CN2337186Y - Hoisting machine for ecrecting bridge flooring - Google Patents

Hoisting machine for ecrecting bridge flooring Download PDF

Info

Publication number
CN2337186Y
CN2337186Y CN 98238114 CN98238114U CN2337186Y CN 2337186 Y CN2337186 Y CN 2337186Y CN 98238114 CN98238114 CN 98238114 CN 98238114 U CN98238114 U CN 98238114U CN 2337186 Y CN2337186 Y CN 2337186Y
Authority
CN
China
Prior art keywords
girder
hoisting machine
crossbeam
tracks
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98238114
Other languages
Chinese (zh)
Inventor
曹阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98238114 priority Critical patent/CN2337186Y/en
Application granted granted Critical
Publication of CN2337186Y publication Critical patent/CN2337186Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hoisting machine for erecting bridge panels. A set of supporting bars is fixedly connected with a cross beam below the cross beam. Large walking wheels are arranged on the tracks of the cross beam. A main beam driving wheel train is arranged on the large walking vehicle, and a wheel shaft unit of the large walking vehicle is axially connected with a shaft box and a shaft rack. A longitudinal girder at the bottom of a main beam is provided with the tracks, and the tracks of the girder are arranged on the lower driving wheels. Two longitudinal girders on the top part of a girder rack are also provided with the tracks, and the hoisting machine is arranged on the tracks of the girders on the top part through base wheels. The utility model has the characteristics of simple structure, small hoisting working area, convenient operation, short construction period, high speed and low cost and is a novel and peculiar hoisting apparatus for erecting bridge panels.

Description

Viaduct concrete bridge plate hoisting machine
The utility model relates to a kind of hoisting machine, more specifically to a kind of viaduct concrete bridge plate hoisting machine, belongs to the bridge span erecting machine class, is applicable to the lifting of viaduct (bridge) concrete slab and T type beam.
Along with the development of society, viaduct (bridge) begins to build in many cities.Often long several kilometers to tens kilometers of viaducts (bridge), and the large-scale stress concrete bridge plate weight of giving all reaches about 20 to 30 tons.Like this, the handling of concrete bridge plate is installed and is just seemed particularly important, directly influences the speed of building and the quality of road and bridge.At present, the bridge pier of viaduct is that the cast of on-the-spot formwork is made, and the bridge deck of viaduct are normally finished in that precasting yard is prefabricated, and then carries out on-the-spot handling and install, and has easy construction, the cycle is short, cost is low, quality is good, do not influence the characteristics of traffic.But after bridge deck are transported to the scene, need be mobile crane collaborative work more than 30 tons, could hang on bridge pier to bridge deck with two lifting capacities.And the position of jenny repeatedly, caused that working area is big, lifting time length, construction and installation expense height, troublesome poeration, make people feel very inconvenient.
The purpose of this utility model provides a kind of viaduct concrete bridge plate hoisting machine, and it not only can remove the trouble that bridge deck are installed in the mobile crane handling from, and working area is little, the lifting time short, low, the flexible and convenient operation of construction and installation expense.
The purpose of this utility model is achieved in that it comprises control device, jack lift and front and back crossbeam, it is characterized in that the last plane of crossbeam vertically is fixed with track, and the support bar that a group length is adjustable is affixed with crossbeam below crossbeam; The walking cart is provided with the return pulley of band drive unit, the return pulley of walking cart place with the vertically affixed track of cantilever beams on; The top of walking cart car body is provided with the girder drive train, and the axle set of girder drive train is coupling with the axle box and the pedestal that are fixed on the car body; Girder is connected into by two English trusses arranged side by side, and the longitudinal girder of two English truss bottoms of girder places on the following driving wheel of girder drive train; Two longitudinal girders at two English truss tops of girder are provided with track, and two jack lifts are sat by return pulley and placed on the track at truss top.
Owing to adopted such scheme, when building viaduct, can remove the trouble that concrete bridge plate is installed with the mobile crane handling from, have simple in structure, the lifting operation area is little, easy to operate, the short characteristics that speed is fast, expense is low of engineering time, is a kind of novelty and the viaduct concrete bridge plate hanging device that shows unique characteristics.
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is a viaduct concrete bridge plate hoisting machine structure chart;
Fig. 2 is a hoisting machine lateral cross section organigram;
Fig. 3 is a walking cart part section constructional drawing;
Fig. 4 is the vertical view of Fig. 3.
In Fig. 1-4, crossbeam 6 has former and later two, is identical box-girder, becomes with welded steel plate.Steel track 5 vertically with crossbeam 6 on the plane be connected with bolt.There is pop-up 7 and the base 9 that is threaded at the two ends of support bar 8, and support bar 8 is established five altogether, and support bar 8 is fixing with crossbeam 6 vertical welding by pop-up 7 below crossbeam 6.The car body 4 usefulness steel plates of walking cart are welded into rectangular box-shaped, the return pulley 15 of band bilateral wheel rim is equipped with in the below of walking cart, on the wheel shaft in the right side return pulley outside, sprocket wheel 30 is housed also, sprocket wheel 30 be fixed on car body 4 tops and be connected by return pulley drive unit 31 chains that motor, gearbox constitute, return pulley 15 places on the track 5 on plane on the crossbeam 6; The top of walking cart car body 4 also is provided with the girder drive train of two symmetries, and the two ends that are welded on car body 4 of two axle box 21 symmetries of girder drive train also are fixed with the pedestal 32 of two symmetries on the top board of the car body 4 at two axle box 21 middle parts.The following driving wheel 3 of four belt wheel edge is contained in the both sides and following driving shaft 23 stationary fits of two following driving shafts 23 respectively, two axle heads of following driving shaft 23 are connected by bearing with axle box 21 and pedestal 32 respectively, also stud with gear 29 on the following driving shaft 23 in axle box 21, gear 29 is meshing with the travelling gear 28 in the axle box 21, top in axle box 21 also has same and driving cog 28 gears 27 of splicing with last driving shaft that mesh, two both sides and last driving shaft stationary fits of going up driving wheel 14 at last driving shaft of belt wheel edge.Top at two pedestals 32 of main drive wheel system also has a clamping wheel shaft 25 that is connected with two pedestals, and pinch wheels 24 is installed in two ends and 25 stationary fits of clamping wheel shaft that clamp wheel shaft 25.Two following driving shafts 23 link into an integrated entity by the shaft coupling of band chain wheel 26, and the girder drive unit that is made of motor, reduction box is connected with sprocket wheel 26 on the following driving shaft 23 by chain.Girder 12 is connected into by crossbeam by two English trusses arranged side by side, four longitudinal girders of two English truss bottoms of girder 12 are i-beam track 22, four tracks 22 of girder 12 lower ends place respectively on four following driving wheels 3, pinch wheels 24 is affixed on the upper surface of two tracks 22, and girder 12 stable seats are put on driving wheel 3 under four girders on the walking cart car body 4.Be welded with track 18 equally on two longitudinal girders at two English truss tops of girder 12, jack lift 2 is sat respectively on two long rails 18 that place the truss top by return pulley 17.
During work, the base 9 of support bar 8 is connected with the pre-buried deposited bolt in bridge pier bent cap 16 tops respectively, and two crossbeams 6 are separately fixed at the top of two adjacent bridge pier capping beams 16 by support bar 8, crossbeam 6 also be connected with prevent from vertically to rock tiltedly draw 13.Four tracks 22 of girder 12 bottoms of two English truss structures place respectively under the girder on the driving wheel 3, again will be in two pinch wheels 24 on the same axle by clamping the top that wheel shaft 25 is contained in two pedestals 32, girder 12 two middle tracks are stuck in the train of the big roof of walking, can only under the control of driving wheel 3,14, vertically move.When lifting bridge deck 33, by control device 10 with seat place girder 12 tops about two jack lifts 2 move to the interior side lock of two adjacent bridge pier 16 belows respectively, make girder by the center of original one independent trolley concentrate stressed change near the dispersion of two fulcrums stressed, greatly reduce the moment of flexure of girder 12, sling the respectively end of concrete bridge plate 33 (or T type beam) of two jack lifts 2 makes girder 12 follow crossbeam 6 by control walking cart drive unit 31 again and laterally moves and lay bridge deck 33 until being paved with.When need are laid the bridge deck of next bridge pier, need hoisting machine is moved to right.At first the drive unit 31 by control device 10 control walking carts makes girder 12 move on to the middle part of beam 6, and the junction plate of walking cart car body 4 sides and the junction plate at crossbeam 6 middle parts are linked together with bolt.By control girder drive unit 32, make girder 12 parallel moving to right again, when moving on to next bridge pier,, make girder 12 fixing by support 1 again at the bridge pier falsework 1 of putting on the shelf.At this moment remove the bolt on the fixing base 9 of front beam support bar 8 and bridge pier bent cap 16 again, base 9 and bridge pier bent cap 16 are broken away from.By control girder drive unit 32 driving wheel 14 is rotated, at this moment girder 2 is motionless, and walking cart band front beam 6 and moved to right along girder 12, and is to the bent cap 16 of next bridge pier, that front beam 6 is fixing.Move on that bridge pier that front beam just left rear cross beam fixing with identical way again.Open the Bolt Connection of walking cart and crossbeam, next new working cycles just can be carried out in locking girder 12, the position of adjusting twice cranes 2.

Claims (3)

1. viaduct concrete bridge plate hoisting machine, it comprises control device, jack lift and front and back crossbeam, it is characterized in that the last plane of crossbeam vertically is fixed with track, the support bar that a group length is adjustable is affixed with crossbeam below crossbeam; The walking cart is provided with the return pulley of band drive unit, the return pulley of walking cart place with the vertically affixed track of cantilever beams on; The top of walking cart car body is provided with the girder drive train, and the axle set of girder drive train is coupling with the axle box and the pedestal that are fixed on the car body; Girder is connected into by two English trusses arranged side by side, and the longitudinal girder of two English truss bottoms of girder places on the following driving wheel of girder drive train; Two longitudinal girders at two English truss tops of girder are provided with track, and two jack lifts are sat by return pulley and placed on the track at truss top.
2. viaduct according to claim 1 concrete bridge plate hoisting machine, pop-up and base is characterized in that being threaded at its two ends of said support bar.
3. viaduct according to claim 1 concrete bridge plate hoisting machine is characterized in that in said girder drive train for also being provided with driving shaft on the top of axle box, two both sides and last driving shaft stationary fit of going up driving wheel at last driving shaft of belt wheel edge.
CN 98238114 1998-06-30 1998-06-30 Hoisting machine for ecrecting bridge flooring Expired - Fee Related CN2337186Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98238114 CN2337186Y (en) 1998-06-30 1998-06-30 Hoisting machine for ecrecting bridge flooring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98238114 CN2337186Y (en) 1998-06-30 1998-06-30 Hoisting machine for ecrecting bridge flooring

Publications (1)

Publication Number Publication Date
CN2337186Y true CN2337186Y (en) 1999-09-08

Family

ID=33985772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98238114 Expired - Fee Related CN2337186Y (en) 1998-06-30 1998-06-30 Hoisting machine for ecrecting bridge flooring

Country Status (1)

Country Link
CN (1) CN2337186Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100362200C (en) * 2006-01-05 2008-01-16 北京市机械施工有限公司 Supporting displacement method for lifting component and supporting system thereof
CN101177933B (en) * 2007-11-28 2010-06-16 贵州省桥梁工程总公司 Bridge rib hoisting and supporting rack integral construction method and device
CN101942804A (en) * 2010-09-07 2011-01-12 李雨恒 Bridge surface construction vehicle for high-speed railway
CN106800245A (en) * 2017-01-25 2017-06-06 中铁大桥局集团第工程有限公司 A kind of floorings lifting suspension bracket, hanging apparatus and hanging method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100362200C (en) * 2006-01-05 2008-01-16 北京市机械施工有限公司 Supporting displacement method for lifting component and supporting system thereof
CN101177933B (en) * 2007-11-28 2010-06-16 贵州省桥梁工程总公司 Bridge rib hoisting and supporting rack integral construction method and device
CN101942804A (en) * 2010-09-07 2011-01-12 李雨恒 Bridge surface construction vehicle for high-speed railway
CN106800245A (en) * 2017-01-25 2017-06-06 中铁大桥局集团第工程有限公司 A kind of floorings lifting suspension bracket, hanging apparatus and hanging method
CN106800245B (en) * 2017-01-25 2019-01-25 中铁大桥局集团第一工程有限公司 A kind of floorings lifting hanger, hanging apparatus and hanging method

Similar Documents

Publication Publication Date Title
US11634877B2 (en) Method for removal of temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN212050244U (en) Gantry crane system for mounting assembled bent cap
CN212052327U (en) Movable type dismounting and hoisting tool for temporary supporting system of small box girder type hidden cover beam of road and bridge prefabrication
CN111335182A (en) Portable single-rail bridge girder erection machine and steel column and steel girder installation method in bridge erecting process
CN111778857B (en) Process for synchronously erecting upper and lower beams of double-layer overhead bridge of urban public rail
JP3026545B2 (en) Bridge girder erection method and device
CN114808747A (en) Multifunctional bridge girder erection machine and bridge girder erection construction method
CN112030777B (en) Descending movable formwork support bracket crossing type transfer construction method
CN2337186Y (en) Hoisting machine for ecrecting bridge flooring
JP2001146716A (en) Erection method for bridge beam
CN206635657U (en) A kind of symmetrical formula Bridge Erector of setting a roof beam in place
JP2007182728A (en) Construction method of bridge, and side floor slab mounting device for bridge
CN113882286B (en) Bridge dismantling and building integrated machine, crossing method thereof, bridge dismantling method and newly-built method
JPH033616Y2 (en)
CN212247887U (en) Portable single-rail bridge girder erection machine
CN113152309A (en) Self-supporting synchronous hanging bracket system for corrugated steel web construction and construction method
JP2001020225A (en) Erection method of bridge and equipment therefor
KR100367028B1 (en) A self propelled working platform for construction and maintenance of bridge
CN219384698U (en) Novel movable operation platform for bridge reinforcement and maintenance
JPH07102531A (en) Method and device for overhanging installation of bridge
JPS5812894Y2 (en) Assembly bridge for construction site
CN114232502B (en) Self-propelled sliding template truss and use method thereof
CN217499962U (en) Multifunctional bridge girder erection machine
CN220598196U (en) Auxiliary lifting device for diamond hanging basket construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee