CN218323835U CN202222661172.6U CN202222661172U CN218323835U CN 218323835 U CN218323835 U CN 218323835U CN 202222661172 U CN202222661172 U CN 202222661172U CN 218323835 U CN218323835 U CN 218323835U
Authority
CN
China
Prior art keywords
walkway
plate
scaffold
angle steel
walkway plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222661172.6U
Other languages
Chinese (zh)
Inventor
赵凯旋
张超
王佳辉
王小雷
刘金元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Quantum Intelligent Technology Co ltd
Hebei Shengzhuo Architectural Equipment Manufacturing Ltd
Original Assignee
Hebei Quantum Intelligent Technology Co ltd
Hebei Shengzhuo Architectural Equipment Manufacturing Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Quantum Intelligent Technology Co ltd, Hebei Shengzhuo Architectural Equipment Manufacturing Ltd filed Critical Hebei Quantum Intelligent Technology Co ltd
Priority to CN202222661172.6U priority Critical patent/CN218323835U/en
Application granted granted Critical
Publication of CN218323835U publication Critical patent/CN218323835U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a guidance tape connecting device and scaffold frame are walked in opening and shutting of scaffold frame relates to building engineering technical field, include: two first walkway plates and two second walkway plates; the two sides of each first walkway plate are provided with vertical rods; the first walkway plate and the second walkway plate are hinged through a first connecting piece; one end of each second walkway plate far away from the first walkway plate is detachably connected with a second connecting piece, and the two second connecting pieces are used for detachably connecting the two second walkway plates; one end of the inhaul cable is fixedly connected with the end part of the second connecting piece, and the other end of the inhaul cable is fixedly connected with the vertical rod on the same side of the same side. The dismantlement pavement board that can be quick solves the scaffold and attaches the interference that the arm produced at the in-process tower crane that climbs, reduces work load, improves the construction progress, avoids the emergence of potential safety hazard.

Description

Track board connecting device and scaffold are walked in opening and shutting of scaffold frame
Technical Field
The utility model relates to a building engineering technical field especially relates to a guidance tape connecting device and scaffold frame are walked in opening and shutting of scaffold frame.
Background
The tower crane is an important material transportation tool for high-rise building construction, the height of the tower crane is gradually increased along with the increase of floors according to construction requirements, in order to maintain the stability of the tower crane, tower crane attaching walls are required to be installed on the tower crane at intervals of a section of height for reinforcing and stabilizing, and the tower crane attaching walls are directly connected with a building structure; but at the promotion of inserted lift scaffold frame and decline in-process, the tower crane attaches the wall and can produce the interference to inserted lift scaffold frame and walk the guidance tape, consequently need demolish part and walk guidance tape and net piece in promotion or decline in-process, wait to install after attaching the arm through the tower crane, walk guidance tape and net piece and demolish, inserted lift scaffold frame promotes or descends to install again and has not only increased work load, influences the construction progress, still has certain potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a guidance tape connecting device and scaffold frame are walked in opening and shutting of scaffold frame to solve the problem that above-mentioned prior art exists, can solve the scaffold frame and attach the interference that the arm produced at the in-process tower crane that climbs, reduce work load, improve the construction progress, avoid the emergence of potential safety hazard.
In order to achieve the above purpose, the utility model provides a following scheme:
the utility model provides a guidance tape connecting device and scaffold frame are walked in opening and shutting of scaffold frame, include: two first walkway plates and two second walkway plates; the two sides of each first walkway plate are provided with vertical rods; the first walkway plate and the second walkway plate are hinged through the first connecting piece; one end, far away from the first walkway plate, of each second walkway plate is detachably connected with the second connecting piece, and the two second connecting pieces are used for detachably connecting the two second walkway plates; one end of the inhaul cable is fixedly connected with the end part of the second connecting piece, and the other end of the inhaul cable is fixedly connected with the vertical rod on the same side of the same side.
Preferably, the first connecting piece comprises a first angle steel, a second angle steel and a plurality of first hinges, the first angle steel and the second angle steel are connected in a hinged mode through the first hinges, the first angle steel is connected with the first walkway plate through bolts, and the second angle steel is connected with the second walkway plate through bolts.
Preferably, the first connecting piece still includes a plurality of square nest of tubes, the square nest of tubes includes first side's pipe and second side's pipe, first side's pipe with first angle steel fixed connection, second side's pipe with second angle steel fixed connection, first side's pipe with second side's pipe corresponds the setting.
Preferably, the second connecting piece includes third angle steel and two mounts, the first curb plate of third angle steel with the second walks the guidance tape and passes through bolted connection, and the second curb plate orientation is kept away from the direction of second guidance tape, two mounts respectively fixed set up in the both ends top of third angle steel, the mount be used for with cable fixed connection, and two the homonymy of second connecting piece the mount can be through bolt fixed connection.
Preferably, the mount is the U template, U template vertical fixation in the third angle steel the second curb plate, just the opening orientation of U template the second guidance tape, the top of two curb plates of U template all is provided with first connecting hole, the one end of cable is fixed in and passes two the bolt of first connecting hole, be provided with the second connecting hole on the bottom plate of U template, the second connecting hole be used for with corresponding another on the second connecting piece the second connecting hole passes through bolt fixed connection.
Preferably, the number of the pull cables is four, and one pull cable is correspondingly and fixedly connected with one fixing frame.
Preferably, still include a plurality of basket bolts, basket bolts is used for setting up in order to adjust the length of cable between cable and the pole setting.
The utility model provides a still another scaffold frame, include:
the open-close walkway plate connecting device of the scaffold as described above;
the opening and closing net piece is connected with the upright rod on the outer side of the first walkway plate in a rotating mode, and the other side of the opening and closing net piece is connected with the other upright rod on the outer side of the first walkway plate in a detachable and fixed mode.
Preferably, one side of the opening and closing net piece is rotatably connected with the upright rod on the outer side of one first walkway plate through a plurality of second hinges, and the other side of the opening and closing net piece is controlled to open and close through a door bolt structure with the upright rod on the outer side of the other first walkway plate.
The utility model discloses for prior art gain following technological effect:
the utility model provides a guidance tape connecting device and scaffold frame open and shut of scaffold frame, during the use, the pole setting fixed connection of first guidance tape and both sides earlier, walk guidance tape and first guidance tape through first connecting piece articulated connection with the second again, make the second walk guidance tape can upwards rotate around first connecting piece, use bolted connection to walk the second connecting piece bolted connection of guidance tape tip with two seconds, can be trained into a whole with the support body, and the second connecting piece of the tip of second guidance tape still passes through the cable fixed with the pole setting, when adhesion type lift scaffold frame promotes or descends the in-process and attaches the arm through the tower crane, demolish the bolt of connecting between two second connecting pieces, it upwards overturns along first connecting piece to realize the second guidance tape through the shrink cable, make adhesion type lift scaffold frame can pass through the tower crane smoothly and attach the arm, after through, will resume normal length of cable, install the bolt between two second connecting pieces, resume normal use state. The utility model discloses simple structure, high durability and convenient use, lifting or descending in-process needn't demolish partial support body at the inserted scaffold, work load has been reduced, the construction progress has been guaranteed, the potential safety hazard has still been avoided simultaneously, production simple process just has the security performance, and only increased first connecting piece, second connecting piece and cable on current support body, the second standard plate that makes using is standard, general specification, need not to increase extra guidance tape product kind, be convenient for production, categorised.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of an opening/closing walkway plate connecting device of a scaffold provided by the present invention;
fig. 2 is a schematic structural view of a first connecting member of the open-close walkway plate connecting device of the scaffold provided by the present invention;
fig. 3 is a cross-sectional view of a first connecting member of the opening/closing walkway plate connecting device for a scaffold according to the present invention;
fig. 4 is a schematic structural view of a second connecting member of the opening/closing walkway plate connecting device of the scaffold provided by the present invention;
fig. 5 is a cross-sectional view of a second connecting member of the opening/closing walkway plate connecting device for a scaffold according to the present invention;
fig. 6 is a schematic structural view illustrating the connection between the open mesh and the vertical rods of the scaffold according to the second embodiment;
in the figure: 1. a first walkway plate; 2. a second walkway plate; 3. a first connecting member; 4. a second connecting member; 5. a pull cable; 6. a first angle steel; 7. a second angle steel; 8. a first hinge; 9. a square tube group; 10. a third angle steel; 11. a fixed mount; 13. a first connection hole; 14. a second connection hole; 16. erecting a rod; 17. opening and closing the mesh sheet; 18. a second hinge; 19. a bolt structure.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
The utility model aims at providing a guidance tape connecting device and scaffold frame are walked in opening and shutting of scaffold frame to solve the problem that above-mentioned prior art exists, the guidance tape is walked in dismantlement that can be quick, solve the scaffold frame and attach the interference that the arm produced at the in-process tower crane that climbs, reduce work load, improve the construction progress, avoid the emergence of potential safety hazard.
In order to make the aforementioned objects, features and advantages of the present invention more comprehensible, the present invention is described in detail with reference to the accompanying drawings and the following detailed description.
Example one
The present embodiment provides an opening/closing walkway plate connecting device for a scaffold, as shown in fig. 1 to 5, including: two first walkway plates 1, two second walkway plates 2; two first connecting pieces 3, two second connecting pieces 4 and a plurality of inhaul cables 5, wherein two sides of each first walkway plate 1 are provided with vertical rods 16; a first walkway plate 1 and a second walkway plate 2 are hinged through a first connecting piece 3; one end of each second walkway plate 2, which is far away from the first walkway plate 1, is detachably connected with a second connecting piece 4, and the two second connecting pieces 4 are used for detachably connecting the two second walkway plates 2; one end of cable 5 and the tip fixed connection of second connecting piece 4, the other end and the pole setting 16 fixed connection of the homonymy of homonymy, in use, earlier with the pole setting 16 fixed connection of first guidance tape 1 and both sides, again with second guidance tape 2 and the articulated connection of first guidance tape 1, make second guidance tape 2 rotate upwards around first connecting piece 3, use bolted connection with two second guidance tapes 2 bolted connection, can become a whole with the support body exercise, and the tip of second guidance tape 2 still is fixed through cable 5 and pole setting 16, when the adhesion type lift tower crane promotes or descends in-process through attaching the arm, demolish the bolt of connecting between two second guidance tapes 2, realize through contracting cable 5 that second guidance tape 2 upwards overturns along first connecting piece 3, make adhesion type lift scaffold can smoothly pass through the tower crane attaching the arm, after through, resume normal length with cable 5, install the bolt between two second guidance tapes 2, resume normal use state, the utility model discloses simple structure, high durability and convenient use, in the adhesion type lift scaffold, the safety lift scaffold has still reduced the support body and has increased the standard production process classification product classification hidden danger, and has avoided the standard product to be used in the second guidance tape 5, and the standard product has still been increased, and the standard product has been increased.
In a preferred embodiment, the first connecting piece 3 comprises a first angle steel 6, a second angle steel 7 and a plurality of first hinges 8, the first angle steel 6 and the second angle steel 7 are connected in an articulated mode through the plurality of first hinges 8, the first angle steel 6 is connected with the first walkway plates 1 through bolts, the second angle steel 7 is connected with the second walkway plates 2 through bolts, the angle steel and the first hinges 8 are connected, the structure is simple, standard and general walkway plates can be connected together in a rotating mode, extra product types do not need to be added to be applied to the disconnected position of the frame body, and the frame body is convenient to produce and classify.
In a preferred embodiment, the first connecting member 3 further includes a plurality of square tube sets 9, each square tube set 9 includes a first square tube and a second square tube, the first square tube is fixedly connected with the first angle steel 6, the second square tube is fixedly connected with the second angle steel 7, the first square tube and the second square tube are correspondingly arranged, the square tube can increase the mechanical properties of the first angle steel 6 and the second angle steel 7, the first square tube and the second square tube are correspondingly arranged to form the square tube set 9, the second angle steel 7 in the horizontal state can be prevented from being turned downwards relative to the first angle steel 6, the second walkway plates 2 of the scaffold in the stable state can be prevented from being turned downwards, and the stability of the scaffold body is further ensured.
In a preferred embodiment, the second connecting member 4 includes a third angle steel 10 and two fixing frames 11, a first side plate of the third angle steel 10 is connected to the second walkway plate 2 through a bolt, the second side plate faces a direction away from the second walkway plate 2, the two fixing frames 11 are respectively fixedly arranged at the tops of two ends of the third angle steel 10, the fixing frames 11 are used for being fixedly connected with the guy cable 5, and the fixing frames 11 at the same side of the two second connecting members 4 can be fixedly connected through bolts, the structure is simple, the bolt connection of the two second walkway plates 2 can be realized, the two first connecting members 3 are only in line contact through the side edges of the second side plate, the interference of the two walkway plates in the lifting or descending process can be avoided, and the lifting or descending of the two walkway plates is influenced.
In a preferred embodiment, the fixing frame 11 is a U-shaped plate, the U-shaped plate is perpendicularly fixed to the second side plate of the third angle steel 10, the opening of the U-shaped plate faces the second walkway plate 2, the top of each of the two side plates of the U-shaped plate is provided with a first connecting hole 13, one end of the stay cable 5 is fixed to a bolt passing through the two first connecting holes 13, a bottom plate of the U-shaped plate is provided with a second connecting hole 14, the second connecting hole 14 is used for being fixedly connected with the second connecting hole 14 of the corresponding second connecting piece 4 through a bolt, the stay cable 5 is fixed to the bolt passing through the two first connecting holes 13, so that the stay cable 5 is not in contact with a sharp part, the stay cable 5 can be protected, and long-time contact with the sharp part is avoided, and abrasion is caused.
In a preferred embodiment, the number of the guy cables 5 is four, one guy cable 5 is fixedly connected with one fixing frame 11 correspondingly, and the four guy cables 5 are uniformly arranged, so that the stability of the second walkway plate 2 can be further ensured.
In a preferred embodiment, the open-close walkway plate connecting device of the scaffold further comprises a plurality of turn-key bolts, the turn-key bolts are used for being arranged between the guy cables 5 and the vertical rods 16 to adjust the length of the guy cables 5, the overall length of the guy cables 5 can be adjusted through the turn-key bolts, and the turn-key bolts can adapt to the deformation of the scaffold after being lifted.
Example two
The present embodiment provides a scaffold, as shown in fig. 1 to 6, including:
the open-close walkway plate connecting device of the scaffold according to embodiment one;
the device comprises an opening and closing net piece, wherein one side of the opening and closing net piece is rotatably connected with one upright rod outside the first walkway plate, and the other side of the opening and closing net piece is fixedly connected with the other upright rod outside the first walkway plate in a detachable manner.
Preferably, one side and one of mesh 17 that opens and shuts first walkway board 1 outside pole setting 16 rotates through a plurality of second hinges 18 and connects, the opposite side and another of mesh 17 that opens and shuts first walkway board outside 1 pole setting 16 opens and shuts through door bolt structure 19 control, and through opening and shutting of two door bolt structure 19 control one side and pole setting 16 of mesh 17 that opens and shuts, the opposite side rotates through two second hinges 18 and pole setting 16 to be connected, at the in-process that promotes the scaffold frame, only need open door bolt structure 19, rotate to open and shut mesh 17 and just can open and shut mesh 17 and avoid the tower crane to attach to the wall book and promote smoothly, simple structure.
The principle and the implementation mode of the utility model are explained by applying a specific embodiment, and the explanation of the embodiment is only used for helping to understand the method and the core idea of the utility model; meanwhile, for the general technical personnel in the field, according to the idea of the present invention, there are changes in the concrete implementation and the application scope. In summary, the content of the present specification should not be construed as a limitation of the present invention.

Claims (9)

1. The utility model provides a scaffold frame walk guidance tape connecting device that opens and shuts which characterized in that: the method comprises the following steps:
two sides of each first walkway plate are fixedly provided with vertical rods;
two second walkway plates;
the first walkway plate and the second walkway plate are hinged through the first connecting pieces;
the two second connecting pieces are detachably connected to one end, far away from the first walkway plate, of each second walkway plate, and are fixed through bolts to detachably connect the two second walkway plates; and
and one end of the stay cable is fixedly connected with the end part of the second connecting piece, and the other end of the stay cable is fixedly connected with the upright stanchion at the same side of the same side.
2. The open-close walkway plate connecting device of scaffold of claim 1, wherein: the first connecting piece comprises first angle steel, second angle steel and a plurality of first hinges, one side plate of the first angle steel is fixedly connected with the first walkway plate through a bolt, one side plate of the second angle steel is fixedly connected with the second walkway plate through a bolt, and the other side plate of the first angle steel is connected with the other side plate of the second angle steel through a plurality of first hinges in a hinged mode.
3. The opening-closing walkway plate connecting device of the scaffold of claim 2, wherein: first connecting piece still includes a plurality of square nest of tubes, the square nest of tubes includes first side's pipe and second side's pipe, first side's pipe with first angle steel fixed connection, second side's pipe with second angle steel fixed connection, first pavement board with when the second pavement board is parallel, one first side's pipe and one the contact is managed in second side.
4. The open-close walkway plate connecting device of scaffold of claim 1, wherein: the second connecting piece includes third angle steel and two mounts, the first curb plate of third angle steel with the second walks the guidance tape and passes through bolted connection, the second curb plate orientation of third angle steel is kept away from the direction of second guidance tape, two mounts respectively fixed set up in the both ends top of third angle steel, the mount be used for with cable fixed connection, and two on the second connecting piece the mount can pass through bolted connection.
5. The open-close walkway plate connecting device of scaffold of claim 4, wherein: the mount is the U template, U template vertical fixation in the third angle steel the second curb plate, just the opening orientation of U template the second guidance tape, the top of two curb plates of U template all is provided with first connecting hole, the one end of cable is fixed in and passes two the bolt of first connecting hole, be provided with the second connecting hole on the bottom plate of U template, the second connecting hole be used for with corresponding another on the second connecting piece the second connecting hole passes through bolt fixed connection.
6. The open-close walkway plate connecting device of scaffold of claim 5, wherein: the number of the pull cables is four, and one pull cable is fixedly connected with one fixing frame correspondingly.
7. The opening-closing walkway plate connecting device of claim 5, wherein: still include a plurality of turn buckle, turn buckle is used for setting up the length in order to adjust the cable between cable and pole setting.
8. A scaffold, characterized in that: the method comprises the following steps:
the opening-closing walkway plate connecting apparatus of the scaffold of claims 1 to 7;
the opening and closing net piece is connected with the upright rod on the outer side of the first walkway plate in a rotating mode, and the other side of the opening and closing net piece is connected with the other upright rod on the outer side of the first walkway plate in a detachable and fixed mode.
9. The scaffold of claim 8, wherein: one side of the opening and closing net piece is rotatably connected with the upright rod on the outer side of the first walkway plate through a plurality of second hinges, and the other side of the opening and closing net piece is controlled to open and close through a door bolt structure.
CN202222661172.6U 2022-10-10 2022-10-10 Track board connecting device and scaffold are walked in opening and shutting of scaffold frame Active CN218323835U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222661172.6U CN218323835U (en) 2022-10-10 2022-10-10 Track board connecting device and scaffold are walked in opening and shutting of scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222661172.6U CN218323835U (en) 2022-10-10 2022-10-10 Track board connecting device and scaffold are walked in opening and shutting of scaffold frame

Publications (1)

Publication Number Publication Date
CN218323835U true CN218323835U (en) 2023-01-17

Family

ID=84824062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222661172.6U Active CN218323835U (en) 2022-10-10 2022-10-10 Track board connecting device and scaffold are walked in opening and shutting of scaffold frame

Country Status (1)

Country Link
CN (1) CN218323835U (en)

Similar Documents

Publication Publication Date Title
CN215291318U (en) Mounting structure of attached lifting scaffold
CN114412158B (en) Aluminum alloy-steel combined attached lifting scaffold and installation method thereof
CN111395728B (en) Aluminum alloy attached lifting scaffold
CN112727074B (en) Building machine and building construction method
CN218323835U (en) Track board connecting device and scaffold are walked in opening and shutting of scaffold frame
CN105776092A (en) Stretching type basket device and construction method thereof
CN201649607U (en) Overhung-type outer wall scaffold
CN207513201U (en) A kind of roofing cornices installation mobile device
CN113044741A (en) Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof
CN216276828U (en) Telescopic adjusting device capable of changing transverse position of trackless construction hanging basket
CN219710948U (en) Push-pull platform device for wall attachment position of climbing tower crane
CN206530037U (en) A kind of elevating platform assembly for Construction of Silo
CN110820564B (en) Liftable and openable bent cap construction overhaul multipurpose platform
CN213329962U (en) Split type lifting scaffold
CN214573256U (en) Arch rib side turning opposite pulling erecting device
CN114278108B (en) Construction lifter canopy and construction method
CN216616821U (en) Suspension bridge frame for climbing frame
CN215366847U (en) Construction platform under portable foldable roof beam
CN219469394U (en) Assembled cage frame of construction elevator cage
CN217461450U (en) Electric formwork climbing frame
CN211619807U (en) Tower crane wall-attached system capable of integrally walking
CN216038290U (en) Gantry crane capable of being integrally and automatically installed and dismantled
CN215670944U (en) A operation platform that is used for high altitude to encorbelment roofing framework beam veneer construction
CN117023416B (en) Tower crane wall-attached supporting platform equipment and application method thereof
CN217054270U (en) Automatic elevator shaft construction platform that climbs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant