CN219794587U - Construction frame convenient to detach for constructional engineering - Google Patents

Construction frame convenient to detach for constructional engineering Download PDF

Info

Publication number
CN219794587U
CN219794587U CN202223092329.4U CN202223092329U CN219794587U CN 219794587 U CN219794587 U CN 219794587U CN 202223092329 U CN202223092329 U CN 202223092329U CN 219794587 U CN219794587 U CN 219794587U
Authority
CN
China
Prior art keywords
frame
construction
box
mounting
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223092329.4U
Other languages
Chinese (zh)
Inventor
黄国
张连瑞
冯建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202223092329.4U priority Critical patent/CN219794587U/en
Application granted granted Critical
Publication of CN219794587U publication Critical patent/CN219794587U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a construction frame for construction engineering, which is convenient to disassemble and belongs to the technical field of construction engineering. The construction frame for the construction engineering, which is convenient to disassemble, is provided with the installation frame, the connection box, the connection port, the bidirectional ball screw and the movable frame, so that the purpose that a worker can conveniently adjust the height of the device is achieved, and the worker can conveniently construct buildings with different heights.

Description

Construction frame convenient to detach for constructional engineering
Technical Field
The utility model belongs to the technical field of constructional engineering, and particularly relates to a construction frame convenient to detach for constructional engineering.
Background
The construction engineering refers to engineering entities formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings, and workers often use a construction frame to perform high-place operation in the process of building construction.
The utility model discloses a construction frame for constructional engineering, which comprises a base, wherein a construction table is arranged at the top of the base, a fence is arranged at the top of the construction table, a vertical rod is arranged between the base and the inner bottom wall of the construction table, a cross rod is arranged between the vertical rod and the construction table, universal wheels are arranged at the bottom of the base, a supporting component penetrating through the inner bottom wall of the base is arranged between the upper side and the lower side of the inner wall of the base, a driving mechanism rotationally connected with the left side of the inner wall of the base is arranged on the right side of the inner wall of the base, and a pushing component in sliding connection with the supporting component is arranged at the bottom of the driving mechanism.
By adopting the technical scheme, the purpose of being convenient for remove the scaffold is realized, can guarantee simultaneously that the scaffold removes the back stable, but above-mentioned technical scheme, the device is when using, because the device highly is fixed to when the workman constructs the building of not co-altitude, the device does not have the purpose of adjusting the device height, and then has reduced the practicality of device.
Therefore, we propose a construction frame for construction engineering, which is convenient to disassemble, to solve the problems.
Disclosure of Invention
The utility model aims to solve the problem of limited support height of a construction frame in the prior art, and provides a construction frame for construction engineering, which is convenient to disassemble.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a construction frame for building engineering convenient to dismantle, includes the construction frame main part, the upper surface fixed mounting of construction frame main part has the joint box, the top of joint box is provided with the mounting bracket, two sets of connectors have all been seted up to the upper surface of mounting bracket and the upper surface of joint box, the mounting bracket joint is in the inside of connector, the inside of joint box and mounting bracket is all rotated and is connected with two-way ball screw, every two-way ball screw's surface all threaded connection has the removal frame, every it all the joint in the inside of mounting bracket to remove the frame;
the upper surface fixed mounting of mounting bracket has fixed case, the inner wall fixed mounting of fixed case has two coupling springs, two the common fixed mounting of right-hand member of coupling spring has the trapezoidal piece, the left surface fixed mounting of trapezoidal piece has the pull rod, the left end of pull rod runs through fixed case and extends to the left side of fixed case, the top of fixed case is provided with the fence frame, the bottom surface fixed mounting of fence frame has the connecting block, the inside at fixed case of connecting block joint, the inside at the connecting block of trapezoidal piece joint.
Preferably, the bottom surface of the construction frame main body is fixedly provided with two groups of supporting legs, and the bottom surface of each supporting leg is fixedly provided with a universal wheel.
Preferably, the inner wall of the construction frame main body is fixedly provided with crawling ladders which are arranged at equal distances, and the upper surface of each crawling ladder is fixedly provided with an anti-skid pad.
Preferably, the inner walls of the connecting box and the mounting frame are fixedly provided with sliding rods, and the inner wall of each movable frame is in sliding connection with the outer surface of each sliding rod.
Preferably, two the one end that the scaffold main part was kept away from to two ball screw runs through junction box and mounting bracket respectively and fixed mounting has the spliced pole, every the inside of spliced pole is all rotated and is connected with the pull ring.
Preferably, the inner wall fixed mounting of fixed case has two telescopic links, every the flexible end of telescopic link all with the left surface fixed connection of ladder type piece.
Preferably, two cylinders are fixedly arranged on the bottom surface of the construction frame main body, and supporting blocks are fixedly arranged at the telescopic ends of the two cylinders together.
Preferably, the outer surface of each cylinder is fixedly provided with a fixing ring, and the upper surface of each fixing ring is fixedly connected with the bottom surface of the construction frame main body.
In summary, the technical effects and advantages of the present utility model are: through being provided with mounting bracket, the joint box, the connector, two-way ball screw and remove the frame, the workman is through inserting the inside of connector with the mounting bracket, then rotate two-way ball screw and drive and remove the frame and draw close to one side that is kept away from each other, thereby with removing the frame joint in the inside of mounting bracket, make things convenient for the workman to install the mounting bracket simultaneously the workman can be through a plurality of mounting brackets of stack, and then realized adjusting the high purpose of device, the convenience is under construction to the building of different height, through being provided with the fixed box, the connection spring, the ladder type piece, the pull rod, fence frame and connecting block, the workman is through inserting the inside of fixed box with the connecting block, make the ladder type piece fix the connecting block under the effect of connection spring elastic force, thereby the purpose of being convenient for the workman dismantles the fence frame has been realized, and then the packaging efficiency of workman has been increased.
Drawings
FIG. 1 is a schematic view of a construction frame body of the present utility model in a three-dimensional configuration;
FIG. 2 is a schematic view of a cross-sectional perspective structure of a stationary box according to the present utility model;
fig. 3 is a schematic view of a bottom perspective structure of the fence frame of the present utility model;
fig. 4 is a schematic view of a construction of a bottom view of a main body of the construction frame according to the present utility model.
In the figure: 1. a scaffold body; 2. a connection box; 3. a mounting frame; 4. a connection port; 5. a two-way ball screw; 6. a moving rack; 7. a fixed box; 8. a connecting spring; 9. ladder-shaped blocks; 10. a pull rod; 11. a fence frame; 12. a connecting block; 13. support legs; 14. a universal wheel; 15. a ladder stand; 16. an anti-slip pad; 17. a slide bar; 18. a connecting column; 19. a pull ring; 20. a telescopic rod; 21. a cylinder; 22. a support block; 23. and a fixing ring.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1 to 4, a construction frame for construction engineering convenient to detach comprises a construction frame main body 1, wherein the construction frame main body 1 is composed of a rectangular plate and four columns, two groups of supporting legs 13 are fixedly arranged on the bottom surface of the construction frame main body 1, universal wheels 14 are fixedly arranged on the bottom surface of each supporting leg 13, and the supporting legs 13 and the universal wheels 14 are arranged, so that a worker can conveniently move the device, and the convenience of movement of the device is improved.
The last fixed surface of scaffold main part 1 installs spread box 2, the top of spread box 2 is provided with mounting bracket 3, mounting bracket 3 comprises the same box and four rectangle posts with spread box 2, the inner wall fixed mounting of scaffold main part 1 has cat ladder 15 that the equidistance was arranged, the equal fixed mounting of upper surface of every cat ladder 15 has slipmat 16, the installation of cat ladder 15 makes things convenient for the workman to remove the top of scaffold main part 1, the installation of slipmat 16 avoids the workman to take place gliding phenomenon when the climbing as far as possible, and then guaranteed workman's security.
Two sets of connectors 4 have all been seted up to the upper surface of mounting bracket 3 and the upper surface of joint case 2, and mounting bracket 3 joint is in the inside of connector 4, and the bottom surface fixed mounting of scaffold main part 1 has two cylinders 21, and the flexible end of two cylinders 21 is fixed mounting jointly has supporting shoe 22, utilizes the power that cylinder 21 provided to drive supporting shoe 22 and moves down for the universal wheel 14 keeps away from ground, thereby avoids the device to take place the phenomenon of moving by oneself as far as possible, and then has guaranteed the stability of device.
The inside of joint box 2 and mounting bracket 3 is all rotated and is connected with two-way ball screw 5, and two opposite screw threads have been seted up to the surface of two-way ball screw 5, and the one end that construction frame main part 1 was kept away from to two-way ball screw 5 runs through joint box 2 and mounting bracket 3 respectively and fixed mounting have spliced pole 18, and the inside of every spliced pole 18 is all rotated and is connected with pull ring 19, and spliced pole 18 and pull ring 19's installation makes things convenient for the workman to rotate two-way ball screw 5.
The equal threaded connection of the surface of every two-way ball screw 5 has movable frame 6, and every movable frame 6 all the joint is in the inside of mounting bracket 3, and movable frame 6's shape is the pi form, and the equal fixed mounting of inner wall of spread box 2 and mounting bracket 3 has slide bar 17, and the inner wall of every movable frame 6 all with slide bar 17's surface sliding connection, slide bar 17's installation has played the effect of restriction movable frame 6 movement track to avoid the phenomenon that movable frame 6 takes place to rotate when removing as far as possible, and then guaranteed movable frame 6's stability.
The upper surface fixed mounting of mounting bracket 3 has fixed case 7, the inner wall fixed mounting of fixed case 7 has two connecting springs 8, the common fixed mounting of right-hand member of two connecting springs 8 has trapezoidal piece 9, the left surface fixed mounting of trapezoidal piece 9 has pull rod 10, the left end of pull rod 10 runs through fixed case 7 and extends to the left side of fixed case 7, the inner wall fixed mounting of fixed case 7 has two telescopic links 20, the telescopic end of every telescopic link 20 all with the left surface fixed connection of trapezoidal piece 9, the installation of telescopic link 20 has played the effect of restriction trapezoidal piece 9 moving track, thereby the phenomenon that the deviation moving track takes place when moving to avoid trapezoidal piece 9 as far as possible, and then the stability of trapezoidal piece 9 removal has been guaranteed.
The top of fixed box 7 is provided with rail frame 11, the bottom surface fixed mounting of rail frame 11 has connecting block 12, the inside at fixed box 7 of connecting block 12 joint, ladder type piece 9 joint is in the inside of connecting block 12, the equal fixed mounting of surface of every cylinder 21 has solid fixed ring 23, the upper surface of every solid fixed ring 23 all with the bottom surface fixed connection of scaffold body 1, gu fixed ring 23's installation has played the effect of fixed cylinder 21 to avoid cylinder 21 to take place the phenomenon of rocking at the during operation as far as possible, and then guaranteed the stability of cylinder 21.
The working principle of the utility model is that; when the device is used, a worker firstly moves the device to a position where the device is required, then the worker is communicated with a power supply, the cylinder 21 is opened, the supporting block 22 is driven to move downwards by utilizing the power provided by the cylinder 21, thereby the supporting block 22 supports the device, further the universal wheel 14 is enabled to leave the ground, the phenomenon that the device moves is avoided as much as possible, when the height of the device needs to be increased, the worker firstly pulls the pull rod 10 to one side far away from the scaffold main body 1, the ladder-shaped block 9 slides away from the connecting block 12, then the worker takes out the connecting block 12 from the inside of the fixed box 7, then the worker inserts the other mounting frame 3 into the inside of the connecting port 4, then the worker rotates the pull ring 19 on the mounting frame 3, the pull ring 19 is matched with the connecting column 18 to drive the bidirectional ball screw 5 to rotate, thereby the bidirectional ball screw 5 drives the two moving frames 6 to move to one side far away from each other, and then the moving frame 6 is clamped inside the other mounting frame 3, the mounting process of the mounting frame 3 can be completed, afterwards the worker inserts the pull rod 10 into one side of the fixed box 7, the height of the device can be adjusted, the worker can detach the connecting block 3 from the inside of the connecting block 3 only through the reverse direction, and the connection frame 3 can detach the bidirectional ball screw 3 from the connecting frame 3.
In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings are merely for convenience in describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the present utility model, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (8)

1. The utility model provides a construction frame for building engineering of convenient dismantlement, includes scaffold main part (1), its characterized in that: the construction frame comprises a construction frame main body (1), wherein a connecting box (2) is fixedly arranged on the upper surface of the construction frame main body (1), a mounting frame (3) is arranged above the connecting box (2), two groups of connecting ports (4) are respectively formed in the upper surface of the mounting frame (3) and the upper surface of the connecting box (2), the mounting frame (3) is clamped inside the connecting ports (4), two-way ball screws (5) are respectively and rotatably connected inside the connecting box (2) and the mounting frame (3), movable frames (6) are respectively and rotatably connected to the outer surfaces of the two-way ball screws (5), and each movable frame (6) is clamped inside the mounting frame (3);
the utility model discloses a fixed box, including fixed box (7), the inner wall fixed mounting of fixed box (7) has two connecting spring (8), two the common fixed mounting of right-hand member of connecting spring (8) has trapezoidal piece (9), the left surface fixed mounting of trapezoidal piece (9) has pull rod (10), the left end of pull rod (10) runs through fixed box (7) and extends to the left side of fixed box (7), the top of fixed box (7) is provided with rail frame (11), the bottom surface fixed mounting of rail frame (11) has connecting block (12), connecting block (12) joint is in the inside of fixed box (7), the inside of trapezoidal piece (9) joint at connecting block (12).
2. The construction work frame for construction engineering convenient to disassemble according to claim 1, wherein: two groups of supporting legs (13) are fixedly arranged on the bottom surface of the construction frame main body (1), and universal wheels (14) are fixedly arranged on the bottom surface of each supporting leg (13).
3. The construction work frame for construction engineering convenient to disassemble according to claim 1, wherein: the inner wall of the construction frame main body (1) is fixedly provided with crawling ladders (15) which are arranged at equal distances, and the upper surface of each crawling ladder (15) is fixedly provided with an anti-skid pad (16).
4. The construction work frame for construction engineering convenient to disassemble according to claim 1, wherein: the inner walls of the connecting box (2) and the mounting frame (3) are fixedly provided with sliding rods (17), and the inner wall of each movable frame (6) is in sliding connection with the outer surface of each sliding rod (17).
5. The construction work frame for construction engineering convenient to disassemble according to claim 1, wherein: one end, far away from the construction frame main body (1), of the two bidirectional ball screws (5) penetrates through the connecting box (2) and the mounting frame (3) respectively and is fixedly provided with connecting columns (18), and pull rings (19) are rotatably connected to the inner parts of the connecting columns (18).
6. The construction work frame for construction engineering convenient to disassemble according to claim 1, wherein: the inner wall of the fixed box (7) is fixedly provided with two telescopic rods (20), and the telescopic end of each telescopic rod (20) is fixedly connected with the left side face of the ladder-shaped block (9).
7. The construction work frame for construction engineering convenient to disassemble according to claim 1, wherein: two air cylinders (21) are fixedly arranged on the bottom surface of the construction frame main body (1), and supporting blocks (22) are fixedly arranged at telescopic ends of the two air cylinders (21) together.
8. The construction work frame for construction engineering convenient to detach according to claim 7, wherein: the outer surface of each air cylinder (21) is fixedly provided with a fixing ring (23), and the upper surface of each fixing ring (23) is fixedly connected with the bottom surface of the construction frame main body (1).
CN202223092329.4U 2022-11-21 2022-11-21 Construction frame convenient to detach for constructional engineering Active CN219794587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223092329.4U CN219794587U (en) 2022-11-21 2022-11-21 Construction frame convenient to detach for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223092329.4U CN219794587U (en) 2022-11-21 2022-11-21 Construction frame convenient to detach for constructional engineering

Publications (1)

Publication Number Publication Date
CN219794587U true CN219794587U (en) 2023-10-03

Family

ID=88178571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223092329.4U Active CN219794587U (en) 2022-11-21 2022-11-21 Construction frame convenient to detach for constructional engineering

Country Status (1)

Country Link
CN (1) CN219794587U (en)

Similar Documents

Publication Publication Date Title
CN111549940B (en) Assembled office partition and installation method thereof
CN213449576U (en) Building engineering protector
CN206319645U (en) A kind of support frame for building
CN219794587U (en) Construction frame convenient to detach for constructional engineering
CN214246595U (en) Mutual climbing type protective platform climbing system
CN218346731U (en) Scaffold frame that can quick detach
CN217711600U (en) Combined type safe scaffold
CN220848595U (en) Building engineering building climbing frame
CN208810957U (en) Door-plate mechanism and electric tube expander with it
CN215368593U (en) Carrying frame is built in room
CN216553359U (en) Building envelope of building engineering
CN216921320U (en) Butt fastener type lengthening vertical rod of steel pipe scaffold
CN219175811U (en) Support convenient to adjust
CN220539229U (en) House building template installation fixed knot constructs
CN218176585U (en) Combined scaffold
CN216517264U (en) Landscape decoration is with compound guardrail of convenient equipment
CN219528313U (en) Portable movable scaffold
CN219794875U (en) Modular portable edge protection device
CN221194372U (en) Temporary protective railing for building construction
CN220434445U (en) Safety protection equipment for building engineering construction
CN216341394U (en) Novel construction rail guard is built in room
CN219622425U (en) Safety protection device for BlM building construction
CN219344283U (en) Temporary guardrail structure for municipal engineering construction
CN219666411U (en) Positioning device for installing box type electromechanical equipment
CN219569527U (en) Outer frame for glass curtain wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant