CN217947299U - In-plate embedded elevator hook structure - Google Patents

In-plate embedded elevator hook structure Download PDF

Info

Publication number
CN217947299U
CN217947299U CN202221755349.2U CN202221755349U CN217947299U CN 217947299 U CN217947299 U CN 217947299U CN 202221755349 U CN202221755349 U CN 202221755349U CN 217947299 U CN217947299 U CN 217947299U
Authority
CN
China
Prior art keywords
lifting hook
steel anchor
slab
concrete slab
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221755349.2U
Other languages
Chinese (zh)
Inventor
陈辉
周志锦
孟灿
欧阳凤鸣
艾杨玲子
王颖
谭雪松
周敏
陈威
罗嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangtan Architectural Design Institute Group Co ltd
Original Assignee
Xiangtan Architectural Design Institute Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangtan Architectural Design Institute Group Co ltd filed Critical Xiangtan Architectural Design Institute Group Co ltd
Priority to CN202221755349.2U priority Critical patent/CN217947299U/en
Application granted granted Critical
Publication of CN217947299U publication Critical patent/CN217947299U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

An in-board pre-buried elevator lifting hook structure includes: the lifting hook is provided with a hanging end and a fixed end, the fixed end is buried in the concrete slab and connected with the steel anchor plate, and the hanging end extends out of the surface of the concrete slab. The utility model provides a pair of in-plate pre-buried elevator lifting hook structure simple manufacture, simple to operate, the anchor is reliable, steel anchor slab, straight anchor bar, brace rod and the first half direct pouring of lifting hook are in concrete slab, there is certain concrete protective layer thickness steel anchor slab top, can ensure the durability of structure, but the elevation of burying underground of strict control lifting hook simultaneously ensures the clear height in lifting hook lower part space and satisfies the requirement.

Description

In-plate embedded elevator lifting hook structure
Technical Field
The utility model belongs to the technical field of building structure component, concretely relates to inboard pre-buried elevator lifting hook structure.
Background
In recent years, the development of the elevator industry has been changing from the past elevators with machine room to elevators without machine room. In order to save space, the machine room-less elevator changes the control cabinet, the host machine, the speed limiter and other devices which are installed in the machine room above the well in the past into installation in the well, cancels the special machine room arrangement, and reduces the construction cost while effectively improving the utilization rate of the building area.
The top structure of the machine room-less elevator is usually embedded with more lifting hooks to ensure the normal operation and maintenance of the elevator. For elevators of different brands, the positions and the number of the lifting hooks are different, so the elevator without a machine room generally adopts a mode of pre-burying the lifting hooks in the plates. If the traditional elevator hook is embedded in advance, a thicker floor slab or an elevator hook beam is usually required to be arranged to ensure the reliable anchoring of the hook; meanwhile, the traditional elevator lifting hook is difficult to control the embedded elevation during construction, so that the actual anchoring length is insufficient, and certain potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
The application provides an in-board pre-buried elevator hook structure, include: lifting hook and steel anchor slab, the steel anchor slab is buried underground in concrete slab, the lifting hook has suspension end and stiff end, the stiff end bury underground in concrete slab and with the steel anchor slab is connected, the suspension end stretches out the concrete slab surface.
Preferably, the method further comprises the following steps: and the straight anchor bars are buried in the concrete slab and connected with the steel anchor plate.
Preferably, the straight anchor bars and the steel anchor plates are arranged perpendicular to each other.
Preferably, the straight anchor bars and the steel anchor plates are located on the same horizontal plane.
Preferably, the method further comprises the following steps: and the supporting ribs are embedded in the concrete slab and connected with the steel anchor plate.
Preferably, the plane of the supporting rib is perpendicular to the plane of the steel anchor plate.
The utility model provides a pair of in-board pre-buried elevator lifting hook structure simple manufacture, simple to operate, the anchor is reliable, the steel anchor slab, straight anchor bar, bracing piece and lifting hook the first half is directly pour in concrete slab, there is certain concrete protective layer thickness at steel anchor slab top, can ensure the durability of structure, but the elevation of burying underground of close control lifting hook simultaneously, ensure the clear height satisfied requirement in lifting hook lower part space.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic front view of an intra-slab embedded elevator hook structure provided by the present invention;
fig. 2 is the utility model provides a pair of inboard pre-buried elevator hook structure's of inboard schematic side view.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail with reference to the accompanying drawings in combination with the following embodiments. It should be understood that the description is intended for purposes of illustration only and is not intended to limit the scope of the present disclosure. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
As shown in fig. 1-2, in the embodiment of the present application, the present application provides an in-board embedded elevator hook structure, including: lifting hook 1 and steel anchor slab 2, steel anchor slab 2 buries underground in concrete slab 5, lifting hook 1 has suspension end and stiff end, the stiff end bury underground in concrete slab 5 and with steel anchor slab 2 is connected, the end that hangs stretches out concrete slab 5 surface.
In the embodiment of the application, the hanging end of the hook 1 extends out of the surface of the concrete slab 5 and is used for hanging objects; the fixed end of the lifting hook 1 is embedded in the concrete slab 5 and connected with the steel anchor plate 2, and the steel anchor plate 2 can firmly fix the lifting hook 1 on the concrete slab 5.
In this application embodiment, the in-board pre-buried elevator lifting hook structure that this application provided still includes: and the straight anchor bars 3 are embedded in the concrete slab 5 and connected with the steel anchor plate 2.
In the present embodiment, the straight anchor bars 3 can enhance the firmness of the steel anchor plate 2 in the concrete plate 5, prevent it from easily detaching from the concrete plate 5, and further enhance the firmness of the installation of the hook 1.
In the embodiment of the present application, the straight anchor bars 3 and the steel anchor plates 2 are arranged perpendicular to each other.
In the embodiment of the present application, the straight anchor bars 3 and the steel anchor plates 2 are located on the same horizontal plane.
In this application embodiment, the in-plate pre-buried elevator lifting hook structure that this application provided still includes: and the supporting ribs 4 are embedded in the concrete slab 5 and connected with the steel anchor plate 2.
In the embodiment of the present application, the support ribs 4 can enhance the firmness of the steel anchor plate 2 in the concrete plate 5, prevent the steel anchor plate from easily separating from the concrete plate 5, and further enhance the firmness of the installation of the hook 1.
In the embodiment of the application, the plane of the support rib 4 is perpendicular to the plane of the steel anchor plate 2.
In the embodiment of the application, the straight anchor bars 3 and the support bars 4 are welded with the steel anchor plate 2, the height of the support bars 4 is equal to the plate thickness minus 60mm of the concrete plate 5, and the support bars 4 can ensure the accurate position elevation of the steel anchor plate 2 in the concrete plate 5, thereby ensuring the clear height of the lower space of the lifting hook 1.
In the embodiment of the application, the lifting hook 1 is made of Q235B grade steel.
In the present embodiment, the steel anchor plate 2 is rectangular.
In the embodiment of the application, the steel anchor plate 2 is made of Q235B grade steel.
In the embodiment of the application, the straight anchor bars and the support bars are hot-rolled threaded steel bars.
In the embodiment of the present application, the thickness of the concrete slab 5 is 200mm or more.
The utility model provides a pair of in-plate pre-buried elevator lifting hook structure simple manufacture, simple to operate, the anchor is reliable, steel anchor slab, straight anchor bar, brace rod and the first half direct pouring of lifting hook are in concrete slab, there is certain concrete protective layer thickness steel anchor slab top, can ensure the durability of structure, but the elevation of burying underground of strict control lifting hook simultaneously ensures the clear height in lifting hook lower part space and satisfies the requirement.
It should be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modifications, equivalents, improvements and the like which are made without departing from the spirit and scope of the present invention should be considered within the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.

Claims (6)

1. The utility model provides an in-plate pre-buried elevator hook structure which characterized in that includes: lifting hook and steel anchor slab, the steel anchor slab is buried underground in concrete slab, the lifting hook has suspension end and stiff end, the stiff end bury underground in concrete slab and with the steel anchor slab is connected, the suspension end stretches out the concrete slab surface.
2. The in-board embedded elevator hook structure according to claim 1, further comprising: and the straight anchor bars are buried in the concrete slab and connected with the steel anchor plate.
3. The in-board embedded elevator hook structure according to claim 2, wherein the straight anchor bars and the steel anchor plates are arranged perpendicular to each other.
4. The in-board embedded elevator hook structure according to claim 2, wherein the straight anchor bars and the steel anchor plates are located on the same horizontal plane.
5. The in-board embedded elevator hook structure according to claim 1, further comprising: and the supporting ribs are buried in the concrete slab and connected with the steel anchor plate.
6. The in-board embedded elevator hook structure as claimed in claim 5, wherein the plane of the support bar is perpendicular to the plane of the steel anchor plate.
CN202221755349.2U 2022-07-09 2022-07-09 In-plate embedded elevator hook structure Active CN217947299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221755349.2U CN217947299U (en) 2022-07-09 2022-07-09 In-plate embedded elevator hook structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221755349.2U CN217947299U (en) 2022-07-09 2022-07-09 In-plate embedded elevator hook structure

Publications (1)

Publication Number Publication Date
CN217947299U true CN217947299U (en) 2022-12-02

Family

ID=84220723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221755349.2U Active CN217947299U (en) 2022-07-09 2022-07-09 In-plate embedded elevator hook structure

Country Status (1)

Country Link
CN (1) CN217947299U (en)

Similar Documents

Publication Publication Date Title
CN101736893B (en) Overhanging type scaffold supporting system
CN205591231U (en) Steel shotcrete dropout prevention means
CN213654185U (en) Elevator shaft operating platform structure
CN202611233U (en) Template for pouring double-way shear wall with deformation joint in the middle
CN217947299U (en) In-plate embedded elevator hook structure
CN204826211U (en) Outer wall hanging plate connecting device of precast concrete
CN103938755B (en) The isolation structure of hanging conversion beam and construction method thereof under a kind of hoistway
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
JP4816503B2 (en) Buried rail device
CN102320512B (en) Installing tooling of traction machine base and traction machine and installing method of traction machine
CN102653947B (en) Underground embedded steel component limiting straightening construction method
CN215367833U (en) Construction elevator short wall-attached device
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN209620636U (en) Prefabricated assembled concrete structure outer hanging plate elevation of bottom regulating device
CN211948447U (en) Foundation pit supporting device
CN205224571U (en) Anchor of builder's jack
CN210760745U (en) Platform installation structure for additionally arranging station between existing elevated line areas
CN209040142U (en) A kind of pile foundation support construction
CN221321238U (en) Prefabricated air conditioner plate structure
CN211498909U (en) Existing building installs prefabricated caisson post-cast strip construction equipment additional of elevator
CN219586983U (en) Device for preventing high-rise shear wall from cracking
CN203558672U (en) Connecting structure for reinforced concrete wall and construction elevator attachment rack
CN215907198U (en) Cast-in-place concrete floor split heads muscle
CN210091836U (en) Buttress insulation board that structural strength is high
CN209322293U (en) A kind of special hanger of Large Steel vestibule lifting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant