CN110076888A - One kind being based on immersed tube prefabricated middle crawl space gallery construction template structure - Google Patents

One kind being based on immersed tube prefabricated middle crawl space gallery construction template structure Download PDF

Info

Publication number
CN110076888A
CN110076888A CN201910472281.3A CN201910472281A CN110076888A CN 110076888 A CN110076888 A CN 110076888A CN 201910472281 A CN201910472281 A CN 201910472281A CN 110076888 A CN110076888 A CN 110076888A
Authority
CN
China
Prior art keywords
trolley
side form
immersed tube
template
chamfering formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910472281.3A
Other languages
Chinese (zh)
Other versions
CN110076888B (en
Inventor
曲远辉
王磊
梁丰
阮明华
杨宝林
翟保进
苏艳
罗平
薛帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Second Harbor Engineering Co
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co, CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Second Harbor Engineering Co
Priority to CN201910472281.3A priority Critical patent/CN110076888B/en
Publication of CN110076888A publication Critical patent/CN110076888A/en
Application granted granted Critical
Publication of CN110076888B publication Critical patent/CN110076888B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • B28B13/065Removing the shaped articles from moulds by applying electric current or other means of discharging, e.g. pneumatic or hydraulic discharging means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/18Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article

Landscapes

  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The present invention relates to immersed tube prefabricated technical field of construction, are based on immersed tube prefabricated middle crawl space gallery construction template structure in particular to one kind.Including trolley, it is characterised in that: further include template;The template includes the backform for being fixed on trolley upper end, the side form for being connected to trolley two sides, the upper chamfering formwork being connected between backform and side form and articulated connection in the lower chamfering formwork of side form lower end;The lower chamfering formwork is the accordion structure for the shrinkable stretching, extension that multistage template is formed.The configuration of the present invention is simple, it is easy to operate, narrow aisle space small template demoulding and molding can be effectively adapted to, construction efficiency is high, and precision is high, has great promotional value.

Description

One kind being based on immersed tube prefabricated middle crawl space gallery construction template structure
Technical field
The present invention relates to immersed tube prefabricated technical field of construction, are based on immersed tube prefabricated middle crawl space gallery in particular to one kind Construction template structure.
Background technique
Immersed tube prefabricated is the present a kind of common method of submerged tunnel construction in China, and it is big to be widely used in port Zhuhai and Macao at present The construction of the immersed tube prefabricated projects such as bridge, Taihu Lake tunnel.For other submerged tunnel construction methods such as opposite shield method, has and apply The advantages that work is high-quality, project cost is low, and the construction period is short, and working security is high.But existing immersed tube prefabricated middle gallery is applied Work is all more spacious, convenient for the mechanized operation of gallery internal model and trolley device.But it is directed in immersed tunnel structure narrowly The gallery of band is constructed, and Immersed tunnel domain variability does not have any embodiment, the gallery construction of tang, template demoulding, molding at present And walking can all be different from spacious gallery because of narrow space, there is a problem of contraction or stretch difficulty, seriously affect and apply Work.
Summary of the invention
The purpose of the present invention is to solve the deficiency of the above background technology, provides one kind and is based on narrow sky in immersed tube prefabricated Between gallery construction template structure.
The technical solution of the present invention is as follows: a kind of be based on immersed tube prefabricated middle crawl space gallery construction template structure, including platform Vehicle, it is characterised in that: further include template;The template includes the backform for being fixed on trolley upper end, the side for being connected to trolley two sides Mould, the upper chamfering formwork being connected between backform and side form and articulated connection are in the lower chamfering formwork of side form lower end;It is fallen under described Angle formwork is the accordion structure for the shrinkable stretching, extension that multistage template is formed.
The further lower chamfering formwork includes the first chamfered part and the second chamfered part;First chamfered part The rotatable articulated connection in upper end is in side form lower end, and the rotatable articulated connection in lower end is in the second chamfered part upper end and the second corner portion Divide and forms gallery lower end chamfered part template.
Transverse support bar is provided between chamfering formwork under further two panels;The transverse support bar is along horizontal cross cloth It sets, both ends are respectively rotatably articulated and connected on the first chamfered part of two panels.
Vertical supporting bar is provided between the further lower chamfering formwork and trolley;The vertical supporting bar is along vertical Direction arrangement, upper/lower terminal are respectively rotatably articulated and connected on trolley and the second chamfered part.
The further backform transverse ends offer sliding slot;The sliding slot is the long hole perpendicular to upper chamfering formwork, The bolt that can be slid in sliding slot is equipped in sliding slot;The upper chamfering formwork is slidably connected in sliding slot by bolt.
The driving structure of driving side moulding/demoulding and molding is provided between the further trolley and side form.
The further driving structure includes more demoulding oil jars;The demoulding oil jar housing hinge is connected to trolley, Pushing end is articulated and connected in side form.
The further driving structure includes fixed sleeve on the car;The sleeve is axis and mould oil cylinder shaft Line parallel tubular structure is equipped with the guide rod that can be moved axially along sleeve in sleeve;Described guide rod one end is slidably connected In sleeve, the other end is articulated and connected in side form.
The further trolley lower end is provided with for driving trolley and the vertically movable jacking cylinder of template.
Advantages of the present invention has: 1, by the way that the lower chamfering formwork in template to be arranged to the collapsible knot of shrinkable stretching, extension Structure reduces lower chamfering formwork and occupies horizontal space in demoulding and molding, copes with the pouring construction of narrow space, solution Existing formwork structure determined the problem of narrow space is not easy stretching, extension use, there is great promotional value;
2, by setting two-part structure for lower chamfering formwork, the first chamfered part and the second chamfered part end are Be articulated and connected structure, can be by being rotated at coercive mechanism, and template of the invention is in demoulding or molding by secondary Rotation can be realized as, easy to operate;
3, lower chamfering formwork is fixed by setting vertical supporting bar and transverse support bar, lower chamfering formwork is completed After molding, by vertical and transverse support bar can be stable support, improve the stability of formwork structure;
4, by setting side form driving structure, horizontal space is saved, power output is provided for side form demoulding and molding, improves The degree of automation when side form molding and demoulding, reduces human input, improves construction efficiency;
5, by setting guide frame, mobile accuracy when side form demoulding and molding is improved;
6, by the way that sliding groove structure is arranged at backform both ends, be conducive to mobile tune of the upper chamfering formwork in demoulding and molding Section, under the collective effect of backform and side form, upper chamfering formwork can be quickly accurately positioned, easy to operate, and construction efficiency is high.
The configuration of the present invention is simple, it is easy to operate, narrow aisle space small template demoulding and molding can be effectively adapted to, is applied Work is high-efficient, and precision is high, has great promotional value.
Detailed description of the invention
Fig. 1: formwork structure schematic diagram of the invention;
Fig. 2: lower chamfering formwork contraction structure schematic diagram of the invention;
Fig. 3: upper chamfering formwork structural schematic diagram of the invention;
Wherein: 1-trolley;2-backforms;3-side forms;4-upper chamfering formworks;5-lower chamfering formworks;5.1-the first falls Angle part;5.2-the second chamfered part;6-transverse support bars;7-vertical supporting bars;8-sliding slots;9-bolts;10-demouldings Oil cylinder;11-sleeves;12-guide rods;13-jacking cylinders.
Specific embodiment
The following further describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
Such as Fig. 1~3, the formwork structure of the present embodiment includes four parts, respectively backform 2, upper chamfering formwork 4, side form 3 With lower chamfering formwork 5, wherein backform 2 is fixed on the upper end of trolley 1, and 1 lower end of trolley is provided with for driving trolley 1 and template knot The vertically movable jacking cylinder 13 of structure drives trolley 1 by driving jacking cylinder 13 when backform 2 needs to demould or mold The vertically movable demoulding or molding that backform 2 can be realized is carried out with backform 2.
Side form 3 is located at the both lateral sides of trolley 1, is provided with what driving side form 3 was demoulded and molded between trolley 1 and side form 3 Driving structure.As shown in Figure 1, driving structure includes more demoulding oil jars 10,10 housing hinge of demoulding oil jar is connected to trolley 1, Pushing end is articulated and connected in side form 3.
Driving structure further includes guide frame, as shown in Figure 1, guide frame includes the sleeve 11 being fixed on trolley 1, set Cylinder 11 is the axis tubular structure parallel with 10 axis of demoulding oil jar, and being equipped in sleeve 11 can lead along what sleeve 11 moved axially To bar 12,12 one end of guide rod is slidably connected to sleeve 11, and the other end is articulated and connected in side form 3.
When side form 3 needs to demould or mold, by driving demoulding oil jar 10, guiding role of the side form 3 in guide rod 12 The lower axial direction along sleeve 11 moves, and realizes that demoulding either molds.
The upper chamfering formwork 4 of the present embodiment is articulated and connected between backform 2 and side form 3, as shown in figure 3, backform 2 lateral two End offers sliding slot 8, and sliding slot 8 is the long hole perpendicular to upper chamfering formwork 4, and inserting of can sliding in sliding slot 8 is equipped in sliding slot 8 Pin 9, upper chamfering formwork 4 are slidably connected in sliding slot 8 by bolt 9.The upper chamfering formwork 4 of the present embodiment is in demoulding and molding What is utilized is the activation force of backform 2 and side form 3, that is, when demoulding or molding, upper chamfering formwork 4 is to follow backform 2 and side What mould 3 moved together, sliding slot 8 is the adjustment space reserved for upper chamfering formwork 4.It is driven by demoulding oil jar 10, side form 3 is realized Demoulding or molding, a part that upper chamfering formwork 4 is connect with side form 3 at this time follow side form 3 mobile.
As shown in Fig. 1~2, the upper end of the lower chamfering formwork 5 of the present embodiment is articulated and connected in the lower end of side form 3, lower chamfering Template 5 is the accordion structure for the shrinkable stretching, extension that multistage template is formed.Lower chamfering formwork 5 includes 5.1 He of the first chamfered part Second chamfered part 5.2, in 3 lower end of side form, lower end is rotatable hingedly to be connected the rotatable articulated connection in 5.1 upper end of the first chamfered part It is connected to 5.2 upper end of the second chamfered part and the second chamfered part 5.2 forms gallery lower end chamfered part template.
Instantly when chamfering formwork 5 is demoulded or molded, pass through electric block either other power-equipments driving the One chamfered part 5.1 is rotated around with the coercive mechanism of side form 3, drives the second chamfered part 5.2 around the hinge with the first chamfered part 5.1 Fulcrum rotation can be realized as the either molding of the demoulding to lower chamfering formwork 5 by rotating twice.The lower chamfering of the present embodiment Template 5 is foldable structure.
After the completion of molding, in order to which lower chamfering formwork 5 is fixed, the present embodiment is being set between chamfering formwork 5 under two panels It is equipped with transverse support bar 6, as shown in Figure 1, transverse support bar 6 arranges that both ends are respectively rotatably articulated and connected along horizontal cross In on the first chamfered part of two panels 5.1.Vertical supporting bar 7, vertical supporting bar 7 are provided between lower chamfering formwork 5 and trolley 1 It is arranged in a vertical direction, upper/lower terminal is respectively rotatably articulated and connected on trolley 1 and the second chamfered part 5.2.
When molding, drive 13 pushing tow trolley 1 of jacking cylinder and entire template vertically movable in place, 10 driving side of demoulding oil jar In place, the first chamfered part 5.1 and the second chamfered part 5.2, which is unfolded, makes lower chamfering mould for mould 3 and 4 transverse shifting of upper chamfering formwork Plate 5 stretches in place, installs vertical supporting bar 7 and lower chamfering formwork 5 is fixed in transverse support bar 6, complete molding.
After the completion of pouring, when needing to demould, vertical supporting bar 7 and transverse support bar 6 are dismantled, lifts the first chamfered part 5.1 and second chamfered part 5.2 fold lower chamfering formwork 5, driving demoulding oil jar 10 make side form 3 and upper chamfering formwork 4 to 1 side of trolley is mobile, and driving jacking cylinder 13 declines trolley 1 and template, completes demoulding.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (9)

1. one kind is based on immersed tube prefabricated middle crawl space gallery construction template structure, including trolley (1), it is characterised in that: also wrap Include template;The template includes the backform (2) for being fixed on trolley (1) upper end, the side form (3) for being connected to trolley (1) two sides, connection Upper chamfering formwork (4) and articulated connection between backform (2) and side form (3) is in the lower chamfering formwork (5) of side form (3) lower end; The lower chamfering formwork (5) is the accordion structure for the shrinkable stretching, extension that multistage template is formed.
2. as described in claim 1 a kind of based on immersed tube prefabricated middle crawl space gallery construction template structure, it is characterised in that: The lower chamfering formwork (5) includes the first chamfered part (5.1) and the second chamfered part (5.2);First chamfered part (5.1) the rotatable articulated connection in upper end is in side form (3) lower end, and the rotatable articulated connection in lower end is on the second chamfered part (5.2) End forms gallery lower end chamfered part template with the second chamfered part (5.2).
3. as claimed in claim 2 a kind of based on immersed tube prefabricated middle crawl space gallery construction template structure, it is characterised in that: Transverse support bar (6) are provided between chamfering formwork (5) under two panels;The transverse support bar (6) is along horizontal cross arrangement, both ends It is respectively rotatably articulated and connected on the first chamfered part of two panels (5.1).
4. a kind of as claimed in claim 2 or claim 3 be based on immersed tube prefabricated middle crawl space gallery construction template structure, feature exists In: vertical supporting bar (7) are provided between the lower chamfering formwork (5) and trolley (1);The vertical supporting bar (7) is along vertical Direction arrangement, upper/lower terminal are respectively rotatably articulated and connected on trolley (1) and the second chamfered part (5.2).
5. as described in claim 1 a kind of based on immersed tube prefabricated middle crawl space gallery construction template structure, it is characterised in that: The driving structure of driving side form (3) demoulding and molding is provided between the trolley (1) and side form (3).
6. as claimed in claim 5 a kind of based on immersed tube prefabricated middle crawl space gallery construction template structure, it is characterised in that: The driving structure includes more demoulding oil jars (10);Demoulding oil jar (10) housing hinge is connected to trolley (1), pushing end It is articulated and connected in side form (3).
7. as claimed in claim 6 a kind of based on immersed tube prefabricated middle crawl space gallery construction template structure, it is characterised in that: The driving structure includes the sleeve (11) being fixed on trolley (1);The sleeve (11) is axis and demoulding oil jar (10) axis The parallel tubular structure of line, sleeve (11) is interior to be equipped with the guide rod (12) that can be moved axially along sleeve (11);The guide rod (12) one end is slidably connected to sleeve (11), and the other end is articulated and connected in side form (3).
8. as described in claim 1 a kind of based on immersed tube prefabricated middle crawl space gallery construction template structure, it is characterised in that: Trolley (1) lower end is provided with for driving trolley (1) and the vertically movable jacking cylinder (13) of template.
9. as claimed in claim 1 or 8 a kind of based on immersed tube prefabricated middle crawl space gallery construction template structure, feature exists In: backform (2) transverse ends offer sliding slot (8);The sliding slot (8) is the long hole perpendicular to upper chamfering formwork (4), sliding The bolt (9) that can be slid in sliding slot (8) is equipped in slot (8);The upper chamfering formwork (4) is slidably connected by bolt (9) In sliding slot (8).
CN201910472281.3A 2019-05-31 2019-05-31 Construction template structure based on immersed tube prefabrication middle and narrow space corridor Active CN110076888B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910472281.3A CN110076888B (en) 2019-05-31 2019-05-31 Construction template structure based on immersed tube prefabrication middle and narrow space corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910472281.3A CN110076888B (en) 2019-05-31 2019-05-31 Construction template structure based on immersed tube prefabrication middle and narrow space corridor

Publications (2)

Publication Number Publication Date
CN110076888A true CN110076888A (en) 2019-08-02
CN110076888B CN110076888B (en) 2024-04-09

Family

ID=67423021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910472281.3A Active CN110076888B (en) 2019-05-31 2019-05-31 Construction template structure based on immersed tube prefabrication middle and narrow space corridor

Country Status (1)

Country Link
CN (1) CN110076888B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110450279A (en) * 2019-08-13 2019-11-15 中交第四航务工程局有限公司 It is a kind of for pouring the dry-docking system and method for arranging of tunneling boring precast concrete
CN111391074A (en) * 2020-04-01 2020-07-10 中交第四航务工程局有限公司 Immersed tube tunnel middle cavity template system and construction method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2238872Y (en) * 1994-12-27 1996-10-30 中国建筑第一工程局构件厂 Extension electrical lift well die carrier
JP2001049997A (en) * 1999-08-04 2001-02-20 Hokukon Co Ltd Panel for narrow carry-in passage, and its building method
DE202011109777U1 (en) * 2011-10-26 2012-02-07 Holzmann Gmbh & Co. Kg Foldable corner formwork element
JP3189496U (en) * 2013-09-10 2014-03-20 利子 上田 Corner chamfer for formwork
CN104763446A (en) * 2015-03-24 2015-07-08 粤水电轨道交通建设有限公司 Multi-functional trolley for subway station construction
CN107165192A (en) * 2017-06-16 2017-09-15 中建七局安装工程有限公司 A kind of pipe gallery segmentation brake type shaped steel door frame and its construction
CN107882064A (en) * 2017-10-30 2018-04-06 成都建工路桥建设有限公司 A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN107905254A (en) * 2017-11-16 2018-04-13 中铁四局集团有限公司 The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic
CN108661670A (en) * 2018-05-03 2018-10-16 十九冶成都建设有限公司 The construction method of piping lane construction is carried out using formwork jumbo
CN109184744A (en) * 2018-09-25 2019-01-11 中国建筑第八工程局有限公司 Plate device and its construction method for narrow space
CN109441484A (en) * 2018-11-26 2019-03-08 中铁隧道集团三处有限公司 A kind of formwork jumbo construction method of underground narrow space air hose passage construction
CN109469100A (en) * 2018-12-25 2019-03-15 平煤神马建工集团有限公司 A kind of piping lane template integral support device
CN210256639U (en) * 2019-05-31 2020-04-07 中交武汉港湾工程设计研究院有限公司 Narrow space corridor construction template structure in immersed tube prefabrication

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2238872Y (en) * 1994-12-27 1996-10-30 中国建筑第一工程局构件厂 Extension electrical lift well die carrier
JP2001049997A (en) * 1999-08-04 2001-02-20 Hokukon Co Ltd Panel for narrow carry-in passage, and its building method
DE202011109777U1 (en) * 2011-10-26 2012-02-07 Holzmann Gmbh & Co. Kg Foldable corner formwork element
JP3189496U (en) * 2013-09-10 2014-03-20 利子 上田 Corner chamfer for formwork
CN104763446A (en) * 2015-03-24 2015-07-08 粤水电轨道交通建设有限公司 Multi-functional trolley for subway station construction
CN107165192A (en) * 2017-06-16 2017-09-15 中建七局安装工程有限公司 A kind of pipe gallery segmentation brake type shaped steel door frame and its construction
CN107882064A (en) * 2017-10-30 2018-04-06 成都建工路桥建设有限公司 A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation
CN107905254A (en) * 2017-11-16 2018-04-13 中铁四局集团有限公司 The construction method of mould trolley in a kind of pipe gallery formwork integrated hydraulic
CN108661670A (en) * 2018-05-03 2018-10-16 十九冶成都建设有限公司 The construction method of piping lane construction is carried out using formwork jumbo
CN109184744A (en) * 2018-09-25 2019-01-11 中国建筑第八工程局有限公司 Plate device and its construction method for narrow space
CN109441484A (en) * 2018-11-26 2019-03-08 中铁隧道集团三处有限公司 A kind of formwork jumbo construction method of underground narrow space air hose passage construction
CN109469100A (en) * 2018-12-25 2019-03-15 平煤神马建工集团有限公司 A kind of piping lane template integral support device
CN210256639U (en) * 2019-05-31 2020-04-07 中交武汉港湾工程设计研究院有限公司 Narrow space corridor construction template structure in immersed tube prefabrication

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱树旺;: "高层建筑狭窄空间伸缩缝墙体支模施工技术的探析", 河南建材, no. 03 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110450279A (en) * 2019-08-13 2019-11-15 中交第四航务工程局有限公司 It is a kind of for pouring the dry-docking system and method for arranging of tunneling boring precast concrete
CN111391074A (en) * 2020-04-01 2020-07-10 中交第四航务工程局有限公司 Immersed tube tunnel middle cavity template system and construction method

Also Published As

Publication number Publication date
CN110076888B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
CN110076888A (en) One kind being based on immersed tube prefabricated middle crawl space gallery construction template structure
CN106426525A (en) Prefabricated pipe rack mold
CN202165096U (en) Tunnel steel arch frame jacking device
CN210256639U (en) Narrow space corridor construction template structure in immersed tube prefabrication
CN102191751B (en) Hydraulic internal mold for asymmetric box girder
CN211250585U (en) Movable prefabricated box girder template system
CN210525428U (en) Telescopic whole window frame mould
CN204078876U (en) The automatic reception bar reinforcing steel bar mechanism of conveying bar reinforcing bar equipment
CN208617288U (en) A kind of lifting device
CN208420289U (en) A kind of accurate type can assemble test machine
CN104289568B (en) Bending device
CN105064700A (en) Simple wall board installing vehicle
CN213500689U (en) Multifunctional mold temperature controller
CN201470834U (en) Hardening and drying line for investment casting of mold shells
CN208932797U (en) A kind of turnable suspender of concrete precast block
CN204607530U (en) A kind of large oblique top assembling Special crane
CN208650616U (en) A kind of expansible stereo garage of rotary and lifting formula
CN205521893U (en) Novel hydraulic pressure brick cutting machine
CN203920142U (en) Cam profile curve plotter
CN206220494U (en) A kind of stairway die
CN209774577U (en) Folding support
CN212811419U (en) Base structure of rare earth permanent magnet synchronous motor
CN221136293U (en) Quick shedder of precast concrete member
CN109057360A (en) A kind of concrete wire pole inside steel bar meter binding apparatus
CN101618436B (en) Investment casting shell making vulcanizing and drying production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant