CN102653947B - Underground embedded steel component limiting straightening construction method - Google Patents

Underground embedded steel component limiting straightening construction method Download PDF

Info

Publication number
CN102653947B
CN102653947B CN201210139131.9A CN201210139131A CN102653947B CN 102653947 B CN102653947 B CN 102653947B CN 201210139131 A CN201210139131 A CN 201210139131A CN 102653947 B CN102653947 B CN 102653947B
Authority
CN
China
Prior art keywords
horizontal adjustment
adjustment bracket
construction
steel column
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210139131.9A
Other languages
Chinese (zh)
Other versions
CN102653947A (en
Inventor
吴洁妹
邹铭
李耀良
张顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201210139131.9A priority Critical patent/CN102653947B/en
Publication of CN102653947A publication Critical patent/CN102653947A/en
Application granted granted Critical
Publication of CN102653947B publication Critical patent/CN102653947B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention relates to an underground embedded steel component limiting straightening construction method which comprises the following steps of: 1, selecting a vertical guide cylinder and a horizontal adjustment bracket; 2, mounting a guide hanging bar on a steel column; 3, positioning the horizontal adjustment bracket; 4, after lowering down a ground/wall reinforcement cage, mounting the horizontal adjustment bracket; 5, leveling the horizontal adjustment bracket; 6, mounting the vertical guide cylinder; 7, hanging the steel column; 8, concreting an underground diaphragm wall; and 9, dismantling a limiting adjustment frame for circular use. In the invention, by adopting the sizing adjustable bracket for auxiliary construction, the construction operation is simple and convenient, the construction efficiency is improved, and the control accuracy is enhanced. After lowering down the ground/wall reinforcement cage, the corresponding embedded steel component is subjected to positioning guide and straightening by erecting a limiting straightening frame; on one hand, the position of the steel column is limited through the limiting straightening frame to improve the construction accuracy; and on the other hand, the sizing straightening frame is quick to mount and simple to adjust and operate, and can be recycled. Through the invention, the construction efficiency is improved, and the construction cost is saved.

Description

The spacing straightening construction method of underground preburied steel beam column
Technical field
The present invention relates to pre-buried steel component in a kind of diaphragm wall or other similar operating mode and carry out the construction method of straightening, especially a kind of construction method of being assisted by mounting limit straightening frame.
Background technology
Along with the development in city, the situation of shortage of land resource is day by day remarkable.The space development utilization rate improving building then becomes the task of top priority.In order to improve the space development utilization rate of building, vertical load node moves in diaphragm wall by increasing structure design, and in continuous underground wall structure, the application of pre-buried steel column also becomes trend of the times.
Because general diaphragm wall reinforcing cage tonnage is large, enter the positioning control of groove depth to integrally wall reinforcing cage and often do not reach respective design permissible accuracy, add cast-in-situ concrete disturbance to the impact of built-in fitting, make such steel column component pre-buried difficulty of construction very large, construction precision is difficult to be guaranteed.Still lack a kind of rationally efficient construction method at present, cause pre-buried steel column constructional difficulties in continuous underground wall structure, waste time and energy, construction effect is not good, steel column off normal is general.
Summary of the invention
The present invention will solve the technical problem that existing underground preburied steel column Embedment Construction precision is low, efficiency of construction low, spillage of material is larger, and provides a kind of underground preburied steel beam column spacing straightening construction method.
For achieving the above object, the present invention is achieved by the following technical solutions:
The spacing straightening construction method of a kind of underground preburied steel beam column, the steps include:
1) vertically-guided cylinder and horizontal adjustment bracket is selected
According to needing the size of pre-buried steel column, form and construction requirement, selected vertically-guided cylinder and horizontal adjustment bracket;
2) steel column is installed guiding and hang muscle
According to construction area absolute altitude and construction requirement, guiding is set at pre-buried steel capital end position and hangs muscle;
3) horizontal adjustment bracket location
Construction area is surveyed, and according to horizontal adjustment bracket size, positioning screw is squeezed on hard place level ground;
4), after wall reinforcing cage is transferred, horizontal adjustment bracket is installed
Ground wall reinforcing cage regulates horizontal girder steel to desired spacing according to construction requirement, screws stop nut 2. after transferring, and after ground wall reinforcing cage is transferred, horizontal adjustment bracket is set on positioning screw;
5) horizontal adjustment bracket leveling
The absolute altitude increasing or reduce on four bases regulates pad, observes the spirit level on vertical, horizontal girder steel, makes horizontal adjustment bracket level, tighten base clamp nut after horizontal adjustment bracket level;
6) vertically-guided cylinder is installed
Vertically-guided cylinder is placed in modulated in the horizontal adjustment bracket of level, inserts limit bolt;
7) steel column is lifted
Steel column is put in vertically-guided cylinder silo, after placing design elevation, fixes steel column on guide cylinder by shoulder pole.
8) diaphragm wall concreting
9) pull down spacing adjusting bracket to recycle
After diaphragm wall concrete initial set, extract vertically-guided cylinder bracket limit bolt out, hang away vertically-guided cylinder, unload lower bottom base clamp nut subsequently, withdraw horizontal adjustment bracket and base.
The invention has the beneficial effects as follows: the sizing adjustable support auxiliary construction of construction method of the present invention owing to selecting, make that constructing operation is easy, efficiency of construction improves, control accuracy promotes, have a extensive future in similar diaphragm wall pre-buried steel column construction operating mode.After transferring ground wall reinforcing cage (or other similar operating modes), utilize the spacing straightening frame of erection to position guiding and straightening to corresponding pre-buried steel beam column, on the one hand, by spacing straightening frame restriction steel column locations, improve construction precision; On the other hand, the features such as regularization straightening frame installation rate is fast, adjustment operation simple, can reuse.Both improve efficiency of construction, again save construction cost.
Accompanying drawing explanation
Fig. 1 is horizontal adjustment bracket location schematic diagram;
Fig. 2 is horizontal adjustment bracket scheme of installation;
Fig. 3 is horizontal adjustment bracket leveling schematic diagram;
Fig. 4 is vertically-guided cylinder scheme of installation;
Fig. 5 is A place enlarged drawing in Fig. 4;
Fig. 6 is lifting steel column and fixing schematic diagram;
Fig. 7 is steel column schematic perspective view.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the invention will be further described.
As shown in Figures 1 to 7, the spacing straightening construction method of underground preburied steel beam column of the present invention, its construction sequence is:
(1) vertically-guided cylinder 14 and horizontal adjustment bracket 15 type selecting (Fig. 4)
According to needing the size of pre-buried steel column, form and construction requirement, selected suitable vertically-guided cylinder and horizontal adjustment bracket.
(2) steel column 16 is installed guiding and is hung muscle 17(Fig. 6,7)
According to construction area absolute altitude and construction requirement, guiding is set at pre-buried steel capital end rational position 10 and hangs muscle 17.
(3) horizontal adjustment bracket 15 is located (Fig. 1)
Construction area is surveyed, and according to horizontal adjustment bracket 15 size, hard place level ground is squeezed into positioning screw 1.
(4), after wall reinforcing cage 11 transfers (or similar operating mode), horizontal adjustment bracket 15 is installed (Fig. 2)
Ground wall reinforcing cage 11 regulates horizontal girder steel 12 to desired spacing according to construction requirement, screws stop nut 2 after transferring (or similar operating mode), after ground wall reinforcing cage 11 is transferred, horizontal adjustment bracket 15 is set on positioning screw 1.
(5) horizontal adjustment bracket 15 leveling (Fig. 3)
The absolute altitude increasing or reduce on four bases regulates pad 4, and observe vertical, horizontal girder steel 13, the spirit level 5 on 12, makes horizontal adjustment bracket 15 level, tightens base clamp nut 6 after horizontal adjustment bracket 15 level.
(6) vertically-guided cylinder 14 is installed (Fig. 4,5)
Vertically-guided cylinder 14 is placed in modulated in the horizontal adjustment bracket 15 of level, inserts limit bolt 7.
(7) steel column 16(Fig. 6 is lifted, 7)
Steel column 16 is put in vertically-guided cylinder 14 storehouse, after placing design elevation, fixes steel column 16 on vertically-guided cylinder 14 by shoulder pole.
(8) diaphragm wall concreting
(9) pull down spacing adjusting bracket to recycle
After diaphragm wall concrete initial set, extract vertically-guided cylinder 14 bracket limit bolt 7 out, hang away vertically-guided cylinder 14, unload lower bottom base clamp nut 6 subsequently, withdraw horizontal adjustment bracket 15 and base.

Claims (1)

1. the spacing straightening construction method of underground preburied steel beam column, it is characterized in that, concrete steps are:
1) vertically-guided cylinder (14) and horizontal adjustment bracket (15) is selected
According to the size, form and the construction requirement that need pre-buried steel column (16), selected vertically-guided cylinder (14) and horizontal adjustment bracket (15);
2) the upper guiding of installing of steel column (16) hangs muscle (17)
According to construction area absolute altitude and construction requirement, guiding is set at pre-buried steel column (16) apical position and hangs muscle (17);
3) horizontal adjustment bracket (15) location
Construction area is surveyed, and according to horizontal adjustment bracket (15) size, hard place level ground is squeezed into positioning screw (1);
4), after wall reinforcing cage (11) is transferred, horizontal adjustment bracket (15) is installed
Ground wall reinforcing cage (11) regulates horizontal girder steel (12) to desired spacing according to construction requirement, screws stop nut (2) after transferring, and after ground wall reinforcing cage (11) is transferred, horizontal adjustment bracket (15) is set on positioning screw (1);
5) horizontal adjustment bracket (15) leveling
The absolute altitude increasing or reduce on four bases regulates pad (4), observes the spirit level (5) in vertical, horizontal girder steel (13,12), makes horizontal adjustment bracket (15) level, tighten base clamp nut (6) after horizontal adjustment bracket (15) level;
6) vertically-guided cylinder (14) is installed
Vertically-guided cylinder (14) is placed in the modulated horizontal adjustment bracket to level (15), inserts bracket limit bolt (7);
7) steel column (16) is lifted
Steel column (16) is put in vertically-guided cylinder (14) storehouse, after placing design elevation, fixes steel column (16) on vertically-guided cylinder (14) by shoulder pole;
8) diaphragm wall concreting
9) pull down spacing adjusting bracket to recycle
After diaphragm wall concrete initial set, extract vertically-guided cylinder (14), bracket limit bolt (7) out, hang away vertically-guided cylinder (14), unload lower bottom base clamp nut (6) subsequently, withdraw horizontal adjustment bracket (15) and base.
CN201210139131.9A 2012-05-08 2012-05-08 Underground embedded steel component limiting straightening construction method Active CN102653947B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210139131.9A CN102653947B (en) 2012-05-08 2012-05-08 Underground embedded steel component limiting straightening construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210139131.9A CN102653947B (en) 2012-05-08 2012-05-08 Underground embedded steel component limiting straightening construction method

Publications (2)

Publication Number Publication Date
CN102653947A CN102653947A (en) 2012-09-05
CN102653947B true CN102653947B (en) 2015-02-18

Family

ID=46729666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210139131.9A Active CN102653947B (en) 2012-05-08 2012-05-08 Underground embedded steel component limiting straightening construction method

Country Status (1)

Country Link
CN (1) CN102653947B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149723B (en) * 2017-12-20 2019-04-02 上海建工集团股份有限公司 A kind of plumbing device and its correcting method for contrary sequence method low Low Level steel-pipe pile
CN108775021A (en) * 2018-07-11 2018-11-09 中铁三局集团有限公司 Contact net basic construction built-in fitting precise positioning tooling
CN109252511A (en) * 2018-10-23 2019-01-22 杭州市市政工程集团有限公司 A kind of installation of steel reinforcement cage and concrete casting platform

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3594965A (en) * 1968-10-01 1971-07-27 Kolbjorn Saether Precast building construction
CN1424469A (en) * 2002-08-23 2003-06-18 上海市第一建筑有限公司 Method and apparatus for controlling verticality of steel pile
CN201065533Y (en) * 2007-07-17 2008-05-28 上海市第一建筑有限公司 Steel pile column perpendicularity regulating and controlling device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3594965A (en) * 1968-10-01 1971-07-27 Kolbjorn Saether Precast building construction
CN1424469A (en) * 2002-08-23 2003-06-18 上海市第一建筑有限公司 Method and apparatus for controlling verticality of steel pile
CN201065533Y (en) * 2007-07-17 2008-05-28 上海市第一建筑有限公司 Steel pile column perpendicularity regulating and controlling device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钢结构高精度大型预埋件安装技术;赵忠东;《施工技术》;20051031;第34卷(第10期);第23、82页 *

Also Published As

Publication number Publication date
CN102653947A (en) 2012-09-05

Similar Documents

Publication Publication Date Title
CN100585098C (en) Underground preburied column high-precision smart verticality-regulating system and mounting construction method
CN104234385A (en) Mounting and construction method for terrace large-size steel plate embedded part
CN201896365U (en) Installing and fixing device for flat plate pre-embedded piece on surface of concrete
CN206971268U (en) The working top plate mobile formwork body of underground pipe gallery
CN106065681A (en) Superimposed sheet hoard strip construction method in a kind of overall assembled architecture based on BIM technology
CN203783165U (en) Multi-directional accurate adjusting device for embedded part
CN102653947B (en) Underground embedded steel component limiting straightening construction method
CN204001428U (en) A kind of Large-diameter Steel tubing string suspension column is installed pre-buried location structure and suspension column structure thereof
CN103321212A (en) One-column-one-pile post inserting method construction process
CN102653943B (en) Underground embedded steel column straightening limiting device
CN204298830U (en) Based on lattice column plane in subterranean excavation and elevation regulation device
CN103174299A (en) An installment and construction method of laminate rubber support and flat plate slipping support
CN215055273U (en) A assembled template for installing support bracket embedded box
CN104153590A (en) Quick positioning and adjusting device for prefabricated residence superimposed wallboard
CN204001427U (en) A kind of steel pipe column suspension column is installed the pre-buried positioning supports structure with location ring flat-plate
CN202509779U (en) Vertical elbow fixing device for concrete pump pipe
CN209760786U (en) instrumentization support system for controlling precision of two-dimensional component
KR101101182B1 (en) Top-down method of underground structure
CN206607706U (en) A kind of drawing shore for shear wall construction
CN204298842U (en) Foundation bolt precast frame mounting structure
CN201991144U (en) Hanging stool for thickness-quality control of cast-in-place concrete floor upper-layer plate-rib protecting layer and concrete plate
CN205296201U (en) Positioner suitable for post installation of rim of a cup basis
CN204040495U (en) A kind of suspension fixing support rack of high-order cast-in fixing bolt
CN204402035U (en) Shear wall template support structure
CN203129165U (en) Quick positioning construction device of bridge steel tube standing column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 200433 Yangpu District, Shanghai Star Road, No. 231

Applicant after: Shanghai Foundation Engineering Group Co., Ltd.

Address before: 200433 Yangpu District, Shanghai Star Road, No. 231

Applicant before: Shanghai Foundation Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI FOUNDATION ENGINEERING CO., LTD. TO: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant