CN2238872Y CN 94248262 CN94248262U CN2238872Y CN 2238872 Y CN2238872 Y CN 2238872Y CN 94248262 CN94248262 CN 94248262 CN 94248262 U CN94248262 U CN 94248262U CN 2238872 Y CN2238872 Y CN 2238872Y
Authority
CN
China
Prior art keywords
hinge
plate
bolt
die
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 94248262
Other languages
Chinese (zh)
Inventor
李永长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Component Factory China Building Engineering Bureau No1
Original Assignee
Component Factory China Building Engineering Bureau No1
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Component Factory China Building Engineering Bureau No1 filed Critical Component Factory China Building Engineering Bureau No1
Priority to CN 94248262 priority Critical patent/CN2238872Y/en
Application granted granted Critical
Publication of CN2238872Y publication Critical patent/CN2238872Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to an extension electrical lift well die carrier, specially used for the wall construction of the lift well for high buildings, which is essentially composed of a bottom die-plate (1) with climbing heads, a wall die-plate (5), a hinge angle (27) with inward contracting function and an inverted umbrella shape extension demountable mechanism. When pressing the extension demountable mechanism down, the die is supported, and when lifting the extension demountable mechanism, the sliding bush (13) positioned on the central post (19) and the relevant mechanism are driven through a draw rod (14), and the entirety of the wall form is pulled to uniformly contract inward so that the release die is able to be demounted and lifted. The utility model is characterized in that it can support die once or can be continuously used for demounting and lifting, and successfully solves the demounting of the die-plate when the narrow well has no the operating area, with fast construction speed, good quality and economy and security.

Description

Telescopic elevator well formwork
Telescopic elevator well formwork belongs to the construction formwork category.
Traditional elevator vertical shaft template at every turn all at the scene directly by manually assembled, in the construction, also needs to be equipped with in addition scaffold, operating platform etc., and when increasing construction, or all dismounting again, or the low layer template is not torn open and again at high-rise decking.In view of highrise building lift well operating surface is narrow, template is propped up and is torn extremely inconvenience open, and not only speed is slow, and is many with material, and the template recycling rate of waterused is low, and quality is difficult for guaranteeing that unsafe factor is also more.
The utility model provides a kind of telescopic elevator well formwork, is exclusively used in highrise building lift well wall construction.Behind the formwork, can promote use continuously, tear open in the lifting process, only need a crane gear to cooperate, design size has big flexibility, field condition that can be scalable, successfully having solved narrow vertical shaft does not have template under the operating surface condition and props up and tear open, can do posture template, operating platform etc. simultaneously, speed of application is fast, quality is guaranteed, and economy, safety can be reused for a long time.
The concrete scheme of the utility model is as follows:
Fig. 1, general assembly drawing; Fig. 2, A-A analyse and observe; Fig. 3, lifting state diagram;
Fig. 4, soffit formwork plan view; Fig. 5, amplification I (supporting girder steel); Fig. 6, amplification II (hinge angle);
The utility model mainly consists of the following components: end template, wall form, telescopic are torn mechanism, hinge open The angle.
An end template 1: have four on it and climb 26 or claim that telescopic leg (reported patent: 90205507.0), carry by mould bases integral body When rising, can automatically stretch into the concrete hoistway wall and give in the hole that stays, keep the steady land of mould bases; Eight guide rails 2 are with body of wall Uniform eight guide wheels 3 of template 5 base faces are corresponding; Central authorities' seat board 24 is contained on the I-shaped girder, and its center has Cylindrical projection, newel 19 lower ends cover is the location thereon; Lower plate 23 quadruplets uniformly are fixed on central seat board 24 On, and corresponding bolt 40 chain connection with it; Four end template suspension hooks 4 are fixed on the load-bearing channel-section steel girder steel.
Wall form 5: eight guide wheels 3 are housed on it, are distributed on four side template base faces, corresponding with guide rail 2; Each one up and down on supporting girder steel 6, every side template lay respectively on two horizontal planes, be fixed together by junction plate 31 by two channel-section steels and form, and be fixed together by securing member 32 and wall form 5, the girder steel two ends have oval wedge hole at the channel-section steel end face, the use fixedly time the with the right angle fuse; Supporting girder steel 6 middle parts are corresponding with sliding sleeve 13, by securing member 30 base plate 7 are housed, and its lateral surface has clamping plate, and are connected with bolt 9 hinges by bearing pin 29; Suspension hook 8.
Tearing mechanism structure open for telescopic consists of: central post 19, but vertical base has upper and lower each one of sliding sleeve 13 on it on central seat board 24, under the spacing hole movable latch limits, and can upper and lower spacing slip along central post 19; The uniform quadruplet sliding sleeve of sliding sleeve 13 lateral surfaces clamping plate 12 are connected with bolt 11 hinges, also have 28 4 of fixed heads simultaneously, and in order to steady brace 14, and 12 on sliding sleeve clamping plate are opened uniform; 10 8 on two-restriction nut, two ends are respectively positive and negative internal thread, with bolt 9 and 11 corresponding being threaded; Low sleeve 13 also has train wheel bridge 21 quadruplets, connects together with fixed head 28, is connected with bolt 39 hinges simultaneously; 22 4 on two-restriction nut, two ends are respectively positive and negative internal thread, with bolt 39 and 40 corresponding being threaded; 14 4 on pull bar is fixed together with fixed head 28, and its upper end is fixed together with top board 17, and lower end and train wheel bridge 21 are fixed together; Suspension hook 16 is fixed on the top board 17, uses when promoting mould bases; 18 on jack uses during the watchman's clapper mould bases between central post 19 tops and top board 17.
Hinge angle 27, as shown in Figure 6, mould bases is respectively adorned a cover for four jiaos, form removal and when promoting mould bases can in contract, break away from the concrete wall, concrete structure is: 33 2 of side rotating shafts, do hinge-type with side plate 34 and mainboard 38 simultaneously and be rotatably connected; 34 2 of side plates are fixed by perpendicular firmware 36 and wall form 5 upright sides; On the installing plate 35 connecting hole is arranged, each one at every joint hinge two ends, dead with mainboard 38 vertical weldings, during lengthening hinge angle, 27 whole location, assurance hinge angle are used; 37 1 of main shafts, contour with wall form 5, do hinge-type with two mainboards 38 simultaneously and be rotatably connected; 38 2 of mainboards connect side rotating shaft 33 and main shaft 37, simultaneously lifting plate right angle effect.
Concrete vertical shaft body of wall 25 gives on it and leaves regular hole, when pouring into concrete, must give staying promoting the required hole in back at every turn, four jiaos each one, climbs 26 corresponding with on the soffit formwork 1 four; When promoting mould bases, climb 26 and can stretch into automatically in the hole, keep the steady land of mould bases.
Operating principle: first during support for shuttering, pour into earlier or puzzle and climb 26 a required hole, then that soffit formwork 1 is surely good, guarantee mould bases Zhi Haohou, during the perfusion concrete, can not run slurry from wall form 5 lateral surface lower limbs, then the vertical shaft mould bases of assembled formation is hung on soffit formwork 1 together with telescopic watchman's clapper mechanism, hang up soffit formwork stay- bolt 39 and 40 and two-restriction nut 22, adjust two-restriction nut 22, pulling sliding sleeve 13, make it to be positioned at horizontal level, adjust two-restriction nut 10 again wall form 5 and hinge angle 27 are put in place, with the right angle fuse adjacent supporting girder steel 6 stretchings are fixed afterwards with bolt 9 and 11, in case perfusion displacement during concrete, promptly formwork finishes.Just allow to tear open when above and carry mould bases when concrete strength reaches 75%CM.During form removal, at first make soffit formwork stay- bolt 39 or 40 and two-restriction nut 22 throw off, and the right angle fuse is unloaded, subsequently, start jack 18, compel top board 17 and rise, drive pull bar 14 and sliding sleeve 13, together with bolt 11,9 and two-restriction nut 10 jointly along central post 19 spacing risings, thereby pulling wall form 5, because hinge angle 27, the function that contracts in having is so formwork integral leaves the concrete wall, in view of the effect of guide wheel 3 and guide rail 2, contract in wall form 5 energy are smooth, leave the concrete wall.Use crane gear subsequently,, rise to next pouring position, also can hang away earlier wall form 5 and be placed on one side, hang soffit formwork 1 again, from new support together with tearing mechanism open by suspension hook 16 or the 8 and 4 whole mould bases of slinging.
Also can adopt following method to tear, promote mould bases open in addition: throw off soffit formwork stay- bolt 39 or 40, unload the right angle fuse after, without jack 18, directly with two of lifting cable wires, (tighter) hanging hook 16, another root (pine) hanging hook 4 is during lifting, tighter before this suspension hook 16 works, pulling top board 17, making contracts in the formwork integral leaves the concrete wall, behind the certain distance, the suspension hook 4 of pine is stressed, thereby whole slip puts in place.
Advantage of the present utility model is: for highrise building lift well wall construction, a formwork can promote continuously, only needs crane gear to cooperate.Successfully having solved narrow vertical shaft does not have template under the operating surface condition and props up and tear open, has overcome the drawback that conventional on-site direct labor props up form removal, and not only speed of application is fast, quality is guaranteed, economy, safety, and design size has big flexibility, field condition that can be scalable.
Embodiment: dimensional units: millimeter.
With the square sectional length of side 2050 elevator shafts is example.
Soffit formwork 1 is a steel wood combination construction, and last plane is the square of the length of side 2000, and spandrel girder is selected the 10# channel-section steel for use, and one of girder is the I-shaped die by the butt welding of two 10# channel-section steel end faces; Central authorities' seat board 24 is connected and fixed with bolt with girder, and 23 welderings of quadruplet lower plate thereon; Center figure post projection φ 50, H50; Eight guide rails 2, corresponding guide wheel 3, two on every limit is welded on the spandrel girder, selects 50 equal leg angle length 300 for use, and drift angle upwards is " ∧ " type; Four suspension hooks 4 are welded on the spandrel girder.
Concrete wall 25 reserving holes specifically are of a size of α=30 °, m=70, H=125, the wide n=120 in hole.
Wall form 5, high by 3300, each side template wide by 1895 (not comprising the hinge angle), thickness 65, the selection standard steel form is widened to Rack to wait thick plank lath; Side template base face is respectively installed two guide wheels 3, and diameter is φ 50, and is corresponding with the guide rail 2 on the soffit formwork 1; Supporting girder steel 6 selects 10 for use #The channel-section steel assembly welding forms, two of every sides, and corresponding with upper and lower two sliding sleeve 13 levels, securing member 32 is selected single ended bolt for use; Base plate 7 is fastening with supporting girder steel 6 usefulness bolts 30, and clamping plate are welded in base plate 7 central authorities; Each one at two ends, suspension hook 8 every side template top.
Tear mechanism open for telescopic: central post 19 is selected 130 * 5 days slit-tubes of φ, H3240 for use; Sliding sleeve 13 is φ 140 * 5, H100, and upper and lower sliding sleeve center to center distance is 1920, upper sliding sleeve 13 center to center distance central posts 19 upper surfaces 390, low sleeve 13 center to center distance central posts 19 lower surfaces 930; Sliding sleeve clamping plate 12 are welded in sliding sleeve 13 lateral surfaces; Bolt 11 is left-handed, and an end is connected with sliding sleeve clamping plate 12 bearing pins, and the other end is threaded with two-restriction nut 10; Bolt 9 is dextrorotation, and an end is connected with clamping plate bearing pin on the base plate 7, and the other end is threaded with two-restriction nut 10; Be welded with train wheel bridge 21 on the low sleeve 13, and welded together with fixed head 28, being connected with bolt 39 bearing pins of dextrorotation simultaneously, bolt 39 other ends are threaded with open type two-restriction nut 22; Bolt 40 is left-handed, and an end is threaded with open type two-restriction nut 22, and the other end is connected with lower plate 23 bearing pins; Four pull bars 14, diameter phi 16 are welded on the fixed head 28 with the length of side 675 square profile; 12 on fixed head 28 and sliding sleeve clamping plate leave uniform, all are welded on the sliding sleeve 13; Top board 17 is bolt with pull bar 14 upper ends and is connected; Suspension hook 16 is positioned at top board 17 central authorities; 18 on jack is between central post 19 upper surfaces and top board 17.
The hinge angle: during holding state, equilateral right angle maximal side 155, side plate 34 is thick 4, and is wide by 65; Mainboard 38 is thick 4, and is wide by 155; Side rotating shaft 33 and main shaft 37 are φ 8 reinforcing bars, make axle sleeve with φ 14 * 2 steel pipes, are the hinge-type hinge with side plate 34 and mainboard 38 respectively, each hinge angle assembling total length 3300.
In the form removal lifting process, contract in the wall form 5 and leave 30 millimeters on concrete wall.
Use the result, effect is very desirable, and relevant department extremely payes attention to, and is considered as the major transformation of vertical shaft template, intends organizational standardization, applies in national builing industry as early as possible.

Claims (2)

1. telescopic elevator well formwork is climbed soffit formwork (1), the wall form (5) of head (26) and is formed by band, it is characterized in that:
(A) there is central seat board (24) in soffit formwork (1) central authorities, are contained on the I-shaped girder, and there is cylindrical projection at its center; Lower plate (23) quadruplet is distributed on the central seat board (24), and corresponding bolt (40) hinge connection with it; Four suspension hooks (4) are fixed on the load-bearing channel-section steel girder steel;
(B) have supporting girder steel (6) on the wall form (5), upper and lower each one of every side template, base plate (7) is equipped with at its middle part; It is corresponding with sliding sleeve (13) that this plate lateral surface has clamping plate, and be connected with bolt (9) hinge by bearing pin (29); Suspension hook (8), each two of every side upper surfaces;
(C) also have telescopic to tear mechanism open: central post (19), but vertical base has upper and lower each one of sliding sleeve (13), under the spacing hole movable latch limits, along central post (19) on it on central seat board (24)) can upper and lower spacing slip; Sliding sleeve (13) lateral surface uniform quadruplet sliding sleeve clamping plate (12) are connected with bolt (11) hinge, also have (28) four of fixed heads simultaneously, in order to steady brace (14), and open uniform between sliding sleeve clamping plate (12); (10) eight on two-restriction nut, two ends are respectively positive and negative internal thread, with bolt (9) and (11) are corresponding is threaded; Low sleeve (13) also has train wheel bridge (21) quadruplet, connects together with fixed head (28), is connected simultaneously with bolt (39) hinge, and (22) four on two-restriction nut, two ends are respectively positive and negative internal thread, reach with bolt (39) that (40) are corresponding to be threaded; (14) four on pull bar is fixed together with fixed head (28), and its upper end is fixed together with top board (17), and the lower end is fixed together with fixed head (28) and train wheel bridge (21) simultaneously; Suspension hook (16) is fixed on the top board (17);
(D) also have hinge angle (27), mould bases is respectively adorned a cover for four jiaos, has (33) two of side rotating shafts, does hinge-type with side plate (34) and mainboard (38) simultaneously and is rotatably connected; (34) two of side plates are fixed by the upright side of securing member (36) and wall form (5); Installing plate has connecting hole on (35), and each one at every joint hinge two ends are dead with mainboard (38) vertical welding, and during lengthening hinge angle, whole location, assurance hinge angle (27) is used; (37) one of main shafts, contour with wall form (5), do hinge-type with two mainboards (38) simultaneously and be rotatably connected; (38) two of mainboards connect side rotating shaft (33) and main shaft (37), simultaneously lifting plate right angle effect.
2. according to the described mould bases of claim 1, it is characterized in that: soffit formwork (1) is gone up the plane eight guide rails (2), corresponding with eight guide wheels (3) that wall form (5) base face is uniform, is welded on the spandrel girder of soffit formwork (1) with each limit vertical configuration; Wall form (5), four side template base faces are respectively installed two guide wheels (3), and totally eight, corresponding with the guide rail (2) on the soffit formwork (1), when reducing form removal, the resistance that contracts in the template.
CN 94248262 1994-12-27 1994-12-27 Extension electrical lift well die carrier Expired - Fee Related CN2238872Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94248262 CN2238872Y (en) 1994-12-27 1994-12-27 Extension electrical lift well die carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94248262 CN2238872Y (en) 1994-12-27 1994-12-27 Extension electrical lift well die carrier

Publications (1)

Publication Number Publication Date
CN2238872Y true CN2238872Y (en) 1996-10-30

Family

ID=33853248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94248262 Expired - Fee Related CN2238872Y (en) 1994-12-27 1994-12-27 Extension electrical lift well die carrier

Country Status (1)

Country Link
CN (1) CN2238872Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104326338A (en) * 2014-09-29 2015-02-04 中国建筑第八工程局有限公司 Jacking platform downwards hung elevator
CN108625389A (en) * 2018-05-30 2018-10-09 五冶集团上海有限公司 A kind of rim of a cup basis internal model panel assembly
CN110076888A (en) * 2019-05-31 2019-08-02 中交武汉港湾工程设计研究院有限公司 One kind being based on immersed tube prefabricated middle crawl space gallery construction template structure
CN113622738A (en) * 2021-08-18 2021-11-09 常州东华建筑安装工程有限公司 Slip form scaffold suitable for chimney construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104326338A (en) * 2014-09-29 2015-02-04 中国建筑第八工程局有限公司 Jacking platform downwards hung elevator
CN108625389A (en) * 2018-05-30 2018-10-09 五冶集团上海有限公司 A kind of rim of a cup basis internal model panel assembly
CN110076888A (en) * 2019-05-31 2019-08-02 中交武汉港湾工程设计研究院有限公司 One kind being based on immersed tube prefabricated middle crawl space gallery construction template structure
CN110076888B (en) * 2019-05-31 2024-04-09 中交武汉港湾工程设计研究院有限公司 Construction template structure based on immersed tube prefabrication middle and narrow space corridor
CN113622738A (en) * 2021-08-18 2021-11-09 常州东华建筑安装工程有限公司 Slip form scaffold suitable for chimney construction

Similar Documents

Publication Publication Date Title
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN212689564U (en) Temporary supporting device and temporary supporting structure for floor bearing plate
CN113090014A (en) High-rise assembled building integral operation platform and construction method and application thereof
CN210460016U (en) Integrated form single power lift material platform
CN111456425A (en) Temporary supporting device, temporary supporting structure and temporary supporting method for floor bearing plate
CN110700579A (en) Truss type formwork support for overhanging cast-in-situ slab and using method thereof
CN2238872Y (en) Extension electrical lift well die carrier
CN2656540Y (en) Telescopic elevator shaft formwork
CN113481852A (en) Bridge wet joint formwork system capable of being continuously constructed
CN212201278U (en) Inverted supporting system of floor support plate
CN209976016U (en) Combined steel formwork keel support with steel bar protection layer support
CN109944447B (en) Multi-slope roof concrete pouring method
CN217268233U (en) Non-dismantling bottom die floor plate for different-surface construction
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN213062938U (en) Hang mould system structure
CN211923466U (en) Elevator shaft regularization operation platform
CN212336718U (en) Climbing formwork scaffold
CN210659227U (en) Exterior wall formwork system free of external scaffold
CN206784960U (en) Lower supporting type overhanging unloading platform
CN2434378Y (en) Creeping formwork construction appts for column shape building
CN213569261U (en) Attached lower hanging turnover plate type operating platform for installing tower crane
CN218117349U (en) A steel cat ladder for prefabricating staircase
CN219490682U (en) Basket hanging device for prestress construction of light T-pier cantilever cap beam
CN217299953U (en) Hang hole shutoff composite set

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee