CN205934962U - A system of sliding for underground pipe gallery cast -in -situ construction - Google Patents

A system of sliding for underground pipe gallery cast -in -situ construction Download PDF

Info

Publication number
CN205934962U
CN205934962U CN201620738471.7U CN201620738471U CN205934962U CN 205934962 U CN205934962 U CN 205934962U CN 201620738471 U CN201620738471 U CN 201620738471U CN 205934962 U CN205934962 U CN 205934962U
Authority
CN
China
Prior art keywords
construction
pipe gallery
underground pipe
cast
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620738471.7U
Other languages
Chinese (zh)
Inventor
陈俊杰
卢国春
赵宗文
芮曦明
曹海良
闫力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620738471.7U priority Critical patent/CN205934962U/en
Application granted granted Critical
Publication of CN205934962U publication Critical patent/CN205934962U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a system of sliding for underground pipe gallery cast -in -situ construction should the system of sliding include: the platform truck, the platform truck top is formed with operation platform, the adjusting part, install in operation platform, and the template, through the adjusting part is adjustable hang in operation platform. Should the system of sliding only need utilize the adjusting part moving die plate to establish the position or break away from the wall body of building can, need not artifical with the template transport to establishing the position, saved the workload of construction, simplified the work progress, has realized the mechanization of cast -in -place wall body construction, and has improved the efficiency of construction.

Description

Sliding system for underground pipe gallery cast-in-place construction
Technical field
This utility model is related to the realm of building construction, refers in particular to a kind of sliding system for underground pipe gallery cast-in-place construction.
Background technology
Underground pipe gallery, is to implement unified planning, design, construction and the facility safeguarded, is built in Urban Underground and is used for applying If mayor's public utility of municipal public use pipeline.General pipe gallery along the supporting setting of basic road, that is, pipe gallery located at The lower section of basic road is simultaneously parallel with basic road, and this pipe gallery is used for housing underground utilities, solves laying of underground utilities Problem.Pipe gallery typically adopts rectangular configuration, and its work progress is first to excavate piping lane tunnel, then applies in piping lane tunnel Pipe rack at work, Pipe rack is xoncrete structure, and existing Normal practice is to be spliced using prefabricated components, or Cast-in-place concrete forms, and when being constructed using prefabricated components, needs lifting to be transported to construction location and the operation such as splices again, construction is numerous Trivial, using cast-in-place concrete construction, need formwork to pour form removal again and be transported to next construction area and carry out formwork again and the behaviour such as pour Make, the workload of construction is big, low construction efficiency.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, provide a kind of for underground pipe gallery cast-in-place construction Sliding system, the construction operation amount existing during the cast-in-place piping lane construction of solution is big and the problem of low construction efficiency.
The technical scheme realizing above-mentioned purpose is:
This utility model provides a kind of sliding system for underground pipe gallery cast-in-place construction, including:
Chassis, described chassis top is formed with operating platform;
Adjusting part, is installed on described operating platform;And
Template, hangs on described operating platform by described adjusting part is adjustable.
This sliding system is used for the construction of the cast-in-situ wall of underground pipe gallery, fastens in slide mass and is hung with template, by two Individual template sandwiched forms the casting space pouring body of wall, so adjusts it is only necessary to utilize in the formwork of body of wall and form removal construction Template, to installing position or departing from the body of wall pouring, manually need not be carried to and install position by assembly moving die plate, section Save the workload of construction, simplified work progress it is achieved that the mechanization of cast-in-situ wall construction, and improve efficiency of construction. When carrying out the construction of next section of body of wall, using chassis, whole system is moved down, compared to existing a dead lift, More time saving and energy saving.It is suspended on chassis so that the regulation freedom and flexibility of template, Neng Goushi by adjusting part using template Answer the construction of the cast-in-situ wall of different in width, meet the construction requirement of cast-in-situ wall.Sliding system also provides for piping lane construction Operating platform, is that the piping lane construction of underground is provided convenience, and solves underground construction space little not and to be not easy to set up operation flat The problem of platform.
This utility model is used for further improvement is that of the sliding system of underground pipe gallery cast-in-place construction, described adjusting part Including:
Skid beam, located at the bottom of described operating platform;
Lifting part, slides in described skid beam, for hanging described template.
This utility model is used for further improvement is that of the sliding system of underground pipe gallery cast-in-place construction, and described chassis includes Column, the paralell being connected to described column top and the bottom girder being connected to described column bottom;It is equiped with described bottom girder Pulley and the reductor driving described pulley;Activity on described paralell is equipped with scaffold board.
This utility model is used for further improvement is that of the sliding system of underground pipe gallery cast-in-place construction, and described pulley is ten thousand To wheel.
This utility model is used for further improvement is that of the sliding system of underground pipe gallery cast-in-place construction, on described column also It is equiped with ruggedized construction, described oblique base plate located at described column and underground pipe gallery of ruggedized construction or lead between wall, described The bottom of ruggedized construction is equiped with directional wheel.
This utility model is used for further improvement is that of the sliding system of underground pipe gallery cast-in-place construction, described template and institute State to install between column and be connected with supporting construction.
Brief description
The slide mass that Fig. 1 is used for underground pipe gallery cast-in-place construction for this utility model ties up to the side view during formwork.
The sliding system that Fig. 2 is used in the sliding system of underground pipe gallery cast-in-place construction for this utility model saves the side of template View.
Fig. 3 is used for the structural representation of the sliding system in the sliding system of underground pipe gallery cast-in-place construction for this utility model Figure.
Fig. 4 for this utility model be used for underground pipe gallery cast-in-place construction sliding system in slide mass system in use Schematic diagram.
The slide mass that Fig. 5 is used in the sliding system of underground pipe gallery cast-in-place construction for this utility model ties up to wall construction mistake The structural representation of template and adjusting part is saved in journey.
Fig. 6 is the side view of Fig. 5.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
This utility model provides the sliding system for underground pipe gallery cast-in-place construction, and the body of wall that can be used for elongated shape is applied Work, is preferably applied to the construction of the pipe gallery of underground.Pipe gallery collection power cable, telecommunications, feedwater, middle water, heating power, rain are dirty The comprehensive urban operating mechanism that water and combustion gas etc. are integrated, realizes all pipelines and enters corridor totally, and the structure of this pipe gallery adopts Cast-in-place concrete structure.Sliding system of the present utility model and its construction method, the body of wall solving pipe gallery was being constructed In journey, the problem of complicated formwork, form removal and carrying (i.e. shifting formwork), simplifies the construction of cast-in-situ wall, eliminates and set up scaffold Step, save material and artificial.Multigroup body of wall can assemble and sliding simultaneously, and construction holding is worked continuously so that various work Sequence simplifies, and improves speed of application.This sliding system assembly and disassembly is all convenient, and it is high to have enough to meet the need utilization rate.Right below in conjunction with the accompanying drawings This utility model is used for the sliding system of underground pipe gallery cast-in-place construction and its construction method illustrates.
Refering to Fig. 1 it is shown that this utility model be used for underground pipe gallery cast-in-place construction slide mass tie up to formwork during Side view.With reference to Fig. 1, the sliding system being used for underground pipe gallery cast-in-place construction to this utility model illustrates.
As shown in figure 1, the sliding system that this utility model is used for underground pipe gallery cast-in-place construction includes chassis 21, adjusting part 22 and template 23, in conjunction with shown in Fig. 4, the top of chassis 21 is formed with operating platform 211, is provided with and applies on operating platform 21 Break gap 212, this operating platform 211 and construction gap 212 provide construction basis so that operator can stand in for operator The construction that construction gap 212 carries out body of wall is passed through on operating platform 211.This chassis 21 is moveable structure, and chassis 21 Moving direction moves towards consistent with body of wall to be onstructed.Adjusting part 22 is installed on the operating platform 211 of chassis 21, utilizes The regulation that adjusting part 22 realizes the width along body of wall to be onstructed is moved.Template 23 is connected with adjusting part 22, this mould Plate 23 is suspended on the operating platform of chassis 21 by adjusting part 22, and template 23 can move together with chassis 21, also may be used To move together with adjusting part 22, by the mobile regulation of chassis 21 and adjusting part 22 so that template can facilitate, suitable Sharp and accurate movement, to position to be onstructed, simplifies the construction procedure of template in cast-in-situ wall, construction can be greatly improved Speed is additionally it is possible to ensure construction quality.Between template 23, sandwiched forms casting space 231, pours coagulation in this casting space 231 Soil defines body of wall, and the construction gap 212 on chassis 21 is corresponding with the casting space that this template 23 is formed, and is passed through with facilitating Construction gap 212 operates to concrete perfusion in casting space.
As shown in Fig. 2, Fig. 4 to Fig. 6, chassis 21 includes column 213, paralell 214 and bottom girder 215, column 213 Top connecting platform frame 214, the bottom of column 213 connects bottom girder 215, and bottom girder 215 is equiped with pulley 2151 and driving pulley 2151 reductor 2152, activity on paralell 214 is equipped with scaffold board, and this scaffold board forms operating platform 211.By work The scaffold board of dynamic laying, can adjust the construction gap 212 between operating platform 211, so that this construction gap 212 can adapt to The change of body of wall, corresponding with the casting space of body of wall.Column 213 adopts frame structure, using square tube, angle steel and steel plate even Connect and form, square tube becomes framework using multiple Bolted angle connection, such as through four square tubes located at four square corners, then adjacent Square tube between using angle steel horizontal and/or oblique be fixedly connected, material is thus formed column 213, then steel plate be arranged on The top of column 213 and bottom, are connected with paralell 214 and bottom girder 215 by steel plate.The size of square tube adopts 80mm* 60mm*5mm, the size of angle steel adopts 50mm*50mm*4mm, and the thickness of steel plate is 10mm.Paralell 214 adopt girder and time Beam transverse and longitudinal is formed by connecting, and girder and secondary beam are also frame structure, and girder adopts 5# channel-section steel, the square tube of 50mm*30mm*2.5mm, The thick flanged plate of 10mm, 5# angle steel, as planker, when making girder, channel-section steel is arranged along the length direction of girder, four grooves Steel located at four square corners, then utilizes square tube skewed horizontal load to connect two adjacent channel-section steels, the also company of installing between channel-section steel It has been connected to angle steel, needed to connect the position setting flanged plate of secondary beam, in the bottom of flanged plate setting angle steel as planker, to drag Live secondary beam.Secondary beam adopts 5# channel-section steel, the steel plate of 100mm*200mm*10mm, and the flanged plate after 10mm, by steel plate located at secondary beam Two ends, then support between two steel plates and connect four channel-section steels, and channel-section steel, located at the corner of steel plate, supports between channel-section steel and connects Angle steel, then arranges flanged plate on channel-section steel.Secondary beam is resisted against between two girders, and rides upon on the supporting plate of girder, then Flanged plate with girder is connected, and material is thus formed paralell 214.Bottom girder 215 adopts 14# channel-section steel and 10# channel-section steel, by one The setting that the notch phase of 14# channel-section steel is deviated from, then installs 10# channel-section steel, by 10# channel-section steel by two between two channel-section steels 14# channel-section steel links into an integrated entity, and is the formation of bottom girder 215.When installing making chassis 21, the girder of paralell 214 is with secondary beam even The place of connecing rides upon on the top of column 213, and is connected with column 213, and the channel-section steel of bottom girder 215 is connected with column 213 bottom.Bottom girder 215 mutually deviate from offers through hole on two channel-section steels of setting, and this through hole is provided with pulley 2151, and pulley 2151 passes through ladder Axle is arranged on bottom girder 215, is fixed on the both sides of bottom girder in the both sides of multidiameter installation bearing and by bearing block.Reductor 2152 are arranged on bottom girder 215 by flanged plate, adjust the elasticity of the chain of reductor 2152, by the output of reductor 2152 Axle be connected by link chain mechanism with the multidiameter of pulley 2151 it is achieved that reductor 2152 driving pulley 2151 rotate function, So it is achieved that chassis 21 can enter the effect of line slip.For the ease of the movement of chassis 21, on the bottom girder 215 of chassis 21 It is equiped with multiple driven pulleys also by optical axis, driven pulley is rotated by the drive of pulley 2151.For adapting to walking of body of wall To, by bottom girder 215 install pulley 2151 be set to universal wheel, if being equiped with driven pulley on bottom girder 215, this driven pulley is also adopted With universal wheel, adjusted using the direction of universal wheel so that chassis 21 moving direction can with body of wall move towards consistent, that is, exist When body of wall occurs to turn to, this universal wheel can adjust the moving direction of chassis 21, to adapt to the actual trend of body of wall, can solve the problem that The problem that body of wall is turned.
The installation process of chassis 21 is:Using top-down mounting means, girder and secondary beam are bolted, shape Become paralell 214, then using hoisting apparatus, paralell 214 is sling and be placed on column 213, by bolt by column 213 Connect with paralell 214, followed by hoisting apparatus, column 213 is sling together with paralell 214, bottom girder 215 is moved to Installation site, using hoisting apparatus, column 213 is placed on bottom girder 215, then passes through bolt by bottom girder 213 and column 213 Connect.Material is thus formed chassis 21.
As shown in Figures 1 to 4, adjusting part 22 is installed on chassis 21, and the glide direction of this adjusting part 22 is to be onstructed The width of body of wall is consistent.Adjusting part 22 includes being installed in the skid beam 221 of paralell 214 bottom and slidably installs Lifting part 222 in skid beam 221, this lifting part 222 can enter line slip along skid beam 221, and this glide direction is to be formed The width of body of wall.The bottom of lifting part 222 connects the top of template 23, and template 23 is suspended on chassis by lifting part 222 On 21.The sliding function of lifting part 222 achieves template 23 and moves or away to be formed towards the direction of body of wall to be formed Body of wall direction mobile it is achieved that the effect of formwork and the demoulding, in formwork, after the reinforcing bar of the good body of wall of colligation, using lifting Part 222, towards the direction moving die plate 23 near reinforcing bar, so that template 23 moves to setting position, then supports fixed form 23.After the body of wall solidification pouring, the supporting construction of form removal 23, then utilize lifting part 222 away from body of wall Direction moving die plate 23, realize the effect of the demoulding.To sum up, formwork and the demoulding of template 23 is simplified using adjusting part 22, Efficiency of construction can be effectively improved.It is preferred that this lifting part 222 is bottle gouard moved by hands or the electronic calabash being slidably installed in skid beam 221 Reed, the operation that manually calabash or electric block one side can be lifted to template and be transferred, to facilitate the installation of template With dismounting, on the other hand also slidable adjustment can be carried out along skid beam 221.
As shown in figure 1, for the stability in the large improving chassis 21, ruggedized construction 216 is equiped with column 213, plus Oblique of fixing structure 216 is located between column 213 and supporting surface, and this supporting surface is the base plate 11 of underground pipe gallery or leads wall.Relatively Goodly, all install in the both sides of column 213 and be connected with ruggedized construction 216, support is provided for chassis 21 by ruggedized construction 216 Firm effect.This ruggedized construction 216 is telescopically adjustable structure, can carry out the regulation of length according to Support Position, with true Protect and provide stable support for chassis 21.The bottom of this ruggedized construction 216 is equiped with fixed pulley, serves guiding by fixed pulley Effect, when promoting chassis 21 to move, this fixed pulley is leading wall or the enterprising line slip of base plate, on the one hand facilitates chassis 21 movement, the on the other hand also movement to chassis 21 serves guide effect so that this chassis 21 can be along wall to be onstructed The trend of body moves, and prevents the moving direction of chassis 21 from deviateing the trend of body of wall.When turning, the guiding of this directional wheel is made With more significantly it can be ensured that the angle of the universal wheel turning of chassis 21 bottom is consistent with the angle of turn of body of wall.
Using adjusting part 22 adjust template 23 to set install position after, run through positioned at body of wall using split bolt The template 23 of reinforcing bar both sides, then fastens.Recycle supporting construction 217 to support the lateral surface connecting template 23 and column 213, be Template 23 provides support force, when template 23 is located at outermost, can be by 217 bottoms being located at template 23 and underground pipe gallery of supporting construction Plate 11 or lead between wall.
For ease of the use of chassis 21, it is equiped with cat ladder 219 in column 213 bottom of chassis 21, can be square by cat ladder 219 Just workmen climbs to paralell 214 to carry out constructing operation.Also it is equipped with guardrail 218 in the surrounding of paralell 214, play The effect of protection is it is ensured that construction safety.
The slide mass of cast-in-situ wall construction of the present utility model is fastened and can be needed to arrange the template of multigroup suspension according to construction, To realize synchronous construction operation, simplify various operations, accelerate speed of application.And only use a set of template in construction, utilize Chassis and adjusting part achieve formwork, the demoulding and the moving operation of template, no longer set up scaffold, artificial supporting module, Save substantial amounts of material and artificial.
The striking time of body of wall is short, using the cast-in-situ wall of piping lane under sliding system construction ground, can greatly improve construction Duration, reduces cost.
Using sliding system come supporting module, realize continuous concreting, construction joint can be reduced it is ensured that structures Globality, quality is readily obtained guarantee.
It is provided with guardrail on operating platform, and safety net and protection rope can be hung on guardrail, constructing operation is safe and reliable.
Template adopts aluminum alloy mould plate, and speed of application is fast, and quality is high.Workmen utilizes operating platform, can carry out coagulation Soil pours, and also can carry out the rendering of the releasing agent of template, and convenient construction is quick.
Whole sliding system is with bolts, convenient disassembly, and turnover utilization rate is high.
The crosshead at chassis top defines operating platform, and it provides, for concreting, the behaviour moving with chassis Make platform, reinforce for wall form simultaneously and also provide operating surface, be that underground pipe gallery construction is provided convenience.
This sliding system is used for the construction of cast-in-situ wall, fastens in slide mass and is hung with template, by two template sandwicheds Form the casting space pouring body of wall, so it is only necessary to move mould using adjusting part in the formwork of body of wall and form removal construction Template, to installing position or departing from the body of wall pouring, manually need not be carried to and install position, save construction by plate Workload, simplifies work progress it is achieved that the mechanization of cast-in-situ wall construction, and improves efficiency of construction.Carry out next During the construction of section body of wall, using chassis, whole system is moved down, compared to existing a dead lift, more save time Laborsaving.It is suspended on chassis so that the regulation freedom and flexibility of template by adjusting part using template, can adapt to different in width Cast-in-situ wall construction, meet the construction requirement of cast-in-situ wall.
Above in association with accompanying drawing embodiment, this utility model is described in detail, those skilled in the art can root According to described above, this utility model is made with many variations example.Thus, some details in embodiment should not be constituted to this practicality New restriction, this utility model is by the scope being defined using appended claims as protection domain of the present utility model.

Claims (6)

1. a kind of sliding system for underground pipe gallery cast-in-place construction is it is characterised in that include:
Chassis, described chassis top is formed with operating platform;
Adjusting part, is installed in described operating platform;And
Template, hangs on described operating platform by described adjusting part is adjustable.
2. it is used for as claimed in claim 1 the sliding system of underground pipe gallery cast-in-place construction it is characterised in that described adjusting part Including:
Skid beam, located at the bottom of described operating platform;
Lifting part, slides in described skid beam, for hanging described template.
3. it is used for as claimed in claim 1 or 2 the sliding system of underground pipe gallery cast-in-place construction it is characterised in that described chassis The paralell including column, being connected to described column top and the bottom girder being connected to described column bottom;Fill on described bottom girder The reductor being provided with pulley and driving described pulley;Activity on described paralell is equipped with scaffold board.
4. it is used for the sliding system of underground pipe gallery cast-in-place construction as claimed in claim 3 it is characterised in that described pulley is ten thousand To wheel.
5. it is used for the sliding system of underground pipe gallery cast-in-place construction as claimed in claim 3 it is characterised in that going back on described column It is equiped with ruggedized construction, described oblique base plate located at described column and underground pipe gallery of ruggedized construction or lead between wall, described The bottom of ruggedized construction is equiped with directional wheel.
6. it is used for as claimed in claim 3 the sliding system of underground pipe gallery cast-in-place construction it is characterised in that described template and institute State to install between column and be connected with supporting construction.
CN201620738471.7U 2016-07-14 2016-07-14 A system of sliding for underground pipe gallery cast -in -situ construction Expired - Fee Related CN205934962U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620738471.7U CN205934962U (en) 2016-07-14 2016-07-14 A system of sliding for underground pipe gallery cast -in -situ construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620738471.7U CN205934962U (en) 2016-07-14 2016-07-14 A system of sliding for underground pipe gallery cast -in -situ construction

Publications (1)

Publication Number Publication Date
CN205934962U true CN205934962U (en) 2017-02-08

Family

ID=57929053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620738471.7U Expired - Fee Related CN205934962U (en) 2016-07-14 2016-07-14 A system of sliding for underground pipe gallery cast -in -situ construction

Country Status (1)

Country Link
CN (1) CN205934962U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013233A (en) * 2016-07-14 2016-10-12 中国建筑第八工程局有限公司 Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN108798714A (en) * 2018-05-28 2018-11-13 广西路建工程集团有限公司 A kind of working portable shifting formwork trolley of channel wall body and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013233A (en) * 2016-07-14 2016-10-12 中国建筑第八工程局有限公司 Slippage system used for underground pipe rack cast-in-place construction and construction method of slippage system
CN108798714A (en) * 2018-05-28 2018-11-13 广西路建工程集团有限公司 A kind of working portable shifting formwork trolley of channel wall body and its construction method

Similar Documents

Publication Publication Date Title
CN106013233B (en) Sliding system and its construction method for underground pipe gallery cast-in-place construction
CN105952482B (en) Self-propelled tunnel inverted arch lining trolley
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN108330842A (en) A kind of Bridge Erector and construction method of large span steel reinforced concrete combination beam erection construction
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN104632251A (en) Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage
CN105908777A (en) Comprehensive pipe gallery sliding mold and application method thereof
CN204457802U (en) Formed by integrally casting formula formwork jumbo
CN101586330A (en) Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN208087078U (en) A kind of boom hoisting of large span steel reinforced concrete combination beam Bridge Erector
CN105401679A (en) Large-gradient cast-in-place concrete inclined roof construction method
CN205894099U (en) Be applied to underground pipe gallery's portable sliding template device
CN102720432A (en) Self-propelled underground boring jumbo
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN205936645U (en) A full liquid die plate system for culvert is pour
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN208563380U (en) A kind of self-propelled pipe gallery plate device
CN107829408B (en) Rectangular aqueduct construction steel mould trolley
CN106013234B (en) The construction method of underground pipe gallery
CN204552760U (en) Traveling type hydraulic formwork jumbo
CN108005684B (en) Separated steel mould trolley and construction method thereof
CN216515141U (en) Novel cantilever construction creeping formwork device
CN214737292U (en) Telescopic sliding formwork device for prefabricating steel-concrete composite beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208