Prior art keywords
tower crane
safety channel
climbing frame
safety
integrated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110359203.XA
Other languages
Chinese (zh)
Other versions
CN113044741B (en
Inventor
孙乐天
徐小凯
刘圣阶
赵军华
龙文勇
楼华峰
吴锦烨
王剑南
张维
吴敏谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Chengjian Construction Group Co ltd
Original Assignee
Zhejiang Chengjian Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Chengjian Construction Group Co ltd filed Critical Zhejiang Chengjian Construction Group Co ltd
Priority to CN202110359203.XA priority Critical patent/CN113044741B/en
Publication of CN113044741A publication Critical patent/CN113044741A/en
Application granted granted Critical
Publication of CN113044741B publication Critical patent/CN113044741B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/88Safety gear
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses a safety channel for connecting an integrated climbing frame and a tower crane and a lifting method thereof, wherein the safety channel comprises a main body part for treading and a telescopic part telescopically connected to the main body part, the main body part is hinged to the integrated climbing frame, the telescopic part can be connected to the tower crane, a telescopic cable-stayed structure is arranged between the main body part and the integrated climbing frame, and the inclination angle of the safety channel is adjusted through the stretching of the cable-stayed structure; the safety channel adopts a structural form that the telescopic cable-stayed structure is connected to the integrated climbing frame, and the inclination angle of the safety channel can be adjusted through the stretching of the cable-stayed structure, so that the influence of height deviation between the safety channel and a tower crane standard knot can be avoided, the safety channel is stably connected to the tower crane, and the passing safety of personnel is ensured.

Description

Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof
Technical Field
The invention relates to the technical field of construction in the building industry, in particular to a safety channel for connecting an integrated climbing frame and a tower crane and a lifting method thereof.
Background
With the increasing maturity of house building development and the increasing of the safety consciousness of the whole people in China, the construction convenience and safety of the engineering become the focus of social attention. In the construction process of the engineering, the zero accident is the precondition of the marker post engineering and is the primary task for creating the best economic benefit, which requires the construction unit to improve the safety consciousness and put an end to the hidden danger of all safety accidents.
Because the tower crane has certain distance apart from the structure thing, the tower crane can be along with the gradual rise of floor height, and the tower crane driver need carry out bare-handed climbing to the control chamber from the vertical cat ladder of the lowest department of tower crane standard festival every day on duty, and its process has very big potential safety hazard, especially meets bad weather, and the cat ladder easily freezes and skids, very easily causes the incident at climbing in-process from top to bottom. At present, a fixing channel is simply erected between a tower crane and a structural object by using a steel pipe and a template, the method is used for a traditional scaffold, more potential safety hazards exist in the erecting and using processes, and the process is extremely complicated along with the continuous rising of the tower crane and the structural object and the repeated cyclic disassembly and installation. In addition, a safe and reliable solution for the problem of the newly-generated liftable attached scaffold in the construction industry cannot be provided. Can promote to adhere to scaffold frame and promote greatly for traditional scaffold frame security, nevertheless the tower crane driver gets into in through the floor and can promote formula and adhere to scaffold frame and get into the tower crane cat ladder degree of difficulty still great.
The application publication number CN111173315A discloses a pedestrian passageway structure of a tower crane on a climbing frame, wherein a keel plate is fixedly connected to one side of an integral lifting climbing frame close to the tower crane, a hanging ring is welded to the outer end of the keel plate, a cross keel is fixed above the keel plate on the integral lifting climbing frame, the lower end of a steel wire rope is connected with the hanging ring, the upper end of the steel wire rope is fixed with the cross keel in a pulling manner, a turning plate is hinged to the outer end of the keel plate, and the turning plate is erected on a standard section of the tower crane after being unfolded; when the pedestrian passageway of tower crane climbs the frame along with integral promotion and risees, the height between pedestrian passageway of tower crane and the tower crane standard festival is not necessarily in same horizontal plane all the time, consequently, pedestrian passageway of tower crane and tower crane set up the connection back through turning over the board to certain steady state is not necessarily ensured, has certain potential safety hazard.
Disclosure of Invention
The invention aims to provide a safety channel for connecting an integrated climbing frame and a tower crane and a lifting method thereof, and aims to solve the problems in the prior art.
In order to achieve the purpose, the invention provides the following scheme:
the invention provides a safety channel for connecting an integrated climbing frame and a tower crane, which comprises a main body part for treading and a telescopic part telescopically connected to the main body part, wherein the main body part is hinged to the integrated climbing frame, the telescopic part can be connected to the tower crane, and a telescopic cable-stayed structure is arranged between the main body part and the integrated climbing frame.
Preferably, the width of the telescopic part is smaller than that of the main body part, the telescopic part is provided with a pulley, the main body part is provided with a sliding groove, the pulley slides in the sliding groove, and a safety locking device is arranged between the main body part and the telescopic part.
Preferably, the main body part and the telescopic part respectively comprise vertical rods with opposite openings and arranged in parallel, a plurality of cross rods are connected between the vertical rods, and the top surfaces of the cross rods are connected with steel plates.
Preferably, the safety locking device is a pin shaft, the longitudinal rod of the main body part and the longitudinal rod of the telescopic part are in through connection through the pin shaft, one end of the pin shaft is provided with an expansion end, and the other end of the pin shaft penetrates through a fixing bolt.
Preferably, the cable-stayed structure is a cable-stayed pole, and a turnbuckle is arranged in the middle of the cable-stayed pole.
Preferably, the tip of pars contractilis is provided with the couple, the couple is connected on the tower crane.
Preferably, an end cross beam is arranged at the end of the main body part, one leaf of the hinge structure is fixedly connected to the end cross beam, and the other leaf of the hinge structure is fixedly connected to the integrated climbing frame.
Preferably, the main body part and the telescopic part are respectively provided with a guardrail at two sides.
The invention also provides a lifting method of a safety channel for connecting the integrated climbing frame and the tower crane, wherein the safety channel is hinged on the integrated climbing frame, and a telescopic cable-stayed structure is also arranged between the safety channel and the integrated climbing frame, and the lifting method comprises the following steps:
(1) adjusting the length of the cable-stayed structure to enable the safety channel to incline upwards, wherein one end of the safety channel connected with the tower crane is separated;
(2) retracting the length of the secure tunnel;
(3) lifting the integrated climbing frame to a specified height, and lifting the safety channel together with the integrated climbing frame;
(4) after reaching a specified height, extending the secure tunnel;
(5) adjusting the length of the cable-stayed structure, and releasing the safety channel downwards;
(6) the safety channel is reconnected to the tower crane;
(7) and (5) repeating the steps (1) to (6) when climbing up again is needed.
Preferably, the secure channel is locked both after shortening and after lengthening using a secure locking device.
Compared with the prior art, the invention has the following technical effects:
(1) the safety channel is connected to the integrated climbing frame through the telescopic cable-stayed structure, and the inclination angle of the safety channel can be adjusted through the stretching of the cable-stayed structure, so that the influence of height deviation between the safety channel and a tower crane standard knot can be avoided, the safety channel is stably connected to a tower crane, and the passing safety of personnel is ensured;
(2) the safety channel comprises the main body part and the telescopic part which are in telescopic connection, the length of the safety channel can be contracted while the safety channel is inclined upwards in the lifting process, the interference influence of a tower crane and a protrusion of the tower crane on the safety channel can be avoided, the safety channel can be smoothly lifted, in addition, the length of the safety channel can be properly adjusted according to the distance between the tower crane and the integrated climbing frame, and the safety channel is ensured to be stably connected between the tower crane and the integrated climbing frame;
(3) the main body part and the telescopic part of the safety channel are in telescopic connection through the pulleys and are locked through the safety locking device, so that the main body part and the telescopic part can be ensured to slide smoothly during telescopic operation, and the main body part and the telescopic part can be firmly and reliably connected after sliding in place, and the passing safety of personnel can be ensured;
(4) the invention adopts the mode that the diagonal draw bar is matched with the turnbuckle to realize the extension and retraction of the diagonal draw structure, and further realizes the adjustment of the inclination angle of the safety channel, namely, the extension and retraction of the diagonal draw bar and the hinging of the safety channel are different technical characteristics of an integral technical scheme, and the invention is an integral technical concept, the adjustment of the inclination angle of the safety channel can be realized only by the mutual matching of the technical characteristics, and the adjustment operation of the safety channel is simple, convenient and fast, and the safety is higher.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without inventive exercise.
FIG. 1 is a schematic structural diagram of a secure tunnel in a normal application state (where a person can pass through the secure tunnel);
FIG. 2 is a schematic view of the structure of the diagonal draw bar contracted and the safety channel inclined upwards;
FIG. 3 is a schematic view of the structure at 1 in FIG. 2;
FIG. 4 is a schematic view of the structure at 2 in FIG. 2;
FIG. 5 is a schematic view of the hinge structure;
wherein, 1, hanging hooks; 2. a longitudinal bar; 3. a pulley; 4. a pin hole; 5. a bolt; 6. a pull ring; 7. a cross bar; 8. a steel plate; 9. a channel end cross member; 10. a diagonal member; 11. a turnbuckle; 12. a hinge structure; 13. a guardrail is arranged; 14. and fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention aims to provide a safety channel for connecting an integrated climbing frame and a tower crane and a lifting method thereof, and aims to solve the problems in the prior art.
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in further detail below.
The invention provides a safe passage for connecting an integrated climbing frame and a tower crane, which comprises a main body part for treading and a telescopic part telescopically connected to the main body part, wherein the main body part and the telescopic part are telescopically connected to form the safe passage for a person to walk. The main body part is used as a main body of the safety channel, the length of the main body part can be larger than that of the telescopic part, and the telescopic part can move in a telescopic manner in the length direction of the main body part, so that the whole safety channel can be extended or shortened; in any case, the telescopic part should only slide in the length direction, and the sliding grooves limit the pulleys or limit the structure so that the telescopic part cannot be turned over downwards by the main body part to break the telescopic connection. The tip of main part articulates on integrated climbing frame for the main part can be round the articulated shaft certain angle of upwards or the downward sloping, because main part and pars contractilis telescopic link form the escape way together, then the escape way is whole can incline through the articulated shaft. The pars contractilis can be connected on the standard festival of tower crane (for example the overlap joint is on the horizontal pole of tower crane standard festival or through mode detachable such as bolt connection on the tower crane standard festival, and former operation is more convenient, the latter connects more stably). A telescopic diagonal structure is arranged between the main body part and the integrated climbing frame, the diagonal structure can be a telescopic rod, a rope, a telescopic bracket and the like, the safety channel can be driven to tilt up and down by the stretching of the diagonal structure, thereby adjusting the inclination angle of the safety channel according to the actual situation and the requirement, therefore, the influence of the height deviation between the safety channel and the standard knot of the tower crane can be avoided, so that the safety passage is stably connected to the tower crane, the safety of personnel passing is ensured, in addition, the length of the safety channel can be contracted while the safety channel is inclined upwards in the process of lifting the integrated climbing frame, the interference influence of a tower crane and a projection thereof on the safety channel can be avoided, make the escape way promote smoothly, moreover, can also climb the length of the suitable adjustment escape way of interval between the frame according to tower crane and integration, guarantee that the escape way is stably connected between tower crane and integration are climbed.
As shown in fig. 1-2, the width of the expansion part can be designed to be smaller than that of the main body part, the expansion part is sleeved inside the main body part, the expansion part can be provided with a pulley 3, the main body part is provided with a sliding groove, and the pulley 3 slides in the sliding groove to realize the expansion and contraction movement of the main body part and the expansion part. It should be noted that, in order to ensure that the pulley 3 only moves in the length direction in the sliding groove, the pulley 3 may be clamped in the sliding groove (the pulley 3 may also be disposed on the upper bottom surface and the lower bottom surface of the telescopic portion at the same time), that is, the sliding groove is disposed on both sides of the pulley 3, and the sliding groove limits the movement of the pulley 3 in the up-down direction. A safety locking device can be arranged between the main body part and the telescopic part, and after the telescopic positions of the telescopic part and the main body part are determined, the relative positions of the telescopic part and the main body part are fixed through the safety locking device, so that dangerous factors caused by the fact that the telescopic part continuously slides relative to the main body part when people pass through or in the process of lifting/lowering the safety channel are avoided; the safety locking device can be a bolt, a limiting block and other structures and is used for limiting the movement of the telescopic part on the main body part in the length direction.
As shown in fig. 1-3, the main body structure of the main body part and the main body structure of the telescopic part are substantially the same, but the width is different, and the main body structure can respectively comprise longitudinal bars 2 with opposite openings and arranged in parallel, the longitudinal bars 2 can be U-shaped steel, and the longitudinal bars 2 form two side edges of the safety channel; a plurality of cross rods 7 are connected between the two side edges, and the cross rods 7 can be made of square steel pipes or U-shaped steel; the both ends of horizontal pole 7 are connected respectively on the vertical pole 2 of two sides, and the top surface of horizontal pole 7 is connected with steel sheet 8, and horizontal pole 7 can form stable main part supporting structure with the combination of vertical pole 2 to can improve steel sheet 8's bearing capacity, further assurance escape way's security, it needs to explain, the connected mode of above-mentioned each position all can adopt welded connected mode, if assembled structure, also can adopt bolted connection's mode. In order to further ensure the safety of walking, an anti-slip structure can be arranged on the surface of the steel plate 8, and the anti-slip structure can be a corrugated protrusion.
As shown in fig. 3, the safety locking device is a pin 5, a plurality of pin holes 4 are respectively formed in the longitudinal rod 2 of the main body part and the longitudinal rod 2 of the telescopic part, the distance in the length direction is equal, the pin holes 4 in the main body part can be coaxial with the pin holes 4 in the telescopic part, and the main body part and the telescopic part are locked after the pin 5 passes through the pin holes 4. The diameter of the pin shaft 5 is smaller than the inner diameter of the pin hole 4, one end of the pin shaft 5 is provided with an expanded end, the diameter of the expanded end is larger than the inner diameter of the pin hole 4, the other end of the pin shaft is provided with a through hole in the vertical axial direction, and after the pin shaft 4 penetrates through the pin hole 4, a fixing pin 14 penetrates through the through hole, so that the pin shaft 5 is fixed in the pin hole 4, and finally the locking of the main body part and the telescopic part is achieved.
As shown in fig. 1-2, the diagonal structure may be a diagonal member 10, and the diagonal member 10 may be a steel wire or a support rod. The oblique pull rod 10 is connected respectively in the both sides of main part to one side, is provided with pull ring 6 on the main part, and the tip of oblique pull rod 10 passes pull ring 6 and realizes connecting, and the tip of oblique pull rod 10 can have certain activity in pull ring 6, and when oblique pull rod 10 drove main part inclination and removed, the relative position of oblique pull rod 10 and pull ring 6 can change to all can realize stable taut fixed action to the main part at the angle of difference. The diagonal draw bar 10 is divided into two sections in the middle, two opposite ends are provided with reverse threads and are connected with the turnbuckles 11, the turnbuckles 11 are used as adjusting nuts, and the turnbuckles can drive the diagonal draw bar 10 to move close to or far away from when rotating, so that the length of the diagonal draw bar 10 can be adjusted, and the inclination angle of the main body part can be adjusted by adjusting the length of the diagonal draw bar 10.
As shown in fig. 1-2, the tip of pars contractilis can be provided with couple 1, couple 1 can be fixed and set up the terminal surface at every vertical pole 2, utilize couple 1 to connect on the horizontal pole of tower crane, thereby can be further inject the connection of pars contractilis and tower crane, avoid rocking about, guarantee the stability of connecting, it needs to explain that couple 1 is connected also based on the characteristic that the flexible section can remove on the main part section with the horizontal pole, that is also the scalable characteristic of safe passageway, when couple 1 is the arc bending structure, can realize couple 1 and be connected or break away from the connection through the removal of flexible section in length direction.
As shown in fig. 2 and 4-5, the end part of the main body part is provided with an end part cross beam 9, the end part cross beam 9 can be connected to the longitudinal rods 2 on both sides of the main body part, the end part cross beam 9 can be a section of square steel pipe, angle steel or U-shaped steel and has a mounting plane, one mounting plane of the end part cross beam 9 is fixedly connected with one leaf of the hinge structure 12, the other leaf of the hinge structure 12 is fixedly connected to the integrated climbing frame, and at least 2 hinge structures 12 can be arranged side by side to ensure the connection stability. The hinge structure 12 is provided with mounting holes, round holes can be formed in corresponding positions of the end cross beams 9 and connected through screws or bolts, the hinge structure 12 can be directly welded on the end cross beams 9, and the other ends of the hinge structure are connected in the same mode. The hinge structure 12 can realize the hinged connection of the main body part and the integrated climbing frame, and the main body part can rotate and move on a hinge shaft (a rotating shaft of the hinge structure 12).
As shown in fig. 1-2, two sides of the main body part and the telescopic part are respectively provided with a fence 13, and the fence 13 can be connected to the longitudinal bars 2 at two sides. Through setting up fence 13 better assurance personnel security when passing on the escape way.
The invention also provides a lifting method of a safety channel for connecting the integrated climbing frame and the tower crane, the safety channel applied in the method can adopt the safety channel recorded in the above, the safety channel is hinged on the integrated climbing frame, and a telescopic cable-stayed structure is also arranged between the safety channel and the integrated climbing frame, and the lifting method specifically comprises the following steps:
(1) the length of the cable-stayed structure is adjusted, the cable-stayed structure can adopt a steel wire rope, and the length of the cable-stayed structure is adjusted by pulling the steel wire rope to shorten the length of the steel wire rope between the safety channel and the integrated climbing frame; when the above-described escape route is used, the turnbuckle 11 may be rotated to adjust the length of the diagonal member 10. No matter which mode is adopted, after the length of the diagonal draw bar structure is adjusted, the safe channel inclines upwards, and one end of the safe channel connected with the tower crane is separated. It should be noted that if the end of the safety channel connected with the tower crane is not lapped but detachably connected by the fastening device, the fastening device needs to be firstly detached, and if the hook 1 is arranged, the length of the safety channel can be firstly extended according to needs, so that the hook 1 is firstly detached from the connection.
(2) After the safety channel is inclined upwards for a certain angle, whether the length of the safety channel is contracted or not is selected according to whether a barrier exists in the upper moving space, when the safety channel is contracted, the bolt 5 connected with the safety channel can be detached firstly, then the length of the safety channel is contracted, and after the safety channel is contracted to a specified length, the bolt 5 is installed. It should be noted that, if the position limiting structure is arranged between the telescopic part and the main body part on the safe passage, the bolt 5 may not be installed at this time, and the position of the telescopic part is limited by the position limiting structure to move, so as to ensure the safety and stability of the safe passage when the safe passage climbs along with the integrated climbing frame.
(3) After fixing the relative position of pars contractilis and main part, promote integrated height of climbing the frame, at this moment, because the escape way articulates on integrated climbing the frame, at integrated in-process that climbs the frame promotion, the escape way promotes thereupon together, relies on the articulated shaft and draws the structure to realize fixing and fix to the escape way to one side at the in-process of whole promotion.
(4) After reaching the designated height, the bolt 5 installed before is detached (if installed), then the safety channel is extended and fixed, so that the length of the safety channel can be larger than the distance between the tower crane and the integrated climbing frame.
(5) Adjusting the length of the cable-stayed structure, in this case, should be elongating the length of the cable-stayed structure, i.e. adjusting in reverse with respect to step (1), thereby releasing the secure channel downwards. It should be noted that the length of the cable-stayed structure can be reasonably adjusted according to whether the safety channel is in contact with the cross rod or not, so that better contact connection is ensured.
(6) After the horizontal pole of escape way overlap joint on the tower crane, realize the overlap joint of escape way and tower crane, if there is couple 1, then adjust escape way at length direction as required for couple 1 can be effectively connected with the horizontal pole, if there is fastener, then installed fastener, finally make escape way reconnect on the tower crane. And can climb the length of the interval between the frame according to tower crane and integration and suitably adjust the escape way, guarantee that the escape way is stably connected between tower crane and integration and climb the frame.
(7) And (5) repeating the steps (1) to (6) when climbing up again is needed.
The safety passageway shortens the back and all can adopt safety locking device to lock behind the extension, and safety locking device can be for structures such as bolt, stopper for inject the removal of length direction of pars contractilis on the main part, guarantee after sliding to target in place, the firm in connection, reliable of main part and pars contractilis of safety passageway, guarantee the current safety of personnel.
The principle and the implementation mode of the invention are explained by applying a specific example, and the description of the embodiment is only used for helping to understand the method and the core idea of the invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, the specific embodiments and the application range may be changed. In view of the above, the present disclosure should not be construed as limiting the invention.

Claims (10)

1. The utility model provides a connect integrated safe passageway of climbing frame and tower crane which characterized in that: including supplying main part and the scalable connection of trampling flexible portion on the main part, the main part articulates on integrated climbing frame, the flexible portion can be connected on the tower crane, the main part with integrated climbing is provided with the telescopic structure of drawing to one side between the frame.
2. The safety channel for connecting the integrated climbing frame and the tower crane according to claim 1, characterized in that: the width of pars contractilis less than the width of main part, pars contractilis is provided with the pulley, the main part is provided with the spout, the pulley is in slide in the spout, the main part with be provided with safe locking device between the pars contractilis.
3. The safety channel for connecting the integrated climbing frame and the tower crane according to claim 2, characterized in that: the main part with the pars contractilis respectively including the relative and parallel arrangement's of opening vertical pole, be connected with a plurality of horizontal poles between the vertical pole, the top surface of horizontal pole is connected with the steel sheet.
4. The safety channel for connecting the integrated climbing frame and the tower crane according to claim 3, characterized in that: the safety locking device is a pin shaft, a longitudinal rod of the main body part is in through connection with a longitudinal rod of the telescopic part through the pin shaft, one end of the pin shaft is provided with an expansion end, and a fixing bolt penetrates through the other end of the pin shaft.
5. The secure corridor for connecting an integrated climbing frame and a tower crane according to any one of claims 1-4, wherein: the cable-stayed structure is a cable-stayed pole, and the middle part of the cable-stayed pole is provided with a turnbuckle.
6. The safety channel for connecting the integrated climbing frame and the tower crane according to claim 5, characterized in that: the tip of pars contractilis provided with the couple, the couple is connected on the tower crane.
7. The safety channel for connecting the integrated climbing frame and the tower crane according to claim 5, characterized in that: the end part of the main body part is provided with an end part cross beam, the end part cross beam is fixedly connected with one leaf of the hinge structure, and the other leaf of the hinge structure is fixedly connected to the integrated climbing frame.
8. The safety channel for connecting the integrated climbing frame and the tower crane according to claim 5, characterized in that: and two sides of the main body part and the telescopic part are respectively provided with an enclosure guardrail.
9. The utility model provides a connect integrated safe passageway's of climbing frame and tower crane promotion method which characterized in that, safe passageway articulates on integrated climbing frame, safe passageway with integrated climbing still is provided with the telescopic structure of drawing to one side between the frame, includes following step:
(1) adjusting the length of the cable-stayed structure to enable the safety channel to incline upwards, wherein one end of the safety channel connected with the tower crane is separated;
(2) retracting the length of the secure tunnel;
(3) lifting the integrated climbing frame to a specified height, and lifting the safety channel together with the integrated climbing frame;
(4) after reaching a specified height, extending the secure tunnel;
(5) adjusting the length of the cable-stayed structure, and releasing the safety channel downwards;
(6) the safety channel is reconnected to the tower crane;
(7) and (5) repeating the steps (1) to (6) when climbing up again is needed.
10. The lifting method of the safety channel for connecting the integrated climbing frame and the tower crane according to claim 9, characterized in that: the safety channel is locked by adopting a safety locking device after being shortened and after being lengthened.
CN202110359203.XA 2021-04-02 2021-04-02 Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof Active CN113044741B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110359203.XA CN113044741B (en) 2021-04-02 2021-04-02 Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110359203.XA CN113044741B (en) 2021-04-02 2021-04-02 Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof

Publications (2)

Publication Number Publication Date
CN113044741A true CN113044741A (en) 2021-06-29
CN113044741B CN113044741B (en) 2023-12-01

Family

ID=76517498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110359203.XA Active CN113044741B (en) 2021-04-02 2021-04-02 Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof

Country Status (1)

Country Link
CN (1) CN113044741B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117550501A (en) * 2024-01-11 2024-02-13 中铁城建集团第一工程有限公司 Climbing frame attached adjustable tower crane walkway and integral lifting method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104044990A (en) * 2014-05-27 2014-09-17 北京航天发射技术研究所 Cable-stayed sling type cross beam spreader
CN205218359U (en) * 2015-12-15 2016-05-11 九冶建设有限公司 A cantilever crane puts up device for welding machine
CN106437153A (en) * 2016-08-08 2017-02-22 中建四局第三建筑工程有限公司 Telescopic and transferrable crane climbing passageway for tower crane driver
CN206940293U (en) * 2017-05-17 2018-01-30 山东天元起重机械安装有限公司 A kind of telescopic driver's lane device of derrick crane
CN207468059U (en) * 2017-06-30 2018-06-08 中国建筑第五工程局有限公司 A kind of telescopic tower crane people row escape way
CN108750970A (en) * 2018-06-07 2018-11-06 重庆工业职业技术学院 A kind of tower crane occasional passage and its installation method
CN208234425U (en) * 2018-05-10 2018-12-14 中建八局第一建设有限公司 A kind of exit passageway device of Super High abnormity Core Walls Structure creeping formwork and attachment tower crane
CN110668324A (en) * 2019-09-27 2020-01-10 中国一冶集团有限公司 Tower crane movable passageway system
CN210236926U (en) * 2019-06-06 2020-04-03 中铁十二局集团建筑安装工程有限公司 Folding type tower crane pedestrian safety passage
CN111173315A (en) * 2020-02-25 2020-05-19 中建四局第一建筑工程有限公司 Climb tower crane pedestrian access structure on frame
CN210655915U (en) * 2019-01-31 2020-06-02 山河建设集团有限公司 Connecting device for climbing frame and tower crane
CN211338618U (en) * 2019-11-21 2020-08-25 中国建筑第五工程局有限公司 Tower crane pedestrian passageway
CN211470603U (en) * 2019-12-24 2020-09-11 中国建筑第二工程局有限公司 Telescopic tower crane passageway
CN211946009U (en) * 2020-03-31 2020-11-17 中建二局第二建筑工程有限公司 Tower crane pedestrian passageway device

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104044990A (en) * 2014-05-27 2014-09-17 北京航天发射技术研究所 Cable-stayed sling type cross beam spreader
CN205218359U (en) * 2015-12-15 2016-05-11 九冶建设有限公司 A cantilever crane puts up device for welding machine
CN106437153A (en) * 2016-08-08 2017-02-22 中建四局第三建筑工程有限公司 Telescopic and transferrable crane climbing passageway for tower crane driver
CN206940293U (en) * 2017-05-17 2018-01-30 山东天元起重机械安装有限公司 A kind of telescopic driver's lane device of derrick crane
CN207468059U (en) * 2017-06-30 2018-06-08 中国建筑第五工程局有限公司 A kind of telescopic tower crane people row escape way
CN208234425U (en) * 2018-05-10 2018-12-14 中建八局第一建设有限公司 A kind of exit passageway device of Super High abnormity Core Walls Structure creeping formwork and attachment tower crane
CN108750970A (en) * 2018-06-07 2018-11-06 重庆工业职业技术学院 A kind of tower crane occasional passage and its installation method
CN210655915U (en) * 2019-01-31 2020-06-02 山河建设集团有限公司 Connecting device for climbing frame and tower crane
CN210236926U (en) * 2019-06-06 2020-04-03 中铁十二局集团建筑安装工程有限公司 Folding type tower crane pedestrian safety passage
CN110668324A (en) * 2019-09-27 2020-01-10 中国一冶集团有限公司 Tower crane movable passageway system
CN211338618U (en) * 2019-11-21 2020-08-25 中国建筑第五工程局有限公司 Tower crane pedestrian passageway
CN211470603U (en) * 2019-12-24 2020-09-11 中国建筑第二工程局有限公司 Telescopic tower crane passageway
CN111173315A (en) * 2020-02-25 2020-05-19 中建四局第一建筑工程有限公司 Climb tower crane pedestrian access structure on frame
CN211946009U (en) * 2020-03-31 2020-11-17 中建二局第二建筑工程有限公司 Tower crane pedestrian passageway device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117550501A (en) * 2024-01-11 2024-02-13 中铁城建集团第一工程有限公司 Climbing frame attached adjustable tower crane walkway and integral lifting method
CN117550501B (en) * 2024-01-11 2024-03-22 中铁城建集团第一工程有限公司 Climbing frame attached adjustable tower crane walkway and integral lifting method

Also Published As

Publication number Publication date
CN113044741B (en) 2023-12-01

Similar Documents

Publication Publication Date Title
US10329781B2 (en) Safety barrier netting system
US9528285B2 (en) Safety barrier netting system with rigid panel net supports and stopper mechanisms
EP2878731B1 (en) Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles
CN107795112A (en) A kind of high maneuverability external wall aerial work platform structure
EP3362611B1 (en) Door system for movable structures
KR101449654B1 (en) Angle and height adjustable apparatus for inspecting bridge
CN106193568A (en) Mobile steel truss operating platform
CN105735103B (en) Portable quick installation can dismantle bridge on foot
CN113044741A (en) Safety channel for connecting integrated climbing frame and tower crane and lifting method thereof
KR101497661B1 (en) foldable pole
CN112982935B (en) Pull-up scaffold for wide-scene balcony and construction method thereof
KR102558279B1 (en) Safety work structure for construction of post-type footbridge and deck roads
CN111852074B (en) Adjustable lifting type supporting device
CN116290716A (en) Hanging basket type working platform capable of transversely expanding working surface
CN205955164U (en) Portable steel truss operation platform
JP3950800B2 (en) Suspension scaffold
CN210511568U (en) Street lamp and foldable bracing piece thereof
CN108518119B (en) Portable power transmission pole maintenance tool and construction method
CN215711300U (en) Tower crane standard festival is from driver's passageway subassembly in area
CN218323835U (en) Track board connecting device and scaffold are walked in opening and shutting of scaffold frame
CN218881530U (en) Adjustable elevator shaft operating platform support frame
CN219585686U (en) Safe telescopic channel for suspended tower crane driver
CN113622642B (en) Push-pull type steel cantilever protection platform and installation method thereof
RU206116U1 (en) Prefabricated and dismantled support of overhead power transmission line
CN220791116U (en) But automatically regulated stretches out and draws back and folding guardrail ladder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant