CN115402944A - Lifting and jacking integrated crown block system - Google Patents

Lifting and jacking integrated crown block system Download PDF

Info

Publication number
CN115402944A
CN115402944A CN202211097601.XA CN202211097601A CN115402944A CN 115402944 A CN115402944 A CN 115402944A CN 202211097601 A CN202211097601 A CN 202211097601A CN 115402944 A CN115402944 A CN 115402944A
Authority
CN
China
Prior art keywords
lifting
hoisting
crown block
frame body
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211097601.XA
Other languages
Chinese (zh)
Inventor
吴健
张皎
刘朝霞
宋超
宋冰
盛朝辉
孔旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202211097601.XA priority Critical patent/CN115402944A/en
Publication of CN115402944A publication Critical patent/CN115402944A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • B66C23/348Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes the erection being operated by jacks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The application provides a hoisting and jacking integrated crown block system, which comprises a hoisting crown block frame body, a continuous climbing mechanism, a hoisting frame body and a lifting appliance; the hoisting crown block body is arranged on a main truss of the self-climbing crane and moves along the transverse bridge direction; the continuous climbing mechanism is arranged on the hoisting crane frame body and used for lifting the hoisting crane frame body along the vertical direction; the lifting frame body is arranged on the lifting crown block frame body and can move along the length direction of the lifting crown block frame body, the lifting appliance is used for lifting a bridge structure to be installed, the lifting appliance is connected with the lifting frame body through a steel wire rope, and the lifting frame body guides the steel wire rope of the lifting appliance. Through the cooperation of pegging graft between the lift stand in the mechanism and the hydro-cylinder that climbs in succession, realize jack-up jacking integral type overhead traveling crane system from climbing to drive the main truss who is connected with jack-up jacking integral type overhead traveling crane system's climbing, need not to use the tower crane of attaching to the column tower to promote the hoist machine, construction convenience.

Description

Lifting and jacking integrated crown block system
Technical Field
The application relates to the field of cable tower construction, in particular to a hoisting and jacking integrated crown block system.
Background
A cable-stayed bridge is also called a diagonal tension bridge, is a bridge with a main beam directly pulled on a bridge tower by a plurality of guys, and is a structural system formed by combining a pressure-bearing tower, a pulled guy and a bending-bearing beam body. It can be seen as a multi-span elastically supported continuous beam with guy cables instead of buttresses. It can reduce the bending moment in the beam body, reduce the building height, lighten the structural weight and save materials.
The cable-stayed bridge mainly comprises a cable tower, a main beam and a stay cable, and the steel tower sections, the steel beam sections and other bridge construction pieces of the tower column are hoisted by the common tower crane at present. Because the steel tower sections and the steel beam sections are heavy, a tower crane with a large tonnage is often required, the manufacturing cost is high, the horizontal thrust of the tower crane attached to a wall during construction is large for a tower column, the stress limit of a cable tower structure is easily exceeded, and the stress of a bridge is very unfavorable.
Disclosure of Invention
The purpose of this application aims at providing a jack-up jacking integral type overhead traveling crane system that can carry out self-climbing.
In order to achieve the above object, the present application provides the following technical solutions:
a lifting and jacking integrated crown block system comprises a lifting crown block frame body, a continuous climbing mechanism, a lifting frame body and a lifting appliance;
the hoisting crown block body is arranged on a main truss of the self-climbing crane and can move along the transverse bridge direction;
the continuous climbing mechanism is arranged on the hoisting crown block frame body and used for lifting the hoisting crown block frame body along the vertical direction;
the lifting frame body is arranged on the lifting crown block frame body and can move along the length direction of the lifting crown block frame body, the lifting appliance is used for lifting a bridge structure to be installed, the lifting appliance is connected with the lifting frame body through a steel wire rope, and the lifting frame body guides the steel wire rope of the lifting appliance.
Further setting: the continuous climbing mechanism comprises a lifting upright post and a climbing oil cylinder, wherein the lifting upright post is provided with a plurality of jacks distributed along the length direction of the lifting upright post, the climbing oil cylinder is arranged on the hoisting crown block frame body, and the extending end of a piston rod of the climbing oil cylinder is provided with a plug pin which enters and exits the jacks so as to push the lifting upright post to move along the direction vertical to the hoisting crown block frame body.
Further setting: set up a plurality of confessions on the crane crown block support body the perforation that the lift stand was planted, the lift stand one-to-one the perforation sets up many, just correspond every on the crane crown block support body the lift stand sets up two sets of climb the hydro-cylinder.
Further setting: two adjacent be equipped with lift parallel mechanism between the lift stand, lift parallel mechanism is including parallel and double-end lift cylinder, the both ends of parallel all are equipped with double-end lift cylinder, the end that stretches out of double-end lift cylinder's two piston rods all be provided with can with lift stand grafting complex plug pin.
Further setting: the hoisting frame body is arranged at two ends of the hoisting overhead traveling crane frame body in the length direction respectively, and a transverse oil cylinder used for pushing the hoisting frame body to move along the hoisting overhead traveling crane frame body in the length direction is arranged between the hoisting frame body and the hoisting overhead traveling crane frame body.
Further setting: the lifting frame body is provided with rollers, the lifting appliance comprises a lifting frame and two groups of movable pulley blocks, the two groups of movable pulley blocks are arranged at two ends of the lifting frame respectively, and the two groups of movable pulley blocks correspond to the lifting frame bodies at two ends of the lifting overhead crane frame body one to one.
Further setting: the hanger comprises an upper hanging beam and a lower hanging frame, the movable pulley block is arranged at two ends of the upper hanging beam, hanging claws are arranged at the bottom side of the lower hanging frame, and a hydraulic oil cylinder for pushing the hanging claws to slide on the lower hanging frame is arranged on the lower hanging frame.
Further setting: the lower hanger is an H-shaped frame, the upper hanging beam is arranged above the middle connecting beam of the lower hanger, a rotary structure is arranged between the upper hanging beam and the lower hanger and comprises an inner ring and an outer ring which are coaxially arranged, the inner ring and the outer ring can rotate relatively, the outer ring is bolted to the upper hanging beam, the inner ring is bolted to the lower hanger, and the upper hanging beam is provided with a motor for driving the inner ring to rotate.
Further setting: the inner ring is provided with a whole circle of internal teeth along the circumferential direction, and an output shaft of the motor is provided with a gear meshed with the internal teeth of the inner ring.
Further setting: the lifting frame is provided with an anchoring seat, the anchoring seat is provided with a plug pin which is used for being in plug-in fit with a jack at the bottom of the lifting upright post, and the lifting claw is anchored with the bridge structure through bolting so that the lifting upright post is anchored with the bridge structure.
Compared with the prior art, the scheme of the application has the following advantages:
in the jack-up jacking integral type overhead traveling crane system of this application, through the lift stand in the mechanism of climbing in succession and the grafting cooperation between the hydro-cylinder that climbs, realize jack-up jacking integral type overhead traveling crane system from climbing to drive the main truss who is connected with jack-up jacking integral type overhead traveling crane system's climbing, need not to use the tower crane of attaching to the column tower to promote the hoist machine, construction convenience.
Additional aspects and advantages of the present application will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the present application.
Drawings
The above and/or additional aspects and advantages of the present application will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
FIG. 1 is a schematic structural diagram of an embodiment of a hoisting and jacking integrated self-climbing crane of the present application;
FIG. 2 is an enlarged view of the part A of FIG. 1;
FIG. 3 is a side view of an embodiment of the present hoisting and jacking integrated self-climbing crane;
FIG. 4 is a schematic structural diagram of a continuous climbing mechanism in the lifting and jacking integrated self-climbing crane of the present application;
FIG. 5 is a schematic view of a connection structure between a continuous climbing mechanism and a dual-anchor type spreader in the lifting and jacking integrated self-climbing crane of the present application;
FIG. 6 is a schematic structural diagram of a spreader in the lifting and jacking integrated self-climbing crane of the present application;
FIG. 7 is a structural top view of a spreader of the present application for use in a lifting and jacking integrated self-climbing crane;
FIG. 8 is a schematic structural diagram of a construction operation platform in the lifting and jacking integrated self-climbing crane of the present application;
fig. 9 is a process flow diagram of the method for constructing the double-tower column cable tower by using the hoisting and jacking integrated self-climbing crane of the present application.
In the figure, 1, a main truss; 2. a sliding support frame; 21. a main frame body is supported in a sliding way; 22. sliding the walking; 221. a sliding seat; 222. a sliding oil cylinder; 23. the hinged support is fixed on the tower wall; 231. a fixed seat; 232. a connecting seat; 3. a hoisting and jacking integrated crown block system; 31. a hoisting crown block frame body; 32. a continuous climbing mechanism; 321. lifting the upright post; 322. climbing oil cylinders; 33. lifting the hanger body; 331. a roller; 332. transversely moving the oil cylinder; 34. a hanger; 3411. an upper hanging beam; 3412. a lower hanging bracket; 342. a lifting claw; 343. a movable pulley block; 344. a hydraulic cylinder; 345. a revolving structure; 3451. an inner ring; 3452. an outer ring; 3453. a motor; 346. an anchoring seat; 35. a drive mechanism; 36. a lifting parallel mechanism; 361. parallel connection; 362. a double-ended lift cylinder; 4. a hoist lifting system; 41. a hoist; 42. a wire rope; 43. a rope winding drum; 5. constructing an operation platform; 51. a crown block operation maintenance platform; 52. an upper maintenance platform; 53. a lower maintenance platform; 54. transversely sliding the welding platform; 55. a longitudinal welding platform; 56. repairing the platform; 57. and an upper channel and a lower channel.
Detailed Description
Reference will now be made in detail to embodiments of the present application, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present application and are not to be construed as limiting the present application.
Referring to fig. 1 to 8, in order to solve the problem of construction of a cable tower with a single tower column or a double tower column, the present application provides a crane with a hoisting and jacking integrated self-climbing function, which can realize self-climbing of the crane without a large hoisting device and can be applied to cable tower construction in different geographic environments.
The hoisting and jacking integrated self-climbing crane (hereinafter referred to as a "crane") comprises a main truss 1, a sliding support frame 2, a hoisting and jacking integrated crown block system 3 and a winch system 4, wherein the main truss 1 is erected at the top of a tower column meeting construction requirements, and the sliding support frame 2 is positioned below the main truss 1 and is used for being anchored with the tower column to support the main truss 1. The hoisting and jacking integrated crown block system 3 is arranged above the main truss 1 and is used for hoisting bridge structures and realizing self-climbing of a crane. The hoisting and jacking integrated crown block system 3 comprises a hoisting crown block frame body 31, a continuous climbing mechanism 32, a hoisting frame body 33 and a hoisting tool 34, wherein the hoisting crown block frame body 31 can move along the length direction of the main truss 1 so as to transport a hoisted bridge structure to the top of a tower column and lower the structure in a contraposition, the hoisting frame body 33 is arranged on the hoisting crown block frame body 31, and the hoisting machine system 4 is connected with the hoisting tool 34 through the hoisting frame body 33 so as to hoist the structure by using the hoisting tool 34.
The hoisting and jacking integrated self-climbing crane is mainly used for construction of cable towers, so that a hoisted bridge structure is a tower column section or a tower column cross beam.
Specifically, the main truss 1 adopts two-piece truss structure, and it includes two parallel arrangement's truss and connects the middle parallel connection of two trusses, main truss 1 sets up the opening along its length direction's at least one distolateral, just the opening of main truss 1 sets up downwards towards its central line slope, so that jack-up jacking integral type overhead traveling crane system 3 follow the opening part of main truss 1 hoist bridge structures extremely inside the main truss 1 and transport to corresponding station of transferring. The top and the bottom of main truss 1 all set up the track (not mark) to be used for leading with the removal of locating the slip support frame 2 of 1 bottom of main truss 1 top jack-up integral type overhead traveling crane system 3 respectively.
Locate main truss 1 bottom the support frame 2 that slides is the main bearing structure who connects this application hoist and column, support frame 2 that slides supports body frame 21, the walking 22 and the fixed articulated bearing 23 of tower wall including sliding, the length direction perpendicular to of the support body frame 21 that slides the length direction of main truss 1, the walking 22 that slides is located between main truss 1 and the support body frame 21 that slides, in order to pass through the walking 22 top that slides supports body frame 21 and follows the length direction of main truss 1 removes. The walking of sliding 22 includes two sliding seat 221 and locates the hydro-cylinder 222 that slides between two sliding seat 221, two sliding seat 221 all with be located the track cooperation of 1 bottom of main truss, two all be equipped with on the sliding seat 221 be used for with the main truss 1 grafting complex is inserted and is pulled out the round pin, and is two in sliding seat 221, be close to in sliding seat 221 and the support body frame body 21 that slides of support body frame body 21 is connected, then through two sliding seat 221 and the cooperation of hydro-cylinder 222 that slides, can realize sliding support frame 21 is followed the length direction of main truss 1 removes.
The tower wall fixing and hinging support 23 is hinged to one side, close to the tower column, of the sliding support main frame body 21, the tower wall fixing and hinging support 23 comprises a fixing seat 231 and a connecting seat 232 which are hinged to each other, the fixing seat 231 is installed on the sliding support main frame body 21, and the connecting seat 232 can be connected and fixed with a connecting piece pre-buried in the side wall of the tower column through a high-strength bolt.
Preferably, in this embodiment, the two groups of the sliding support frames 2 are respectively arranged on two sides of the tower column, the main truss 1 is supported by the two groups of the sliding support frames 2, and the two sliding steps 22 of each group of the sliding support frames 2 are arranged in two corresponding to the two-piece truss structure of the main truss 1, so that the two groups of the sliding steps 22 push the sliding support frames 2 to approach or leave the tower column along the length direction of the main truss 1. Meanwhile, the main sliding support frame 21 is connected with the tower columns by arranging four tower wall fixing hinged supports 23, so that the connection strength between the main sliding support frame 21 and the tower columns is ensured.
The main sliding support frames 21 of the two groups of sliding support frames 2 on the two sides of the tower column are driven by the sliding footrests 22 to be close to the tower column, and the tower wall fixing hinged supports 23 are anchored with the tower column, so that the whole crane load of the crane of the application is transmitted to the tower column through the sliding support frames 2 and then the tower wall fixing hinged supports 23, and the crane of the application is effectively supported.
The hoisting and jacking integrated crown block system 3 can realize self-climbing of the crane and hoisting of a bridge structure, namely, the main truss 1 can climb to the top of an installed tower column segment under the driving of the hoisting and jacking integrated crown block system 3 so as to install the next tower column segment. The sliding support frame 2 is lifted along with the lifting of the main truss 1, and under the condition that the crane hoists the bridge structure, the tower wall fixed hinged supports 23 of the sliding support frame 2 are anchored with the side walls of the tower columns; under the condition that the crane climbs, the constraint between all the tower wall fixed hinged supports 23 and the tower column is released, and the sliding support frame 21 is driven to be far away from the tower column through the sliding walking track 22, so that the lifting operation of the main truss 1 is facilitated.
Jack-up jacking integral type overhead traveling crane system 3 can follow the length direction removal of main truss 1, jack-up jacking integral type overhead traveling crane system 3 includes jack-up overhead traveling crane support body 31, climbing mechanism 32, jack-up support body 33 and hoist 34 in succession, jack-up overhead traveling crane support body 31 with be equipped with actuating mechanism 35 between the main truss 1, actuating mechanism 35 includes drive seat and actuating cylinder, the drive seat with the track cooperation at 1 top of main truss, just be equipped with on the drive seat and be used for with the track complex plug pin of pegging graft, actuating cylinder locates the drive seat with between the jack-up overhead traveling crane support body 31, through actuating cylinder intermittently stretches out and draws back in order to promote jack-up overhead traveling crane support body 31 follows the length direction removal of main truss 1.
Further, the crane crown block frame body 31 spans the two trusses of the main truss 1, and two sets of driving mechanisms 35 are arranged between the crane crown block frame body 31 and the main truss 1 corresponding to the two trusses, so that the transverse moving stability of the crane crown block frame body 31 is improved.
The continuous climbing mechanism 32 is disposed in the crane block frame 31, and includes a lifting upright post 321 and a climbing cylinder 322, a through hole (not shown) is disposed on the crane block frame 31, the lifting upright post 321 penetrates the crane block frame 31 from the through hole, a plurality of insertion holes (not labeled) are disposed on the lifting upright post 321 along a length direction thereof, the climbing cylinder 322 is disposed on the crane block frame 31, and an extending end of a piston rod thereof is provided with an insertion pin which is inserted and matched with the insertion hole of the lifting upright post 321. Moreover, at least two sets of climbing cylinders 322 are provided corresponding to each lifting upright 321, and the climbing cylinders 322 of different sets can alternately extend and retract to push the lifting upright 321 to move along the length direction (vertical direction in this embodiment).
Preferably, four lifting columns 321 are provided in this embodiment, four through holes are correspondingly formed in the hoisting crown block frame body 31, connecting lines of the four through holes are rectangular, the through holes are square holes, and the lifting columns 321 are square columns, so that four groups of climbing cylinders 322 in this embodiment are provided corresponding to four surfaces of the square columns, and the four groups of climbing cylinders 322 are provided along the peripheries of the through holes. In addition, the four groups of climbing cylinders 322 form two groups, and the two groups of climbing cylinders 322 in the same group are synchronous in extension and retraction and are oppositely arranged on the opposite surfaces of the lifting upright columns 321. It should be noted that each group of climbing cylinders 322 includes at least one cylinder for pushing the lifting column 321, and the more the number of cylinders is, the higher the supporting capability of the lifting column 321 is. Therefore, in this embodiment, each group of the climbing cylinders 322 includes three cylinders arranged side by side for synchronous extension, and the end of the extending end of the piston rod of the three cylinders is provided with a mounting seat (not labeled), and the plug pin in plug-in fit with the lifting upright 321 is fixed on the mounting seat.
Further, four still be equipped with the flat antithetical couplet mechanism 36 that goes up and down between two adjacent of lift stand 321, the flat antithetical couplet mechanism 36 that goes up and down includes flat antithetical couplet 361 and double-end lift cylinder 362, the both ends of flat antithetical couplet 361 all are equipped with double-end lift cylinder 362, double-end lift cylinder 362 has the telescopic piston rod in both ends, and the end that stretches out of its both ends piston rod all be provided with can with lift stand 321 grafting complex plug pin. The two adjacent lifting columns 321 are connected through the lifting parallel connection 361, so that the lifting columns 321 can be lifted synchronously.
The hoisting frame body 33 is respectively provided at two ends of the hoisting overhead traveling crane frame body 31, and the hoisting frame body 33 can move along the length direction relative to the hoisting overhead traveling crane frame body 31. Specifically, the crane jib body 31 is provided with a traverse cylinder 332 which extends and retracts along the length direction of the crane jib body 31, the extending end of a piston rod of the traverse cylinder 332 is connected with the crane jib body 33, meanwhile, two ends of the crane jib body 31 are also provided with guide rails (not shown) which extend along the length direction of the crane jib body, and the crane jib body 33 is provided with guide grooves (not shown) which are matched with the guide rails, so that the position of the crane jib body 33 on the crane jib body 31 is adjusted through the traverse cylinder 332.
Set up gyro wheel 331 on the lifting frame body 33, the hoist hoisting system 4 of this application mainly adopts hoist 41 collocation wire rope 42 to carry out the hoist and mount operation, the wire rope 42 of hoist hoisting system 4 passes through be connected with hoist 34 behind the gyro wheel 331 on the lifting frame body 33, promptly lifting frame body 33 is to wire rope 42's the effect that plays the direction, then can adjust the position that wire rope 42 transferred through the position of sideslip hydro-cylinder 332 regulation lifting frame body 33 to the adaptation is connected with different specification hoists 34. The lifting appliance 34 comprises a lifting frame and a lifting claw 342, the lifting claw 342 is arranged below the lifting frame and used for being connected with a bridge structure to be lifted, and the lifting frame is provided with a movable pulley block 343 and used for being connected with a steel wire rope 42 passing through the lifting frame body 33. Two sets of movable pulley blocks 343 are disposed at two ends of the lifting tool 34 and respectively correspond to the rolling wheels 331 of the two lifting frame bodies 33 on the lifting crown block frame body 31, so that the winch lifting system 4 is provided with two sets of steel wire ropes 42 to be connected with the movable pulley blocks 343 at two ends of the lifting frame through the rolling wheels 331 of the two lifting frame bodies 33, that is, the steel wire ropes 42 lift the lifting frame through the movable pulley blocks 343 connected to the two ends of the lifting frame, thereby improving the lifting stability and the lifting construction safety.
The hanger includes an upper hanging beam 3411 and a lower hanging frame 3412, the movable pulley block 343 is disposed at both ends of the upper hanging beam 3411, and the hanging claws 342 are disposed at the bottom side of the lower hanging frame 3412. The lower suspension bracket 3412 is an H-shaped frame, the lifting device 34 is disposed at each of four corner ends of the lower suspension bracket 3412, and each of the lifting claws 342 is a four-claw lifting claw. In addition, the lower suspension bracket 3412 is further provided with a hydraulic cylinder 344 corresponding to each lifting claw 342, the hydraulic cylinder 344 pushes the lifting claw 342 to slide on the lower suspension bracket 3412, so that the position of the lifting claw 342 is changed according to the position of a lifting point of a bridge structure to be lifted, that is, the lifting appliance 34 is an adjustable lifting appliance 34, so as to adapt to the lifting operation of bridge structures with different specifications.
The upper hanging beam 3411 is disposed above a middle connecting beam of the lower hanging bracket 3412, a rotating structure 345 is disposed between the upper hanging beam 3411 and the lower hanging bracket 3412, the rotating structure 345 includes an inner ring 3451 and an outer ring 3452 which are coaxially disposed, the inner ring 3451 and the outer ring 3452 are relatively rotatable, the outer ring 3452 is bolted to the upper hanging beam 3411, the inner ring 3451 is bolted to the lower hanging bracket 3412, the upper hanging beam 3411 is provided with a motor 3453, the motor 3453 drives the inner ring 3451 to rotate, the inner ring 3451 is provided with a full circle of internal teeth, an output shaft of the motor 3453 is provided with a gear engaged with the internal teeth, the motor 3453 drives the upper hanging beam 3411 and the lower hanging bracket 3412 to relatively rotate through the gear engagement when rotating, and the motor 3453 has a self-locking function, and when the motor 3453 stops rotating, the relative position of the upper hanging beam 3411 and the lower hanging bracket 3412 is fixed. The utility model provides a gallows sets up revolution mechanic 345 at last hanging beam 3411 and between lower hoist 34, can be applicable to along the condition of the gradual widen of following the bridge at the pylon segment section, adopts the minor face to be located along the bridge to during the hoist and mount, long limit is located the cross bridge to, promotes to install the position after rotatory 90 again and installs, otherwise need install initiative stull and interim crossbeam between the cable-stayed tower to the pylon cross bridge outside, avoid its interference pylon and crossbeam installation.
The hoisting system 4 comprises a hoisting machine 41, a steel cable 42 and a rope reeling drum 43, and since the hoisting system is limited in spatial arrangement, in this embodiment, the hoisting machine 41 is arranged on the hoisting crown block body 31 and moves therewith, and the rope reeling drum 43 is arranged at the bottom of the tower column. Preferably, the friction type winding machine 41 is preferably used in the present application, and the wire rope 42 of the friction type winding machine 41 in operation passes only without being wound on the winding machine 41, so that the winding machine 41 can be separated from the rope take-up reel 43. One end of the steel wire rope 42 is wound at the rope winding drum 43, and the other end of the steel wire rope passes through the winch 41 and then passes through the roller 331 on the lifting frame body 33 to be connected with the movable pulley block 343 on the lifting appliance 34, so that the lifting appliance 34 is pulled to be lifted through the friction force between the winch 41 and the steel wire rope 42.
In this embodiment, the hoisting capacity of each set of hoisting machine system 4 is 300 tons, and the diameter of the steel wire rope 42 is
Figure BDA0003838888860000093
Model number optimization
Figure BDA0003838888860000092
The breaking force of the steel wire rope 42 is 99.4 tons, and the lifting speed under the rated load is 6m/min. The total length of the steel wire rope 42 is 3000m multiplied by 4, the self weight of the single set of friction type winch 41 is 30 tons, and the self weight of the single set of rope collecting machine is 10 tons.
In addition, after the crane of the present application finishes hoisting the current tower column segment, the continuous climbing mechanism 32 may be used to climb to the top of the current tower column segment, at this time, the hoist 34 is kept fixed to the top of the tower column segment, and the climbing cylinder 322 is used to lower the lifting column 321 so as to anchor the bottom of the lifting column to the top of the hoist 34. The lifting appliance 34 is a double-anchor type lifting appliance 34, four groups of anchor seats 346 are arranged at positions corresponding to four lifting upright columns 321, each anchor seat 346 is provided with an insertion and extraction pin, and when the bottoms of the lifting upright columns 321 are abutted to the lifting appliance 34, the insertion and extraction pins are inserted into insertion holes in the bottoms of the lifting upright columns 321 to realize anchoring between the lifting upright columns 321 and lifting appliance 34 beams. In addition, at least two anchor seats 346 are provided for each lifting column 321 in each set of anchor seats 346, and the connection strength between the lifting column 321 and the spreader 34 is ensured by anchoring at least two points of the lifting column 321. In this embodiment, four anchor seats 346 are arranged in each set of anchor seats 346 to anchor four sides of each lifting column 321 in a one-to-one correspondence, so that the anchoring stability between the lifting column 321 and the spreader 34 is high.
Next, the crane frame body 31 is caused to ascend along the lifting column 321 by the telescopic operation of the ascent cylinder 322 on the crane frame body 31, and the crane frame body 31 stops after ascending in place. The main truss 1 can climb along with the climbing of the crane frame body 31, before the main truss 1 climbs along with the crane frame body 31, the anchoring between the sliding support frame 2 and the tower column should be firstly released, the sliding support frame 2 slides out for a certain distance to be completely separated from the tower column, so that the main truss 1 and the tower column are relatively free, and at the moment, the load of the crane is transferred to the top of the tower column through the lifting upright column 321 and the lifting appliance 34 to bear the load. Or, before the crane crown block body 31 climbs, the limitation of the crane crown block body 31 and the main truss 1 is removed, after the crane crown block body 31 climbs in place, the limitation of the wire rope 42 and the lifting tool 34 is removed, the temporary lifting tool 34 is arranged at the end part of the wire rope 42 for lifting, the lifting frame bodies 33 at the two ends of the crane crown block body 31 are adjusted to adjust the position of the temporary lifting tool 34 to be connected with the main truss 1, at this time, the connection of the sliding support frame 2 and the tower column is removed, the main truss 1 and the sliding support frame 2 are lifted to the lower position of the crane crown block body 31 by using the temporary lifting tool 34, the crane crown block body 31 is connected with the main truss 1, and the sliding support frame 2 is anchored with the tower column segment which is installed at the current top, so that the self-climbing of the crane of the present application is completed.
The self-climbing crane mainly depends on the cooperation of the climbing oil cylinder 322 and the plug pin, a multipoint synchronous control system is adopted to ensure the action consistency and synchronism of all the lifting oil cylinders, and the synchronous control system adopts a mature load sensitive electro-hydraulic proportional multi-way valve in the aspect of hydraulic system design, so that the point-to-point independent control of all the lifting oil cylinders can be realized. In the lifting process, the electric control system can acquire the position of a piston rod of the oil cylinder according to a displacement sensor arranged on the oil cylinder, correspondingly adjust the oil supply amount of each proportional valve in real time according to the difference of the position of the oil cylinder, and realize the synchronous control of the whole process on all the lifting oil cylinders by adopting a PID algorithm (namely a control algorithm integrating three links of proportion (proportionality), integral (integral) and derivative (derivative).
To sum up, the lifting jacking integrated self-climbing crane of the application integrates lifting and self-climbing, large-scale lifting equipment does not need to be arranged additionally, the problems that the existing tower crane is adopted to hoist structures, the cost is high and the progress is slow are solved, after construction of a single-section structure is completed, the crane of the application is lifted to the next section of hoisting position through a continuous lifting structure, the sequential circulation is realized, the process operation is simple, the construction time is saved, and the construction efficiency is improved.
Moreover, the hoisting and jacking integrated self-climbing crane is not only suitable for cable tower construction with a single tower column structure, but also can meet the construction requirement of a double-tower-column cable tower.
Specifically, during the construction of the cable tower of single-tower column structure, main truss 1 erects at the top tower column segment that this tower column has satisfied the requirement of construction height, through set up one set of jack-up jacking integral type overhead traveling crane system 3 on the main truss 1 can accomplish the hoist and mount operation of tower column segment.
Therefore, the using method of the hoisting and jacking integrated self-climbing crane comprises the following steps:
s001, arranging a lifting and jacking integrated self-climbing crane on the top of the tower column meeting the construction height requirement. The hoisting and jacking integrated self-climbing crane comprises a main truss 1, a sliding support frame 2, a hoisting and jacking integrated crown block system 3 and a winch lifting system 4, wherein the main truss 1 of the hoisting and jacking integrated self-climbing crane is erected at the top of a single tower column along the transverse bridge direction, the sliding support frame 2 is arranged in two groups along the bridge direction and is arranged on two sides of the tower column, and the main truss 1 is provided with the hoisting and jacking integrated crown block system 3 and the winch lifting system 4.
And S002, hoisting and jacking integrated crown block system 3 and winch lifting system 4 from one end of the main truss 1 in the length direction to lift the steel tower segment to the position above the installed tower column segment for installation.
The main truss 1 is located its length direction's one end and sets up the slope opening to make things convenient for jack-up jacking integral type overhead traveling crane system 3 and hoist lifting system 4 hoist and mount steel tower segment section and enter into main truss 1 and transport, jack-up jacking integral type overhead traveling crane system 3 is controllable in the position on main truss 1, thereby ensures that the steel tower segment section of hoist and mount and the accurate counterpoint of the pylon post of having installed, ensures the installation accuracy of pylon post.
During the period that the steel tower segment is hoisted by the hoisting and jacking integrated crown block system 3 and the winch hoisting system 4, the sliding support frame 2 below the main truss 1 is anchored with the tower column, so that the main truss 1 is ensured to have enough support capacity to realize hoisting operation of the steel tower segment.
And S003, after the installed steel tower segment is completely installed, the hoisting and jacking integrated crown block system 3 is utilized to enable the hoisting and jacking integrated self-climbing crane to move to the top of the currently installed steel tower segment.
The known hoisting and jacking integrated crown block system comprises a hoisting crown block body 31, a continuous climbing mechanism 32, a hoisting frame body 33 and a lifting appliance 34, wherein the continuous climbing mechanism 32 comprises a lifting upright column 321 and a climbing cylinder 322. When the crane of the present application climbs, the climbing cylinder 322 moves the lifting column 321 to abut against the lifting tool 34 anchored at the top of the tower column below the lifting column, the bottom of the lifting column 321 and the lifting tool 34 are in anchoring connection through the insertion and extraction pins of the anchoring seats 346, and after the three anchoring of the lifting column 321, the lifting tool 34 and the top of the tower column are ensured, the climbing cylinder 322 with the crane frame body 31 climbs to the top of the lifting column 321 along the vertical direction. The main truss 1 can climb along with the climbing of the hoisting crown block frame body 31, and in the climbing process, the sliding support frame 2 at the bottom of the main truss 1 is separated from the tower column; or, the crane crown block frame body 31 and the main truss 1 may be separated, and after the crane crown block frame body 31 climbs in place, the crane frame bodies 33 at the two ends of the crane crown block frame body 31 cooperate with the temporary lifting appliance 34 to lift the main truss 1 to the lower part of the crane crown block frame body 31 and then connect. It should be noted that, when the main truss 1 is lifted, the sliding support frame 2 at the bottom of the main truss 1 is separated from the tower column, and after the main truss 1 moves to the top of the currently installed steel tower segment, the sliding support frame 2 is anchored with the top of the current tower column, so that the self-climbing of the lifting and jacking integrated self-climbing crane is completed.
And (5) circulating the steps S002 and S003, namely, performing the height connection of the tower column through the circulating operation of the climbing operation of the hoisting steel tower segment and the hoisting and jacking integrated crown block system 3 until the construction of the tower column is finished.
When the cable tower with a double-tower-column structure is constructed, the height connection construction of a single tower column needs to be completed, and a cross beam between two tower columns needs to be constructed. Then this application utilizes jack-up jacking integral type to erect from main truss 1 of hoist that climbs on two adjacent pylons that have satisfied the requirement of construction height along the horizontal bridge to earlier when the cable tower of hoist construction double-pylon structure is constructed to hoist jack-up integral type, simultaneously, the support frame 2 that slides corresponds two pylons respectively and is provided with two sets ofly, every group the support frame 2 that slides equally divide and respectively establishes one set in the both sides that correspond the pylon, in order to ensure main truss 1's both ends homoenergetic obtains effective support.
In addition, when the cable tower with a double-tower-column structure is constructed, since the cable tower structure is more complicated than that of a cable tower with a single tower column, a construction operation platform 5 can be arranged on the main truss 1 to facilitate the construction of workers. Construction operation platform 5 includes that the overhead traveling crane operation overhauls platform 51, goes up overhauls platform 52, overhauls platform 53, lateral sliding welded platform 54, vertical welded platform 55 and repair platform 56 down, it locates to go up overhauls platform 52 the top side of main truss 1, overhead traveling crane operation overhauls platform 51 locates on the jack-up overhead traveling crane support body 31, just overhead traveling crane operation platform with it overhauls passageway 57 about being equipped with between the platform 52 to go up, overhaul platform 53 down and locate main truss 1 downside, it also is equipped with passageway 57 about going up to overhaul between platform 52 and the lower maintenance platform 53, passageway 57 about should depend on the bracing setting of main truss 1 to guarantee the structural strength and the stability of passageway 57 about, lateral sliding welded platform 54 sets up along the horizontal bridge, vertical welded platform 55 sets up along the bridge, and lateral sliding welded platform 54 and vertical sliding welded platform are located the pylon top to the pylon segment that waits the pylon hoist to carry out the welding jobs between two pylon segments after the pylon segment top. The repairing platform 56 is correspondingly arranged at the sliding support frame 2 and can be used for repairing the structure of the sliding support frame 2, and an upper channel 57 and a lower channel 57 are arranged between the repairing platform 56 and the longitudinal welding platform 55. This application sets up passageway 57 about between the platform that a plurality of high positions are different and communicates, and faces the high protection guardrail of limit protection and all adopt 1.5m to make things convenient for the workman to reach each construction operation platform 5 through passageway 57 from top to bottom, can accomplish the operation of different positions.
Therefore, when the crane is used for constructing the cable tower of the double-tower-column structure, the construction operation platform 5 is additionally arranged on the main truss 1, and the joint design of the construction operation platform 5 and the main truss 1 enables the construction operation platform 5 to be driven by the continuous climbing mechanism 32 to lift up along with the main truss 1, and a conventional annular operation platform does not need to be additionally arranged.
In addition, to the cable tower of two tower column structures, set up two sets of jack-up jacking integral type overhead traveling crane systems 3 on the main truss 1 of this application, can carry out the synchronous construction of two pylons for the efficiency of construction then, and the cable tower of two tower column structures is still including the crossbeam, usable two sets jack-up jacking integral type overhead traveling crane systems 3 lifts by crane the crossbeam and installs.
Referring to fig. 9, the construction method of the double-tower cable tower includes the following steps:
firstly, a hoisting and jacking integrated self-climbing crane is arranged between two adjacent tower columns in the transverse bridge direction and meets the requirement of construction height.
The hoisting and jacking integrated self-climbing crane comprises a main truss 1, a sliding support frame 2, a hoisting and jacking integrated crown block system 3, a winch lifting system 4 and a construction operation platform 5, wherein the main truss 1 is erected between two adjacent tower columns meeting the construction height along the transverse bridge direction, the sliding support frame 2 is positioned below the main truss 1 and is provided with two groups corresponding to the two tower columns respectively, and the sliding support frame 2 is anchored with a top tower column section so as to support the main truss 1 and the upper structure of the main truss.
Be equipped with two sets on the main truss 1 jack-up jacking integral type overhead traveling crane system 3, just jack-up jacking integral type overhead traveling crane system 3 can be followed the length direction of main truss 1 removes, jack-up jacking integral type overhead traveling crane system 3 includes jack-up overhead traveling crane support body 31, continuous climbing mechanism 32, jack-up support body 33 and hoist 34, jack-up overhead traveling crane support body 31 is located on the main truss 1 and be equipped with between the two and be used for promoting jack-up overhead traveling crane support body 31 is followed the actuating mechanism 35 that 1 length direction of main truss removed, continuous climbing mechanism 32 is located in order to be used for with on the jack-up overhead traveling crane support body 31 hoist vertical direction lift is followed to jack-up overhead traveling crane support body 31's length direction removes, hoist lifting system 4 passes through jack-up support body 33 with hoist 34 is connected in order to be used for promoting hoist 34 and is promoted the steel tower festival section.
And hoisting the steel tower segment by utilizing the hoisting and jacking integrated self-climbing crane to connect the height of the tower column.
Specifically, the hoisting and jacking integrated crown block system 3 and the winch lifting system 4 are used for hoisting the steel tower segment to the top of the installed tower column segment to be heightened, after the current top tower column segment is installed, the continuous climbing mechanism 32 of the hoisting and jacking integrated crown block system 3 is reused for moving to the top of the installed steel tower segment from the currently connected steel tower segment, and then hoisting of the next steel tower segment is carried out.
The self-climbing step of the crane on the double-tower cable tower is the same as the self-climbing step of the crane installed on the single-tower cable tower, that is, the lifting appliance 34 for lifting the steel tower segment is anchored on the top of the currently installed steel tower segment, the bottom of the lifting upright 321 of the continuous climbing mechanism 32 is abutted against the lifting appliance 34 anchored on the top of the installed steel tower segment under the driving of the climbing cylinder 322, and the lifting upright 321 and the lifting appliance 34 are locked by the anchoring seat 346 and the inserting and pulling pin arranged on the top of the lifting appliance 34. After the crane crown block frame body 31 climbs to the target height of the lifting upright column 321 under the driving of the climbing oil cylinder 322, the fixing of the sliding support frame 2 and the tower column is released, the main truss 1 is lifted to the lower part of the crane crown block frame body 31 by using the winch lifting system 4, and then the sliding support frame 2 and the tower column segment which is installed at the current top part are anchored through the tower wall fixing hinged support 23.
It should be noted that the self-climbing of the crane of the double-tower cable tower needs to be performed after the steel tower segments of the two towers are symmetrically installed and welded, and the self-climbing systems on the two towers need to operate synchronously to ensure the straight ascending of the main truss 1. Meanwhile, the hoisting and jacking integrated self-climbing crane for double-tower-column cable tower construction further comprises a construction operation platform 5, the construction operation platform 5 is attached to the main truss 1, and the self-climbing system also drives the construction operation platform 5 to climb when lifting the main truss 1.
And in the process of connecting the tower columns to be high, the hoisting and jacking integrated crown block system 3 and the winch lifting system 4 are used for hoisting the temporary cross beam from bottom to top to different height positions of the tower columns so as to connect the two tower columns.
And after the two tower columns are constructed to the target height, sequentially hoisting the upper cross beam and the lower cross beam to the specified height position from top to bottom and connecting the upper cross beam and the lower cross beam with the two tower columns.
Specifically, after the tower column is constructed to the preset height of the tower top, an assembling support is arranged at the position of the tower bottom, and the height position of the assembling support is consistent with the height of an installation station of the lower cross beam. Hoisting the beam sections to the assembling support by using the hoisting and jacking integrated self-climbing crane, assembling to form an integral upper beam, and integrally hoisting the upper beam to an upper beam installing station by using the hoisting and jacking integrated self-climbing crane and installing and fixing the upper beam to complete the installation and construction of the upper beam.
Then, reuse jack-up integral type is from climbing crane divides its crossbeam segmental hoisting, hoists the crossbeam segmental at lower beam both ends earlier and installs, and the crossbeam segmental hoisting in the middle of at last carries out folding of lower beam, accomplishes the construction and installation of lower beam then.
And finally, sequentially removing the temporary steel cross beam and the lifting and jacking integrated self-climbing crane to complete the construction of the double-tower-column steel cable tower.
After the construction of the tower columns and the cross beams of the double-tower-column cable tower is completed, an assembling support for assembling the cross beams, a temporary cross beam for connecting the two tower columns and a lifting and jacking integrated self-climbing crane are sequentially detached from bottom to top.
When the hoisting and jacking integrated self-climbing crane is dismantled, the hoisting and jacking integrated crown block system 3 is manufactured at the top of the tower column, the main truss 1 is hoisted by the winch hoisting system 4, and the connection between the sliding support frame 2 at the bottom of the main truss 1 and the tower column is released. Then, the main truss 1 is integrally lowered to the ground by using the winch lifting system 4, and then the main truss 1 is disassembled and dismantled by using the crawler crane.
And the hoisting and jacking integrated crown block system 3 positioned at the top of the tower column is dismantled by the aid of the tower crane, so that dismantling of the hoisting and jacking integrated self-climbing crane is completed.
The foregoing is only a few embodiments of the present application and it should be noted that those skilled in the art can make various improvements and modifications without departing from the principle of the present application, and that these improvements and modifications should also be considered as the protection scope of the present application.

Claims (10)

1. A lifting and jacking integrated crown block system is characterized by comprising a lifting crown block frame body, a continuous climbing mechanism, a lifting frame body and a lifting appliance;
the hoisting crown block body is arranged on a main truss of the self-climbing crane and can move along the transverse bridge direction;
the continuous climbing mechanism is arranged on the hoisting crown block frame body and is used for lifting the hoisting crown block frame body along the vertical direction;
the lifting frame body is arranged on the lifting crown block frame body and can move along the length direction of the lifting crown block frame body, the lifting appliance is used for lifting a bridge structure to be installed, the lifting appliance is connected with the lifting frame body through a steel wire rope, and the lifting frame body guides the steel wire rope for lifting the lifting appliance.
2. The hoisting and jacking integrated crown block system according to claim 1, wherein the continuous climbing mechanism comprises a lifting upright and a climbing cylinder, the lifting upright is provided with a plurality of jacks distributed along the length direction of the lifting upright, the climbing cylinder is arranged on the lifting crown block frame body, and the extending end of a piston rod of the climbing cylinder is provided with a plug pin which enters and exits the jacks so as to push the lifting upright to move along the direction vertical to the lifting crown block frame body.
3. The hoisting and jacking integrated crown block system according to claim 2, wherein a plurality of through holes for the insertion of the lifting columns are formed in the crown block frame body, a plurality of lifting columns are arranged corresponding to the through holes one by one, and two sets of climbing cylinders are arranged corresponding to each lifting column on the crown block frame body.
4. The hoisting and jacking integrated crown block system according to claim 3, wherein a lifting and leveling mechanism is arranged between two adjacent lifting columns, the lifting and leveling mechanism comprises a leveling link and a double-headed lifting cylinder, the double-headed lifting cylinder is arranged at each of two ends of the leveling link, and the extending ends of the piston rods at two ends of the double-headed lifting cylinder are provided with plug pins which can be plugged and matched with the lifting columns.
5. The hoisting and jacking integrated crown block system according to claim 1, wherein the hoisting frame body is provided at each of both ends in a length direction of the hoisting crown block body.
6. The hoisting and jacking integrated crown block system according to claim 5, wherein the hoisting frame body is provided with rollers, the lifting appliance comprises a lifting frame and two sets of movable pulley blocks, the two sets of movable pulley blocks are arranged at two ends of the lifting frame respectively, and the two sets of movable pulley blocks are in one-to-one correspondence with the hoisting frame body at two ends of the hoisting crown block body.
7. The hoisting and jacking integrated crown block system according to claim 6, wherein the lifting frame comprises an upper lifting beam and a lower lifting frame, the movable pulley blocks are arranged at two ends of the upper lifting beam, the bottom side of the lower lifting frame is provided with lifting claws, and the lower lifting frame is provided with hydraulic oil cylinders for pushing the lifting claws to slide on the lower lifting frame.
8. The hoisting and jacking integrated crown block system according to claim 7, wherein the lower hanger is an H-shaped frame, the upper hanging beam is arranged above a middle connecting beam of the lower hanger, a revolving structure is arranged between the upper hanging beam and the lower hanger, the revolving structure comprises an inner ring and an outer ring which are coaxially arranged, the inner ring and the outer ring can rotate relatively, the outer ring is bolted with the upper hanging beam, the inner ring is bolted with the lower hanger, and the upper hanging beam is provided with a motor for driving the inner ring to rotate.
9. The hoisting and jacking integrated crown block system according to claim 8, wherein the inner ring is provided with a full circle of internal teeth along a circumferential direction thereof, and the output shaft of the motor is provided with a gear engaged with the internal teeth of the inner ring.
10. The hoisting and jacking integrated crown block system according to claim 7, wherein the hanger is provided with an anchoring seat, the anchoring seat is provided with an inserting and pulling pin for inserting and matching with a jack at the bottom of the lifting upright post, and the lifting claw is anchored with the bridge structure through bolting so as to anchor the lifting upright post with the bridge structure.
CN202211097601.XA 2022-09-08 2022-09-08 Lifting and jacking integrated crown block system Pending CN115402944A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211097601.XA CN115402944A (en) 2022-09-08 2022-09-08 Lifting and jacking integrated crown block system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211097601.XA CN115402944A (en) 2022-09-08 2022-09-08 Lifting and jacking integrated crown block system

Publications (1)

Publication Number Publication Date
CN115402944A true CN115402944A (en) 2022-11-29

Family

ID=84166067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211097601.XA Pending CN115402944A (en) 2022-09-08 2022-09-08 Lifting and jacking integrated crown block system

Country Status (1)

Country Link
CN (1) CN115402944A (en)

Similar Documents

Publication Publication Date Title
CN112160243B (en) Steel tower lifting installation method
CN113005912A (en) Reciprocating dragging type super-tonnage steel box girder continuous traction device and use method thereof
CN112681141B (en) Automatic movable hanging basket device for pouring concrete outside steel arch frame
CN112160244B (en) Method for mounting steel cross beam
CN218145304U (en) Adjustable lifting appliance
JP2007291719A (en) Method and equipment for erecting heavy load
CN113006145B (en) Reverse construction method construction process for large-diameter working well movable formwork
CN110467113B (en) Large-tonnage tunnel anchor cable saddle hoisting device and method
CN111877728A (en) Lifting type movable operation platform for steel structure overhanging construction
CN218320407U (en) Lifting and jacking integrated crown block system
CN218320409U (en) Continuous lifting mechanism
CN218320408U (en) Double-anchor type lifting appliance
CN218320410U (en) Lifting and jacking integrated self-climbing crane
CN218434629U (en) Lifting frame for tower type pier construction
CN115402944A (en) Lifting and jacking integrated crown block system
CN115402945A (en) Lifting and jacking integrated self-climbing crane
CN116163535A (en) Construction method for lifting prefabricated part in delta shape by walking on top of column
CN115559209A (en) Double-tower-column cable tower construction method
CN112681144B (en) Self-climbing installation method of steel cable tower
CN211200095U (en) Matching structure of support leg and main beam of bridge girder erection machine
CN210368664U (en) Wide-body bridge girder erection machine
CN116281659A (en) Lifting and jacking integrated self-climbing crane
CN113802462A (en) Section-splicing bridge girder erection machine and front supporting leg for hoisting
CN112761187A (en) Electric lifting movable mould frame for large-diameter working well
CN215564411U (en) Sliding construction device for high-rise cylindrical building

Legal Events