CN218090541U - Self-lifting short tower stay cable padlock construction platform - Google Patents

Self-lifting short tower stay cable padlock construction platform Download PDF

Info

Publication number
CN218090541U
CN218090541U CN202222174828.1U CN202222174828U CN218090541U CN 218090541 U CN218090541 U CN 218090541U CN 202222174828 U CN202222174828 U CN 202222174828U CN 218090541 U CN218090541 U CN 218090541U
Authority
CN
China
Prior art keywords
construction platform
lifting
cable
steel pipe
staple bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222174828.1U
Other languages
Chinese (zh)
Inventor
周日瑜
卿迟
冯前进
李长伟
张楠
张耀祖
任晋颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong No 2 Hydropower Engineering Co Ltd
Original Assignee
Guangdong No 2 Hydropower Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong No 2 Hydropower Engineering Co Ltd filed Critical Guangdong No 2 Hydropower Engineering Co Ltd
Priority to CN202222174828.1U priority Critical patent/CN218090541U/en
Application granted granted Critical
Publication of CN218090541U publication Critical patent/CN218090541U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a building engineering field specifically is a from promoting short tower stay cable padlock construction platform, draws together cable tower, suspension cable and steel pipe support, be equipped with hoist system and construction platform on the steel pipe support, the cable tower passes through the suspension cable and connects steel pipe support, hoist system includes hand-operated hoist, back force staple bolt and supports the staple bolt, the back force staple bolt sets up on steel pipe support, back force staple bolt below is equipped with hand-operated hoist, hand-operated hoist connects construction platform, the construction platform below is equipped with the support staple bolt, the utility model discloses utilize counter-force staple bolt and hand-operated hoist to promote construction platform, support the staple bolt and support construction platform, can realize construction platform and carry by oneself, easy and simple to handle, and simple structure, reasonable in design has improved the efficiency of setting up construction platform, and simplified operation has reduced constructor's intensity of labour, has very high security simultaneously.

Description

Self-lifting short tower stay cable padlock construction platform
Technical Field
The utility model relates to a building engineering technical field especially relates to a from promoting short tower stay cable padlock construction platform.
Background
With the acceleration of traffic construction along with the progress of urbanization in China, domestic bridge construction also enters a new development stage, large-scale river-crossing and river-crossing bridge projects are continuously generated, and the application of the short tower stay cables is more and more common.
The mode of setting up the short tower stay cable among the prior art and hanging and establishing construction platform mainly is through the mode of setting up the scaffold on the bridge floor, changes at every turn and highly all need increase on original scaffold's basis, and the intensity and the rigidity of scaffold can reduce, and scaffold construction platform's time limit for a project and artifical height, need a simple structure for this, with low costs, simplified operation's short tower stay cable hangs and establishes construction platform.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a simple structure, low cost, simplified operation's short tower suspension cable hang and establish construction platform.
In order to achieve the above purpose, the technical scheme of the utility model is as follows:
the utility model provides a from promoting short tower suspension cable padlock construction platform, including the cable tower, suspension cable and steel pipe support, be equipped with hoist system and construction platform on the steel pipe support, the cable tower passes through suspension cable and connects the steel pipe support, hoist system includes hand block, the staple bolt of doing all can and support the staple bolt, the staple bolt of doing all can sets up on the steel pipe support, it is equipped with hand block to do all can below the staple bolt, hand block connects construction platform, the construction platform below is equipped with supports the staple bolt, construction platform is by preceding construction platform, it constitutes to promote construction platform and back construction platform, it is equipped with preceding construction platform and back construction platform respectively to promote the construction platform left and right sides, be equipped with discontinuous guardrail on preceding construction platform and the back construction platform, and the space satisfies the suspension cable and wears the cable, and connect the cable tower through the suspension cable, it sets up in promotion construction platform below to support the staple bolt, the staple bolt sets up in promotion construction platform top, and be equipped with hand block and promote construction platform and be connected.
Borrow by above-mentioned structure, through being equipped with the cable tower, the cable on the cable tower is with the mode of drawing to one side, the mode of suspension cable plays the effect of drawing to the lift platform promptly, prevent that the lift platform from dropping, at the in-process that promotes, the steel pipe support is hugged closely to the counter-force staple bolt, hand block hangs on the counter-force staple bolt, it loosens to support the staple bolt, constructor promotes through hand block, wait until after promoting, support the staple bolt and hug closely the steel pipe support again, accomplish the fixed of construction platform, utilize the counter-force staple bolt, suspension cable and hand block promote construction platform, it supports construction platform to support the staple bolt, realize construction platform self-lifting, and is easy and simple to handle, construction platform divide into preceding construction platform simultaneously, promote construction platform and back construction platform, the efficiency of setting up construction platform is improved.
The construction platform is fixed on the steel pipe bracket by fixing the counter-force hoop and the supporting hoop,
preferably, crawling ladders are arranged between the front construction platform and the lifting construction platform and between the lifting construction platform and the rear construction platform.
Therefore, the crawling ladder is arranged between the construction platforms, so that the personnel can conveniently pass through the crawling ladder, and the operation efficiency is improved.
Preferably, the stay cables are sequentially installed and connected on the rear construction platform after extending from the cable tower, and are installed and connected on the front construction platform through the lower part of the lifting construction platform.
Preferably, the front construction platform, the lifting construction platform and the rear construction platform are fixedly connected through welding.
Therefore, the strength between the platforms is improved by welding the platforms into a whole, and the whole is lifted when the platforms are lifted.
Preferably, the ladder is supported on a front construction platform and a rear construction platform.
Preferably, the lifting construction platform is provided with a three-side limiting steel pipe support.
Therefore, the construction platform is prevented from deviating from the track in the lifting process by arranging the three-side limiting steel pipe support, and the lifting safety is improved.
The utility model has the advantages that: the utility model discloses utilize counter-force staple bolt and hand block to promote construction platform, support the staple bolt and support construction platform, can realize construction platform and carry by oneself, it is easy and simple to handle.
The utility model discloses simple structure, reasonable in design has improved the efficiency of setting up construction platform, and the simplified operation has reduced constructor's intensity of labour, has higher security simultaneously.
Drawings
Fig. 1 is a structural elevation view of the present invention.
Fig. 2 is a side view of the structure of the present invention.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
Example 1
As shown in fig. 1-2, a self-lifting low tower stay cable 2 padlock construction platform 5, comprising a cable tower 1, a stay cable 2 and a steel pipe bracket 3, wherein a lifting system 4 and a construction platform 5 are arranged on the steel pipe bracket 3, the cable tower 1 is connected with the steel pipe bracket 3 through the stay cable 2, the lifting system 4 comprises a hand hoist 401, a return hoop 402 and a support hoop 403, the return hoop 402 is arranged on the steel pipe bracket 3, the hand hoist 401 is arranged below the return hoop 402, the hand hoist 401 is connected with the construction platform 5, the support hoop 403 is arranged below the construction platform 5, the construction platform 5 comprises a front construction platform 501, a lifting construction platform 502 and a rear construction platform 503, the left side and the right side of the lifting construction platform 502 are respectively provided with the front construction platform 501 and the rear construction platform 503, the front construction platform 501 and the rear construction platform 503 are provided with a guardrail discontinuity 6, and the gap satisfies the stay cable 2 reeving, and is connected with the cable tower 1 through the stay cable 2, the support hoop 403 is arranged below the lifting construction platform 502, the return hoop 402 is arranged above the lifting construction platform 502.
The construction platform 5 is fixed on the steel pipe bracket 3 by fixing the counter-force hoop and the supporting hoop 403,
in this embodiment, all be provided with cat ladder 7 between preceding construction platform 501 and promotion construction platform 502 and the back construction platform 503, through set up cat ladder 7 between construction platform 5, the personnel of being convenient for pass, improve the operating efficiency.
In this embodiment, the stay cables 2 are sequentially installed and connected to the rear construction platform 503 after extending from the pylon 1, and are installed and connected to the front construction platform 501 through the lower side of the lifting construction platform 502, thereby realizing the pulling of the construction platform 5.
In this embodiment, the front construction platform 501, the lifting construction platform 502 and the rear construction platform 503 are connected through welding and fixing, and are welded into a whole, so that the strength between the platforms is improved, and the platforms are integrally lifted when lifted.
In this embodiment, the ladder stand 7 is supported on a front construction platform 501 and a rear construction platform 503.
In this embodiment, promote construction platform 502 and be equipped with trilateral spacing steel pipe support 3, prevent that construction platform 5 from promoting the skew track of in-process, improve the security that promotes.
The utility model discloses a concrete using-way, earlier with the cable on the cable tower 1 with the mode of drawing to one side, the mode of suspension cable 2 plays to draw the effect of holding promptly to the lift platform, prevent that the lift platform from dropping, constructor stands and is under construction on construction platform 5, when the process that needs promoted, hold steel pipe support 3 tightly through the counter-force staple bolt, hand block 401 hangs on the counter-force staple bolt, will support staple bolt 403 to loosen then, constructor promotes through hand block 401, wait to promote after accomplishing, it holds steel pipe support 3 tightly again to support staple bolt 403, accomplish construction platform 5's fixing, can accomplish once from promoting.
The present invention has been described in detail with reference to the specific embodiments, and it should not be construed that the embodiments of the present invention are limited to the description. For a person skilled in the art to which the invention pertains, several equivalent alternatives or obvious modifications, all of which have the same properties or uses, should be considered as belonging to the scope of protection of the invention, as determined by the claims submitted, without departing from the inventive concept.

Claims (6)

1. The utility model provides a from promoting short tower suspension cable padlock construction platform, includes cable tower, suspension cable and steel pipe support, its characterized in that: the steel pipe support is provided with a lifting system and a construction platform, and the cable tower is connected with the steel pipe support through a stay cable;
the lifting system comprises a manual hoist, a return anchor ear and a supporting anchor ear;
the return anchor ear is arranged on the steel pipe bracket, and a hand-operated block is arranged below the return anchor ear;
the manual hoist is connected with the construction platform;
a supporting hoop is arranged below the construction platform;
the construction platform consists of a front construction platform, a lifting construction platform and a rear construction platform;
the left side and the right side of the lifting construction platform are respectively provided with a front construction platform and a rear construction platform;
discontinuous guardrails are arranged on the front construction platform and the rear construction platform, gaps meet the requirement of stay cable penetrating, and the stay cable is connected with a cable tower through stay cables;
the support hoop is arranged below the lifting construction platform, the return hoop is arranged above the lifting construction platform, and a hand-operated hoist is arranged to be connected with the lifting construction platform.
2. The self-elevating pylon stay cable padlock construction platform of claim 1, wherein: and crawling ladders are arranged between the front construction platform and the lifting construction platform and between the lifting construction platform and the rear construction platform.
3. The self-lifting short tower stay cable padlock construction platform as claimed in claim 1, wherein: the stay cable is sequentially installed and connected on the rear construction platform after extending from the cable tower, and is installed and connected on the front construction platform through the lower part of the lifting construction platform.
4. The self-elevating pylon stay cable padlock construction platform of claim 1, wherein: the front construction platform, the lifting construction platform and the rear construction platform are fixedly connected through welding.
5. The self-lifting short tower stay cable padlock construction platform as claimed in claim 2, wherein: the crawling ladder is supported on the front construction platform and the rear construction platform.
6. The self-elevating pylon stay cable padlock construction platform of claim 1, wherein: the lifting construction platform is provided with a three-side limiting steel pipe support.
CN202222174828.1U 2022-08-17 2022-08-17 Self-lifting short tower stay cable padlock construction platform Active CN218090541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222174828.1U CN218090541U (en) 2022-08-17 2022-08-17 Self-lifting short tower stay cable padlock construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222174828.1U CN218090541U (en) 2022-08-17 2022-08-17 Self-lifting short tower stay cable padlock construction platform

Publications (1)

Publication Number Publication Date
CN218090541U true CN218090541U (en) 2022-12-20

Family

ID=84447253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222174828.1U Active CN218090541U (en) 2022-08-17 2022-08-17 Self-lifting short tower stay cable padlock construction platform

Country Status (1)

Country Link
CN (1) CN218090541U (en)

Similar Documents

Publication Publication Date Title
CN101672102B (en) Steel structural overhead ceiling construction platform
CN201598820U (en) Single-point suspension external hanging rack
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN102444271B (en) Suspended scaffolding
CN113152873A (en) Heightening hanging basket system
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN218090541U (en) Self-lifting short tower stay cable padlock construction platform
CN210178366U (en) Scattered cable saddle portal system of narrow space tunnel anchor of super large inclination
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN201722937U (en) Sliding platform for installation of net rack
CN214575532U (en) Lifting type steel platform arranged at corridor lighting well position
CN213572927U (en) Movable steel platform with adjustable size and capable of being circulated
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN210316599U (en) A curtain ring rail for roofing truss beam position
CN211257761U (en) Lifting type elevator shaft operating platform
CN218116158U (en) Pier hanging flower basket installation operation platform
CN217203935U (en) Trash rack pier template hoisting device
CN216042530U (en) Heightening hanging basket system
CN216105699U (en) Hoisting and dismantling device for track beam of hydropower station suspended ceiling trolley
CN218714945U (en) Assembled building combination is from promoting protection frame
CN203961239U (en) High-altitude overhanging awning construction operation platform
CN212406038U (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss
CN217480795U (en) Combined building formwork structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant