CN217417152U - Tubular pile conveyer - Google Patents

Tubular pile conveyer Download PDF

Info

Publication number
CN217417152U
CN217417152U CN202220937689.0U CN202220937689U CN217417152U CN 217417152 U CN217417152 U CN 217417152U CN 202220937689 U CN202220937689 U CN 202220937689U CN 217417152 U CN217417152 U CN 217417152U
Authority
CN
China
Prior art keywords
tubular pile
bearing
fixing
hoop
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220937689.0U
Other languages
Chinese (zh)
Inventor
赵红艳
陈万明
郑伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Hexingyuan Building Engineering Co ltd
Original Assignee
Tianjin Hexingyuan Building Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Hexingyuan Building Engineering Co ltd filed Critical Tianjin Hexingyuan Building Engineering Co ltd
Priority to CN202220937689.0U priority Critical patent/CN217417152U/en
Application granted granted Critical
Publication of CN217417152U publication Critical patent/CN217417152U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The application relates to a tubular pile conveyer, it includes: the transportation track is fixedly arranged on the ground; the bearing body is slidably arranged on the transportation track; and the driving mechanism is connected with the bearing body and is used for driving the bearing body to move along the length direction of the transportation track. In this application, use the hoist to hoist the tubular pile to bearing the weight of the body on, then bear the weight of the body through the drive of control actuating mechanism and remove, it drives the tubular pile and removes to bear the weight of the body, when the tubular pile removes to the destination, rethread actuating mechanism bears the weight of the restriction of body, respectively set up a hoist through the place of keeping in of tubular pile and the transfer destination of tubular pile, bear the weight of the removal route of body control tubular pile, the hoist only need carry out lifting by crane and placing of tubular pile in the small distance within range, can effectively improve the inconvenient problem of hoist transfer tubular pile in the workshop, increase the efficiency of moving of tubular pile simultaneously.

Description

Tubular pile conveyer
Technical Field
The application relates to the field of tubular pile technology, especially, relate to a tubular pile conveyer.
Background
When the geological conditions are poor and the bearing capacity of the foundation is small, the pile foundation is needed to be adopted, one tubular pile is driven into the ground, the tubular pile is used as one part of the foundation, the tubular pile can transmit the weight of a building on the ground to the soil layer on the lower layer of the tubular pile, and the problem of small bearing capacity of the foundation is effectively solved.
The method comprises the steps of preparing a die according to requirements of a tubular pile in a manufacturing process, pouring concrete into the die, combining a film, tensioning a steel bar framework after the film is combined, centrifuging the tubular pile after the film is tensioned, demolding and maintaining, wherein the tubular pile needs to be transferred for many times in the manufacturing process, a machine for transferring the tubular pile is usually a crane, when the tubular pile is transported by the crane, the tubular pile is firstly hoisted by the crane, then the crane is moved to a transfer place of the tubular pile, and finally the tubular pile is put down by operating the crane, and when the tubular pile is moved by the crane in a workshop, the site is small, the movement of the crane is limited, and the tubular pile is inconvenient to transfer.
SUMMERY OF THE UTILITY MODEL
In order to improve the inconvenient problem of hoist transfer tubular pile in the workshop, this application provides a tubular pile conveyer.
The application provides a pair of tubular pile conveyer adopts following technical scheme:
a tubular pile transport device, comprising: the transportation track is fixedly arranged on the ground; the bearing body is slidably arranged on the transportation track; and the driving mechanism is connected with the bearing body and is used for driving the bearing body to move along the length direction of the transportation track.
Through adopting above-mentioned technical scheme, use the hoist to hoist the tubular pile to bearing the weight of the body on, then bear the weight of the body through the drive of control actuating mechanism and remove, it drives the tubular pile and removes to bear the weight of the body, when the tubular pile removes to the target site, rethread actuating mechanism bears the weight of the restriction of body, respectively set up a hoist through the place of keeping in at the tubular pile and the transfer destination of tubular pile, bear the weight of the removal route of body control tubular pile, the hoist only need carry out the lifting by crane removal and the placement of tubular pile in little distance range, can effectively improve the inconvenient problem of hoist transfer tubular pile in the workshop, increase the efficiency of moving of tubular pile simultaneously.
Optionally, the number of the bearing bodies is two, and a connecting rod for connecting the two bearing bodies is fixedly arranged between the two bearing bodies.
Through adopting above-mentioned technical scheme, can get up two bearing body coupling through the setting of connecting rod, and then make conveyer can steadily transport longer size's tubular pile.
Optionally, the driving mechanism includes a winch body and a pulley fixedly arranged on the ground, the transportation rail is arranged between the winch body and the pulley, a steel wire rope passing around the pulley is wound on the winch body, and two ends of the steel wire rope are sequentially and fixedly connected to the two bearing bodies.
By adopting the technical scheme, after the tubular pile is placed on the bearing body, the winch body is controlled to wind the steel wire rope, so that the steel wire rope can drive the bearing body to move towards the direction close to a transportation place, and the transportation of the tubular pile on the bearing body is completed.
Optionally, the bearing body comprises two i-beams and a first connecting plate fixedly connected between the two i-beams.
By adopting the technical scheme, the I-shaped steel has stronger hardness, so the bending resistance is very strong, the pipe pile is not easy to bend in the transportation process, the I-shaped steel has stronger bearing capacity and is a better material used as a bearing body for the transportation of the pipe pile, and the wing plate special for the I-shaped steel can also enclose and block the pipe pile, thereby improving the transportation stability of the pipe pile in many aspects.
Optionally, each I-steel is far away from one side of first connecting plate all is fixed and is equipped with the extension platform.
Through adopting above-mentioned technical scheme, the setting of extension platform can increase the quantity that conveyer single transported the tubular pile, effectively improves conveyer's conveying efficiency.
Optionally, a hoop plate is rotatably connected to the upper surface of each extension table, and a fixing assembly for fixing the two hoop plates is arranged between the two hoop plates on each bearing body.
Through adopting the above technical scheme, one bears two hoop plates on the body and can enclose the fender to bearing the tubular pile on the body, when the transportation of tubular pile is carried out to needs, rotate two hoop plates towards the direction of keeping away from first connecting plate, place the tubular pile in I-steel and extension bench again, then rotate two hoop plates towards the direction that is close to first connecting plate again, fix two hoop plates through fixed subassembly, make two hoop plates can enclose the fender to the tubular pile of bearing the transportation on the body, reduce the possibility that the tubular pile dropped in the transportation, further increase the stability of tubular pile transportation.
Optionally, each fixing assembly includes a pair of mounting pieces fixedly connected to one end of the hoop plate away from the i-beam and a mounting bar fixedly connected to one end of the hoop plate away from the i-beam, and a fixing member for fixing the mounting bar is provided between each mounting piece and the corresponding mounting bar.
Through adopting above-mentioned technical scheme, when carrying out the fixed of hoop board, rotate two hoop boards towards the direction that is close to first connecting plate, make the mounting bar arrange in between two installation pieces, use the mounting to accomplish the fixed to the mounting bar again on two installation pieces, two mountings are fixed the mounting bar, have just accomplished the fixed to two hoop boards.
Optionally, the fixing piece is a fixing bolt, and each fixing bolt passes through the corresponding mounting piece and then is in threaded connection with the corresponding mounting bar.
Through adopting above-mentioned technical scheme, when carrying out the fixed of installing strip, all pass behind the installation piece that corresponds every fixing bolt with the installing strip threaded connection that corresponds, the fixed process is more convenient.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the driving mechanism is controlled to drive the bearing body to move, the bearing body moves to drive the tubular pile to move, and the tubular pile is transported without using a crane by an operator in a workshop, so that the problem that the tubular pile is inconvenient to transfer by the crane in the workshop can be effectively solved, and the moving efficiency of the tubular pile is improved;
2. through setting up two fixed hoop plates of fixed subassembly, make two hoop plates on bearing the weight of the body can enclose the fender to the tubular pile that bears the weight of the transportation on the body, reduce the possibility that the tubular pile dropped in the transportation, further increase the stability of tubular pile transportation.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a schematic view of a portion of a load-bearing body according to an embodiment of the present disclosure;
FIG. 3 is a partial schematic view of the second connecting plate according to the embodiment of the present application;
fig. 4 is a partially enlarged view of a portion a in fig. 2 of the embodiment of the present application.
Description of reference numerals: 1. a transportation track; 2. a load-bearing body; 21. i-shaped steel; 22. a first connecting plate; 23. a second connecting plate; 24. a third connecting plate; 25. a reinforcing plate; 26. a roller; 3. a drive mechanism; 31. a hoist body; 32. a pulley; 33. a wire rope; 4. connecting rods; 5. a lengthening stage; 6. a hoop plate; 7. a fixing assembly; 71. mounting a sheet; 72. mounting a bar; 73. and a fixing member.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses a tubular pile conveyer. Referring to fig. 1, a tubular pile conveyer includes transportation track 1, and transportation track 1 is fixed to be established on ground, is equipped with on the transportation track 1 slidable and bears body 2, bears body 2 and can bear the tubular pile, bears body 2 and is connected with actuating mechanism 3, and actuating mechanism 3 can drive and bear body 2 and remove along the length direction of transportation track 1.
The tubular pile is hoisted to the bearing body 2 by using a crane, then the bearing body 2 is driven to move by controlling the driving mechanism 3, the bearing body 2 moves to drive the tubular pile to move, after the tubular pile moves to a proper position, the driving mechanism 3 is stopped to control the tubular pile, so that the bearing body 2 is kept static, and the tubular pile on the bearing body 2 is transferred.
Through respectively setting up a hoist in the place of keeping in of tubular pile and the transfer destination of tubular pile, bear the removal route of body 2 through actuating mechanism 3 control, the hoist only need carry out the lifting by crane removal and placing of tubular pile in the small distance within range, does not need the hoist to carry out the removal of longer route in the workshop, so can effectively improve in the workshop that the hoist shifts the tubular pile and is limited, the inconvenient problem of manipulation, can also increase the efficiency of moving of tubular pile simultaneously.
Referring to fig. 1, two bearing bodies 2 are arranged, the two bearing bodies 2 are arranged along the length direction of the transportation track 1, a connecting rod 4 is arranged between the two bearing bodies 2, the length direction of the connecting rod 4 is parallel to the length direction of the transportation track 1, and the connecting rod 4 is used for connecting the two bearing bodies 2.
Two bear body 2 and can bear the support to the tubular pile, connect two through connecting rod 4 and bear body 2 and can realize removing the tubular pile of longer distance, effectively strengthen the suitability that bears body 2, reduce the wasting of resources.
Referring to fig. 2 and 3, each bearing body 2 comprises two i-beams 21, the two i-beams 21 are parallel to each other, the length directions of the two i-beams 21 are parallel to the length direction of the transportation track 1, a pair of first connecting plates 22 is fixedly connected between the two i-beams 21, the two first connecting plates 22 are horizontally arranged, a plurality of second connecting plates 23 are fixedly connected between the two i-beams 21, the plurality of second connecting plates 23 are vertically arranged, and the plurality of second connecting plates 23 are evenly distributed along the length directions of the i-beams 21 at intervals.
The lower surface of every I-steel 21 all fixedly connected with third connecting plate 24, third connecting plate 24 level sets up, a plurality of reinforcing plates 25 of fixedly connected with between I-steel 21 and the third connecting plate 24, the equal vertical setting of a plurality of reinforcing plates 25, and a plurality of reinforcing plates 25 along the even interval distribution of length direction of I-steel 21, the equal fixed mounting of lower surface of every I-steel 21 has a plurality of gyro wheels 26, the equal roll connection of every gyro wheel 26 is in transportation track 1.
When carrying out the transportation of tubular pile, place the tubular pile in the upper surface that bears body 2, once realize depositing of a plurality of tubular piles, rethread actuating mechanism 3 drive I-steel 21 motion, I-steel 21 motion can drive the tubular pile and remove, and then realize the removal of tubular pile.
Referring to fig. 1 and 2, the driving mechanism 3 includes a winch body 31 and a pulley 32, the winch body 31 and the pulley 32 are sequentially disposed at two ends of the transportation rail 1, the winch body 31 and the pulley 32 are both fixedly disposed on the ground, a wire rope 33 is wound on the winch body 31, one end of the wire rope 33 is fixedly connected to a side surface of the second connection plate 23 nearest to the winch body 31, and the other end of the wire rope 33 is fixedly connected to a side surface of the second connection plate 23 nearest to the pulley 32.
The movement of the steel wire rope 33 can be controlled by controlling the winch body 31, the steel wire rope 33 can move to drive the two second connecting plates 23 to move, the tubular pile can be moved, and the moving process is convenient.
Referring to fig. 2, each i-steel 21 is fixedly connected with an extension table 5 on one side away from the first connecting plate 22, a hoop plate 6 is rotatably connected to the upper surface of each extension table 5, the hoop plate 6 is arc-shaped, a fixing assembly 7 is arranged between two hoop plates 6 on two opposite extension tables 5 on each bearing body 2, and the fixing assembly 7 is used for fixing the hoop plates 6.
The setting of extension platform 5 can further increase the quantity that conveyer one side transported the tubular pile, can effectively increase conveyer's conveying efficiency, fixes two hoop plates 6 through using fixed subassembly 7 simultaneously, can enclose the fender to the tubular pile of two extension platform 5 upper surfaces, effectively reduces the tubular pile and removes the possibility that in-process tubular pile dropped, further increases the stability that the tubular pile removed.
Referring to fig. 2 and 4, each fixing assembly 7 includes a pair of mounting pieces 71, the pair of mounting pieces 71 is fixedly connected to one end of one of the hoop plates 6 away from the first connecting plate 22, a mounting bar 72 is arranged on the hoop plate 6 opposite to the hoop plate 6 provided with the mounting piece 71, the mounting bar 72 is fixedly connected to one end of the hoop plate 6 away from the first connecting plate 22, the mounting bar 72 is disposed between the two mounting pieces 71, and a fixing member 73 is disposed between each mounting piece 71 and the corresponding mounting bar 72, and the fixing member 73 is used for connecting the mounting piece 71 and the mounting bar 72.
When the removal of tubular pile needs to be carried out, hoop plate 6 is rotated towards the direction of keeping away from first connecting plate 22, then move the tubular pile to the upper surface of I-steel 21 and extension platform 5, enclose the tubular pile and establish the back using two hoop plates 6, rotate two hoop plates 6 towards the direction that is close to first connecting plate 22 again, place in between two corresponding installation pieces 71 to mounting bar 72, then use mounting 73 to fix mounting bar 72, accomplish enclosing of tubular pile and keep off, it can to carry out the transportation removal of tubular pile again.
Referring to fig. 4, the fixing members 73 are fixing bolts, each of which is threaded to the corresponding mounting bar 72 after passing through the corresponding mounting piece 71.
When the hoop plate 6 is fixed, the fixing bolt penetrates through the corresponding mounting piece 71 and then is connected to the mounting bar 72 in a threaded mode, the hoop plate 6 can be fixed, and the fixing process is convenient.
The implementation principle of the pipe pile conveying device in the embodiment of the application is as follows: when the transportation of tubular pile needs to be carried out, hoop plate 6 is rotated towards the direction of keeping away from first connecting plate 22, place the tubular pile in the upper surface of I-steel 21 and extension platform 5, then hoop plate 6 is rotated towards the direction of being close to first connecting plate 22, it all arranges in between a pair of corresponding installation piece 71 to every mounting bar 72, then pass corresponding mounting bar 71 back threaded connection in the installation bar 72 that corresponds with fixing bolt on every installation piece 71 again, then again control hoist engine body 31, make wire rope 33 remove, the in-process that wire rope 33 removed can drive and bear the weight of body 2 and remove, and then accomplish the transportation to the tubular pile.
In this application, unless expressly stated or limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can include, for example, fixed connections, removable connections, or integral parts; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those of ordinary skill in the art.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. A tubular pile conveyer, its characterized in that includes:
the transportation track (1) is fixedly arranged on the ground;
the bearing body (2) is arranged on the transportation track (1) in a sliding way;
the driving mechanism (3) is connected with the bearing body (2) and is used for driving the bearing body (2) to move along the length direction of the transportation track (1).
2. The tubular pile conveying device according to claim 1, characterized in that: the two bearing bodies (2) are arranged, and a connecting stick (4) used for connecting the two bearing bodies (2) is fixedly arranged between the two bearing bodies (2).
3. The tubular pile conveying device according to claim 2, characterized in that: the driving mechanism (3) comprises a winch body (31) and pulleys (32) which are fixedly arranged on the ground, the conveying track (1) is arranged between the winch body (31) and the pulleys (32), a steel wire rope (33) which bypasses the pulleys (32) is wound on the winch body (31), and two end parts of the steel wire rope (33) are sequentially connected to the two bearing bodies (2).
4. A tube pile transporting device according to claim 2 or 3, characterized in that: the bearing body (2) comprises two I-shaped steels (21) and a first connecting plate (22) fixedly connected between the two I-shaped steels (21).
5. The tubular pile conveying device according to claim 4, characterized in that: and an extension table (5) is fixedly arranged on one side, far away from the first connecting plate (22), of each I-shaped steel (21).
6. The tubular pile conveying device according to claim 5, characterized in that: the upper surface of every extension platform (5) all rotates and is connected with hoop board (6), every bear two on body (2) all be provided with between hoop board (6) and be used for fixing two fixed subassembly (7) of hoop board (6).
7. The tubular pile conveying device according to claim 6, characterized in that: each fixing assembly (7) comprises a pair of mounting pieces (71) fixedly connected with one end, far away from the I-shaped steel (21), of one hoop plate (6) and a mounting strip (72) fixedly connected with one end, far away from the I-shaped steel (21), of the other hoop plate (6), and a fixing piece (73) used for fixing the mounting strip (72) is arranged between each mounting piece (71) and the corresponding mounting strip (72).
8. The tubular pile conveying device according to claim 7, characterized in that: the fixing pieces (73) are fixing bolts, and each fixing bolt penetrates through the corresponding mounting piece (71) and then is connected to the corresponding mounting bar (72) in a threaded mode.
CN202220937689.0U 2022-04-22 2022-04-22 Tubular pile conveyer Active CN217417152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220937689.0U CN217417152U (en) 2022-04-22 2022-04-22 Tubular pile conveyer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220937689.0U CN217417152U (en) 2022-04-22 2022-04-22 Tubular pile conveyer

Publications (1)

Publication Number Publication Date
CN217417152U true CN217417152U (en) 2022-09-13

Family

ID=83183728

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220937689.0U Active CN217417152U (en) 2022-04-22 2022-04-22 Tubular pile conveyer

Country Status (1)

Country Link
CN (1) CN217417152U (en)

Similar Documents

Publication Publication Date Title
CN107059640B (en) Bridge girder erection machine for prefabricated segmental beam span-by-span construction and construction method thereof
CN206703269U (en) A kind of resilient support block production line
JP3026545B2 (en) Bridge girder erection method and device
CN107476195B (en) Girder transporting pulley system for transporting stiffening girder by suspension bridge
CN217417152U (en) Tubular pile conveyer
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN112160246B (en) Method for installing composite beam
CN110127520B (en) Method for installing small-lattice funnel and dust-settling pipe of large sintering machine
JP5292019B2 (en) Pile construction device and cast-in-place concrete pile construction method
CN209835463U (en) Prefabricated bridge deck hoisting equipment
CN210419067U (en) Movable plate lifting device for ship box body repair
CN115157432B (en) Production line and production method of hollow interlayer composite material pole tower
JP4489872B2 (en) Bridge erection method and apparatus
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN214738076U (en) Ship lock chamber wall concrete pouring construction device
CN210710588U (en) Hoisting system for prefabricating pipe trench in highly-limited narrow space
CN212614780U (en) Collapsible shield constructs section of jurisdiction and stacks device
CN212639713U (en) Movable portable gantry type hoisting device
CN219009673U (en) Device for assisting intelligent water meter installation
CN214269899U (en) Consigning assembly for horizontal transportation of large electromechanical equipment
CN215363157U (en) Unloading and positioning device for dry-type transformer
CN220886893U (en) Transfer device for installation of equipment in narrow space
CN219635066U (en) Conveying vehicle for bridge construction
CN216379159U (en) Auxiliary device of bridge girder erection machine for erecting small-radius bridge
CN108840234B (en) Hoisting device for prefabricated section and hoisting method thereof