CN220365154U - Multi-scene adaptive embedded foundation fixing structure - Google Patents

Multi-scene adaptive embedded foundation fixing structure Download PDF

Info

Publication number
CN220365154U
CN220365154U CN202321646368.6U CN202321646368U CN220365154U CN 220365154 U CN220365154 U CN 220365154U CN 202321646368 U CN202321646368 U CN 202321646368U CN 220365154 U CN220365154 U CN 220365154U
Authority
CN
China
Prior art keywords
groups
steel plate
embedded foundation
buried
quick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202321646368.6U
Other languages
Chinese (zh)
Inventor
戴劲
魏盛杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Ruifan Innovation Technology Development Co ltd
Original Assignee
Chongqing Ruifan Innovation Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Ruifan Innovation Technology Development Co ltd filed Critical Chongqing Ruifan Innovation Technology Development Co ltd
Priority to CN202321646368.6U priority Critical patent/CN220365154U/en
Application granted granted Critical
Publication of CN220365154U publication Critical patent/CN220365154U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a multi-scene adaptive embedded foundation fixing structure, which comprises an embedded foundation fixing structure body; the embedded foundation fixed knot constructs the body including the embedded foundation main structure, the embedded foundation main structure is formed by first steel sheet and second steel sheet combination to mutual welding forms the frame construction that the integration set up, first steel sheet and second steel sheet all adopt two sets of settings, have all seted up the wire hole on two sets of first steel sheets of embedded foundation main structure to be connected with the equipment pipeline through the wire hole, and be connected with the control computer lab through the equipment pipeline. The utility model has simple integral structure and adopts a unified standard structure to realize the high efficiency and the flexibility of pre-buried installation.

Description

Multi-scene adaptive embedded foundation fixing structure
Technical Field
The utility model relates to the technical field of building foundation equipment installation, in particular to a multi-scene adaptive embedded foundation fixing structure.
Background
The pre-buried (or pre-set) is the position of the pipeline, the electric circuit and the like which are reserved in advance in the building structure, so that the subsequent installation and maintenance are convenient. The pre-buried mode has a plurality of, and is common including: and (3) embedding a sleeve: in the construction process of the building concrete structure, a pipe hole is arranged, and then a steel pipe or a PVC pipe is arranged in the pipe hole and fixed, so that the effect of hiding the pipeline and the circuit is achieved.
And (3) a pre-buried groove method: and (3) a shallower notch is cut in advance along the reserved pipeline position (such as right below the wall) designed on the building wall, a cable pipeline to be laid is put into the notch, and mortar is used for filling and sealing.
And (3) embedding a cassette method: a certain space is reserved in the building structure, and various devices and pipelines are consumed by installing prefabricated cassettes, so that the interior of the building is tidy and attractive.
Other forms are pre-buried: the embedding method is also used in special occasions, such as insert plate welding or rack type embedding of steel members, and the proper embedding method is selected according to actual requirements.
Whether an embedded method is adopted, a traditional embedded structure is generally adopted to customize embedded parts on site during construction, so that the conditions of long construction period, high manufacturing cost, non-uniform standard, low process standard and the like are caused.
In order to solve the defects of the technical problems, a multi-scene adaptive embedded foundation fixing structure is developed.
Disclosure of Invention
The utility model aims to provide a multi-scene adaptive embedded foundation fixing structure which is simple in overall structure and adopts a unified standard structure to realize high efficiency and flexibility of embedded installation.
In order to achieve the above purpose, the present utility model provides the following technical solutions: a multi-scene adaptive pre-buried foundation fixing structure comprises a pre-buried foundation fixing structure body; the pre-buried foundation fixed knot constructs the body including pre-buried basic major structure, its characterized in that: the embedded foundation main structure is formed by combining a first steel plate and a second steel plate, and the first steel plate and the second steel plate are welded with each other to form a frame structure which is integrally arranged, the first steel plate and the second steel plate are arranged in two groups, wire passing holes are formed in the two groups of the first steel plates of the embedded foundation main structure, the embedded foundation main structure is connected with an equipment pipeline through the wire passing holes, and the equipment pipeline is connected with a control machine room.
By adopting the technical scheme, the utility model has simple integral structure and adopts a unified standard structure to realize the high efficiency and flexibility of pre-buried installation
The utility model is further provided with:
the wire passing holes are arranged in a plurality of groups and are uniformly formed in the first steel plate.
The utility model is further provided with:
clamping grooves are formed in two groups of second steel plates of the embedded foundation main structure, and are arranged in multiple groups and uniformly distributed along the transverse direction of the second steel plates.
The utility model is further provided with:
two sets of equal fixed mounting has the fast-assembling support on the second steel sheet, the fast-assembling support is L type setting to fixed mounting has the fastener on the vertical board side of fast-assembling support terminal surface, and the fastener card of fast-assembling support carries out the block connection in going into the draw-in groove, and carries out fixed connection through fastening bolt.
By adopting the technical scheme, the connection and fixation of the fast-assembly bracket and the embedded foundation main structure are realized.
The utility model is further provided with:
the screw holes of two groups of first steel plates are arranged oppositely, the screw holes of the two groups of first steel plates are connected with lengthening bolts through internal threads, and the lengthening bolts are arranged in four groups.
The utility model is further provided with:
the quick-mounting bracket is arranged in four groups, a plurality of groups of connecting holes are formed in the transverse plates of the quick-mounting bracket, bolts are connected with the connecting holes through internal threads, and the heights of the bolts are shorter than those of the lengthened bolts.
Compared with the prior art, the utility model has the beneficial effects that:
the utility model has simple integral structure and adopts a unified standard structure to realize the high efficiency and the flexibility of pre-buried installation.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present utility model;
FIG. 2 is a schematic view of a part of the structure of an embodiment of the present utility model;
FIG. 3 is an exploded view of an embodiment of the present utility model;
in the figure: 1. embedding a foundation main structure; 2. a wire through hole; 3. screw holes; 4. a clamping groove; 5. lengthening the bolt; 6. a fast-assembling bracket; 7. a connection hole; 8. a bolt; 10. a first steel plate; 11. and a second steel plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: a multi-scene adaptive pre-buried foundation fixing structure comprises a pre-buried foundation fixing structure body; the embedded foundation fixing structure body comprises an embedded foundation main structure 1, wherein the embedded foundation main structure 1 is formed by combining a first steel plate 10 and a second steel plate 11, and the first steel plate 10 and the second steel plate 11 are welded with each other to form an integrally arranged frame structure, the first steel plate 10 and the second steel plate 11 are arranged in two groups, the two groups of first steel plates 10 of the embedded foundation main structure 1 are provided with wire through holes 2, are connected with equipment pipelines through the wire through holes 2, and are connected with a control machine room through the equipment pipelines; the wire passing holes 2 are arranged in a plurality of groups and are uniformly formed in the first steel plate 10, and equipment pipelines reach the control machine room in the inner space of the embedded structure main structure 1 through the wire passing holes 2.
Referring to fig. 1-3, in order to solve the problems that the existing embedded structure has no standard structure, the conventional embedded structure generally adopts to customize embedded parts on a construction site according to the site situation, which results in long construction period, high manufacturing cost, non-uniform standard, low process standard and the like;
clamping grooves 4 are formed in two groups of second steel plates 11 of the embedded foundation main structure 1, and the clamping grooves 4 are arranged in a plurality of groups and are uniformly distributed along the transverse direction of the second steel plates 11; the two groups of second steel plates 11 are fixedly provided with quick-mounting brackets 6, the quick-mounting brackets 6 are L-shaped, clamping pieces are fixedly arranged on the non-end surfaces of the vertical plate sides of the quick-mounting brackets 6, the clamping pieces of the quick-mounting brackets 6 are clamped into the clamping grooves 4 for clamping connection, and the quick-mounting brackets 6 are fixedly connected with the embedded foundation main structure 1 through fastening bolts, so that the fixed connection between the quick-mounting brackets 6 and the embedded foundation main structure 1 is realized;
a plurality of groups of screw holes 3 are formed in the two groups of first steel plates 10, the screw holes of the upper and lower groups of first steel plates 10 are arranged oppositely, the screw holes 3 are internally connected with extension bolts 5 in a threaded manner, and the extension bolts 5 are arranged in four groups and are positioned at four corners of the embedded foundation main structure 1;
the quick-mounting bracket 6 is arranged in four groups, a plurality of groups of connecting holes 7 are formed in the transverse plates of the quick-mounting bracket 6, bolts 8 are connected with the connecting holes 7 in a threaded mode, and the height of each bolt 8 is shorter than that of the lengthening bolt 5.
The application flow and the working principle of the utility model are as follows:
the utility model can be installed according to actual site conditions and equipment during installation, and the embedded foundation main structure can be integrally embedded into the ground if the required installation equipment needs permanent installation and fixation;
if the embedded main structure is not installed and fixed in a buried way, the embedded main structure is directly and fixedly installed on the ground only through the lengthened bolt 5;
if when the pre-buried main structure is not consistent with the buried installation and is fixed on the ground through the extension bolt, the clamping piece of the quick-mounting bracket 6 is clamped into the clamping groove 4 to be clamped and connected, and then the quick-mounting bracket is fixedly connected through the fastening bolt, so that the fixed connection between the pre-buried main foundation structure 1 and the quick-mounting bracket 6 can be realized, and the quick-mounting bracket is fixed on two sides of the pre-buried main foundation structure, so that the pre-buried main foundation structure forms a very wide ground stress surface, and the mounting and fixing of different equipment can be met.
When in actual installation, a plurality of embedded foundation main structures can be connected through extension bolts to form a required embedded main body frame so as to meet the requirement of a fixed support structure for on-site uneven ground and water surface installation; and all that is not described in detail in this specification is within the skill of the art.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (3)

1. A multi-scene adaptive pre-buried foundation fixing structure comprises a pre-buried foundation fixing structure body; the pre-buried foundation fixed knot constructs the body including pre-buried basic major structure, its characterized in that: the embedded foundation main structure is formed by combining a first steel plate and a second steel plate, and the first steel plate and the second steel plate are welded with each other to form an integrally arranged frame structure, the first steel plate and the second steel plate are arranged in two groups, the two groups of first steel plates of the embedded foundation main structure are provided with wire passing holes, and the embedded foundation main structure is connected with an equipment pipeline through the wire passing holes, so that the equipment pipeline is connected with a control machine room;
clamping grooves are formed in two groups of second steel plates of the embedded foundation main structure, and are uniformly distributed along the transverse direction of the second steel plates in a plurality of groups;
the two groups of second steel plates are fixedly provided with quick-mounting brackets which are L-shaped, clamping pieces are fixedly arranged on the non-end surfaces of the vertical plate sides of the quick-mounting brackets, and the clamping pieces of the quick-mounting brackets are clamped into the clamping grooves for clamping connection and are fixedly connected through fastening bolts;
the quick-mounting bracket is arranged in four groups, a plurality of groups of connecting holes are formed in the transverse plates of the quick-mounting bracket, bolts are connected with the connecting holes through internal threads, and the heights of the bolts are shorter than those of the lengthened bolts.
2. The multi-scenario adaptive pre-buried foundation fixing structure according to claim 1, wherein: the wire passing holes are arranged in a plurality of groups and are uniformly formed in the first steel plate.
3. The multi-scenario adaptive pre-buried foundation fixing structure according to claim 1, wherein: the screw holes of two groups of first steel plates are arranged oppositely, the screw holes of the two groups of first steel plates are connected with lengthening bolts through internal threads, and the lengthening bolts are arranged in four groups.
CN202321646368.6U 2023-06-27 2023-06-27 Multi-scene adaptive embedded foundation fixing structure Active CN220365154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321646368.6U CN220365154U (en) 2023-06-27 2023-06-27 Multi-scene adaptive embedded foundation fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321646368.6U CN220365154U (en) 2023-06-27 2023-06-27 Multi-scene adaptive embedded foundation fixing structure

Publications (1)

Publication Number Publication Date
CN220365154U true CN220365154U (en) 2024-01-19

Family

ID=89519534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321646368.6U Active CN220365154U (en) 2023-06-27 2023-06-27 Multi-scene adaptive embedded foundation fixing structure

Country Status (1)

Country Link
CN (1) CN220365154U (en)

Similar Documents

Publication Publication Date Title
CN107060151B (en) Assembled partition wall
CN220365154U (en) Multi-scene adaptive embedded foundation fixing structure
CN205369954U (en) Positioner is assembled to truss steel pipe
CN219100584U (en) Wall aluminum honeycomb panel stone pendant adjusting screw mounting structure
CN111593836A (en) Combined light steel keel wall module and mounting method thereof
CN207775743U (en) A kind of rectangle corrugated plating culvert for culvert linear
CN216920996U (en) Assembly type wall body structure based on pipeline separation
CN214657703U (en) Assembly type building
CN210685112U (en) Steel-concrete combined prefabricated bottom plate assembly for laminated slab and wall
CN113356409A (en) Pipeline integrated installation device and method
CN219732611U (en) Positioning and mounting device for assembled factory building external wall panel
CN211118002U (en) Supporting and fixing part for electromechanical pipeline on steel beam
CN220379080U (en) Mounting rack for modularized integrated building outer wall water supply and drainage vertical pipe
CN110485600A (en) A kind of joint structure of assembled architecture wallboard
CN208339449U (en) A kind of chassis structure
CN211312924U (en) Wall system integrating stress supporting and heat insulation
CN212561942U (en) Precast concrete air conditioner board
CN111424854B (en) Keel pipeline module assembled with cement lath
CN221372569U (en) Integrated steel spliced building construction structure
CN212534668U (en) Combined light steel keel wall module
CN206346311U (en) Steel-structure box roof frame
CN212001903U (en) Air conditioner plate with floor drain directly installed in place
CN215498149U (en) Block terminal secretly applies pipe construction fixing device
CN220964248U (en) Enclosure top cable support device
CN221150840U (en) Water-electricity refitted wiring device for wiring pipeline of water-electricity refitted wiring pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant