CN2418156Y - Double guiding-beam bridge-laying machine - Google Patents
Double guiding-beam bridge-laying machine Download PDFInfo
- Publication number
- CN2418156Y CN2418156Y CN 00208647 CN00208647U CN2418156Y CN 2418156 Y CN2418156 Y CN 2418156Y CN 00208647 CN00208647 CN 00208647 CN 00208647 U CN00208647 U CN 00208647U CN 2418156 Y CN2418156 Y CN 2418156Y
- Authority
- CN
- China
- Prior art keywords
- guiding
- bridge
- chassis
- backward
- leading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a double guiding-beams bridge-laying machine for highways and railways, comprising a main guiding-beam and an auxiliary guiding-beam butt-jointed at the front end, and the front part of the auxiliary guiding-beam is provided with a supporting leg. A front and a rear cranes are arranged on the main guiding-beam; the underside of the main guiding-beam is provided with a front and a rear supporting legs, an edge beam oil cylinder and a front and a rear trolleys connected with the main guiding-beam through a hanging wheel and a supporting roller; the trolley body of the front trolley is provided with an upper and a lower joists connected by a central shaft and are provided with rolling bodies. Compared with the existing double guiding-beam bridge-laying machines, the utility model has the advantages of light weight and short machine body, a vertically moving rail does not need to be laid, and the utility model is suitable for the construction of a bridge with a small curvature radius.
Description
The utility model relates to the bridge erection machinery of highway and railway, specifically a kind of double guide beam bridge erecting machine.
At present, the double guide beam bridge erecting machine that in highway and railway bridge erecting operation, uses, mainly by the leading beam of trussed construction and configuration in the above can be longitudinal and transverse mobile play crane and be fixed on below the leading beam vertically move chassis and before, during and after supporting leg forms,, assembly unit speed simple in structure with it is widely used soon.But, its advancing in operation process moves ahead because of relying on vertical shift chassis integral body, need on the good precast bridge of frame, lay long rails, and the length of nose girder can not be less than 2.5 times of pier distance, operational difficulty when setting up curved bridge in addition, the curved bridge construction of inapplicable small curvature radius.
The purpose of this utility model is the problems referred to above at existing double guide beam bridge erecting machine existence, and provides a kind of length that does not need to lay advance track, nose girder at bridge floor can foreshorten to 1.75 times of pier distance and be suitable for setting up the novel double guide beam bridge erecting machine that small curvature radius is bent bridge.
The technical scheme that realizes above-mentioned purpose is: a kind of double guide beam bridge erecting machine, have leading beam and butt up against front end and the guidance beam of telescopic legs forwardly is set, on leading beam, dispose forward and backward crane, below leading beam, be provided with forward and backward telescopic legs and reach the forward and backward chassis that is connected with leading beam by change gear and carrying roller with the side bar oil cylinder.
The technical scheme that realizes above-mentioned purpose also comprises: the upper and lower joist that the car body of preceding chassis is provided with relative configuration and is connected by central axis, its fitting face of the both sides of upper and lower joist is provided with corresponding deep-slotted chip breaker, is equipped with rolling element in its deep-slotted chip breaker.
The utility model is compared with existing double guide beam bridge erecting machine, has following advantage:
1, do not need on the good precast bridge of frame, to lay long rails;
2, exchange length foreshortens to 1.75 times of pier distances by 2.5 times of original piers distances;
3, can realize the complete machine gyration, be suitable for setting up of curved bridge;
4, complete machine is in light weight.
Accompanying drawing 2 is that back chassis and leading beam have reached crane configuration structure schematic diagram;
The utility model is described in further detail below in conjunction with drawings and Examples:
Provide as accompanying drawing 1, this double guide beam bridge erecting machine has the leading beam 1 of trussed construction and is docked at the guidance beam 2 of its front end, and its leading beam is the load spandrel girder, and teaching beam is simple and easy lightweight structures.Be respectively arranged with telescopic legs 5,6,7 at the two ends of leading beam and the front portion of guidance beam.On leading beam 1, dispose forward and backward crane 3,4, be respectively arranged with side bar oil cylinder 8 and forward and backward chassis 9,10 in the bottom of leading beam 1.
Provide as accompanying drawing 2, accompanying drawing 3, the top and bottom of the leading beam 1 of this double guide beam bridge erecting machine are respectively arranged with track.Planer-type plays the road wheel of crane 3,4 by the bottom and cooperates with the track of its upper end and has realized vertically moving of crane, is provided with the horizontal travelling car that disposes on cross track and this track by self crossbeam and finishes horizontal mobile to hanging precast beam and play crane.Two forward and backward chassis 9 and 10 are assemblied on the track of leading beam lower end by two groups of change gears 11 and the carrying roller 12 that disposes motor separately respectively, are used to realize that leading beam vertically moves or make two chassis to vertically move with guidance Liang Shangzuo at leading beam on two chassis.Dispose the lateral rows travelling wheel in the lower end of each chassis, its be laid on the cross track of construction on the beam and cooperate and can realize that complete machine is laterally mobile.
Provide as accompanying drawing 3, the car body of the preceding chassis 9 of this bridge formation machine is provided with relative configuration and by the upper and lower joist 14 and 15 that central axis 13 is connected, is used for realizing leading beam corner at erection process.The arc groove of edge rolling element 16 on its fitting face of the both sides of upper and lower joist, offering, the friction when being used to reduce upper and lower joist and reversing relatively.
This double guide beam bridge erecting machine is when building bridge construction, stretch out rear support leg make the back chassis unsettled after, start back chassis change gear motor and the back chassis can be moved forward to the appropriate location on leading beam, fix the back chassis and reclaim rear support leg, before can starting, the carrying roller motor of back chassis and the leading relative chassis of beam is moved forward, and pier was finished the supporting of nose girder and fixing before the supporting leg of teaching the beam front end was arrived, pier and fall rear support leg and make back chassis reach in place before chassis makes it to move to before then starting respectively, promptly by step type move finish bridge formation machine complete machine stride the pier displacement.In the curved bridge erection process, when after after chassis moves forward to the appropriate location, can start the traversing motor of back chassis, make complete machine rotate respective angles around the upper and lower joist central axis of preceding chassis, can realize turning to of the machine of building bridge, finish setting up of curved bridge.The supporting leg of its leading beam front portion can be used for the bridge formation machine turn to finish after, the supporting when the upper and lower joist of preceding chassis resets.
Claims (2)
1, a kind of double guide beam bridge erecting machine, include leading beam (1), on leading beam, dispose forward and backward crane (3), (4), below leading beam, be provided with forward and backward telescopic legs (5), (6) and side bar oil cylinder (8) and forward and backward chassis (9), (10), it is characterized in that: to being connected to the front portion guidance beam (2) of telescopic legs (7) is set at the front end of leading beam (1), described forward and backward chassis (9), (10) are connected with leading beam (1) with carrying roller (12) by the change gear (11) that assembles thereon.
2, require described double guide beam bridge erecting machine according to right 1, it is characterized in that: the car body of chassis (9) is provided with relative configuration and is connected by central axis (13) before described upper and lower joist (14), (15), its fitting face of both sides of upper and lower joist (14), (15) is provided with corresponding deep-slotted chip breaker, is equipped with rolling element (16) in its deep-slotted chip breaker.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00208647 CN2418156Y (en) | 2000-04-28 | 2000-04-28 | Double guiding-beam bridge-laying machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 00208647 CN2418156Y (en) | 2000-04-28 | 2000-04-28 | Double guiding-beam bridge-laying machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2418156Y true CN2418156Y (en) | 2001-02-07 |
Family
ID=33575964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 00208647 Expired - Fee Related CN2418156Y (en) | 2000-04-28 | 2000-04-28 | Double guiding-beam bridge-laying machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2418156Y (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100415995C (en) * | 2005-07-21 | 2008-09-03 | 郑州市华中建筑机械有限公司 | Half span type down guide frame bridging machine and its beam building method |
CN101824803A (en) * | 2010-04-29 | 2010-09-08 | 郑州市华中建机有限公司 | Bridge erecting machine for bridge erection |
CN1880581B (en) * | 2006-01-18 | 2010-10-13 | 秦皇岛天业通联重工股份有限公司 | Method for erecting a last arch bridge in front of tunnel and accessing tunnel by railway bridge girder erection machine |
CN101967798A (en) * | 2010-10-08 | 2011-02-09 | 中铁一局集团有限公司 | Highway double-guide-beam bridge erecting machine and turning method |
CN1816665B (en) * | 2003-06-06 | 2014-12-03 | 佩德罗·阿尔瓦雷斯·里贝罗·多·卡尔罗·帕谢科 | Gantry with auto-adjusting prestessing |
CN108611983A (en) * | 2018-06-19 | 2018-10-02 | 沙焕焕 | A kind of Bridge Erector of bridging method and band special piling machine |
CN109944163A (en) * | 2019-03-13 | 2019-06-28 | 郑州新大方重工科技有限公司 | A kind of double nose-girder type integration of transporting and building Bridge Erectors |
-
2000
- 2000-04-28 CN CN 00208647 patent/CN2418156Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1816665B (en) * | 2003-06-06 | 2014-12-03 | 佩德罗·阿尔瓦雷斯·里贝罗·多·卡尔罗·帕谢科 | Gantry with auto-adjusting prestessing |
CN100415995C (en) * | 2005-07-21 | 2008-09-03 | 郑州市华中建筑机械有限公司 | Half span type down guide frame bridging machine and its beam building method |
CN1880581B (en) * | 2006-01-18 | 2010-10-13 | 秦皇岛天业通联重工股份有限公司 | Method for erecting a last arch bridge in front of tunnel and accessing tunnel by railway bridge girder erection machine |
CN101824803A (en) * | 2010-04-29 | 2010-09-08 | 郑州市华中建机有限公司 | Bridge erecting machine for bridge erection |
CN101967798A (en) * | 2010-10-08 | 2011-02-09 | 中铁一局集团有限公司 | Highway double-guide-beam bridge erecting machine and turning method |
CN108611983A (en) * | 2018-06-19 | 2018-10-02 | 沙焕焕 | A kind of Bridge Erector of bridging method and band special piling machine |
CN109944163A (en) * | 2019-03-13 | 2019-06-28 | 郑州新大方重工科技有限公司 | A kind of double nose-girder type integration of transporting and building Bridge Erectors |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201801818U (en) | Bridge erecting machine capable of erecting double-track twin beams at tunnel entrance by zero distance | |
CN110541347A (en) | large-span full-hydraulic tire walking type tunnel inverted arch trestle and construction method | |
CN107558378A (en) | A kind of Bridge Erector and its bridging method for being used to set up full precast beam | |
CN201058969Y (en) | Novel bridging machine | |
CN2418156Y (en) | Double guiding-beam bridge-laying machine | |
CN108130862B (en) | Tunnel passing beam vehicle | |
CN110158486B (en) | Bridge girder erection machine for erecting spliced wide beams and construction method | |
CN107311047A (en) | The steel box-girder lift structure and method for improving of large span bondbeam | |
CN107604828A (en) | The Bridge Erector of double-T shaped beam bridge | |
CN201695345U (en) | Striding pierced type bridge erector | |
CN207919265U (en) | Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge | |
CN207078928U (en) | A kind of steel box-girder lift structure of large span bondbeam | |
CN110259228A (en) | It is a kind of sky iron intelligent vehicle section solid storing system and storage dispatching method | |
CN2712991Y (en) | Multi-span movable form-frame bridge fabrication machine | |
CN104929056B (en) | The hydraulic drive of a kind of sphere track and control Bridge Erector, bridge formation system and bridging method | |
CN114275684A (en) | Self-service variable-span broken line supporting leg tire type lifting beam machine | |
CN211285296U (en) | City viaduct large-spread arm bent cap self-propelled portal template system | |
CN114438901A (en) | Construction method for built-in magnetic suspension elevated line bridge girder erection machine | |
CN107401124A (en) | The Bridge Erector of T-shaped beam bridge | |
CN208502797U (en) | It is a kind of for Subway Tunnel can automatically walk trolley | |
CN220908181U (en) | Lifting frame integrated bridging system | |
CN109944163A (en) | A kind of double nose-girder type integration of transporting and building Bridge Erectors | |
CN201459609U (en) | Oblique crossing box beam bridge girder erection machine | |
CN217678651U (en) | Combined transverse-moving type abdominal mould longitudinal-moving device for support cast-in-place method | |
CN218263976U (en) | Pipe gallery trolley for building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |