CN216685944U - Intelligent logistics production line for steel coil transportation - Google Patents

Intelligent logistics production line for steel coil transportation Download PDF

Info

Publication number
CN216685944U
CN216685944U CN202220092628.9U CN202220092628U CN216685944U CN 216685944 U CN216685944 U CN 216685944U CN 202220092628 U CN202220092628 U CN 202220092628U CN 216685944 U CN216685944 U CN 216685944U
Authority
CN
China
Prior art keywords
line
temporary storage
production line
coil
saddle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220092628.9U
Other languages
Chinese (zh)
Inventor
孙文军
周亚军
涂帅
黄玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Superworker Technology Co ltd
Original Assignee
Shenzhen Superworker Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Superworker Technology Co ltd filed Critical Shenzhen Superworker Technology Co ltd
Priority to CN202220092628.9U priority Critical patent/CN216685944U/en
Application granted granted Critical
Publication of CN216685944U publication Critical patent/CN216685944U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model is suitable for the technical field of steel coil production lines, and provides an intelligent logistics production line for steel coil transportation, wherein three groups of temporary storage production lines are arranged in a warehouse of a region to be sheared in parallel, each group of temporary storage production lines is provided with a left row of fixed saddles and a right row of fixed saddles for orderly storing steel coils, a primary car and a secondary car for loading, unloading and transporting are arranged between each group of temporary storage production lines, the primary car is responsible for transportation along the temporary storage production lines, the secondary cars are responsible for loading and unloading the left side and the right side, a first transfer production line and a second transfer production line are arranged at two ends of the three groups of temporary storage production lines, the first transfer production line is used for connecting two upstream groups of receiving steel coil unloading receiving production lines of an annealing unit with the three production lines in the warehouse of the region to be sheared and used for directly transferring the annealed steel coils into the temporary storage production lines for storage, the first transfer production line and the second transfer production line are used for transporting the steel coils on each temporary storage production line to the shearing unit at two ends for shearing operation, the whole warehouse arrangement of the shearing area is regular.

Description

Intelligent logistics production line for steel coil transportation
Technical Field
The utility model belongs to the technical field of steel coil production lines, and particularly relates to an intelligent logistics production line for steel coil transportation.
Background
Coil of strip is rolled off the production line behind the department of being made, hang up the coil of strip by the overhead traveling crane by the manual work again, send storage battery trailer to, transport the storehouse district edge by storage battery trailer, then hang up the coil of strip by the manual work with the overhead traveling crane and keep in the warehouse, when going out of the storehouse and cuting, find the coil of strip according to the coil of strip number in the storehouse district by the manual work earlier, the coil of strip is hung up to the reuse overhead traveling crane, send to on the shearing unit handing-over saddle, whole storehouse district is put in disorder easily, low efficiency, whole concrete operation process passes through manual operation, the danger coefficient is big.
SUMMERY OF THE UTILITY MODEL
The utility model provides an intelligent logistics production line for steel coil transportation, and aims to solve the problems that steel coil storage areas are arranged disorderly, errors are easy to occur, the efficiency is low, the whole specific operation process is operated manually, and the danger coefficient is large.
The utility model is realized in this way, an intelligent logistics production line for steel coil transportation comprises a to-be-sheared area warehouse, wherein multiple groups of temporary storage production lines are arranged in the to-be-sheared area warehouse in parallel, the temporary storage production lines are connected with multiple groups of carrying production lines through first transfer production lines which are perpendicular to the temporary storage production lines, the multiple groups of carrying production lines are used for carrying steel coils which are off a production line of an annealing unit, the multiple groups of carrying production lines carry the steel coils to the first transfer production lines through mother-son cars which move above the temporary storage production lines, the first transfer production lines carry the steel coils to the temporary storage production lines through gantry cars, the temporary storage production lines carry out adjustment of steel coil placement positions and convenience for later-stage finding and shearing through the mother-son cars, and saddles for placing the steel coils are arranged on each production line.
Preferably, treat and be provided with three groups side by side in the shear zone warehouse the line is produced in the temporary storage, and three groups the both ends of producing the line in the temporary storage are passed through respectively first transfer is produced line and second transfer and is produced the line connection, is used for three groups the coil of strip position on the line is produced in the temporary storage is changed.
Preferably, three groups the longest second that is located the centre in the production line of keeping in is kept in storage and is produced line both ends and be provided with a plurality of shearing units that are used for carrying out the shearing to the coil of strip respectively, and about the bilateral symmetry that the second was kept in production line is provided with the first line of keeping in of same length and the second is kept in production line.
Preferably, the multiunit accept to produce the line and be provided with two sets ofly side by side, and every group accept to produce the line and every group and keep in producing the line and all set up to two rows of symmetries, wherein, same group accept to produce line or same group keep in producing the line and all share one son mother's car.
Preferably, the primary and secondary car divide into along accept to produce the line or the line mother's car that carries out parallel translation is produced in the temporary storage it is perpendicular and each to be provided with on the mother's car accept to produce the line or the line direction is produced in the temporary storage carries out the sub-car that removes and is used for accepting to produce the line or the saddle of producing the line both sides is produced in the temporary storage goes on unloading.
Preferably, the saddle is divided into a fixed saddle and a rotary saddle, and the contact positions of the upper surface of the saddle and the steel coil are set to be low in the middle and high on two sides.
Preferably, the intersection between the temporary storage production line and the first transfer production line or the second transfer production line is provided with the rotary saddle, and the rest saddles are the fixed saddles.
Preferably, the gantry crane is along first transport production line with the second is transported and is produced the line and remove, just the gantry crane will the coil of strip is embraced in the centre and is mentioned, just the saddle is followed the centre setting of gantry crane.
Preferably, a plurality of fixed saddles used for manual loading and unloading are symmetrically arranged on two sides of two ends of the second temporary storage production line.
Compared with the prior art, the utility model has the beneficial effects that: the utility model relates to an intelligent logistics production line for steel coil transportation, which is characterized in that three groups of temporary storage production lines are arranged in a warehouse of a region to be sheared in parallel, each group of temporary storage production lines is provided with a left row of fixed saddles and a right row of fixed saddles for orderly storing steel coils, a primary car and a secondary car for loading and unloading and transporting are arranged between the temporary storage production lines, the primary car is responsible for transporting along the temporary storage production lines, the secondary cars are responsible for loading and unloading the left side and the right side, a first transfer production line and a second transfer production line are arranged at two ends of the three groups of temporary storage production lines, the first transfer production line is used for connecting two upstream groups of receiving annealing unit off-line steel coils with the three groups of temporary storage production lines in the warehouse of the region to be sheared and used for directly transferring the annealed steel coils into the temporary storage production lines for storage, and the first transfer production line and the second transfer production line are used for transporting the steel coils on the respective temporary storage production lines to the shearing unit at two ends for shearing operation, the whole shearing area warehouse is regularly arranged, goods on the upper stream and the lower stream can be smoothly circulated, the whole processing production line is clear, full-automatic intelligent control is realized, manual operation is not needed, and the safety factor and the working efficiency are improved.
Drawings
FIG. 1 is a schematic overall layout of the present invention;
FIG. 2 is a schematic front view of a gantry of the present invention;
FIG. 3 is a schematic side view of the gantry of the present invention;
FIG. 4 is a schematic top view of the fixed saddle according to the present invention;
FIG. 5 is a schematic view of the combined structure of the master-slave train of the present invention;
FIG. 6 is a schematic structural view of the parent vehicle according to the present invention;
FIG. 7 is a schematic view of the structure of the sub-vehicle of the present invention;
in the figure:
1. temporarily storing a production line; 11. a first temporary storage production line; 12. a second temporary storage production line; 13. a third temporary storage production line; 2. a first transfer production line; 3. carrying out production line; 4. a second transfer production line; 5. a primary vehicle and a secondary vehicle; 51. carrying out primary vehicle; 52. carrying out secondary turning; 6. a gantry vehicle; 7. a saddle; 71. fixing the saddle; 72. the saddle is rotated.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Referring to fig. 1-7, the present invention provides a technical solution: the utility model provides an intelligence commodity circulation production line of coil of strip transportation, including treating the shearing area warehouse, treat to be provided with the multiunit in the shearing area warehouse and keep in producing line 1, it connects the multiunit through the perpendicular first transfer production line 2 that sets up with it to keep in production line 1, the multiunit is accepted and is produced line 3 and be used for accepting the coil of strip of annealing unit down, the multiunit is accepted and is produced line 3 and all transport the coil of strip to first transfer through the primary and secondary car 5 of its top motion and produce the line 2 on, this first transfer is produced line 2 and is transported the coil of strip through longmen car 6 and keep in production line 1, it produces line 1 and carries out the adjustment that the coil of strip placed the position and make things convenient for the later stage to look for the shearing through primary and secondary car 5 to keep in storage, and all be provided with the saddle 7 that is used for the coil of strip to carry out the placing on every production line.
In this embodiment, three sets of temporary storage production lines 1 are arranged in parallel in a warehouse of a shearing area to be cut, and each set of temporary storage production line 1 is provided with a left row of fixed saddles 71 and a right row of fixed saddles 71 for orderly storing of steel coils, wherein, a primary and secondary car 5 for loading and unloading and transporting is arranged between each set of temporary storage production line 1, the primary car 51 is responsible for transporting along the temporary storage production line 1, the secondary car 52 is responsible for loading and unloading the left side and the right side fixed saddles 71, and a first transfer production line 2 and a second transfer production line 4 are arranged at two ends of the three sets of temporary storage production lines 1 and a second transfer production line 3 for connecting the three sets of temporary storage production lines 1 in the warehouse of the shearing area to be cut in the later period and discharging from the warehouse, and the first transfer production line 2 and the second transfer production line 4 are used for temporarily storing the steel coils transported to the second steel coils located in the middle on the temporary storage production lines 1 at two ends of each temporary storage production line 1 The temporary storage production line 12 is transported to the shearing machine sets at two ends by the primary and secondary vehicles 5 on the second temporary storage production line 12 for shearing and trimming.
Three groups of temporary storage production lines 1 are arranged in the warehouse of the shearing area in parallel, and the two ends of the three groups of temporary storage production lines 1 are connected with a second transfer production line 4 through a first transfer production line 2 respectively, so that the steel coil positions on the three groups of temporary storage production lines 1 can be changed.
In the embodiment, the steel coils are transported to the first transfer production line 2 end or the second transfer production line 4 by the master and slave vehicles 5 corresponding to the three temporary storage production lines 1, and are transferred on the first transfer production line 2 for warehousing temporary storage or steel coil position replacement among the temporary storage production lines 1; the coil of strip can also be transported to 4 end transportation of producing the line to the second by the son and mother car 5 that corresponds on three groups of temporary storage produce the line 1 respectively, transports on producing the line 4 at the second and also transports and be used for carrying out the change of position between three groups of temporary storage produce the line 1.
A plurality of shearing units for shearing the steel coils are respectively arranged at two ends of the longest second temporary storage production line 12 positioned in the middle of the three temporary storage production lines 1, and a first temporary storage production line 11 and a second temporary storage production line 12 which have the same length are symmetrically arranged on two sides of the second temporary storage production line 12; a plurality of fixed saddles 71 used for manual loading and unloading are symmetrically arranged on two sides of two ends of the second temporary storage production line 12.
In this embodiment, the line 4 alternately is produced with first transport production line 2 and second to the both ends of producing line 1 of three groups of temporary storage for exchange the coil of strip between primary and secondary car 5 and gantry crane 6, be about to the coil of strip and rotate between the line 1 is produced in three groups of temporary storage, wherein the second that lies in the centre is temporary storage to produce line 12 and first transport and produce line 2 and second and transport and produce line 4 and all have the extension section, the second that extends the section is temporary storage to produce 12 both sides and is provided with the shearing machine group respectively and be used for shearing the coil of strip that the transportation was come. Meanwhile, the two sides of the extension section of the second temporary storage production line 12, which do not reach the shearing unit, are provided with fixed saddles 71 for manual intervention of shearing or warehousing of steel coils, wherein the shearing or warehousing comprises feeding errors or defective materials to the shearing unit, and the errors all need to return from the original way of the fixed saddles 71 before feeding of the shearing unit.
The multiunit is accepted and is produced line 3 and be provided with two sets ofly side by side, and every group accepts and produces line 3 and every group and keep in producing line 1 and all set up to two rows of symmetries, and wherein, same group accepts and produces line 3 or same group and keep in producing line 1 and all share a son and mother car 5.
In this embodiment, each assembly receiving production line 3 or the temporary storage production line 1 is provided with two symmetrical rows of fixed saddles 71, a rail is arranged between the two rows of fixed saddles 71 for the primary car 51 of the primary and secondary cars 5 to run, wherein the primary car 51 runs along the rail to transport the steel coil to the front of the two fixed saddles 71 at the same position, and the secondary car 52 sends the steel coil to the fixed saddle 71 at the corresponding side. Each row of receiving production lines 3 corresponds to one annealing lower coil outlet and is used for receiving the lower coil.
In waiting to cut apart the district warehouse, goods in three groups are kept in producing the line 1 and are transported on producing the line 4 to the first transportation of both sides respectively, and the coil of strip on two rows of fixed saddles 71 about in the same group is transported to both sides respectively by primary car 5 promptly, and arbitrary coil of strip in two rows all probably transports to produce the line 4 transportation toward the left second transportation or transport to the first transportation of producing the line 2 on right side, by system automatic allocation, realizes the transportation to same group's coil of strip through the side-to-side motion of primary and secondary car 5.
The primary and secondary vehicles 5 are divided into primary vehicles 51 which move in parallel along the receiving production line 3 or the temporary storage production line 1, and secondary vehicles 52 which move vertically along the receiving production line 3 or the temporary storage production line 1 are arranged on the primary vehicles 51 and used for loading and unloading saddles 7 on two sides of the receiving production line 3 or the temporary storage production line 1. .
In this embodiment, each group is kept in producing line 1 and is accepted and all be provided with the track that supplies mother car 51 to remove between producing the line 3, mother car 51 removes along this track, thereby drive son car 52 and the coil of strip that carries and keep in producing line 1 or accept and produce the line 3 middle removal along each group, son car 52 moves about along the track on mother car 51, its left and right sides all is provided with and is used for pegging graft the inserted bar in the middle of the coil of strip, this inserted bar pegs graft and lifts up the back to the coil of strip in the middle of the coil of strip, then shift to mother car 51 on it, the direction of motion mutually perpendicular of son car 52's the direction of motion mother car 51 sets up, thereby before mother car 51 is used for removing the coil of strip to the station that corresponds, son car 52 removes the coil of strip to the station that corresponds on.
The saddle 7 is divided into a fixed saddle 71 and a rotary saddle 72, and the contact positions of the upper surfaces of the two saddles 7 and the steel coil are set to be low in the middle and high on two sides; a rotary saddle 72 is arranged at the intersection between the temporary storage production line 1 and the first transfer production line 2 or the second transfer production line 4, and the rest saddles 7 are fixed saddles 71.
In this embodiment, the position of saddle 7 and coil of strip contact sets up to middle low both sides height to block the both sides of coil of strip, avoid the coil of strip to lead to the problem that drops to appear in the rotation on saddle 7.
What arrange on the production line 1 of keeping in is the fixed saddle 71 that is used for the coil of strip to keep in, and the production line 1 of keeping in sets up rotatory saddle 72 with first transfer production line 2 or second transfer between the production line 4, and rotatory saddle 72 is used for treating the adjustment that the coil of strip head of cuting carries out the direction, makes things convenient for follow-up cutter group to cut it, except the rotatory saddle 72 of these two places, the saddle 7 of all the other positions is fixed saddle 71.
In this embodiment, the rotating saddle 72 is provided with two places, each place is provided with two saddles 71, the saddles 7 at the other places are fixed saddles 71, the two places of the rotating saddle 72 are respectively extension sections of two second temporary storage production lines 12, namely, the intersections of the second temporary storage production line 12 and the first transfer production line 2 and the second transfer production line 4, and the rotating saddle 72 arranged at the intersection of the second temporary storage production line 12 and the first transfer production line 2 is used for adjusting the strip head position of each steel coil, is used for rotating the strip head direction of the steel coil needing to be adjusted towards the same direction, and is convenient for shearing the steel coil; the rotary saddle 72 arranged at the intersection of the second temporary storage production line 12 and the second transfer production line 4 is used for adjusting the steel strip head to be sheared. The fixed saddles 71 at each position are used for temporarily storing the steel coil, and the fixed saddles 71 at the cross positions of other production lines are used for transferring the steel coil by matching the primary and secondary vehicles 5 and the gantry vehicles 6 on the two production lines; the fixed saddles 71 on each temporary storage production line 1 in the warehouse of the area to be sheared are used for temporarily storing distributed steel coils and buffering the time before shearing the steel coils out of the warehouse.
Line 4 removal is produced along first transport production line 2 and second transport to gantry truck 6, and gantry truck 6 embraces the coil of strip in the middle and mentions, and saddle 7 sets up along gantry truck 6's centre.
In this embodiment, longmen car 6 removes along the track, longmen car 6's setting is used for transporting to produce the line 4 at first transportation and produce and remove the coil of strip on line 2 and second, because first transportation is produced and is transported fixed saddle 71 on line 4 and second and all set up in the middle, thereby longmen car 6 spanes and moves in its both sides, further longmen car 6 is followed fixed saddle 71 and is mentioned the back with the coil of strip, and drive it and transport along first transportation and produce line 2 or second and produce line 4 and remove, make things convenient for the removal on the line is produced in transporting of coil of strip.
Four working conditions of steel coil logistics warehousing and ex-warehouse:
the steel coil is taken off the line from the annealing line and is transported to a warehouse of a to-be-sheared area: firstly, a primary and secondary car 5 on a bearing production line 3 obtains an instruction, a steel coil is automatically taken from a saddle 7 at the outlet of an annealing unit, the steel coil is moved to a first transfer production line 2 along the bearing production line 3 after being taken, the steel coil is transported to the saddle 7 of the first transfer production line 2 to be subsequently transported by a gantry crane 6, after the primary and secondary cars 5 are moved, the gantry crane 6 is moved to lift the steel coil on the saddle 7 and moves to a warehouse of a region to be sheared along the first transfer production line 2, the first transfer production line 2 transports the steel coil to the saddle 7 at the intersection of any one of the three temporary storage production lines 1 and stops the steel coil on the saddle 7, after the gantry crane 6 is moved, the primary and secondary cars 5 on the temporary storage production line 1 move to the steel coil and collect the steel coil and move to the interior of the warehouse of the region to be sheared along the temporary storage line 1, when the coil moves to the position allocated to the coil by the system, the coil is put on the fixed saddle 71 for temporary storage.
And (3) conveying the steel coils in the warehouse of the area to be sheared to a shearing unit: firstly, the primary and secondary cars 5 on the temporary storage production line 1 corresponding to the steel coil storage position obtain a coil conveying instruction, automatically go to the position of the fixed saddle 71 where the steel coil is located, and take the steel coil away from the fixed saddle 71, then convey the steel coil to the fixed saddle 71 on the first transfer production line 2 or the second transfer production line 4 along the temporary storage production line 1, then the primary and secondary cars 5 move away, and control the gantry cars 6 on the first transfer production line 2 or the second transfer production line 4 to drive the steel coil on the fixed saddle 71 to the rotating saddle 72 crossed with the second temporary storage production line 12 extension section, the rotating saddle 72 can adjust the strip head direction of the steel coil by 180 degrees according to the requirement so as to meet the requirements of shearing units at different feeding positions, and the shearing units shear the steel coil.
And returning the cut steel coil to a region to be cut: under the circumstances such as wrong material or last bad material wherein appearing, the son and mother car 5 on the second is kept in production line 12 carries out the wrong material or the bad material that corresponds from the fixed saddle 71 of this department and takes away, takes to and transports the crossing department of production line 4 with first transfer production line 2 and second to transport it through longmen car 6 and transport it by first transfer production line 2 or second and transport production line 4 and transport to first keeping in production line 11 or third and keep in production line 13 on, then transport the coil of strip to fixed saddle 71 along this the production line of keeping in from the fixed saddle 71 at crosspoint by son and mother car 5 again.
Unloading and loading: this first temporary storage is produced line 11 and the third and is temporarily taken off this coil of strip from the fixed saddle 71 of distribution to the line 1 removes to first transport production line 2 or second transport production line 4 department along this temporary storage, and on removing the fixed saddle 71 of producing line 4 with its first transport production line 2 or second transport, get the material by gantry crane 6 on line 4 is transported to first transport production line 2 or second transport afterwards, later by the second temporary storage produce the transport of line 12 on the son mother's car 5 with it carry out the loading and handling of leaving warehouse. Wherein, partial steel coils do not need to be sheared, and are directly transferred to the primary and secondary vehicles 5 of the second temporary storage production line 12 from the gantry vehicle 6 on the first temporary storage production line 2 through the receiving production line 3 to be directly delivered out of the warehouse and loaded.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (9)

1. The utility model provides an intelligent commodity circulation production line of coil of strip transportation which characterized in that: including treating the shearing area warehouse, it produces line (1) to be provided with the multiunit in parallel in treating the shearing area warehouse, it produces line (1) and connects the multiunit through perpendicular first transfer of setting with it and accepts and produce line (3), the multiunit accept to produce line (3) and be used for accepting the annealing unit coil of strip, the multiunit accept to produce line (3) and all transport the coil of strip through primary and secondary car (5) of moving above that go up first transfer and produce on line (2), this first transfer is produced line (2) and is transported the coil of strip through portal frame car (6) to on line (1) is produced in the temporary storage, line (1) is produced in the temporary storage is passed through primary and secondary car (5) carry out the coil of strip and place the adjustment of position and make things convenient for the later stage to seek the shearing, and all be provided with saddle (7) that are used for the coil of strip to place on every production line.
2. The intelligent logistics production line for steel coil transportation according to claim 1, characterized in that: treat to be provided with three groups side by side in the shear zone warehouse line (1) is produced in the temporary storage, and three groups the both ends of producing line (1) in the temporary storage are passed through respectively first transfer is produced line (2) and second and is transported and produce line (4) and connect, are used for three groups coil of strip position on the line (1) is produced in the temporary storage is changed.
3. The intelligent logistics production line for steel coil transportation according to claim 2, characterized in that: three set in the line (1) is produced in the temporary storage the longest second in the centre of lieing in and temporarily store in and produce line (12) both ends and be provided with a plurality of shearing units that are used for carrying out the shearing to the coil of strip respectively, and about the bilateral symmetry that the line (12) was produced in the temporary storage of second is provided with the first temporary storage of same length and produces line (11) and the second temporary storage of producing line (12).
4. The intelligent logistics production line for steel coil transportation according to claim 2, characterized in that: multiunit accept to produce line (3) and be provided with two sets ofly side by side, and every group accept to produce line (3) and every group and keep in producing line (1) and all set up to two rows of symmetries, wherein, same group accept to produce line (3) or same one set of keep in producing line (1) and all share one primary and secondary car (5).
5. The intelligent logistics production line for steel coil transportation of claim 1, characterized in that: primary and secondary car (5) divide into along accept to produce line (3) perhaps line (1) carries out parallel movement's female car (51) is produced in the scratch storage be provided with on female car (51) perpendicular and each accept to produce line (3) perhaps the scratch storage is produced sub-car (52) that line (1) direction was removed and is used for giving accept to produce line (3) perhaps saddle (7) of line (1) both sides are produced in the scratch storage go on unloading.
6. The intelligent logistics production line for steel coil transportation of claim 2, characterized in that: saddle (7) divide into fixed saddle (71) and rotatory saddle (72) two kinds, and two kinds the position of the upper surface of saddle (7) and coil of strip contact all sets up to middle low both sides height.
7. The intelligent logistics production line for steel coil transportation of claim 6, characterized in that: temporary storage produce line (1) with first transport produce line (2) or with the second transport is produced the intersection between line (4) and is provided with rotatory saddle (72), remaining saddle (7) are fixed saddle (71).
8. The intelligent logistics production line for steel coil transportation according to claim 2, characterized in that: gantry crane (6) along first transfer produce line (2) with second transfer produce line (4) and remove, just gantry crane (6) embrace the coil of strip in the centre and mention, just saddle (7) are followed the centre of gantry crane (6) sets up.
9. The intelligent logistics production line for steel coil transportation according to claim 3, characterized in that: and a plurality of fixed saddles (71) used for manual loading and unloading are symmetrically arranged on two sides of two ends of the second temporary storage production line (12).
CN202220092628.9U 2022-01-13 2022-01-13 Intelligent logistics production line for steel coil transportation Active CN216685944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220092628.9U CN216685944U (en) 2022-01-13 2022-01-13 Intelligent logistics production line for steel coil transportation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220092628.9U CN216685944U (en) 2022-01-13 2022-01-13 Intelligent logistics production line for steel coil transportation

Publications (1)

Publication Number Publication Date
CN216685944U true CN216685944U (en) 2022-06-07

Family

ID=81826397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220092628.9U Active CN216685944U (en) 2022-01-13 2022-01-13 Intelligent logistics production line for steel coil transportation

Country Status (1)

Country Link
CN (1) CN216685944U (en)

Similar Documents

Publication Publication Date Title
US11447336B2 (en) Robotic cargo handling system and method
EP1713707B1 (en) Method for storing rolls of material
WO2013004712A1 (en) Storage and picking system and method for automated picking by means of a channel storage facility
CN109573429A (en) A kind of double-layer combined double-station RGV trolley and Automated tridimensional warehousing system
US3991889A (en) Railway transportating system and apparatus therefor
CN207226564U (en) A kind of high ferro logistics handling system
EP1594774B1 (en) Depot for material rolls of a web processing machine and material supply system
CN216685944U (en) Intelligent logistics production line for steel coil transportation
CN113460550B (en) Goods sorting system and sorting method
CN109335544B (en) Sorting equipment for mixed goods
CN114368573A (en) Intelligent logistics production line for steel coil transportation
CN114803358B (en) Linear reciprocating type double RGV flexible logistics production line
DE4015938A1 (en) Rotor spinning assembly sliver supply - has station to transfer contents of round cans to flat cans for increased density along row of spinning stations
CN210735329U (en) Intelligent production workshop for robot
EP2876060B1 (en) Transport device for the distribution of different piece goods for multiple processing locations and method for operating the transport device
CN209814152U (en) AGV car holds system with taking longeron
CN217228921U (en) Aluminum coil processing logistics transportation system
JP2010235214A (en) Traveling vehicle system
DE19648518C1 (en) Device for loading and unloading magnet track train
CN111099355B (en) Blank breaking and conveying system and method
DE19726593A1 (en) Commissioning stockpile for goods located on palettes with pre-specified height, width and/or length
US20240158169A1 (en) Shuttle system, and method for operating a shuttle system
CN117819208A (en) Pipe conveying system and method capable of preventing thread damage
CN117690836A (en) Running rail and automatic transmission system
JPH1110228A (en) Coil transferring method and equipment therefor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant