CN218290239U - Tower crane regularization channel equipment with formula lift scaffold promotes - Google Patents

Tower crane regularization channel equipment with formula lift scaffold promotes Download PDF

Info

Publication number
CN218290239U
CN218290239U CN202222294512.6U CN202222294512U CN218290239U CN 218290239 U CN218290239 U CN 218290239U CN 202222294512 U CN202222294512 U CN 202222294512U CN 218290239 U CN218290239 U CN 218290239U
Authority
CN
China
Prior art keywords
tower crane
passageway
main frame
regularization
decorative pattern
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222294512.6U
Other languages
Chinese (zh)
Inventor
孙金霞
罗少平
李鸿飞
黄志麟
易韩勍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202222294512.6U priority Critical patent/CN218290239U/en
Application granted granted Critical
Publication of CN218290239U publication Critical patent/CN218290239U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a novel detecting instrument technical field especially relates to a tower crane regularization access device that accompanies formula lifting foot hand rack to promote, include: tower crane regularization passageway, tower crane regularization passageway overlap joint climbs between frame and the tower crane for fixed and follow and climb a removal, the tower crane regularization passageway includes: passageway main frame and interim door, the passageway main frame is connected with interim door, the passageway main frame be used for with climb a lap joint fixed, interim door is used for providing an access way for make things convenient for the tower crane driver to leave the tower crane, the passageway main frame is walked the guidance tape by vertical keel, decorative pattern and the fixed subassembly of metal is formed, vertical keel and decorative pattern walk the guidance tape butt, the fixed subassembly of metal is used for fixed vertical keel and decorative pattern to walk the guidance tape. The utility model discloses aim at solving the tower crane driver and climb high-rise cat ladder from top to bottom at every turn, consume the plenty of time, and have serious potential safety hazard, fixed floor tower crane passageway needs to set up many times, and is artifical, material cost too big.

Description

Tower crane regularization channel equipment with formula lift scaffold promotes
Technical Field
The utility model relates to a construction scaffold field specifically is a tower crane regularization access device who accompanies formula lifting scaffold frame promotion.
Background
The scaffold is a working platform which is erected for ensuring the smooth proceeding of each construction process, is various supports which are erected for workers to operate and solve the problems of vertical and horizontal transportation on a construction site, is a general term of the building industry in the construction of the existing-stage building structure, and is a floor type external scaffold which is mostly adopted as a construction platform and safety protection. With the rapid development of domestic economy, the growth of population and the reduction of construction land promote the development and extension of buildings to space, high-rise buildings and super high-rise buildings are more and more, and the traditional floor type external scaffold can not meet the requirements of building construction. Compared with the traditional floor type external scaffold, the attachment type lifting scaffold developed in recent years has great advantages in the aspects of safety, economy, construction period and the like, the overall construction image is superior to that of the floor type external scaffold, and the scaffold is gradually adopted to replace the floor type external scaffold in the current domestic structure construction.
Building construction scaffold among the prior art has the problem: when building construction scaffold, current construction scaffold installation and dismantlement step are loaded down with trivial details, and the subassembly of constitution is more, and does not have safeguard measure, and factor of safety is not high, and the staff takes place the accident easily when using, harms constructor's healthy easily, has reduced the efficiency of construction.
The utility model has the following contents:
in order to overcome prior art's is not enough, the utility model aims at providing a tower crane regularization passageway equipment that accompanies formula lifting foot hand frame promotion aims at solving the tower crane driver and climbs high-rise cat ladder from top to bottom at every turn, consumes a large amount of time, and has serious potential safety hazard, and fixed floor tower crane passageway needs to be set up many times, and manual work, material cost are too big.
In order to solve the above problems, the utility model adopts the following technical scheme: a tower crane regularization access device with attached lifting scaffold lifting, comprising: the tower crane regularization passageway, tower crane regularization passageway overlap joint climbs between frame and the tower crane for fixed and follow and climb a removal, the tower crane regularization passageway includes: passageway main frame and interim door, the passageway main frame is connected with interim door, the passageway main frame is used for and climbs a lap joint fixed, interim door is used for providing an access passage for make things convenient for the tower crane driver to leave the tower crane, the passageway main frame is walked guidance tape and metal fixed subassembly by erectting fossil fragments, decorative pattern and is formed, erectting fossil fragments with decorative pattern walks guidance tape butt, metal fixed subassembly is used for fixing erectting fossil fragments and decorative pattern and walks guidance tape.
Therefore, the utility model discloses possess following beneficial effect:
the utility model provides a pair of tower crane regularization access arrangement that accompanies formula lift scaffold promotes, it is fixed with climbing frame vertical keel and walk bolt butt joint for the guidance tape to stereotype the passageway, the vertical keel of regularization front end is connected with the wire rope for the vertical keel of climbing frame, the installation turns over the board between regularization passageway and the tower crane, and use a net piece to seal as interim door, make when climbing the frame is promoting, the tower crane passageway can be along with climbing the frame promotion, thereby reduce the well high floor and set up the tower crane and go up people's passageway many times and reach the effect that reduces the cost of labor.
According to a further scheme, the metal fixing component comprises a net piece, a steel wire rope, a steel pipe and a turning plate, the net piece is connected with the lower portion of the vertical keel in a welding mode, the turning plate is located on one side of the vertical keel, and the steel wire rope is connected with the vertical keel and used for stabilizing tower crane sizing channel equipment.
It can be seen that the metal fixing component is used for fixing the channel main frame, so that the channel main frame has good safety, and in addition, the mesh sheet prevents the falling of the construction tool and the construction worker.
According to a further scheme, the mesh is provided with an opening, the temporary door is arranged at the opening of the mesh, and one end of the temporary door is welded and fixed with the vertical keel.
It can be seen that the metal fixing component is used for fixing the temporary door of the tower crane regularization channel equipment, so that a tower crane driver can enter a building, and the tower crane driver can leave a tower crane conveniently.
A further scheme is that two through many between the vertical keel steel tube welding, the steel pipe is located on the net piece that vertical keel connects, the decorative pattern pavement slab erects on the steel pipe, just decorative pattern pavement board and steel tube welding.
Therefore, the patterned walkway plate can make the construction workers more comfortable to walk, and meanwhile, the patterned walkway plate is erected on the steel pipe so that the patterned walkway plate is more stable and cannot shake.
The further scheme is that the frame of the channel main frame is made of the vertical keels, the vertical keels are connected with the channel main frame through bolts, the net piece is arranged in the frame of the channel main frame in a sealing mode, the vertical keels are provided with a plurality of holes connected with steel pipes, and the vertical keels are connected with the steel pipes in a vertical welding mode.
Therefore, the vertical keel is made into a lifting ring forming the pattern walkway plate, and the lifting ring can be lifted to a specified position by using a tower crane to be installed.
The further scheme is that each pattern walkway plate is welded with two lifting rings which are respectively welded at the positions of two sides of the pattern walkway plate and used for lifting the pattern walkway plate to a specified position through a tower crane for installation.
Therefore, the lifting rings on the pattern walkway plate can be installed at the specified positions by using the tower crane to lift.
According to a further scheme, one end of the turning plate is in contact with the wall body, the other end of the turning plate is in welded connection with the pattern walkway plate, and the turning plate can be bent and is used for being in abutting connection with the wall body without damaging the wall body.
Therefore, the turnover plate is in abutting connection with the wall body, the wall body cannot be damaged, and the turnover plate is suitable for serving as a component in contact with the wall body.
Drawings
Fig. 1 is the utility model discloses a tower crane regularization access arrangement's that accompanies formula lift scaffold to promote structural schematic.
Fig. 2 is the utility model discloses a tower crane regularization access device's that accompanies formula lifting foot hand rack and promote schematic structure drawing.
The reference numbers illustrate: a vertical keel 100; a mesh sheet 200; a hanging ring 300; a turning plate 400; a temporary door 500; a patterned walkway plate 600; a steel pipe 700.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the drawings in the embodiment of the present invention, and it is obvious that the described embodiment is only a part of the embodiments of the present invention, rather than all embodiments, and based on the embodiments of the present invention, all other embodiments obtained on the premise that the person skilled in the art does not make creative work all belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution:
as shown in fig. 1, the utility model discloses a tower crane regularization passageway equipment that accompanying formula lift scaffold promoted, it includes: a passage main frame and a temporary door 500; the main channel frame is composed of vertical keels 100, a pattern walkway board 600 and a net piece 200, two turning plates 400 are arranged at one end of the main channel frame and the temporary door 500, and the main channel frame is hinged with the turning plates 400 at one end of the temporary door 500.
Therefore, the utility model provides a tower crane regularization access device who accompanies formula lifting foot hand frame promotion, the decorative pattern of a passageway main frame is walked guidance tape 600 and is equipped with the opening part, net piece 200 among the decorative pattern is walked guidance tape 600 can be opened, a passageway main frame opening part can be connected with another passageway, the passageway main frame is connected with climbing frame centre keel 100 with the bolt, and the decorative pattern is walked guidance tape 600 and is climbed frame centre keel 100 and be connected with the bolt, the available on-the-spot existing material of passageway main frame is assembled and is constituteed, its installation is simple convenient, can play fine safety protection effect to the construction worker.
Further, the metal fixing component comprises a net piece 200, a steel wire rope, a steel pipe 700 and a turning plate 400, the net piece 200 is connected to the lower portion of the vertical keel 100 in a welding mode, the turning plate 400 is located on one side of the vertical keel 100, and the steel wire rope is connected with the vertical keel 100 and used for stabilizing tower crane sizing channel equipment.
Further, an opening is formed in the mesh sheet 200, a temporary door 500 is arranged at the opening of the mesh sheet 200, and one end of the temporary door 500 is welded and fixed to the vertical keel 100.
Further, two vertical keels 100 are welded through a plurality of steel pipes 700, the steel pipes 700 are located on the net sheets 200 connected with the vertical keels 100, the pattern walkway plate 600 is erected on the steel pipes 700, and the pattern walkway plate 600 is welded with the steel pipes 700.
Further, the frame of passageway main frame is made by erector keel 100, erector keel 100 is connected with the passageway main frame with the bolt, and net piece 200 is sealed to be laid in the frame of passageway main frame, and erector keel 100 is equipped with a plurality of holes of being connected with steel pipe 700, and erector keel 100 links to each other with the perpendicular welding of many steel pipes 700.
Furthermore, each pattern walkway plate 600 is welded with two lifting rings 300, which are respectively welded at the two sides of the pattern walkway plate 600 and used for lifting the pattern walkway plate 600 to a specified position for installation through a tower crane.
Further, the one end of turning over board 400 contacts with the wall body, and turns over the other end of board 400 and decorative pattern guidance tape 600 welded connection, turns over board 400 flexible for with the wall body conflict be connected and can not harm the wall body.
Specifically, the tower crane regularization passageway equipment that accompanies formula lift scaffold of this embodiment promotes includes: a main channel frame, a lifting ring 300, and a temporary door 500. The channel main frame is made of the mullion 100, the tread board 600 and the net 200. The tread boards 600 are welded to the steel pipes 700, and the steel pipes 700 are welded to the shaft keels 100. The hanging rings 300 are located at both sides of the passage main frame, and the temporary doors 500 are located at sides of the passage main frame. As fig. 2, the passageway main frame with climb a centre keel 100 and decorative pattern and walk the board 600 and dock with the bolt fastening for the passageway main frame is along with centre keel 100 liftable, and the main entrance is equipped with the opening part, makes the main frame of passageway main frame and another passageway be connected, and this utility model has certain spreading value.
The utility model discloses work flow: the main frame of the regularization channel is installed on the ground through the pattern walkway plate 600, the vertical keels 100, the steel pipe 700 and the punched net piece 200, the site is blocked and the warning board is hung to prevent other personnel from passing through, the net piece 200 is opened at the position of the tower crane channel of the 5 th walkway plate 600 of the climbing frame, the pre-installed regularization channel is hung to the opening position of the net piece 200 through the tower crane, a constructor can butt-joint the regularization channel with the vertical keels 100 of the climbing frame and the pattern walkway plate 600 through bolts, the regularization front end vertical keel 100 is obliquely pulled on the vertical keel 100 of the climbing frame through 2 steel wire ropes No. 15, the turning plate 400 is installed between the regularization channel and the tower crane, one net piece 200 is used for sealing to serve as the temporary door 500 and is only used for a tower crane driver.
The main channel frame is required to be installed on the ground in advance, and the main channel frame is fixed at the corresponding position of the climbing frame in a lap joint mode. Regularization tower crane passageway main frame is equipped with interim door 500 along with climbing a frame automatic lifting between regularization tower crane passageway main frame and the tower crane, and interim door 500 can reach the safeguard effect. The installation process is simple and convenient, and the assembled steel plate is formed by assembling existing materials on site. The invention can make the construction worker more convenient and safer to get on or off the tower crane, and has certain popularization value. Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
It should be noted that, in the description of the present invention, if the orientation or the positional relationship indicated by the orientation description, such as up, down, front, back, left, right, etc., is referred to the orientation or the positional relationship shown in the drawings, it is only for the convenience of description of the present invention and simplification of description, but not for the purpose of indicating or implying that the indicated device or element must have a specific orientation, be constructed or operated in a specific orientation, and should not be interpreted as limiting the present invention.
In the description of the present invention, a plurality of means are one or more, a plurality of means are two or more, and the terms greater than, less than, exceeding, etc. are understood as not including the present number, and the terms greater than, less than, within, etc. are understood as including the present number. The description to first or second etc. is for the purpose of distinguishing between technical features and is not to be construed as indicating or implying a relative importance or implying a number of indicated technical features or implying a precedence relationship between indicated technical features.
In the description of the present invention, unless there is an explicit limitation, the words such as setting, installation, connection, etc. should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above words in combination with the specific contents of the technical solution.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention cannot be limited thereby, and any insubstantial changes and substitutions made by those skilled in the art on the basis of the present invention are all within the protection scope of the present invention.

Claims (7)

1. The utility model provides a tower crane regularization access device that rises with attached lifting scaffolding which characterized in that includes: the tower crane regularization passageway, tower crane regularization passageway overlap joint climbs between frame and the tower crane for fixed and follow and climb a removal, the tower crane regularization passageway includes: passageway main frame and interim door, the passageway main frame is connected with interim door, the passageway main frame is used for with climb a lap joint fixed, interim door is used for providing an access passage for make things convenient for the tower crane driver to leave the tower crane, the passageway main frame is walked the guidance tape and is fixed the subassembly by erectting fossil fragments, decorative pattern and constitute, erect fossil fragments with the decorative pattern is walked the guidance tape butt, the fixed subassembly of metal is used for fixing it is walked the guidance tape and decorative pattern to erect fossil fragments.
2. The tower crane sizing passageway equipment lifted by the attached lifting scaffold as claimed in claim 1, wherein:
the metal fixing component comprises a net piece, a steel wire rope, a steel pipe and a turning plate, the net piece is welded and connected with the lower portion of the vertical keel, the turning plate is located on one side of the vertical keel, and the steel wire rope is connected with the vertical keel and used for stabilizing sizing channel equipment of the tower crane.
3. The tower crane sizing passageway equipment lifted by an attached lifting scaffold according to claim 2, wherein:
the net piece is provided with an opening, the opening of the net piece is provided with the temporary door, and one end of the temporary door is welded and fixed with the vertical keel.
4. The tower crane sizing passageway equipment lifted by the attached lifting scaffold according to claim 3, wherein:
two through many between the vertical keel steel tube welding, the steel pipe is located on the net piece that vertical keel connects, decorative pattern pavement board erects on the steel pipe, just decorative pattern pavement board and steel tube welding.
5. The tower crane sizing channel equipment with the attached lifting scaffold lifting function as claimed in any one of claims 2 to 4, wherein:
the frame of passageway main frame by the mullion is made, the mullion is connected with the bolt for the passageway main frame, the net piece is sealed to be laid in the frame of passageway main frame, the mullion is equipped with a plurality of holes of being connected with the steel pipe, the mullion links to each other with the perpendicular welding of many steel pipes.
6. The tower crane sizing channel equipment with the attached lifting scaffold lifting function as claimed in any one of claims 2 to 4, wherein:
every the welding has two rings on the decorative pattern pavement slab, welds respectively the position of decorative pattern pavement slab both sides is used for with the decorative pattern pavement slab is hoisted the assigned position through the tower crane and is installed.
7. A tower crane sizing walkway apparatus as claimed in any one of claims 2 to 4, which is hoisted with an attached lifting scaffold, wherein:
one end of the turning plate is in contact with the wall body, the other end of the turning plate is in welded connection with the pattern walkway plate, and the turning plate can be bent and is used for being in abutting connection with the wall body without damaging the wall body.
CN202222294512.6U 2022-08-30 2022-08-30 Tower crane regularization channel equipment with formula lift scaffold promotes Active CN218290239U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222294512.6U CN218290239U (en) 2022-08-30 2022-08-30 Tower crane regularization channel equipment with formula lift scaffold promotes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222294512.6U CN218290239U (en) 2022-08-30 2022-08-30 Tower crane regularization channel equipment with formula lift scaffold promotes

Publications (1)

Publication Number Publication Date
CN218290239U true CN218290239U (en) 2023-01-13

Family

ID=84812914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222294512.6U Active CN218290239U (en) 2022-08-30 2022-08-30 Tower crane regularization channel equipment with formula lift scaffold promotes

Country Status (1)

Country Link
CN (1) CN218290239U (en)

Similar Documents

Publication Publication Date Title
CN102383588B (en) Lifting platform for protecting safety of high-level construction
CN104763109B (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN107700719A (en) A kind of hanging method of high-rise building glass curtain wall
CN210236926U (en) Folding type tower crane pedestrian safety passage
CN202359510U (en) Multi-functional working vehicle for concrete anti-collision guardrail of bridge
CN218290239U (en) Tower crane regularization channel equipment with formula lift scaffold promotes
CN205476420U (en) Modular steel cat ladder
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN208152583U (en) A kind of high-building construction ancillary equipment
CN213418444U (en) A access & exit structure for elevator well adheres to lift platform
CN210655915U (en) Connecting device for climbing frame and tower crane
CN212249126U (en) Sliding platform for large-size cornice aluminum plate construction
CN211775606U (en) Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway
CN206987720U (en) A kind of double shield cage cat ladders
CN206636153U (en) Indoor individual layer scaffold
CN207228673U (en) A kind of cage combination vertical passage
CN217418120U (en) Novel practical tower crane passageway of going to people device
CN214996224U (en) Multifunctional protective frame for light production well for building construction
CN207079889U (en) A kind of working assembling type mobile construction platform of ceiling
CN217627285U (en) Tool type tower crane driver channel
CN214831948U (en) Mounting bracket platform for cable-stayed bridge of vertical steel tower
CN221143715U (en) Temporary stair operation platform for assembled building construction
CN215714676U (en) Arch bridge construction operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant