CN218116158U - Pier hanging flower basket installation operation platform - Google Patents

Pier hanging flower basket installation operation platform Download PDF

Info

Publication number
CN218116158U
CN218116158U CN202222201406.9U CN202222201406U CN218116158U CN 218116158 U CN218116158 U CN 218116158U CN 202222201406 U CN202222201406 U CN 202222201406U CN 218116158 U CN218116158 U CN 218116158U
Authority
CN
China
Prior art keywords
jib
fixed
pier
operation platform
basket installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222201406.9U
Other languages
Chinese (zh)
Inventor
段利宾
陈向军
武林
景俊虎
周庆强
罗三亮
张欢
李汝梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 21st Bureau Group Co Ltd
Original Assignee
China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 21st Bureau Group Co Ltd filed Critical China Railway 21st Bureau Group Co Ltd
Priority to CN202222201406.9U priority Critical patent/CN218116158U/en
Application granted granted Critical
Publication of CN218116158U publication Critical patent/CN218116158U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides a pier hanging flower basket installation operation platform belongs to bridge construction technical field, and it has solved the inconvenient problem of current hanging flower basket installation. This pier hanging flower basket installation operation platform, including a plurality of fixed connecting rods and two crossbeam jibs, fixed connecting rod bottom both ends respectively with two crossbeam jib fixed connection, the bottom both ends of crossbeam jib all are fixed with first jib, the other end of first jib is connected with second jib through coupling assembling, second jib is fixed with vertical platform steel step board through supporting beam, vertical platform steel step board is connected with horizontal platform steel step board through the connector, be fixed with the guardrail bar on the horizontal platform steel step board. The utility model has the advantages of can effectively improve hanging flower basket installation convenience.

Description

Pier hanging flower basket installation operation platform
Technical Field
The utility model belongs to the technical field of the bridge construction, a operation platform, especially a pier hanging flower basket installation operation platform are related to.
Background
The hanging basket is a construction machine for high-altitude operation in construction engineering, and is used for curtain wall installation and outer wall cleaning. The hanging basket is a novel high-altitude operation device which can replace a traditional scaffold, reduce labor intensity, improve working efficiency and be repeatedly used. The use of the construction hanging basket has gradually become a trend, and the construction hanging basket is widely accepted in high-rise operations such as outer wall construction, curtain wall installation, heat insulation construction, maintenance and cleaning of outer walls and the like of high-rise multi-storey buildings, and can be used for the operation of large-scale tank bodies, bridges, dams and other projects. The product can avoid scaffold. Make construction cost reduce, the operating expenses is twenty-eight percent of traditional scaffold frame, and work efficiency improves by a wide margin moreover. The hanging basket is flexible to operate, easy to shift, convenient, practical, safe and reliable.
Railway pier sets up the maintenance platform of hanging flower basket rail as the operation period, and the hanging flower basket is connected with the pier shaft through pre-buried channel, because the highly different of pier shaft, adopts the crane as the operation platform of hanging flower basket installation more during construction in the past, and this kind of mode needs to shift the platform many times, and consuming time power, and safety can not obtain the assurance, and from this, a pier hanging flower basket installation operation platform is proposed.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a there is above-mentioned problem to current technique, has provided a pier hanging flower basket installation operation platform, and the technical problem that this utility model will solve is: how to realize effectively improving the convenience of hanging flower basket installation.
The purpose of the utility model can be realized by the following technical proposal:
the utility model provides a pier hanging flower basket installation operation platform, includes a plurality of fixed connecting rods and two crossbeam jibs, fixed connecting rod bottom both ends respectively with two crossbeam jib fixed connection, the bottom both ends of crossbeam jib all are fixed with first jib, the other end of first jib is connected with second jib through coupling assembling, second jib is fixed with vertical platform steel step board through supporting beam, vertical platform steel step board is connected with horizontal platform steel step board through the connector, be fixed with the guardrail bar on the horizontal platform steel step board.
The utility model discloses a theory of operation is: during the preparation, make first jib in advance, single components such as second jib and supporting beam, then it is fixed with the tie point through welding mode, so reduced the preparation degree of difficulty, be convenient for install, improve the installation effectiveness of hanging flower basket, manpower and time have been saved, during the use, operating personnel gets into in the protection railing, then adopt the crane to lift by crane, fix on pier crown support base stone through the crossbeam jib, operating personnel carries out pier hanging flower basket installation construction all around through the operation platform of installation, the back of finishing in construction, lift by crane whole one to next pier crown start next operation flow with the crane for the operation platform, very big improvement operating efficiency, the setting of protection railing has effectively reduced safe input cost.
The connecting assembly comprises a plurality of first bolts and a plurality of nuts, connecting plates are fixed to the lower end of the upper half suspender and the upper end of the lower half suspender, a plurality of first holes are formed in the connecting plates, the first holes of the two connecting plates are communicated, and the first bolts penetrate through the first holes and are in threaded connection with the nuts.
Structure more than adopting, through the cooperation of connecting plate, first bolt and nut, can be connected first jib and second jib fast, the dismantlement in the later stage of also being convenient for, very big reduction the preparation degree of difficulty, also saved installation time.
The connector comprises a first connecting block, a second bolt and a second nut, the first connecting block is fixedly connected with the longitudinal platform steel walking plate, the second connecting block is fixedly connected with the transverse platform steel walking plate, second holes are formed in the first connecting block and the second connecting block, the two second holes are communicated, and the second bolt penetrates through the second holes and is in threaded connection with the second nut.
Structure more than adopting, the setting of connector is convenient for connect vertical platform steel running board and horizontal platform steel running board, improves vertical platform steel running board and the direct stability of horizontal platform steel running board, also the later stage of being convenient for is dismantled and is carried.
A first supporting leg is fixed between the cross beam hanging rod and the upper half hanging rod.
And a second supporting leg is fixed between the lower half suspender and the supporting beam.
By adopting the structure, the first supporting legs are arranged to improve the stability between the beam suspender and the upper half suspender, the second supporting legs are arranged to improve the stability between the lower half suspender and the supporting beam, and the safety of workers during operation is improved.
The guard rail comprises an upper frame and a lower frame, a protective net and a plurality of supporting rods are fixed between the upper frame and the lower frame, and third supporting legs are fixed between the supporting rods and the upper frame and the lower frame respectively.
By adopting the structure, the stability of the protective railing is improved, the operation of operators is facilitated, and the safety of the operators is also improved.
Compared with the prior art, this pier hanging flower basket installation operation platform has following advantage:
1. during the preparation, make first jib in advance, single components such as second jib and supporting beam, then it is fixed with the tie point through welding mode, so reduced the preparation degree of difficulty, be convenient for install, improve the installation effectiveness of hanging flower basket, manpower and time have been saved, during the use, operating personnel gets into in the protection railing, then adopt the crane to lift by crane, fix on pier crown support base stone through the crossbeam jib, operating personnel carries out pier hanging flower basket installation construction all around through the operation platform of installation, the back of finishing in construction, lift by crane whole one to next pier crown start next operation flow with the crane for the operation platform, very big improvement operating efficiency, the setting of protection railing has effectively reduced safe input cost.
2. Through the cooperation of connecting plate, first bolt and nut, can be connected first half jib and second half jib fast, the dismantlement in the later stage of also being convenient for, very big reduction the preparation degree of difficulty, also saved installation time.
3. The setting of connector is convenient for connect vertical platform steel running board and horizontal platform steel running board, improves vertical platform steel running board and the direct stability of horizontal platform steel running board, also is convenient for later stage dismantlement and transport.
4. The setting of first supporting leg has improved the stability between crossbeam jib and the first jib, and the setting of second supporting leg has improved the stability between second jib and the supporting beam, security when improving the staff operation.
5. The stability of the guard rail is improved, the operation of the operating personnel is facilitated, and the safety of the operating personnel is also improved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a right side view of the present invention.
In the figure, 1, a fixed connecting rod; 2. a cross beam boom; 3. an upper half boom; 4. a connecting plate; 5. a lower half boom; 6. a supporting beam; 7. a longitudinal platform steel step plate; 8. a guard rail; 9. a transverse platform steel step plate; 10. a connector is provided.
Detailed Description
The following are specific embodiments of the present invention and the accompanying drawings are used to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.
As shown in fig. 1-2, this pier hanging flower basket installation operation platform, including a plurality of fixed link 1 and two crossbeam jibs 2, fixed link 1 bottom both ends respectively with two crossbeam jibs 2 fixed connection, crossbeam jib 2's bottom both ends all are fixed with first half jib 3, the other end of first half jib 3 is connected with second half jib 5 through coupling assembling, second half jib 5 is fixed with vertical platform steel step board 7 through supporting beam 6, vertical platform steel step board 7 is connected with horizontal platform steel step board 9 through connector 10, be fixed with guard rail 8 on the horizontal platform steel step board 9.
During the preparation, make first half jib 3 in advance, single component such as second half jib 5 and supporting beam 6, then it is fixed with the tie point through the welding mode, so reduced the preparation degree of difficulty, be convenient for install, improve the installation effectiveness of hanging flower basket, manpower and time have been saved, in using, operating personnel gets into in the guardrail bar 8, then adopt the crane to lift by crane, fix on pier top support padstone through crossbeam jib 2, operating personnel carries out pier hanging flower basket installation construction all around through the operation platform of installation, the construction finishes the back, wholly lift by crane for the operation platform to next pier top one by one and begin next operation flow, very big improvement the operating efficiency, the safe input cost has effectively been reduced in the setting of guardrail bar 8.
The connecting assembly comprises a plurality of first bolts and a plurality of nuts, the lower end of the upper half suspender 3 and the upper end of the lower half suspender 5 are both fixed with connecting plates 4, a plurality of first holes are formed in the connecting plates 4, the first holes of the two connecting plates 4 are communicated, and the first bolts penetrate through the first holes and are in threaded connection with the nuts.
Through the cooperation of connecting plate 4, first bolt and nut, can be connected first jib 3 and second jib 5 fast, the dismantlement in the later stage of also being convenient for, very big reduction the preparation degree of difficulty, also saved installation time.
The connector 10 comprises a first connecting block, a second bolt and a second nut, the first connecting block is fixedly connected with the longitudinal platform steel walking plate 7, the second connecting block is fixedly connected with the transverse platform steel walking plate 9, second holes are formed in the first connecting block and the second connecting block, the two second holes are communicated, and the second bolt penetrates through the second holes and is in threaded connection with the second nut.
The setting of connector 10 is convenient for connect vertical platform steel running plate 7 and horizontal platform steel running plate 9, improves vertical platform steel running plate 7 and the direct stability of horizontal platform steel running plate 9, also is convenient for later stage dismantlement and transport.
A first supporting leg is fixed between the beam hanger rod 2 and the upper half hanger rod 3.
And a second supporting leg is fixed between the lower half suspender 5 and the supporting beam 6.
The setting of first supporting leg has improved the stability between crossbeam jib 2 and the first jib 3, and the setting of second supporting leg has improved the stability between second jib 5 and supporting beam 6, security when improving the staff operation.
The protective barrier 8 comprises an upper frame and a lower frame, a protective net and a plurality of supporting rods are fixed between the upper frame and the lower frame, and third supporting legs are fixed between the supporting rods and the upper frame and the lower frame respectively.
The stability of the protective barrier 8 is improved, the operation of the operating personnel is convenient, and the safety of the operating personnel is also improved.
The utility model discloses a theory of operation during the preparation, make first jib 3 in advance, single component such as second jib 5 and supporting beam 6, then it is fixed with the tie point through the welding mode, so reduced the preparation degree of difficulty, be convenient for install, improve the installation effectiveness of hanging flower basket, manpower and time have been saved, in the use, operating personnel gets into in the guardrail bar 8, then adopt the crane to lift by crane, fix on pier top support base stone through crossbeam jib 2, operating personnel carries out pier hanging flower basket installation construction all around through the operation platform of installing, after finishing the construction, lift by crane whole one by one to next pier top with the crane operation platform and begin next operation flow.
To sum up, through the cooperation of components such as fixed link 1, crossbeam jib 2 and first half jib 3, realized effectively improving the function of hanging flower basket installation convenience.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications, additions and substitutions for the specific embodiments described herein may be made by those skilled in the art without departing from the spirit of the invention or exceeding the scope of the invention as defined in the accompanying claims.

Claims (6)

1. The utility model provides a pier hanging flower basket installation operation platform, including a plurality of fixed link (1) and two crossbeam jib (2), a serial communication port, fixed link (1) bottom both ends respectively with two crossbeam jib (2) fixed connection, the bottom both ends of crossbeam jib (2) all are fixed with first half jib (3), the other end of first half jib (3) is connected with second half jib (5) through coupling assembling, second half jib (5) are fixed with vertical platform steel step board (7) through supporting beam (6), vertical platform steel step board (7) are connected with horizontal platform steel step board (9) through connector (10), be fixed with guard bar (8) on horizontal platform steel step board (9).
2. The pier hanging basket installation and operation platform is characterized in that the connecting assembly comprises a plurality of first bolts and a plurality of nuts, the connecting plates (4) are fixed to the lower end of the upper half hanging rod (3) and the upper end of the lower half hanging rod (5), a plurality of first holes are formed in the connecting plates (4), the first holes of the two connecting plates (4) are communicated, and the first bolts penetrate through the first holes and are in threaded connection with the nuts.
3. The pier hanging basket installation and operation platform as claimed in claim 1, wherein the connector (10) comprises a first connecting block, a second bolt and a second nut, the first connecting block is fixedly connected with the longitudinal platform steel walking plate (7), the second connecting block is fixedly connected with the transverse platform steel walking plate (9), second holes are formed in the first connecting block and the second connecting block respectively, the two second holes are communicated, and the second bolt penetrates through the second holes and is in threaded connection with the second nut.
4. A pier basket installation and operation platform according to claim 1, wherein a first support leg is fixed between the cross beam hanger rod (2) and the upper half hanger rod (3).
5. The pier cradle installation and operation platform as claimed in claim 1, wherein a second support leg is fixed between the lower half boom (5) and the support beam (6).
6. The pier basket installation and operation platform as claimed in claim 1, wherein the guard rail (8) comprises an upper frame and a lower frame, a protective net and a plurality of support rods are fixed between the upper frame and the lower frame, and third support legs are fixed between the support rods and the upper frame and the lower frame respectively.
CN202222201406.9U 2022-08-22 2022-08-22 Pier hanging flower basket installation operation platform Active CN218116158U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222201406.9U CN218116158U (en) 2022-08-22 2022-08-22 Pier hanging flower basket installation operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222201406.9U CN218116158U (en) 2022-08-22 2022-08-22 Pier hanging flower basket installation operation platform

Publications (1)

Publication Number Publication Date
CN218116158U true CN218116158U (en) 2022-12-23

Family

ID=84524173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222201406.9U Active CN218116158U (en) 2022-08-22 2022-08-22 Pier hanging flower basket installation operation platform

Country Status (1)

Country Link
CN (1) CN218116158U (en)

Similar Documents

Publication Publication Date Title
CN113152873A (en) Heightening hanging basket system
CN210798252U (en) Assembled outer protection frame system
CN219280494U (en) Tower beam temporary consolidation supporting structure for bridge tower stability control
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN218116158U (en) Pier hanging flower basket installation operation platform
CN202055502U (en) Basket-type operating platform for construction of high-rise building construction
CN208294079U (en) A kind of detachable set shaped steel formwork concrete operating platform
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN213572927U (en) Movable steel platform with adjustable size and capable of being circulated
CN215101546U (en) Chinese ancient architecture pavilion maintenance and roof lifting device
CN215978575U (en) Safety protection system for dismantling reinforced concrete water tower in limited space
CN210597325U (en) Anti-falling conversion device for steel enclosing purlin
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN204038917U (en) Dismountable external hanging service platform
CN219839973U (en) Combined operation safety protection platform for climbing formwork outer vertical face of bridge engineering bridge pier
CN208981152U (en) A kind of fast-type high-speed rail Bridge Pier Construction hanging basket mounting platform
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN218090541U (en) Self-lifting short tower stay cable padlock construction platform
CN219297028U (en) Super high-rise climbing type tower crane auxiliary operation platform
CN207377096U (en) Overlength large girder scaffold building structure
CN217203935U (en) Trash rack pier template hoisting device
CN216787787U (en) Manual operation platform for tower crane dismantling
CN208220169U (en) Packaged type construction operation platform in a kind of elevator shaft
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant