CN221138542U - Assembled type water multifunctional operation platform - Google Patents

Assembled type water multifunctional operation platform Download PDF

Info

Publication number
CN221138542U
CN221138542U CN202322013440.8U CN202322013440U CN221138542U CN 221138542 U CN221138542 U CN 221138542U CN 202322013440 U CN202322013440 U CN 202322013440U CN 221138542 U CN221138542 U CN 221138542U
Authority
CN
China
Prior art keywords
main
positioning
main body
floating body
multifunctional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322013440.8U
Other languages
Chinese (zh)
Inventor
刘富华
仲佳豪
李文超
程书佳
刘亚鑫
刘军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Jiecheng Foundation Engineering & Machine Co ltd
Original Assignee
Kunming Jiecheng Foundation Engineering & Machine Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Jiecheng Foundation Engineering & Machine Co ltd filed Critical Kunming Jiecheng Foundation Engineering & Machine Co ltd
Priority to CN202322013440.8U priority Critical patent/CN221138542U/en
Application granted granted Critical
Publication of CN221138542U publication Critical patent/CN221138542U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides an assembled water multifunctional operation platform, and relates to the field of water operation. The utility model provides an assembled multifunctional working platform on water, includes the main body, the main body sets up to detachable mechanism, the both sides of main body are provided with limit body, be provided with multifunctional crane in the subsidence berth of main body, the silt collecting well is installed to multifunctional crane's hanging end, the both sides of limit body are provided with positioner, the top surface of main body and limit body is provided with location connecting device. Through setting up a plurality of body, the concatenation mode adopts upper end flange bolt to fix, and the fixed mode of lower extreme trip can make the spud anchor platform unable removal, improves the stability of platform, improves continuity and the smoothness of work, arranges more nimble conveniently and adjusts, improves work efficiency.

Description

Assembled type water multifunctional operation platform
Technical Field
The utility model relates to the technical field of water operation, in particular to an assembled water multifunctional operation platform.
Background
The water operation platform is generally used for water engineering and construction tasks such as river dredging, ocean wind power and the like, the projects generally need to be spanned among different water areas such as rivers, lakes or oceans, the water operation platform can be effectively transferred from one area to another through the assembly type water operation platform, the water operation platform spans water area barriers, required infrastructure is provided for the engineering tasks, flexibility and adaptability are provided for the engineering tasks, the water operation platform can be quickly disassembled and assembled according to specific requirements, and transported to different water areas and work sites so as to meet the requirements of specific projects, and engineering staff can better cope with challenges under different areas and water area conditions through the flexibility, so that adaptive construction is realized.
The Chinese patent publication No. CN115404862A discloses a construction platform for water operation, which drives the structure of each second telescopic supporting leg sliding along the first direction to be independent of each other by realizing front-back and left-right walking, and does not need complex structure association between the two structures, so that the table top of the main platform is simpler and cleaner, but the existing water operation platform is inconvenient in transportation, free transition transportation of the water platform cannot be realized, and the work efficiency of the water area is low.
Disclosure of utility model
(One) solving the technical problems
Aiming at the defects of the prior art, the utility model provides an assembled water multifunctional operation platform, which solves the problems that the existing water operation platform cannot realize free transition and has low work efficiency across water areas during transportation.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the utility model provides an assembled multifunctional working platform on water, includes the main body, the main body sets up to detachable mechanism, the both sides of main body are provided with the limit body, be provided with multifunctional crane in the subsidence berth of main body, the both sides of limit body are provided with positioner, the top surface of main body and limit body is provided with location connecting device.
Through the technical scheme, the disassembly and assembly can be conveniently and rapidly carried out, so that the convenient transition transportation of the water operation platform is realized, and meanwhile, the multifunctional crane can carry out operations such as water lifting and hoisting, well pipe installation, tubular pile construction and the like, and has strong functionality.
Preferably, the detachable mechanism comprises two independent floating bodies, the top ends of the two independent floating bodies are fixedly connected through flange bolts, the bottom ends of the two independent floating bodies are fixedly connected through clamping hooks, and the side floating bodies are fixedly connected with the main floating bodies through flange bolts and the clamping hooks.
Preferably, the stern department of main body installs main link up the oar, four corners in the outside of main body install the bollard, the top of main body is provided with the compartment and adds and be equipped with the window lid, the top of main body is provided with the subsidence hold, the inside main diesel engine that is provided with of main body stern, one side of main diesel engine is provided with the switch board.
Through the technical scheme, the main floating body can pass through the bridge opening more conveniently and rapidly, and the time cost is reduced.
Preferably, the top of limit body is provided with the transportation cabin, limit oar machine is hung to the stern department of limit body, the bollard is installed in the front and back both ends outside installation of limit body and is fixed, every limit body top has a plurality of compartment, install the immersible pump in the compartment at limit body top, the hull edge fixedly connected with fence board of limit body.
Through the technical scheme, the floating body is convenient to overhaul, and water injection and water pumping and loading are convenient when the floating body is spliced with the side floating body on water.
Preferably, the positioning device comprises a plurality of positioning bases, the positioning bases are fixedly connected with the side walls of the side floating bodies, the positioning bases are respectively located on one sides of the side floating bodies, positioning piles are slidably connected inside the positioning bases, a plurality of limiting holes are formed in the positioning piles, the distances among the plurality of limiting holes are the same, a pin shaft is slidably connected to one side of the top end of each positioning base, and one end of each pin shaft is slidably connected with each limiting hole inside each positioning pile.
Through above-mentioned technical scheme, can make things convenient for the platform at the during operation, stabilize the hull through the spud, prevent its removal.
Preferably, the positioning connection device comprises sliding grooves, the sliding grooves are respectively positioned on two sides of the top surface of the ship, the sliding grooves penetrate through the main floating body and the side floating body, I-steel is connected in a sliding mode in the sliding grooves, a plurality of positioning pins are arranged on two sides of the I-steel, and the I-steel is fixedly connected with the positioning pins through bolts.
Through the technical scheme, the floating body can independently navigate through the narrower bridge and culvert, meanwhile, in the aspects of inspection and maintenance, the whole platform does not need to be lifted out of the water surface, the workload and time required by maintenance and maintenance are greatly reduced, and the applicability and the operation efficiency of the platform are improved.
Working principle: after the main floating body 1 and the side floating body 2 pass through the bridge hole respectively, the main floating body 1 and the side floating body 2 are combined and close together by cables through the mooring piles 7 of the main floating body 1 and the side floating body 2, water is injected into the front and rear cabins of the side floating body 2 through the suction pumps arranged on the ship, the overall balance of the operation platform is realized, the heights of the side floating bodies 2 on the two sides are basically consistent with that of the starboard of the main floating body 1, the sliding grooves 8 of the main floating body 1 and the sliding grooves 8 of the side floating body 2 are aligned by ship operators, the I-steel 9 connected in a positioning manner in the main floating body 1 is pulled out into the sliding grooves 8 of the side floating body 2, fixing bolts are inserted, the side floating bodies 2 on the two sides are connected and fixed, the rear crawler crane is started to lift the positioning piles 12 on the two sides, and then the water in each allocation cabin of the main floating body 1 and the side floating body 2 is slowly extracted, in order to operate conveniently and quickly, the operation platform on the water is provided with 4 submersible pumps 19, and the submersible pumps 12 are manually taken out and put into the river and the mooring ropes to be hung on the mooring piles 7 when water allocation is needed. When the split main floating body 1 needs to pass through the shorter bridge opening, the draft level of the split main floating body 1 should be observed in advance, for example, the freeboard is higher than 0.5 meter, the pump water should be pumped and loaded into the compartment 18 of the main floating body 1 in time, the balance of the loading is noted, and the split main floating body 1 slowly and safely passes through the bridge opening when the freeboard is lower than 0.5 meter. Meanwhile, when in transportation and storage, the water operation platform can be split into a plurality of independent floating bodies, and then the floating bodies can be conveniently transported and stored separately, so that the difficulty and the cost of transportation and storage can be reduced, and more flexibility and selectivity are provided.
(III) beneficial effects
The utility model provides an assembled water multifunctional operation platform. The beneficial effects are as follows:
1. According to the utility model, the main floating bodies and the side floating bodies are arranged, the upper flange bolts are adopted to fix the main floating bodies, the lower clamping hooks are adopted to fix the main floating bodies, I-steel connected in a positioning manner in the main floating bodies is pulled out into the side floating body sliding grooves, and the fixing bolts are inserted through the positioning pins, so that the main floating bodies and the side floating bodies are fixed, the operation is convenient and quick, and the overall working efficiency is improved.
2. According to the utility model, the positioning piles are arranged on the side walls of the side floating bodies, and before the platform works, the positioning piles are moved to the bottom of the river bed by moving the positioning piles, and the pin shafts are inserted into the limiting holes in the positioning columns, so that the positioning pile anchoring platform cannot move, the stability and the reliability of the platform are improved, and the working efficiency is further improved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a top cross-sectional view of the present utility model;
FIG. 3 is a side perspective view of the present utility model;
FIG. 4 is a rear perspective view of the present utility model
FIG. 5 is a side plan view of the present utility model;
fig. 6 is a top plan view of the present utility model.
Wherein, 1, a main floating body; 2. an edge floating body; 3. sinking the cabin; 4. a transportation bunk; 5. a fence panel; 6. a hoisting hole; 7. mooring bollards; 8. a chute; 9. i-steel; 10. a positioning pin; 11. positioning a base; 12. positioning piles; 13. a pin shaft; 14. a main paddle hanging machine; 15. a side-mounted paddle machine; 16. a hook; 17. a flange bolt; 18. a compartment; 19. submersible pump; 20. a main diesel engine; 21. a control cabinet; 22. the multifunctional crane, 23, collection siltation well.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Embodiment one:
As shown in fig. 1-4, the embodiment of the utility model provides an assembled water multifunctional working platform, which comprises a main floating body 1, wherein the main floating body 1 is provided with a detachable mechanism, the detachable mechanism comprises two independent floating bodies, the top ends of the two independent floating bodies are fixedly connected through flange bolts 17, and the bottom ends of the main floating bodies 1 are fixedly connected through clamping hooks 16. The stern department of main body 1 installs main link up the oar machine 14, and four corners in the outside of main body 1 install bollard 7, and the top of main body 1 is provided with compartment 18 and adds and be equipped with the window lid, and the top of main body 1 is provided with the subsidence hold 3, and main body 1 stern inside is provided with main diesel engine 20, and one side of main diesel engine 20 is provided with switch board 21.
The two sides of the main floating body 1 are provided with side floating bodies 2, the top of each side floating body 2 is provided with a transportation cabin 4, the stern of each side floating body 2 is provided with a side suspension paddle machine 15, the mooring bolsters 7 are fixedly arranged on the outer sides of the front end and the rear end of each side floating body 2, the top of each side floating body 2 is provided with a plurality of compartments 18, and the compartments 18 at the top of each side floating body 2 are internally provided with submersible pumps 19.
The top end surfaces of the main floating body 1 and the side floating body 2 are provided with sliding positioning connection devices, the sliding positioning connection devices comprise sliding grooves 8, the sliding grooves 8 are respectively located on two sides of the top surface of the ship, the sliding grooves 8 penetrate through the main floating body 1 and the side floating body 2, I-steel 9 is connected in a sliding mode in the sliding grooves 8, a plurality of positioning pins 10 are arranged on two sides of the I-steel 9, the ship body can be stabilized through positioning piles 12 when the platform works conveniently, movement of the ship body is prevented, and the I-steel 9 and the positioning pins 10 are fixedly connected through bolts. The sliding connection device between the main floating body 1 and the side floating body 2 can enable the main floating body 1 and the side floating body 2 to independently navigate and pass through respectively when the platform passes through a narrower bridge hole, the bridge is not required to be hoisted integrally, the bridge is more convenient and quick, and the time cost is reduced; meanwhile, the assembly type structure can be disassembled and assembled rapidly, so that convenient transition transportation of the water operation platform is realized.
The ship body edge fixedly connected with fence board 5 of limit body 2, be provided with multi-functional crane 22 in the subsidence bunk 3 of main body 1, can carry out operation such as hoist and mount on water, well pipe installation, tubular pile are beaten, the functional stronger, limit body 2 one side is equipped with 2 sets of locating base 11, locating base 11 and limit body 2 lateral wall fixed connection, locating base 11's inside sliding connection has locating pile 12, locating pile 12's inside is provided with a plurality of spacing hole, and the distance between a plurality of spacing hole is the same, locating base 11's top one side sliding connection has round pin axle 13, the one end of round pin axle 13 and the spacing hole sliding connection of locating pile 12 inside, the locating pile can anchor the platform unable removal, stability and the reliability of platform are improved, further improve platform work efficiency on water.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an assembled multi-functional operation platform on water, includes main body (1), its characterized in that: the multifunctional floating body is characterized in that the main floating body (1) is arranged to be a detachable mechanism, side floating bodies (2) are arranged on two sides of the main floating body (1), a multifunctional crane (22) is arranged in a sinking cabin (3) of the main floating body (1), a silt collecting well (23) is arranged at a hanging end of the multifunctional crane (22), positioning devices are arranged on two sides of the side floating body (2), and positioning connection devices are arranged on top surfaces of the main floating body (1) and the side floating body (2).
2. The fabricated waterborne multifunctional work platform according to claim 1, wherein: the detachable mechanism comprises two independent floating bodies, the top ends of the two independent floating bodies are fixedly connected through flange bolts (17), the bottom ends of the two independent floating bodies are fixedly connected through clamping hooks (16), and the side floating bodies (2) are fixedly connected with the main floating bodies (1) through the flange bolts (17) and the clamping hooks (16).
3. The fabricated waterborne multifunctional work platform according to claim 1, wherein: main oar machine (14) are installed in stern department of main body (1), four corners in the outside of main body (1) are installed bollard (7), the top of main body (1) is provided with compartment (18) and adds and is equipped with the window lid, the top of main body (1) is provided with subsides bunk (3), the inside main diesel engine (20) that is provided with in main body (1) stern, one side of main diesel engine (20) is provided with switch board (21).
4. A fabricated waterborne multi-purpose work platform according to claim 3, wherein: the top of limit body (2) is provided with transportation cabin position (4), limit paddle hanging machine (15) are installed to the stern department of limit body (2), both ends outside installation is fixed around limit body (2) are installed in bollard (7), every limit body (2) top has a plurality of compartment (18), install immersible pump (19) in compartment (18) at limit body (2) top, hull edge fixedly connected with fence board (5) of limit body (2).
5. The fabricated waterborne multifunctional work platform according to claim 1, wherein: the positioning device comprises a plurality of positioning bases (11), the positioning bases (11) are fixedly connected with the side walls of the side floating bodies (2), the positioning bases (11) are respectively located at two sides of the side floating bodies (2), positioning piles (12) are slidably connected inside the positioning bases (11), a plurality of limiting holes are formed in the positioning piles (12), the distances between the limiting holes are the same, a pin shaft (13) is slidably connected to one side of the top end of each positioning base (11), and one end of each pin shaft (13) is slidably connected with the limiting hole in each positioning pile (12).
6. The fabricated waterborne multifunctional work platform according to claim 1, wherein: the positioning connection device comprises sliding grooves (8), the sliding grooves (8) are respectively arranged on two sides of the top surface of the ship, the sliding grooves (8) penetrate through the main floating body (1) and the side floating body (2), I-steel (9) is connected in a sliding mode in the sliding grooves (8), a plurality of positioning pins (10) are arranged on two sides of the I-steel (9), and the I-steel (9) is fixedly connected with the positioning pins (10) through bolts.
CN202322013440.8U 2023-07-28 2023-07-28 Assembled type water multifunctional operation platform Active CN221138542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322013440.8U CN221138542U (en) 2023-07-28 2023-07-28 Assembled type water multifunctional operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322013440.8U CN221138542U (en) 2023-07-28 2023-07-28 Assembled type water multifunctional operation platform

Publications (1)

Publication Number Publication Date
CN221138542U true CN221138542U (en) 2024-06-14

Family

ID=91423620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322013440.8U Active CN221138542U (en) 2023-07-28 2023-07-28 Assembled type water multifunctional operation platform

Country Status (1)

Country Link
CN (1) CN221138542U (en)

Similar Documents

Publication Publication Date Title
JPS6315381Y2 (en)
CN101774422B (en) Novel offshore installation construction resource-combined type pontoon barge
CN202007400U (en) Marine foundation construction platform for jacket construction
CN101837929A (en) Operation method for lifting fan for barge in shoal area
KR101354383B1 (en) Working platform for underwater explosion work using small barges
CA1040440A (en) Method and apparatus for rapid erection of offshore towers
JPS62215711A (en) Ocean structure and method for anchoring the same
CN110130342B (en) Piling equipment and piling method for underwater reinforced concrete prefabricated sheet pile construction
CN108222069A (en) A kind of underwater immersed tube, the device and construction method for setting up underwater immersed tube
CN221138542U (en) Assembled type water multifunctional operation platform
CN102206938A (en) Novel method for installing upper part block of offshore platform
CN116767438A (en) Assembled type water multifunctional operation platform
CN207143999U (en) A kind of underwater immersed tube and the device for setting up underwater immersed tube
JP7291302B2 (en) Semi-submersible submersible box transport installation integrated ship and construction process
WO2022166288A1 (en) Multifunctional integral displacement over-water platform
CN213625592U (en) Lifting, placing and anchoring device for leveling frame in riprap leveling ship
TWI834746B (en) Work platform vessel equipped with crane and method of using the crane
CN115704209A (en) Shallow water area offshore platform installation method
CN220284798U (en) Double-body piling ship suitable for shallow water area
CN219989468U (en) Suspended positioning platform for offshore pile sinking
CN2642836Y (en) Device for hoisting and positioning and ramming concrete pile
CN215926122U (en) Platform equipment for cofferdam foundation cleaning
CN216918395U (en) Semi-submersible type marine hoisting platform
CN218540749U (en) Ship floating platform auxiliary pile foundation structure capable of being movably positioned
CN113585382B (en) Counter weight formula platform equipment that clear base of cofferdam was used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant