioning splint left side, the right side respectively has one group, every group of positioning splint is all by last, two block-shaped identical semi-circular steel plates are formed down, weld a fastening bolt ear on the cylindrical at the every flat Kou Chu of semi-circular positioning splint two ends, on the fastening bolt ear bolt hole is arranged, clamping bolt is installed in this bolt hole, respectively there is an axial screw thread hole at the middle part of positioning splint up and down, a left side is installed at the two ends of two adjusting leading screws respectively up and down, in four axial screw thread holes of right positioning splint, the middle part of the two adjusting leading screws adjusting turning handle vertical with leading screw of respectively burn-oning, two axial baffles spot weld respectively on the counterpart pipeline section cannula tip cylindrical.
2. the marine welding of submarine pipeline according to claim 1 is auxiliary to is characterized in that the axial screw thread hole of left and right both sides positioning splint to mouthpart, Yi Bian be plus thread, another side is a left-hand thread.
3. the marine welding of submarine pipeline according to claim 1 is auxiliary to mouthpart, it is characterized in that the left and right two ends screw rod of two adjusting leading screws up and down, and an end is a plus thread, and the other end is a left-hand thread.
CN 00256424 2000-11-14 2000-11-14 Auxiliary butt joint device for offshore welding of submarine pipeline Expired - Fee Related CN2448508Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00256424 CN2448508Y (en) 2000-11-14 2000-11-14 Auxiliary butt joint device for offshore welding of submarine pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00256424 CN2448508Y (en) 2000-11-14 2000-11-14 Auxiliary butt joint device for offshore welding of submarine pipeline

Publications (1)

Publication Number Publication Date
CN2448508Y true CN2448508Y (en) 2001-09-19

Family

ID=33613143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00256424 Expired - Fee Related CN2448508Y (en) 2000-11-14 2000-11-14 Auxiliary butt joint device for offshore welding of submarine pipeline

Country Status (1)

Country Link
CN (1) CN2448508Y (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102029494A (en) * 2010-12-31 2011-04-27 杭州余杭獐山钢瓶有限公司 Comprehensive steel cylinder welding machine
CN102198577A (en) * 2011-04-13 2011-09-28 胜利油田胜利石油化工建设有限责任公司 Gunwale welding operating shed for laying submarine pipelines
CN102407514A (en) * 2011-09-02 2012-04-11 中建五局工业设备安装有限公司 Bellows connecting device
CN102500980A (en) * 2011-11-02 2012-06-20 中国十九冶集团有限公司 Support frame capable of preventing welding deformation and profile steel welding process using same
CN102705581A (en) * 2012-06-20 2012-10-03 中国石油大学(北京) Device for lowering and mounting submarine pipeline and crossing pipeline
CN103604018A (en) * 2013-11-19 2014-02-26 上海市基础工程集团有限公司 Fiber reinforced plastic joint for marine discharge pipelines
CN104014952A (en) * 2014-05-23 2014-09-03 中国第一重型机械集团大连加氢反应器制造有限公司 Mechanical connection type connection pipe inner wall surfacing auxiliary device and method for conducting connection pipe inner wall surfacing through mechanical connection type connection pipe inner wall surfacing auxiliary device
CN104723012A (en) * 2015-03-23 2015-06-24 上海外高桥造船海洋工程有限公司 Welding tool
CN104723011A (en) * 2013-12-24 2015-06-24 齐齐哈尔轨道交通装备有限责任公司 Auxiliary positioning device and system for barrel welding
CN105003770A (en) * 2015-07-13 2015-10-28 江苏南铸科技股份有限公司 Pipe body end part connecting device
CN105715868A (en) * 2016-04-25 2016-06-29 冯若愚 Auxiliary installation device for heavy-caliber spigot and socket pipelines and installation method utilizing device
CN106670717A (en) * 2017-02-20 2017-05-17 吴涛 Butt-joint location device for mechanical part welding
CN107297595A (en) * 2017-08-17 2017-10-27 江苏阳明船舶装备制造技术有限公司 Ensure beveling and cutting and weld indeformable fixing device
CN107701852A (en) * 2017-11-10 2018-02-16 青岛理工大学 Axial traction type connecting seabed pipeline repairing operation device
CN109185558A (en) * 2018-08-15 2019-01-11 中交航局第三工程有限公司 The method that a kind of major diameter GRP tube road is installed under water
CN110193696A (en) * 2019-05-14 2019-09-03 武汉船用机械有限责任公司 The processing tool and processing method of tube body part
CN110369939A (en) * 2019-08-02 2019-10-25 台州市杰龙风机厂 Fixed mechanism is used in a kind of welding of blower ventilating duct

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102029494A (en) * 2010-12-31 2011-04-27 杭州余杭獐山钢瓶有限公司 Comprehensive steel cylinder welding machine
CN102198577A (en) * 2011-04-13 2011-09-28 胜利油田胜利石油化工建设有限责任公司 Gunwale welding operating shed for laying submarine pipelines
CN102198577B (en) * 2011-04-13 2014-02-19 中石化胜利油建工程有限公司 Gunwale welding operating shed for laying submarine pipelines
CN102407514A (en) * 2011-09-02 2012-04-11 中建五局工业设备安装有限公司 Bellows connecting device
CN102500980A (en) * 2011-11-02 2012-06-20 中国十九冶集团有限公司 Support frame capable of preventing welding deformation and profile steel welding process using same
CN102705581A (en) * 2012-06-20 2012-10-03 中国石油大学(北京) Device for lowering and mounting submarine pipeline and crossing pipeline
CN103604018A (en) * 2013-11-19 2014-02-26 上海市基础工程集团有限公司 Fiber reinforced plastic joint for marine discharge pipelines
CN104723011B (en) * 2013-12-24 2016-08-24 齐齐哈尔轨道交通装备有限责任公司 Auxiliary locator and aided positioning system thereof for barrel soldering
CN104723011A (en) * 2013-12-24 2015-06-24 齐齐哈尔轨道交通装备有限责任公司 Auxiliary positioning device and system for barrel welding
CN104014952A (en) * 2014-05-23 2014-09-03 中国第一重型机械集团大连加氢反应器制造有限公司 Mechanical connection type connection pipe inner wall surfacing auxiliary device and method for conducting connection pipe inner wall surfacing through mechanical connection type connection pipe inner wall surfacing auxiliary device
CN104723012A (en) * 2015-03-23 2015-06-24 上海外高桥造船海洋工程有限公司 Welding tool
CN104723012B (en) * 2015-03-23 2017-03-22 上海外高桥造船海洋工程有限公司 Welding tool
CN105003770A (en) * 2015-07-13 2015-10-28 江苏南铸科技股份有限公司 Pipe body end part connecting device
CN105715868A (en) * 2016-04-25 2016-06-29 冯若愚 Auxiliary installation device for heavy-caliber spigot and socket pipelines and installation method utilizing device
CN105715868B (en) * 2016-04-25 2017-09-29 冯若愚 Heavy caliber socket joint pipeline auxiliary installation device and the installation method using the device
CN106670717A (en) * 2017-02-20 2017-05-17 吴涛 Butt-joint location device for mechanical part welding
CN107297595A (en) * 2017-08-17 2017-10-27 江苏阳明船舶装备制造技术有限公司 Ensure beveling and cutting and weld indeformable fixing device
CN107701852A (en) * 2017-11-10 2018-02-16 青岛理工大学 Axial traction type connecting seabed pipeline repairing operation device
CN109185558A (en) * 2018-08-15 2019-01-11 中交航局第三工程有限公司 The method that a kind of major diameter GRP tube road is installed under water
CN109185558B (en) * 2018-08-15 2020-09-01 中交一航局第三工程有限公司 Method for underwater installation of large-diameter GRP pipeline
CN110193696A (en) * 2019-05-14 2019-09-03 武汉船用机械有限责任公司 The processing tool and processing method of tube body part
CN110369939A (en) * 2019-08-02 2019-10-25 台州市杰龙风机厂 Fixed mechanism is used in a kind of welding of blower ventilating duct
CN110369939B (en) * 2019-08-02 2021-06-25 台州市杰龙风机厂 Fixing mechanism for welding air guide cylinder of fan

Similar Documents

Publication Publication Date Title
CN2448508Y (en) Auxiliary butt joint device for offshore welding of submarine pipeline
CN201828463U (en) Hydraulic testing device of pipeline
CN203484846U (en) Center-adjustable connecting clamp
CN2923197Y (en) Quick butt-jointing righting pipe-clamp
CN202921728U (en) Hydraulic flanging machine for copper-nickel alloy pipe
CN108871941B (en) Pressure test tool for pipe fitting
CN2853295Y (en) Pipe external aligning device with jack
CN217063087U (en) Threading device for embedded wire pipes in wall
CN201909109U (en) Traction pipe
CN112139368B (en) Flanging process for effectively retarding corrosion of lining of plate heat exchanger
CN210731533U (en) Rapid aligning device for large-diameter pipeline installation
CN109163862B (en) Pressure testing method for pipe fitting
CN101832425B (en) Installation method of underwater tee joint of seabed pipeline
CN213655897U (en) Splicing device for nodular cast iron pipes
CN111946703A (en) High pressure fuel pipe bundling device
CN218363131U (en) Large-diameter thick-wall pipe opening aligning device in power station boiler
CN104986288B (en) Gun wale energy pipeline support
CN101666412A (en) Connection method of double-wall corrugated pipes
CN201120534Y (en) Force saving port aligning machine
CN211464576U (en) Positioning device for mounting flared pipe
CN208019725U (en) The device at targeted duct center when pipeline docks
CN214946980U (en) Reinforced concrete drain pipe
CN212839738U (en) A mounting fixture for polyethylene pipe way multi-angle is connected
CN217815562U (en) Novel inner thread loose joint reducing outer thread straight-through connecting pipe
CN217647905U (en) Ship pipeline laying installation frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee