CN217204082U - Civil engineering pile foundation construction structures - Google Patents

Civil engineering pile foundation construction structures Download PDF

Info

Publication number
CN217204082U
CN217204082U CN202220833166.1U CN202220833166U CN217204082U CN 217204082 U CN217204082 U CN 217204082U CN 202220833166 U CN202220833166 U CN 202220833166U CN 217204082 U CN217204082 U CN 217204082U
Authority
CN
China
Prior art keywords
wall
pipe
pile foundation
civil engineering
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220833166.1U
Other languages
Chinese (zh)
Inventor
王乐超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Corp Ltd
Original Assignee
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Construction Group Corp Ltd filed Critical Hebei Construction Group Corp Ltd
Priority to CN202220833166.1U priority Critical patent/CN217204082U/en
Application granted granted Critical
Publication of CN217204082U publication Critical patent/CN217204082U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a civil engineering pile foundation construction structures, including stake parent tube and first fixed pipe, the coupling mechanism that the size is the same is all installed from top to bottom to the inner wall of stake parent tube, the outer wall both sides at the stake parent tube are all installed to first fixed pipe, the inner wall of first fixed pipe is equipped with the supporting mechanism that is used for the installation, installation mechanism is installed to the outer wall below of stake parent tube, outer wall one side of supporting mechanism is equipped with size assorted positioning mechanism. This civil engineering pile foundation construction structures through setting up coupling mechanism, can strengthen the inside intensity of pile foundation pipe like this to can prevent that pile foundation pipe from producing the condition of warping, through setting up installation mechanism, can fix a position the position of stake parent tube like this.

Description

Civil engineering pile foundation construction structures
Technical Field
The utility model relates to a civil engineering correlation technique field specifically is a civil engineering pile foundation construction structures.
Background
Civil engineering is a general term for the science and technology of building various land engineering facilities, and refers to both the materials and equipment used and the technical activities of surveying, designing, constructing, maintaining, repairing, etc. performed, and the objects of engineering construction. The civil engineering refers to engineering entities which are built on the ground or underground or onshore and directly or indirectly serve various engineering facilities of human life, production, military and scientific research, such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, ports, power stations, airports, ocean platforms, water supply and drainage, protection engineering and the like, the civil engineering refers to engineering entities which are completed by various technical works such as investigation, planning, design, construction, installation, maintenance and the like of buildings, structures, related supporting facilities and the like of various engineering besides house buildings, and the civil engineering is usually finished by pile foundations, so that a civil engineering pile foundation construction structure is provided.
But the construction structure who uses at present, when installing, stability is relatively poor, and inner structure is more fragile simultaneously, and intensity is low, is difficult to carry out the outrigger to both sides position, is difficult to fix a position the installation to the position of pile foundation.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a civil engineering pile foundation construction structures to solve the construction structures who uses at present that proposes in the above-mentioned background art, when installing, stability is relatively poor, and inner structure is more fragile simultaneously, and intensity is low, is difficult to carry out the outrigger to the both sides position, is difficult to carry out the problem of location installation to the position of pile foundation.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a civil engineering pile foundation construction structures, includes pile parent tube and first solid fixed tube, the coupling mechanism that the size is the same is all installed from top to bottom to the inner wall of pile parent tube, the outer wall both sides at the pile parent tube are all installed to first solid fixed tube, the inner wall of first solid fixed tube is equipped with the supporting mechanism who is used for the installation, installation mechanism is installed to the outer wall below of pile parent tube, outer wall one side of supporting mechanism is equipped with size assorted positioning mechanism.
Preferably, coupling mechanism includes fixed block, first spacing groove, bracing piece, first locating piece, fixed disk and connecting rod, the fixed block is all installed in the inner wall both sides of stake parent tube, first spacing groove has been seted up to the inner wall of fixed block, the inner wall of first spacing groove is equipped with size assorted bracing piece, first locating piece is installed to surface one side of bracing piece, the fixed disk is installed to the inner wall of first locating piece, the connecting rod is installed in the inner wall center through of fixed disk.
Preferably, the supporting mechanism includes thread groove, threaded rod, connecting pipe, dead lever, the fixed pipe of second, sleeve pipe, fixture block, screw shaft and stopper, both sides about the inner wall of first fixed pipe are all seted up to the thread groove, the inner wall of thread groove is equipped with size assorted threaded rod, the connecting pipe is installed to the outer wall below of threaded rod, the dead lever is installed to the inner wall of connecting pipe, the fixed pipe of second is installed to the outer wall below of dead lever, the outer wall of the fixed pipe of second is equipped with size assorted sleeve pipe, the sheathed tube inner wall runs through and installs the fixture block, the sheathed tube inner wall is equipped with rotatable movable screw shaft, the stopper is all installed to screw shaft's outer wall both sides.
Preferably, the threaded rod passes through thread groove and first fixed tubular threaded connection, and the threaded rod sets up with the axis symmetry of pile foundation pipe.
Preferably, installation mechanism includes fixed plate, steel pipe and intubate, the fixed plate is installed at the outer wall below edge of pile basic tube, the steel pipe is installed in the outer wall below run-through of fixed plate, the welding of the outer wall below of steel pipe has the intubate.
Preferably, positioning mechanism includes second locating piece, second spacing groove, inserted sheet, solid fixed ring and registration arm, the outer wall one side at the stopper is installed to the second locating piece, the second spacing groove has been seted up to the inner wall of second locating piece, the inner wall of second spacing groove is equipped with size assorted inserted sheet, gu fixed ring is installed to the inner wall of inserted sheet, the registration arm is installed in the outer wall below one side welding of second locating piece.
Preferably, the inserted sheet passes through the second spacing groove and is connected with second locating piece block, and the inserted sheet sets up with the axis symmetry of pile foundation pipe.
Compared with the prior art, the beneficial effects of the utility model are that:
1. according to the civil engineering pile foundation construction structure, the connecting mechanism is arranged, so that the strength inside the pile foundation pipe can be enhanced, the pile foundation pipe can be prevented from deforming, and the position of the pile base pipe can be positioned by arranging the mounting mechanism;
2. this civil engineering pile foundation construction structures through setting up supporting mechanism, can support the regulation to the both sides of stake parent tube like this, can strengthen the stability of stake parent tube like this, through setting up positioning mechanism, can stabilize the location to the below position of stake parent tube like this, can stabilize simultaneously and install to position all around.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of the connecting mechanism of the present invention;
FIG. 3 is a schematic structural view of the supporting mechanism of the present invention;
fig. 4 is a schematic structural diagram of the positioning mechanism of the present invention.
In the figure: 1. pile base pipe; 2. a connecting mechanism; 201. a fixed block; 202. a first limit groove; 203. a support bar; 204. a first positioning block; 205. fixing the disc; 206. a connecting rod; 3. a first stationary tube; 4. a support mechanism; 401. a thread groove; 402. a threaded rod; 403. a connecting pipe; 404. fixing the rod; 405. a second stationary tube; 406. a sleeve; 407. a clamping block; 408. a threaded shaft; 409. a limiting block; 5. an installation mechanism; 501. a fixing plate; 502. a steel pipe; 503. inserting a tube; 6. a positioning mechanism; 601. a second positioning block; 602. a second limit groove; 603. inserting sheets; 604. a fixing ring; 605. and (6) positioning the tube.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a civil engineering pile foundation construction structure comprises a pile base pipe 1 and a first fixed pipe 3, connecting mechanisms 2 with the same size are installed on the upper portion and the lower portion of the inner wall of the pile base pipe 1, each connecting mechanism 2 comprises a fixed block 201, a first limiting groove 202, a supporting rod 203, a first positioning block 204, a fixed disc 205 and a connecting rod 206, the fixed blocks 201 are installed on two sides of the inner wall of the pile base pipe 1, the first limiting grooves 202 are formed in the inner wall of the fixed blocks 201, the supporting rods 203 with matched sizes are arranged on the inner wall of the first limiting grooves 202, the first positioning blocks 204 are installed on one side of the outer surface of the supporting rods 203, the fixed discs 205 are installed on the inner wall of the first positioning blocks 204, the connecting rods 206 are installed in the center of the inner wall of the fixed discs 205 in a penetrating mode, the connecting mechanisms 2 can connect and support the interior of the pile base pipe 1, therefore the strength of a pile foundation can be enhanced, the supporting rods 203 are fixed in the middle of the inner walls of the first limiting grooves 202, meanwhile, the supporting rods 203 on the outer wall of the fixed disc 205 can support the inner wall of the pile base tube 1 in an abutting mode, and meanwhile the connecting rods 206 are convenient for connection between the fixed discs 205;
the first fixing pipe 3 is installed on two sides of the outer wall of the pile base pipe 1, a supporting mechanism 4 for installation is arranged on the inner wall of the first fixing pipe 3, the supporting mechanism 4 comprises a thread groove 401, a threaded rod 402, a connecting pipe 403, a fixing rod 404, a second fixing pipe 405, a sleeve 406, a clamping block 407, a thread shaft 408 and a limiting block 409, the thread groove 401 is arranged on the upper side and the lower side of the inner wall of the first fixing pipe 3, the inner wall of the thread groove 401 is provided with the threaded rod 402 with matched size, the connecting pipe 403 is installed below the outer wall of the threaded rod 402, the fixing rod 404 is installed on the inner wall of the connecting pipe 403, the second fixing pipe 405 is installed below the outer wall of the fixing rod 404, the sleeve 406 with matched size is arranged on the outer wall of the second fixing pipe 405, the clamping block 407 is installed on the inner wall of the sleeve 406 in a penetrating manner, the thread shaft 408 capable of rotating and moving is arranged on two sides of the outer wall of the thread shaft 408, the supporting mechanism 4 can support the pile base pipe 1, so that the stability of the pile base pipe 1 can be enhanced, the second fixing pipe 405 mounted on the outer wall of the sleeve 406 is driven to rotate by rotating the threaded shaft 408, meanwhile, the connecting pipe 403 moves on the surface of the fixing rod 404, so that the height of the pile base pipe 1 can be adjusted, the threaded rod 402 is rotated to enable the inner wall of the fixing thread groove 401 to penetrate through the inner wall of the first fixing pipe 3, so that the position of the pile base pipe 1 can be connected and supported, the threaded rod 402 is in threaded connection with the first fixing pipe 3 through the thread groove 401, and the threaded rod 402 is symmetrically arranged with the central axis of the pile base pipe 1, so that the position supported by the side face can be fixed;
the installation mechanism 5 is installed below the outer wall of the pile base pipe 1, the installation mechanism 5 comprises a fixing plate 501, a steel pipe 502 and an insertion pipe 503, the fixing plate 501 is installed at the edge below the outer wall of the pile base pipe 1, the steel pipe 502 is installed below the outer wall of the fixing plate 501 in a penetrating mode, the insertion pipe 503 is welded below the outer wall of the steel pipe 502, the installation mechanism 5 can position the position of the pile base pipe 1, the insertion pipe 503 below the steel pipe 502 is inserted into the ground bottom position, this enables the position of the pile base pipe 1 to be located, the positioning mechanism 6 enables the position of the pile base pipe 1 to be located, to ensure the stability of the pile foundation during installation, the inserting piece 603 is fixed in the second limiting groove 602 formed on the inner wall of the second positioning block 601, therefore, the position of the inserting sheet 603 can be positioned and installed, the situation that the pile base pipe 1 is deviated is prevented, meanwhile, the positioning tube 605 can perform positioning installation on the position of the second positioning block 601;
outer wall one side of supporting mechanism 4 is equipped with size assorted positioning mechanism 6, positioning mechanism 6 includes second locating piece 601, second spacing groove 602, inserted sheet 603, solid fixed ring 604 and registration arm 605, second locating piece 601 is installed in the outer wall one side of stopper 409, second spacing groove 602 has been seted up to the inner wall of second locating piece 601, the inner wall of second spacing groove 602 is equipped with size assorted inserted sheet 603, gu fixed ring 604 is installed to the inner wall of inserted sheet 603, registration arm 605 is installed in the welding of outer wall below one side of second locating piece 601, inserted sheet 603 is connected with second locating piece 601 block through second spacing groove 602, and inserted sheet 603 sets up with the axis symmetry of pile parent tube 1, can fix a position the installation to the position of pile parent tube 1 according to the position of second locating piece 601 like this.
The working principle is as follows: firstly, the device is placed at a designated position, the connecting mechanism 2 can connect and support the inside of the pile base pipe 1, so that the strength of a pile foundation can be enhanced, the supporting rod 203 is fixed in the inner wall of the first limiting groove 202, meanwhile, the supporting rod 203 on the outer wall of the fixed disc 205 can support the inner wall of the pile base pipe 1 in an abutting mode, meanwhile, the connecting rod 206 is convenient for connecting the fixed discs 205, the installation mechanism 5 can position the position of the pile base pipe 1, the insertion pipe 503 below the steel pipe 502 is inserted into the ground bottom position, so that the position of the pile base pipe 1 can be positioned, the positioning mechanism 6 can position the position of the pile base pipe 1 to ensure the stability of the pile foundation during installation, the insertion piece 603 is fixed in the second limiting groove 602 formed in the inner wall of the second positioning block 601, so that the position of the insertion piece 603 can be positioned and installed, prevent that pile base pipe 1 from producing the condition of offset, registration arm 605 can fix a position the installation to the position of second locating piece 601 simultaneously, supporting mechanism 4 can support pile base pipe 1, thereby can strengthen pile base pipe 1's stability, rotatory threaded spindle 408 makes its second fixed pipe 405 that drives the installation of sleeve 406 outer wall rotate, connecting pipe 403 moves about on the surface of dead lever 404 simultaneously, can adjust according to pile base pipe 1's height like this, rotatory threaded rod 402 makes in the middle of its fixed thread groove 401's the inner wall, run through the inner wall of first fixed pipe 3 simultaneously, can connect the support to pile base pipe 1's position like this, just so accomplished the operation flow of a civil engineering pile foundation construction structure.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a civil engineering pile foundation construction structures, includes pile parent tube (1) and first solid fixed tube (3), its characterized in that: the utility model discloses a pile foundation pipe, including pile foundation pipe (1), the inner wall of pile foundation pipe (1) all installs coupling mechanism (2) that the size is the same from top to bottom, the outer wall both sides at pile foundation pipe (1) are all installed in first solid fixed tube (3), the inner wall of first solid fixed tube (3) is equipped with supporting mechanism (4) that are used for the installation, installation mechanism (5) are installed to the outer wall below of pile foundation pipe (1), outer wall one side of supporting mechanism (4) is equipped with size assorted positioning mechanism (6).
2. A civil engineering pile foundation construction structure as claimed in claim 1, wherein: coupling mechanism (2) are including fixed block (201), first spacing groove (202), bracing piece (203), first locating piece (204), fixed disk (205) and connecting rod (206), the inner wall both sides at pile parent tube (1) are all installed in fixed block (201), first spacing groove (202) have been seted up to the inner wall of fixed block (201), the inner wall of first spacing groove (202) is equipped with size assorted bracing piece (203), first locating piece (204) are installed to surface one side of bracing piece (203), fixed disk (205) are installed to the inner wall of first locating piece (204), the inner wall center through-mounting of fixed disk (205) has connecting rod (206).
3. A civil engineering pile foundation construction structure as claimed in claim 2, wherein: the supporting mechanism (4) comprises a thread groove (401), a threaded rod (402), a connecting pipe (403), a fixing rod (404), a second fixing pipe (405), a sleeve (406), a clamping block (407), a threaded shaft (408) and a limiting block (409), wherein the thread groove (401) is formed in the upper side and the lower side of the inner wall of the first fixing pipe (3), the threaded rod (402) with matched size is arranged on the inner wall of the thread groove (401), the connecting pipe (403) is installed below the outer wall of the threaded rod (402), the fixing rod (404) is installed on the inner wall of the connecting pipe (403), the second fixing pipe (405) is installed below the outer wall of the fixing rod (404), the sleeve (406) with matched size is arranged on the outer wall of the second fixing pipe (405), the clamping block (407) is installed on the inner wall of the sleeve (406) in a penetrating manner, the threaded shaft (408) capable of rotating and moving is arranged on the inner wall of the sleeve (406), and limiting blocks (409) are arranged on two sides of the outer wall of the threaded shaft (408).
4. A civil engineering pile foundation construction structure as claimed in claim 3, wherein: threaded rod (402) pass through thread groove (401) and first fixed pipe (3) threaded connection, and threaded rod (402) set up with the axis symmetry of stake parent tube (1).
5. A civil engineering pile foundation construction structure as claimed in claim 1, wherein: installation mechanism (5) are including fixed plate (501), steel pipe (502) and intubate (503), the outer wall below edge at pile base pipe (1) is installed in fixed plate (501), steel pipe (502) are installed in the outer wall below of fixed plate (501) running through, the welding of the outer wall below of steel pipe (502) has intubate (503).
6. A civil engineering pile foundation construction structure as claimed in claim 3, wherein: positioning mechanism (6) include second locating piece (601), second spacing groove (602), inserted sheet (603), solid fixed ring (604) and registration arm (605), install in outer wall one side of stopper (409) second locating piece (601), second spacing groove (602) have been seted up to the inner wall of second locating piece (601), the inner wall of second spacing groove (602) is equipped with size assorted inserted sheet (603), solid fixed ring (604) are installed to the inner wall of inserted sheet (603), registration arm (605) are installed in the welding of outer wall below one side of second locating piece (601).
7. A civil engineering pile foundation construction structure as claimed in claim 6, wherein: inserting piece (603) are connected through second spacing groove (602) and second locating piece (601) block, and inserting piece (603) set up with the axis symmetry of stake parent tube (1).
CN202220833166.1U 2022-04-12 2022-04-12 Civil engineering pile foundation construction structures Expired - Fee Related CN217204082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220833166.1U CN217204082U (en) 2022-04-12 2022-04-12 Civil engineering pile foundation construction structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220833166.1U CN217204082U (en) 2022-04-12 2022-04-12 Civil engineering pile foundation construction structures

Publications (1)

Publication Number Publication Date
CN217204082U true CN217204082U (en) 2022-08-16

Family

ID=82760130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220833166.1U Expired - Fee Related CN217204082U (en) 2022-04-12 2022-04-12 Civil engineering pile foundation construction structures

Country Status (1)

Country Link
CN (1) CN217204082U (en)

Similar Documents

Publication Publication Date Title
CN213233477U (en) Foundation pit supporting structure and foundation pit slope supporting system
CN112013165B (en) Municipal pipeline construction structure and method thereof
CN109469089A (en) A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing and construction method
CN211873950U (en) Combined supporting pile for civil engineering
CN209538210U (en) A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing
CN217204082U (en) Civil engineering pile foundation construction structures
CN219196719U (en) Cantilever support template for water inlet tower construction
CN208039269U (en) A kind of three-layer pipe corridor section foundation pit supporting construction
CN210507175U (en) Support template device for reinforcing bridge
CN211006708U (en) Retaining wall for foundation pit support
CN210341904U (en) Civil engineering composite pile
CN212477746U (en) Be used for civil engineering with fender pile underground structure supporting device
CN220927783U (en) Device for reinforcing concrete core sample
CN214789397U (en) Pipe jacking installation structure for urban garden
CN211850785U (en) Civil engineering is with construction template
CN210195194U (en) Civil engineering construction support
CN219219045U (en) Pile foundation casing positioner
CN216327745U (en) Fixing device is used in municipal works drainage pipe construction
CN215929400U (en) Hydraulic engineering is with lighting apparatus that stability is good
CN220725109U (en) Comprehensive pipe rack enclosure structure
CN217231864U (en) Shaped steel cap shaped steel sheet pile supporting device convenient to combination
CN220927969U (en) T-shaped rivet plate-shaped assembled foundation pit supporting structure device
CN214246523U (en) Civil engineering safety scaffold
CN214510338U (en) Drawing display device for civil engineering
CN220394568U (en) Reinforcing apparatus for building municipal works

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220816

CF01 Termination of patent right due to non-payment of annual fee