CN218145304U - Adjustable lifting appliance - Google Patents

Adjustable lifting appliance Download PDF

Info

Publication number
CN218145304U
CN218145304U CN202222393869.XU CN202222393869U CN218145304U CN 218145304 U CN218145304 U CN 218145304U CN 202222393869 U CN202222393869 U CN 202222393869U CN 218145304 U CN218145304 U CN 218145304U
Authority
CN
China
Prior art keywords
lifting
tower
crane
frame
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222393869.XU
Other languages
Chinese (zh)
Inventor
张敬弦
张皎
雷栋
史双涛
黄开开
苏金堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202222393869.XU priority Critical patent/CN218145304U/en
Application granted granted Critical
Publication of CN218145304U publication Critical patent/CN218145304U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The application provides a hoist with adjustable, it includes gallows and lifting claw, the gallows includes hanging beam and lower hanger, is equipped with the revolution mechanic that is used for adjusting both relative deflection angles between them between hanging beam and the lower hanger, and hanging beam and hoist engine hoist system are connected, and the bottom of hanging claw locating the lower hanger is in order to be used for being connected with the bridge structures that wait to lift by crane, is equipped with the position control spare that is used for promoting the lifting claw along lower hanger length direction removal on the lower hanger. The slewing structure is arranged between the upper hanging beam and the lower hanging frame, so that the slewing structure can be suitable for the condition that the tower column segment gradually widens along the bridge direction, the short edge is positioned along the bridge direction, the long edge is positioned along the transverse bridge direction during hoisting, and the tower column segment is rotated by 90 degrees after being lifted to the installation position for installation, so that the tower column segment and the cross beam are prevented from being interfered for installation; meanwhile, the position of the lifting claw can be adjusted by the position adjusting piece at the bottom of the lower hanging bracket, so that the lifting device is suitable for lifting bridge structures of different specifications.

Description

Adjustable lifting appliance
Technical Field
The application relates to the field of lifting appliances, in particular to an adjustable lifting appliance.
Background
A cable-stayed bridge is also called a diagonal tension bridge, is a bridge with a main beam directly pulled on a bridge tower by a plurality of guys, and is a structural system formed by combining a pressure-bearing tower, a pulled guy and a bending-bearing beam body. It can be seen as a multi-span elastically supported continuous beam with guy cables instead of buttresses. It can reduce the bending moment in the beam body, reduce the building height, lighten the structural weight and save materials.
In the construction process of a cable-stayed bridge, a crane is commonly used for being matched with a lifting appliance to hoist bridge structures, but when the bridge structures with different specifications are hoisted, the installation lifting claws need to be adjusted again, so that the operation is complex, and the construction period is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a can angle regulation and lifting claw position with the adjustable hoist of the operation of different specification bridge structures hoist and mount.
In order to achieve the above object, the present application provides the following technical solutions:
the adjustable lifting appliance comprises a lifting frame and a lifting claw, wherein the lifting frame comprises an upper lifting beam and a lower lifting frame, a rotary structure used for adjusting the relative deflection angle of the upper lifting beam and the lower lifting frame is arranged between the upper lifting beam and the lower lifting frame, the upper lifting beam is connected with a winch lifting system, the lifting claw is arranged at the bottom of the lower lifting frame and used for being connected with a bridge structure to be lifted, and a position adjusting piece used for pushing the lifting claw to move along the length direction of the lower lifting frame is arranged on the lower lifting frame.
Further setting: the rotary structure comprises an inner ring and an outer ring which are coaxially arranged and can rotate relatively, the outer ring is connected with the upper hanging beam, the inner ring is connected with the lower hanging frame, and a driving piece used for driving the inner ring to rotate relatively to the outer ring is arranged on the upper hanging beam.
Further setting: the driving piece is a motor.
Further setting: the inner ring is provided with a whole circle of internal teeth along the circumferential direction, and an output shaft of the motor is provided with a gear meshed with the internal teeth of the inner ring.
Further setting: the lower hanging bracket is an H-shaped frame, the upper hanging beam is positioned above the middle connecting beam of the lower hanging bracket, and the rotary structure is arranged between the upper hanging beam and the middle connecting beam of the lower hanging bracket.
Further setting: the lifting claws are respectively provided with one group corresponding to four corner ends of the lower lifting frame, and the position adjusting elements are four corresponding to four groups of lifting claws and correspond to the four groups of lifting claws one by one.
Further setting: the position adjusting piece comprises a hydraulic oil cylinder, the extending end of a piston rod of the hydraulic oil cylinder is connected with the lifting claw, and a cylinder barrel of the hydraulic oil cylinder is fixed on the lower lifting frame.
Further setting: the lifting claw is a four-claw lifting claw.
Further setting: and movable pulley blocks used for being connected with a hoisting system of the winch are arranged at two ends of the upper hoisting beam.
Compared with the prior art, the scheme of the application has the following advantages:
in the adjustable lifting appliance, the rotation structure is arranged between the upper lifting beam and the lower lifting frame, so that the adjustable lifting appliance can be suitable for the condition that the tower column segment gradually widens along the direction along the bridge, the short edge is positioned along the direction along the bridge, the long edge is positioned along the transverse bridge direction during lifting, the adjustable lifting appliance is rotated by 90 degrees to be installed after being lifted to the installation position, and otherwise, the driving cross brace and the temporary cross beam between cable towers are required to be installed to the outer side of the transverse bridge of the tower column, so that the tower column and the cross beam are prevented from being interfered; meanwhile, the position of the lifting claw can be adjusted by the position adjusting piece at the bottom of the lower hanging bracket, so that the lifting device is suitable for lifting bridge structures of different specifications.
Additional aspects and advantages of the present application will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the present application.
Drawings
The foregoing and/or additional aspects and advantages of the present application will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a schematic structural diagram of an embodiment of a hoisting and jacking integrated self-climbing crane of the present application;
FIG. 2 is an enlarged view of the part A of FIG. 1;
FIG. 3 is a side view of an embodiment of the present hoisting and jacking integrated self-climbing crane;
FIG. 4 is a schematic structural diagram of a continuous climbing mechanism in the hoisting and jacking integrated self-climbing crane of the present application;
FIG. 5 is a schematic view of a connection structure between a continuous climbing mechanism and a dual-anchor type spreader in the lifting and jacking integrated self-climbing crane of the present application;
FIG. 6 is a schematic structural diagram of a spreader of the present application for a lifting and jacking integrated self-climbing crane;
FIG. 7 is a structural top view of a spreader of the present application for use in a lifting and jacking integrated self-climbing crane;
FIG. 8 is a schematic structural diagram of a construction operation platform in the lifting and jacking integrated self-climbing crane of the present application;
fig. 9 is a process flow diagram of the method for constructing the double-tower cable-stayed tower by using the hoisting and jacking integrated self-climbing crane of the present application.
In the figure, 1, a main truss; 2. a sliding support frame; 21. the main frame body is supported in a sliding manner; 22. sliding the walking; 221. a sliding seat; 222. a sliding oil cylinder; 23. the hinged support is fixed on the tower wall; 231. a fixed seat; 232. a connecting seat; 3. a hoisting and jacking integrated crown block system; 31. a crane frame body; 32. a continuous climbing mechanism; 321. lifting the upright post; 322. climbing oil cylinders; 33. lifting the hanger body; 331. a roller; 332. transversely moving the oil cylinder; 34. a spreader; 3411. an upper hanging beam; 3412. a lower hanging bracket; 342. a lifting claw; 343. a movable pulley block; 344. a hydraulic cylinder; 345. a revolving structure; 3451. an inner ring; 3452. an outer ring; 3453. a motor; 346. an anchoring seat; 35. a drive mechanism; 36. a lifting parallel mechanism; 361. parallel connection; 362. a double-ended lift cylinder; 4. a hoist lifting system; 41. a winch; 42. a wire rope; 43. a rope winding drum; 5. constructing an operation platform; 51. a crown block operation maintenance platform; 52. an upper maintenance platform; 53. a lower maintenance platform; 54. transversely sliding the welding platform; 55. a longitudinal welding platform; 56. repairing the platform; 57. an upper channel and a lower channel.
Detailed Description
Reference will now be made in detail to the embodiments of the present application, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present application and are not to be construed as limiting the present application.
Referring to fig. 1 to 8, in order to solve the problem of construction of a cable tower with a single tower column or a double tower column, the present application provides a crane with a hoisting and jacking integrated self-climbing function, which can realize self-climbing of the crane without a large hoisting device and can be applied to cable tower construction in different geographic environments.
The hoisting and jacking integrated self-climbing crane (hereinafter referred to as a "crane") comprises a main truss 1, a sliding support frame 2, a hoisting and jacking integrated crown block system 3 and a winch system 4, wherein the main truss 1 is erected at the top of a tower column meeting construction requirements, and the sliding support frame 2 is positioned below the main truss 1 and is used for being anchored with the tower column to support the main truss 1. The hoisting and jacking integrated crown block system 3 is arranged above the main truss 1 and is used for hoisting bridge structures and realizing self-climbing of a crane. The hoisting and jacking integrated crown block system 3 comprises a hoisting crown block frame body 31, a continuous climbing mechanism 32, a hoisting frame body 33 and a lifting appliance 34, wherein the hoisting crown block frame body 31 can move along the length direction of the main truss 1 so as to transport a hoisted bridge structure to the top of a tower column and place the structure in opposite position, the hoisting frame body 33 is arranged on the hoisting crown block frame body 31, and the winch system 4 is connected with the lifting appliance 34 through the hoisting frame body 33 so as to hoist the structure by using the lifting appliance 34.
The hoisting and jacking integrated self-climbing crane is mainly used for construction of cable towers, so that a lifted bridge structure is a tower column segment or a tower column cross beam.
Specifically, the main truss 1 adopts two-piece truss structure, and it includes two parallel arrangement's truss and connects the middle parallel connection of two trusses, main truss 1 sets up the opening along its length direction's at least one distolateral, just the opening of main truss 1 sets up downwards towards its central line slope, so that jack-up jacking integral type overhead traveling crane system 3 follows the opening part hoist and mount bridge structures of main truss 1 extremely inside and transport to corresponding station of transferring of main truss 1. The top and the bottom of main truss 1 all set up the track (not mark) to be used for leading with the removal of locating the slip support frame 2 of 1 bottom of main truss 1 top jack-up integral type overhead traveling crane system 3 respectively.
Locate main truss 1 bottom slip support frame 2 is the main bearing structure who connects this application hoist and king-post, slip support frame 2 supports the body frame 21, slides step 22 and the fixed articulated bearing 23 of tower wall including sliding, the length direction perpendicular to that slides and supports the body frame 21 the length direction of main truss 1, the step 22 that slides is located between main truss 1 and the support body frame 21 that slides, in order to pass through the step 22 top of sliding pushes the support body frame 21 that slides is followed the length direction of main truss 1 removes. The walking of sliding 22 includes two sliding seat 221 and locates the hydro-cylinder 222 that slides between two sliding seat 221, two sliding seat 221 all with be located the track cooperation of 1 bottom of main truss, two all be equipped with on the sliding seat 221 be used for with the main truss 1 grafting complex is inserted and is pulled out the round pin, and is two in sliding seat 221, be close to in sliding seat 221 and the support body frame body 21 that slides of support body frame body 21 is connected, then through two sliding seat 221 and the cooperation of hydro-cylinder 222 that slides, can realize sliding support frame 21 is followed the length direction of main truss 1 removes.
The tower wall fixing and hinging support 23 is hinged to one side, close to the tower column, of the sliding support main frame body 21, the tower wall fixing and hinging support 23 comprises a fixing seat 231 and a connecting seat 232 which are hinged to each other, the fixing seat 231 is installed on the sliding support main frame body 21, and the connecting seat 232 can be connected and fixed with a connecting piece pre-buried in the side wall of the tower column through a high-strength bolt.
Preferably, in this embodiment, the two groups of the sliding support frames 2 are respectively arranged on two sides of the tower column, the main truss 1 is supported by the two groups of the sliding support frames 2, and the two sliding steps 22 of each group of the sliding support frames 2 are arranged in two corresponding to the two-piece truss structure of the main truss 1, so that the two groups of the sliding steps 22 push the sliding support frames 2 to approach or leave the tower column along the length direction of the main truss 1. Meanwhile, the main sliding support frame 21 is connected with the tower columns by arranging four tower wall fixing hinged supports 23, so that the connection strength between the main sliding support frame 21 and the tower columns is ensured.
The main sliding support frames 21 of the two groups of sliding support frames 2 on the two sides of the tower column are driven by the sliding footrests 22 to be close to the tower column, and the tower wall fixing hinged supports 23 are anchored with the tower column, so that the whole crane load of the crane of the application is transmitted to the tower column through the sliding support frames 2 and then the tower wall fixing hinged supports 23, and the crane of the application is effectively supported.
The hoisting and jacking integrated crown block system 3 can realize self-climbing of the crane and hoisting of a bridge structure, namely, the main truss 1 can climb to the top of an installed tower column segment under the driving of the hoisting and jacking integrated crown block system 3 so as to install the next tower column segment. The sliding support frame 2 is lifted along with the lifting of the main truss 1, and under the condition that the crane hoists the bridge structure, the tower wall fixed hinged supports 23 of the sliding support frame 2 are all anchored with the side walls of the tower columns; under the condition that the crane climbs, the constraint between all the tower wall fixed hinged supports 23 and the tower column is released, and the sliding support frame 21 is driven to be far away from the tower column through the sliding walking track 22, so that the lifting operation of the main truss 1 is facilitated.
Jack-up jacking integral type overhead traveling crane system 3 can follow the length direction removal of girder 1, jack-up jacking integral type overhead traveling crane system 3 includes jack-up overhead traveling crane support body 31, climbing mechanism 32 in succession, lifts by crane support body 33 and hoist 34, jack-up overhead traveling crane support body 31 with be equipped with actuating mechanism 35 between the girder 1, actuating mechanism 35 is including drive seat and actuating cylinder, the drive seat with the track cooperation at 1 top of girder, just be equipped with on the drive seat and be used for pegging graft the complex plug pin with the track, actuating cylinder locates the drive seat with between the overhead traveling crane support body 31, through actuating cylinder intermittently stretches out and draws back in order to promote jack-up overhead traveling crane support body 31 follows the length direction removal of girder 1.
Further, the hoisting overhead traveling crane frame body 31 spans two trusses of the main truss 1, two sets of driving mechanisms 35 are arranged between the hoisting overhead traveling crane frame body 31 and the main truss 1 corresponding to the two trusses, and the transverse movement stability of the hoisting overhead traveling crane frame body 31 is improved.
The continuous climbing mechanism 32 is disposed in the crane block frame 31, and includes a lifting upright post 321 and a climbing cylinder 322, a through hole (not shown) is disposed on the crane block frame 31, the lifting upright post 321 penetrates the crane block frame 31 from the through hole, a plurality of insertion holes (not labeled) are disposed on the lifting upright post 321 along a length direction thereof, the climbing cylinder 322 is disposed on the crane block frame 31, and an extending end of a piston rod thereof is provided with an insertion pin which is inserted and matched with the insertion hole of the lifting upright post 321. Moreover, at least two sets of climbing cylinders 322 are provided corresponding to each lifting upright 321, and the climbing cylinders 322 of different sets can alternately extend and retract to push the lifting upright 321 to move along the length direction (vertical direction in this embodiment).
Preferably, four lifting columns 321 are provided in this embodiment, four through holes are correspondingly formed in the hoisting crown block frame body 31, connecting lines of the four through holes are rectangular, the through holes are square holes, and the lifting columns 321 are square columns, so that four groups of climbing cylinders 322 in this embodiment are provided corresponding to four surfaces of the square columns, and the four groups of climbing cylinders 322 are provided along the peripheries of the through holes. In addition, the four groups of climbing cylinders 322 form two-by-two teams, and the two groups of climbing cylinders 322 of the same team are synchronous in extension and retraction and are oppositely arranged corresponding to the opposite surfaces of the lifting upright columns 321. It should be noted that each group of climbing cylinders 322 includes at least one cylinder for pushing the lifting column 321, and the more the number of cylinders is, the higher the supporting capability of the lifting column 321 is. Therefore, in this embodiment, each group of the climbing cylinders 322 has three cylinders arranged side by side for synchronous extension, and the end of the extending end of the piston rod of the three cylinders has a mounting seat (not labeled), and the plug pin engaged with the lifting upright 321 is fixed on the mounting seat.
Further, four still be equipped with the flat antithetical couplet mechanism 36 that goes up and down between two adjacent of lift stand 321, the flat antithetical couplet mechanism 36 that goes up and down includes flat antithetical couplet 361 and double-end lift cylinder 362, the both ends of flat antithetical couplet 361 all are equipped with double-end lift cylinder 362, double-end lift cylinder 362 has the telescopic piston rod in both ends, and the end that stretches out of its both ends piston rod all be provided with can with lift stand 321 grafting complex plug pin. The lifting horizontal connection 361 is used for connecting two adjacent lifting upright posts 321, so that the lifting upright posts 321 can be lifted synchronously.
The hoisting frame body 33 is respectively provided at two ends of the hoisting overhead traveling crane frame body 31, and the hoisting frame body 33 can move along the length direction relative to the hoisting overhead traveling crane frame body 31. Specifically, a traverse cylinder 332 which extends and retracts along the length direction of the crane tower body 31 is arranged on the crane tower body 31, the extending end of a piston rod of the traverse cylinder 332 is connected with the crane tower body 33, meanwhile, guide rails (not shown) which extend along the length direction of the crane tower body 31 are arranged at two ends of the crane tower body 31, and the crane tower body 33 is provided with guide grooves (not shown) which are matched with the guide rails, so that the position of the crane tower body 33 on the crane tower body 31 is adjusted through the traverse cylinder 332.
Set up gyro wheel 331 on the lifting frame body 33, the hoist hoisting system 4 of this application mainly adopts hoist 41 collocation wire rope 42 to carry out the hoist and mount operation, the wire rope 42 of hoist hoisting system 4 passes through be connected with hoist 34 behind the gyro wheel 331 on the lifting frame body 33, promptly lifting frame body 33 is to wire rope 42 play the effect of direction, then can adjust the position that wire rope 42 transferred through the position of sideslip hydro-cylinder 332 regulation lifting frame body 33 to the adaptation is connected with different specification hoists 34. The lifting appliance 34 comprises a lifting frame and lifting claws 342, the lifting claws 342 are arranged below the lifting frame and are used for being connected with a bridge structure to be lifted, and movable pulley blocks 343 are arranged on the lifting frame and are used for being connected with the steel wire ropes 42 passing through the lifting frame body 33. Two sets of movable pulley blocks 343 are disposed at two ends of the lifting tool 34 and respectively correspond to the rolling wheels 331 of the two lifting frame bodies 33 on the lifting crown block frame body 31, so that the winch lifting system 4 is provided with two sets of steel wire ropes 42 to be connected with the movable pulley blocks 343 at two ends of the lifting frame through the rolling wheels 331 of the two lifting frame bodies 33, that is, the steel wire ropes 42 lift the lifting frame through the movable pulley blocks 343 connected to the two ends of the lifting frame, thereby improving the lifting stability and the lifting construction safety.
The hanger includes an upper hanging beam 3411 and a lower hanging frame 3412, the movable pulley block 343 is disposed at both ends of the upper hanging beam 3411, and the hanging claws 342 are disposed at the bottom side of the lower hanging frame 3412. The lower suspension bracket 3412 is an H-shaped frame, the lifting device 34 is disposed at each of four corner ends of the lower suspension bracket 3412, and each of the lifting claws 342 is a four-claw lifting claw. In addition, the lower suspension bracket 3412 is further provided with a hydraulic cylinder 344 corresponding to each lifting claw 342, the hydraulic cylinder 344 pushes the lifting claw 342 to slide on the lower suspension bracket 3412, so that the position of the lifting claw 342 is changed according to the position of a lifting point of a bridge structure to be lifted, that is, the lifting appliance 34 is an adjustable lifting appliance 34, so as to adapt to the lifting operation of bridge structures with different specifications.
The upper suspension beam 3411 is disposed above a middle connecting beam of the lower suspension frame 3412, a rotary structure 345 is disposed between the upper suspension beam 3411 and the lower suspension frame 3412, the rotary structure 345 includes an inner ring 3451 and an outer ring 3452 which are coaxially disposed, the inner ring 3451 and the outer ring 3452 are relatively rotatable, the outer ring 3452 is bolted to the upper suspension beam 3411, the inner ring 3451 is bolted to the lower suspension frame 3412, the upper suspension beam 3411 is provided with a motor 3453, the motor 3453 drives the inner ring 3451 to rotate, the inner ring 3451 is provided with a full circle of internal teeth, an output shaft of the motor 3453 is provided with a gear engaged with the internal teeth, the motor 3453 drives the upper suspension beam 3411 and the lower suspension frame 3412 to relatively rotate through the gear engagement when rotating, and the motor 3453 has a self-locking function, and when the motor 3453 stops rotating, the relative position of the upper suspension beam 3411 and the lower suspension frame 3412 is fixed. The utility model provides a gallows sets up revolution mechanic 345 at last hanging beam 3411 and between lower hoist 34, can be applicable to along the condition of the gradual widen of following the bridge at the pylon segment section, adopts the minor face to be located along the bridge to during the hoist and mount, long limit is located the cross bridge to, promotes to install the position after rotatory 90 again and installs, otherwise need install initiative stull and interim crossbeam between the cable-stayed tower to the pylon cross bridge outside, avoid its interference pylon and crossbeam installation.
The hoisting system 4 includes a hoisting machine 41, a steel wire rope 42 and a rope winding drum 43, and since the spatial arrangement position of the hoisting system is limited, in this embodiment, the hoisting machine 41 is disposed on the crane frame body 31 and moves therewith, and the rope winding drum 43 is disposed at the bottom of the tower. Preferably, the friction type winding machine 41 is preferably used in the present application, and the wire rope 42 of the friction type winding machine 41 in operation passes only without being wound on the winding machine 41, so that the winding machine 41 can be separated from the rope take-up reel 43. One end of the steel wire rope 42 is wound at the rope winding drum 43, and the other end of the steel wire rope passes through the winch 41 and then passes through the roller 331 on the lifting frame body 33 to be connected with the movable pulley block 343 on the lifting appliance 34, so that the lifting appliance 34 is pulled to be lifted by the friction force between the winch 41 and the steel wire rope 42.
In this embodiment, the hoisting capacity of each set of the hoist system 4 is 300 tons, and the diameter of the steel wire rope 42 is
Figure BDA0003838886690000081
Type preference
Figure BDA0003838886690000082
The breaking force of the steel wire rope 42 is 99.4 tons, and the lifting speed under the rated load is 6m/min. Wire rope 42 with total length of 3000m x 4, single friction type hoister 41 dead weight30 tons, and the self weight of a single rope collecting machine is 10 tons.
In addition, after the crane of the present application finishes hoisting the current tower column segment, the continuous climbing mechanism 32 may be used to climb to the top of the current tower column segment, at this time, the hoist 34 is kept fixed to the top of the tower column segment, and the climbing cylinder 322 is used to lower the lifting column 321 so as to anchor the bottom of the lifting column to the top of the hoist 34. The lifting appliance 34 is a double-anchor type lifting appliance 34, four groups of anchor seats 346 are arranged at positions corresponding to four lifting columns 321, each anchor seat 346 is provided with an insertion and extraction pin, and when the bottoms of the lifting columns 321 are abutted to the lifting appliance 34, the insertion and extraction pins are inserted into insertion holes at the bottoms of the lifting columns 321 to realize anchoring between the lifting columns 321 and lifting appliance 34 beams. In addition, at least two anchor seats 346 are provided for each lifting column 321 in each set of anchor seats 346, and the connection strength between the lifting column 321 and the spreader 34 is ensured by anchoring at least two points of the lifting column 321. In this embodiment, four anchor seats 346 are arranged in each set of anchor seats 346 to anchor four sides of each lifting column 321 in a one-to-one correspondence, so that the anchoring stability between the lifting column 321 and the spreader 34 is high.
Next, the crane frame body 31 is caused to ascend along the lifting column 321 by the telescopic operation of the ascent cylinder 322 on the crane frame body 31, and the crane frame body 31 stops after ascending in place. The main truss 1 can climb along with the climbing of the crane frame body 31, before the main truss 1 climbs along with the crane frame body 31, the anchoring between the sliding support frame 2 and the tower column should be firstly released, the sliding support frame 2 slides out for a certain distance to be completely separated from the tower column, so that the main truss 1 and the tower column are relatively free, and at the moment, the load of the crane is transferred to the top of the tower column through the lifting upright column 321 and the lifting appliance 34 to bear the load. Or, before the crane crown block body 31 climbs, the limitation of the crane crown block body 31 and the main truss 1 is removed, after the crane crown block body 31 climbs in place, the limitation of the wire rope 42 and the lifting tool 34 is removed, the temporary lifting tool 34 is arranged at the end part of the wire rope 42 for lifting, the lifting frame bodies 33 at the two ends of the crane crown block body 31 are adjusted to adjust the position of the temporary lifting tool 34 to be connected with the main truss 1, at this time, the connection of the sliding support frame 2 and the tower column is removed, the main truss 1 and the sliding support frame 2 are lifted to the lower position of the crane crown block body 31 by using the temporary lifting tool 34, the crane crown block body 31 is connected with the main truss 1, and the sliding support frame 2 is anchored with the tower column segment which is installed at the current top, so that the self-climbing of the crane of the present application is completed.
The self-climbing crane mainly depends on the cooperation of the climbing oil cylinder 322 and the plug pin, a multipoint synchronous control system is adopted to ensure the action consistency and synchronism of all the lifting oil cylinders, and the synchronous control system adopts a mature load sensitive electro-hydraulic proportional multi-way valve in the aspect of hydraulic system design, so that the point-to-point independent control of all the lifting oil cylinders can be realized. In the lifting process, the electric control system can acquire the position of a piston rod of the oil cylinder according to a displacement sensor arranged on the oil cylinder, correspondingly adjust the oil supply amount of each proportional valve in real time according to the difference of the position of the oil cylinder, and realize the synchronous control of the whole process on all the lifting oil cylinders by adopting a PID algorithm (namely a control algorithm integrating three links of proportion (proportionality), integral (integral) and derivative (derivative).
To sum up, the lifting jacking integrated self-climbing crane of the application integrates lifting and self-climbing, large-scale lifting equipment does not need to be arranged additionally, the problems that the existing tower crane is adopted to hoist structures, the cost is high and the progress is slow are solved, after construction of a single-section structure is completed, the crane of the application is lifted to the next section of hoisting position through a continuous lifting structure, the sequential circulation is realized, the process operation is simple, the construction time is saved, and the construction efficiency is improved.
Moreover, the hoisting and jacking integrated self-climbing crane is not only suitable for cable tower construction with a single tower column structure, but also can meet the construction requirement of a double-tower-column cable tower.
Specifically, during the construction of the cable tower of single-tower column structure, main truss 1 erects at the top tower column segment that this tower column has satisfied the requirement of construction height, through set up one set of jack-up jacking integral type overhead traveling crane system 3 on the main truss 1 can accomplish the hoist and mount operation of tower column segment.
Therefore, the using method of the hoisting and jacking integrated self-climbing crane comprises the following steps:
s001, arranging a lifting and jacking integrated self-climbing crane on the top of the tower column meeting the construction height requirement. The hoisting and jacking integrated self-climbing crane is characterized in that a main truss 1 of the hoisting and jacking integrated self-climbing crane is erected at the top of a single tower column along a transverse bridge direction, two groups of sliding support frames 2 are arranged along the bridge direction and arranged on two sides of the tower column, and a set of hoisting and jacking integrated crown block system 3 and a set of winch lifting system 4 are arranged on the main truss 1.
And S002, hoisting and jacking the integrated crown block system 3 and the winch lifting system 4 from one end of the main truss 1 in the length direction to lift the steel tower segment to the position above the installed tower column segment for installation.
The main truss 1 is located its length direction's one end and sets up the slope opening to make things convenient for jack-up jacking integral type overhead traveling crane system 3 and hoist hoisting system 4 hoist and mount steel tower festival section to enter into main truss 1 and transport, jack-up jacking integral type overhead traveling crane system 3 is controllable in the position on main truss 1, thereby ensures that the steel tower festival section of hoist and mount and the accurate counterpoint of the pylon of having installed, ensures the installation accuracy of pylon.
During the period that the lifting and jacking integrated crown block system 3 and the winch lifting system 4 lift the steel tower segment, the sliding support frame 2 below the main truss 1 is anchored with the tower column, so that the main truss 1 is ensured to have enough support capacity to realize the lifting operation of the steel tower segment.
And S003, after the installed steel tower segment is completely installed, the hoisting and jacking integrated crown block system 3 is utilized to enable the hoisting and jacking integrated self-climbing crane to move to the top of the currently installed steel tower segment.
The known hoisting and jacking integrated crown block system comprises a hoisting crown block body 31, a continuous climbing mechanism 32, a hoisting frame body 33 and a lifting appliance 34, wherein the continuous climbing mechanism 32 comprises a lifting upright column 321 and a climbing cylinder 322. When the crane of the present application climbs, the climbing cylinder 322 moves the lifting column 321 to abut against the lifting tool 34 anchored at the top of the tower column below the lifting column, the bottom of the lifting column 321 and the lifting tool 34 are in anchoring connection through the insertion and extraction pins of the anchoring seats 346, and after the three anchoring of the lifting column 321, the lifting tool 34 and the top of the tower column are ensured, the climbing cylinder 322 with the crane frame body 31 climbs to the top of the lifting column 321 along the vertical direction. The main truss 1 can climb along with the climbing of the hoisting crown block frame body 31, and in the climbing process, the sliding support frame 2 at the bottom of the main truss 1 is separated from the tower column; or, the crane crown block frame body 31 and the main truss 1 may be separated, and after the crane crown block frame body 31 climbs in place, the crane frame bodies 33 at the two ends of the crane crown block frame body 31 cooperate with the temporary lifting appliance 34 to lift the main truss 1 to the lower part of the crane crown block frame body 31 and then connect. It should be noted that, when the main truss 1 is lifted, the sliding support frame 2 at the bottom of the main truss 1 is separated from the tower column, and after the main truss 1 moves to the top of the currently installed steel tower segment, the sliding support frame 2 is anchored with the top of the current tower column, so that the self-climbing of the lifting and jacking integrated self-climbing crane is completed.
And (5) circulating the steps S002 and S003, namely, performing the height connection of the tower column through the circulating operation of the climbing operation of the hoisting steel tower segment and the hoisting and jacking integrated crown block system 3 until the construction of the tower column is finished.
When constructing a cable tower with a double-tower-column structure, the construction of connecting the height of a single tower column needs to be completed, and a cross beam between two tower columns needs to be constructed. Then this application utilizes jack-up jacking integral type to erect from main truss 1 of hoist that climbs on two adjacent pylons that have satisfied the requirement of construction height along the horizontal bridge to earlier when the cable tower of hoist construction double-pylon structure is constructed to hoist jack-up integral type, simultaneously, the support frame 2 that slides corresponds two pylons respectively and is provided with two sets ofly, every group the support frame 2 that slides equally divide and respectively establishes one set in the both sides that correspond the pylon, in order to ensure main truss 1's both ends homoenergetic obtains effective support.
In addition, when the cable tower with a double-tower-column structure is constructed, since the cable tower structure is more complicated than that of a cable tower with a single tower column, a construction operation platform 5 can be arranged on the main truss 1 to facilitate the construction of workers. Construction operation platform 5 includes that the overhead traveling crane operation overhauls platform 51, goes up to overhaul platform 52, overhauls platform 53, lateral sliding welded platform 54, vertical welded platform 55 and repair platform 56 down, it locates to go up to overhaul platform 52 the top side of main truss 1, overhead traveling crane operation overhauls platform 51 locates on the jack-up overhead traveling crane support body 31, just overhead traveling crane operation platform with it goes up to overhaul passageway 57 from top to bottom to be equipped with between the platform 52, it locates to overhaul platform 53 down main truss 1 downside, it also is equipped with passageway 57 from top to bottom to go up to overhaul between platform 52 and the lower overhaul platform 53, and passageway 57 is depended on the bracing setting of main truss 1 from top to bottom to this to ensure the structural strength and the stability of passageway 57 from top to bottom, lateral sliding welded platform 54 sets up along the horizontal bridge, vertical welded platform 55 sets up along the bridge direction, and lateral sliding welded platform 54 and vertical sliding welded platform are located the column top to treat that the column segment of hoist to carry out the welding jobs between two sections of column segments after the column segment top has been installed. The repairing platform 56 is correspondingly arranged at the sliding support frame 2 and can be used for repairing the structure of the sliding support frame 2, and an upper channel 57 and a lower channel 57 are arranged between the repairing platform 56 and the longitudinal welding platform 55. This application sets up passageway 57 about between the platform that a plurality of high positions are different and communicates, and faces the high protection guardrail of limit protection and all adopt 1.5m to make things convenient for the workman to reach each construction operation platform 5 through passageway 57 from top to bottom, can accomplish the operation of different positions.
Therefore, when the crane is used for constructing the cable tower of the double-tower-column structure, the construction operation platform 5 is additionally arranged on the main truss 1, and the joint design of the construction operation platform 5 and the main truss 1 enables the construction operation platform 5 to be driven by the continuous climbing mechanism 32 to lift up along with the main truss 1, and a conventional annular operation platform does not need to be additionally arranged.
In addition, to the cable tower of two tower column structures, set up two sets of jack-up jacking integral type overhead traveling crane systems 3 on the main truss 1 of this application, can carry out the synchronous construction of two pylons for the efficiency of construction then, and the cable tower of two tower column structures is still including the crossbeam, usable two sets jack-up jacking integral type overhead traveling crane systems 3 lifts by crane the crossbeam and installs.
Referring to fig. 9, the construction method of the double-tower cable tower includes the following steps:
firstly, a hoisting and jacking integrated self-climbing crane is arranged between two adjacent tower columns in the transverse bridge direction and meets the requirement of construction height.
The hoisting and jacking integrated self-climbing crane comprises a main truss 1, a sliding support frame 2, a hoisting and jacking integrated crown block system 3, a winch lifting system 4 and a construction operation platform 5, wherein the main truss 1 is erected between two adjacent tower columns meeting the construction height along the transverse bridge direction, the sliding support frame 2 is positioned below the main truss 1 and respectively corresponds to the two tower columns to be provided with two groups, and the sliding support frame 2 is anchored with a top tower column segment to achieve the effect of supporting the main truss 1 and an upper structure.
Be equipped with two sets on the main truss 1 jack-up jacking integral type overhead traveling crane system 3, just jack-up jacking integral type overhead traveling crane system 3 can follow the length direction of main truss 1 removes, jack-up jacking integral type overhead traveling crane system 3 includes jack-up overhead traveling crane support body 31, continuous climbing mechanism 32, jack-up support body 33 and hoist 34, jack-up overhead traveling crane support body 31 is located on the main truss 1 and be equipped with between the two and be used for promoting jack-up overhead traveling crane support body 31 is followed the actuating mechanism 35 that 1 length direction of main truss removed, continuous climbing mechanism 32 locates on the jack-up overhead traveling crane support body 31 in order to be used for with jack-up overhead traveling crane support body 31 promotes along vertical direction, jack-up support body 33 is followed the length direction of jack-up overhead traveling crane support body 31 removes, hoist lift system 4 passes through jack-up support body 33 with hoist 34 is connected in order to be used for promoting hoist 34 and promotes the steel tower festival section.
And hoisting the steel tower segment by utilizing the hoisting and jacking integrated self-climbing crane to connect the height of the tower column.
Specifically, the hoisting and jacking integrated crown block system 3 and the winch lifting system 4 are used for hoisting the steel tower segment to the top of the installed tower column segment to be heightened, after the current top tower column segment is installed, the continuous climbing mechanism 32 of the hoisting and jacking integrated crown block system 3 is reused for moving to the top of the installed steel tower segment from the currently connected steel tower segment, and then hoisting of the next steel tower segment is carried out.
The self-climbing step of the crane on the double-tower cable tower is the same as the self-climbing step of the crane installed on the single-tower cable tower, that is, the lifting appliance 34 for lifting the steel tower segment is anchored on the top of the currently installed steel tower segment, the bottom of the lifting upright 321 of the continuous climbing mechanism 32 is abutted against the lifting appliance 34 anchored on the top of the installed steel tower segment under the driving of the climbing cylinder 322, and the lifting upright 321 and the lifting appliance 34 are locked by the anchoring seat 346 and the inserting and pulling pin arranged on the top of the lifting appliance 34. After the crane crown block frame body 31 climbs to the target height of the lifting upright column 321 under the driving of the climbing oil cylinder 322, the fixing of the sliding support frame 2 and the tower column is released, the main truss 1 is lifted to the lower part of the crane crown block frame body 31 by using the winch lifting system 4, and then the sliding support frame 2 is anchored with the tower column segment installed at the current top part through the tower wall fixing hinged support 23.
It should be noted that the self-climbing of the crane of the double-tower cable tower needs to be performed after the steel tower segments of the two towers are symmetrically installed and welded, and the self-climbing systems on the two towers need to be operated synchronously to ensure the straight elevation of the main truss 1. Meanwhile, the hoisting and jacking integrated self-climbing crane for double-tower-column cable tower construction further comprises a construction operation platform 5, the construction operation platform 5 is attached to the main truss 1, and the self-climbing system also drives the construction operation platform 5 to climb when lifting the main truss 1.
And in the process of connecting the tower columns to be high, the hoisting and jacking integrated crown block system 3 and the winch lifting system 4 are used for hoisting the temporary cross beam from bottom to top to different height positions of the tower columns so as to connect the two tower columns.
And after the two tower columns are constructed to the target height, sequentially hoisting the upper cross beam and the lower cross beam to the specified height position from top to bottom and connecting the upper cross beam and the lower cross beam with the two tower columns.
Specifically, after the tower column is constructed to a preset tower top height, an assembling support is arranged at the bottom of the tower, and the height position of the assembling support is consistent with the height of an installation station of the lower cross beam. And hoisting the beam sections to the assembling support by using the hoisting and jacking integrated self-climbing crane, assembling to form an integral upper beam, and integrally hoisting the upper beam to an upper beam mounting station by using the hoisting and jacking integrated self-climbing crane and mounting and fixing the upper beam to complete the mounting and construction of the upper beam.
And then hoisting the beam sections of the self-climbing crane by three sections by using the hoisting and jacking integrated self-climbing crane, firstly hoisting the beam sections at two ends of the lower beam for installation, and finally hoisting the middle beam section for folding the lower beam so as to complete the installation and construction of the lower beam.
And finally, sequentially removing the temporary steel cross beam and the lifting and jacking integrated self-climbing crane to complete the construction of the double-tower-column steel cable tower.
After the construction of the tower columns and the cross beams of the double-tower-column cable tower is completed, an assembling support for assembling the cross beams, a temporary cross beam for connecting the two tower columns and a lifting and jacking integrated self-climbing crane are sequentially detached from bottom to top.
When the hoisting and jacking integrated self-climbing crane is dismantled, the hoisting and jacking integrated crown block system 3 is manufactured at the top of the tower column, the main truss 1 is hoisted by the winch hoisting system 4, and the connection between the sliding support frame 2 at the bottom of the main truss 1 and the tower column is released. Then, the main truss 1 is integrally lowered to the ground by using the winch lifting system 4, and then the main truss 1 is disassembled and dismantled by using the crawler crane.
And the hoisting and jacking integrated crown block system 3 positioned at the top of the tower column is dismantled by the aid of the tower crane, so that dismantling of the hoisting and jacking integrated self-climbing crane is completed.
The foregoing is only a partial embodiment of the present application, and it should be noted that, for those skilled in the art, several modifications and decorations can be made without departing from the principle of the present application, and these modifications and decorations should also be regarded as the protection scope of the present application.

Claims (9)

1. The utility model provides a hoist with adjustable, characterized by: the lifting device comprises a lifting frame and a lifting claw, wherein the lifting frame comprises an upper lifting beam and a lower lifting frame, a rotary structure for adjusting the relative deflection angle of the upper lifting beam and the lower lifting frame is arranged between the upper lifting beam and the lower lifting frame, the upper lifting beam is connected with a winch lifting system, the lifting claw is arranged at the bottom of the lower lifting frame and is used for being connected with a bridge structure to be lifted, and a position adjusting piece for pushing the lifting claw to move along the length direction of the lower lifting frame is arranged on the lower lifting frame.
2. The adjustable spreader of claim 1 wherein: the rotary structure comprises an inner ring and an outer ring which are coaxially arranged and can rotate relatively, the outer ring is connected with the upper hanging beam, the inner ring is connected with the lower hanging frame, and a driving piece used for driving the inner ring to rotate relatively to the outer ring is arranged on the upper hanging beam.
3. The adjustable spreader of claim 2 wherein: the driving piece is a motor.
4. The adjustable spreader of claim 3 wherein: the inner ring is provided with a whole circle of internal teeth along the circumferential direction, and an output shaft of the motor is provided with a gear meshed with the internal teeth of the inner ring.
5. The adjustable spreader of claim 1 wherein: the lower hanging bracket is an H-shaped frame, the upper hanging beam is positioned above the middle connecting beam of the lower hanging bracket, and the rotary structure is arranged between the upper hanging beam and the middle connecting beam of the lower hanging bracket.
6. The adjustable spreader of claim 5 wherein: the lifting claws are respectively provided with one group corresponding to four corner ends of the lower lifting frame, and the position adjusting elements are four corresponding to four groups of lifting claws and correspond to the four groups of lifting claws one by one.
7. The adjustable spreader of claim 6 wherein: the position adjusting piece comprises a hydraulic oil cylinder, the extending end of a piston rod of the hydraulic oil cylinder is connected with the lifting claw, and a cylinder barrel of the hydraulic oil cylinder is fixed on the lower lifting frame.
8. The adjustable spreader of claim 6 wherein: the lifting claw is a four-claw lifting claw.
9. The adjustable spreader of claim 1 wherein: and movable pulley blocks used for being connected with a hoisting system of the winch are arranged at two ends of the upper hoisting beam.
CN202222393869.XU 2022-09-08 2022-09-08 Adjustable lifting appliance Active CN218145304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222393869.XU CN218145304U (en) 2022-09-08 2022-09-08 Adjustable lifting appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222393869.XU CN218145304U (en) 2022-09-08 2022-09-08 Adjustable lifting appliance

Publications (1)

Publication Number Publication Date
CN218145304U true CN218145304U (en) 2022-12-27

Family

ID=84560390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222393869.XU Active CN218145304U (en) 2022-09-08 2022-09-08 Adjustable lifting appliance

Country Status (1)

Country Link
CN (1) CN218145304U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117068918A (en) * 2023-08-17 2023-11-17 南京交通职业技术学院 Hoisting device and hoisting method for energy storage battery

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117068918A (en) * 2023-08-17 2023-11-17 南京交通职业技术学院 Hoisting device and hoisting method for energy storage battery
CN117068918B (en) * 2023-08-17 2024-02-13 南京交通职业技术学院 Hoisting device and hoisting method for energy storage battery

Similar Documents

Publication Publication Date Title
WO2022048320A1 (en) Hydraulic self-elevating integrated cable-stayed bridge lifting formwork
CN112160243B (en) Steel tower lifting installation method
CN218145304U (en) Adjustable lifting appliance
CN110820602A (en) Single-segment box girder bridge girder erection machine and operation method thereof
CN113006145B (en) Reverse construction method construction process for large-diameter working well movable formwork
CN218320410U (en) Lifting and jacking integrated self-climbing crane
CN218320408U (en) Double-anchor type lifting appliance
CN111877728A (en) Lifting type movable operation platform for steel structure overhanging construction
CN218320407U (en) Lifting and jacking integrated crown block system
CN108928783B (en) Shear type climbing hoisting machine for existing building additionally installed elevator
CN218320409U (en) Continuous lifting mechanism
CN218434629U (en) Lifting frame for tower type pier construction
CN116163535A (en) Construction method for lifting prefabricated part in delta shape by walking on top of column
CN115402944A (en) Lifting and jacking integrated crown block system
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN115402945A (en) Lifting and jacking integrated self-climbing crane
WO2023070257A1 (en) Intelligent hoisting robot
CN115559209A (en) Double-tower-column cable tower construction method
CN112681144B (en) Self-climbing installation method of steel cable tower
CN210368664U (en) Wide-body bridge girder erection machine
CN211200095U (en) Matching structure of support leg and main beam of bridge girder erection machine
CN116281659A (en) Lifting and jacking integrated self-climbing crane
CN113802462A (en) Section-splicing bridge girder erection machine and front supporting leg for hoisting
CN112761187A (en) Electric lifting movable mould frame for large-diameter working well
CN215564411U (en) Sliding construction device for high-rise cylindrical building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant