CN216553764U - Traffic engineering road surface pile equipment - Google Patents

Traffic engineering road surface pile equipment Download PDF

Info

Publication number
CN216553764U
CN216553764U CN202123311943.0U CN202123311943U CN216553764U CN 216553764 U CN216553764 U CN 216553764U CN 202123311943 U CN202123311943 U CN 202123311943U CN 216553764 U CN216553764 U CN 216553764U
Authority
CN
China
Prior art keywords
gear
road surface
fixedly connected
traffic engineering
engineering road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123311943.0U
Other languages
Chinese (zh)
Inventor
潘亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123311943.0U priority Critical patent/CN216553764U/en
Application granted granted Critical
Publication of CN216553764U publication Critical patent/CN216553764U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model relates to a traffic engineering pavement pile driving device which comprises a base, a main rod and a cross beam, wherein the pile driving device is arranged between the main rod and the cross beam and comprises a cylinder, an output end of the cylinder is fixedly connected with an installation plate, the right side of the installation plate is fixedly connected with a driving motor, an output shaft of the driving motor is fixedly connected with a first gear, the left side of the first gear is meshed with a second gear, the bottom of the second gear is fixedly connected with a screw rod, the outer side of the screw rod is in threaded connection with a guide block, the left side of the guide block is welded with a sleeve, a slide rod is inserted into the sleeve, the left side of the sleeve is fixedly provided with a connecting block, the left side of the connecting block is fixedly provided with a rotating motor, the output shaft of the rotating motor is fixedly connected with a drill bit, and the top of the installation plate is welded with a connecting plate. This traffic engineering road surface pile equipment can pile the road surface more high-efficiently, has improved pile efficiency.

Description

Traffic engineering road surface pile equipment
Technical Field
The utility model relates to the technical field of traffic engineering, in particular to a road surface piling device for traffic engineering.
Background
If the ground traffic building is built on the ground, the ground is subjected to great pressure, the ground must have enough strength to resist the pressure, which is often difficult to achieve, so the ground bearing the building must be reinforced or the bearing mode of the ground is improved, so that it is thought that piling is carried out on the foundation, most of the weight of the building is transmitted to a position deep below the ground through piles, because the foundation at the position has a much larger bearing capacity than the ground, the piles are driven to a great depth, the distribution condition of the underground strata (called geological structure layer in the profession) is required, and if the ground traffic building can sufficiently bear the pressure of the building, the piles are driven to the position, and if the ground traffic building cannot, the piles are further driven to the depth.
The existing piling method is used for excavating the space position of a pile foundation below the ground where the reinforced concrete is required to be poured in a manual mode when piling the road surface, so that the working strength is greatly improved by piling through manpower, a large amount of physical power is consumed, the physical and mental health is influenced, the efficiency of piling is low, the existing requirement is difficult to meet, and the existing problem in the method is solved by the traffic engineering road surface piling equipment.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides the traffic engineering pavement piling equipment which has the advantages of high piling efficiency and the like, and solves the problem of low piling efficiency caused by manual operation in the existing piling method.
In order to achieve the purpose, the utility model provides the following technical scheme: the road surface piling equipment for the traffic engineering comprises a base, a main rod and a cross beam, wherein the piling equipment is arranged between the main rod and the cross beam;
the pile driving equipment includes the cylinder, fixedly connected with mounting panel on the output of cylinder, the right side fixedly connected with driving motor of mounting panel, the first gear of fixedly connected with on driving motor's the output shaft, the left side meshing of first gear has the second gear, the bottom fixedly connected with screw rod of second gear, the outside threaded connection of screw rod has the guide block, the left side welding of guide block has the sleeve, telescopic inside is pegged graft and is had the slide bar, telescopic left side fixed mounting has the connecting block, the left side fixed mounting of connecting block has the rotation motor, fixedly connected with drill bit on the output shaft of rotation motor, the welding of top of mounting panel has the connecting plate, the bottom movable mounting of connecting plate has the pulley.
Further, the top fixed mounting of mobile jib has the signal lamp, the top fixed mounting of base has quick-witted case.
Further, mobile jib fixed mounting is in the top of base, crossbeam and cylinder are all fixed mounting in the left side of mobile jib.
Further, the meshing angle of the first gear and the second gear is ninety degrees, and the screw is movably connected to the inside of the mounting plate.
Further, the slide bar is fixedly installed in the mounting plate, and the number of the pulleys is not less than two.
Furthermore, the inner side of the top of the cross beam is provided with a sliding groove, and the pulley is connected to the inner side of the sliding groove in a rolling manner.
Further, the bottom movable mounting of base has the gyro wheel, the quantity of gyro wheel is no less than four, the right side fixedly connected with handrail of base.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
this traffic engineering road surface pile equipment, pile equipment through setting up can pile the road surface more high-efficiently, the effect of pile has been promoted, and simultaneously, the device can conveniently adjust the position of pile, a large amount of manpowers have been saved, and pile efficiency has also been improved, current pile method of having solved when pile the road surface, pile through the manpower and not only promoted working strength greatly, a large amount of physical power has also been consumed simultaneously, physical and mental health has been influenced, the problem that the efficiency of pile is low leads to, the device simple structure, and convenient operation has good practicality.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of A in FIG. 1 according to the present invention.
In the figure: the device comprises a base 1, a main rod 2, a cross beam 3, a cylinder 4, a mounting plate 5, a driving motor 6, a first gear 7, a second gear 8, a screw rod 9, a guide block 10, a sleeve 11, a sliding rod 12, a connecting block 13, a rotating motor 14, a drill bit 15, a connecting plate 16, a pulley 17 and a signal lamp 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Please refer to fig. 1-2, a traffic engineering road surface pile driving equipment in this embodiment, including base 1, mobile jib 2 and crossbeam 3, the bottom movable mounting of base 1 has the gyro wheel, four are no less than to the quantity of gyro wheel, the right side fixedly connected with handrail of base 1, handrail and the gyro wheel through setting up can conveniently remove pile driving equipment, the convenience of using has been promoted, mobile jib 2 fixed mounting is in the top of base 1, the top fixed mounting of base 1 has a quick-witted case, crossbeam 3 and the equal fixed mounting in the left side of mobile jib 2 of cylinder 4.
It can be understood that, the spout has been seted up to the inboard at crossbeam 3 top, and the top fixed mounting of mobile jib 2 has signal lamp 18, and when this equipment function, signal lamp 18 can light, possesses the effect of warning, can prevent that irrelevant personnel from being close to, promotes factor of safety, is provided with pile driving equipment between mobile jib 2 and the crossbeam 3, can pile the road surface more high-efficiently through the pile driving equipment that sets up, has promoted the effect of pile, has good performance.
It should be noted that, pile equipment includes cylinder 4, fixedly connected with mounting panel 5 on the output of cylinder 4, can drive mounting panel 5 through starting cylinder 4 and remove, thereby it is more convenient to adjust the position of pile, performance has been improved, the right side fixedly connected with driving motor 6 of mounting panel 5, the first gear 7 of fixedly connected with on driving motor 6's the output shaft, the left side meshing of first gear 7 has second gear 8, the meshing angle of first gear 7 and second gear 8 is ninety degrees, through starting driving motor 6, just can drive first gear 7 and rotate.
In this embodiment, the bottom fixedly connected with screw rod 9 of second gear 8, screw rod 9 swing joint is in the inside of mounting panel 5, the outside threaded connection of screw rod 9 has guide block 10, because the relation of connection between first gear 7 and the second gear 8, when first gear 7 rotates, just can drive second gear 8 and rotate, just can drive screw rod 9 from this and rotate, the left side welding of guide block 10 has sleeve 11, the inside grafting of sleeve 11 has slide bar 12, slide bar 12 fixed mounting is in the inside of mounting panel 5, the left side fixed mounting of sleeve 11 has connecting block 13.
It should be noted that, when the screw 9 rotates, just can drive guide block 10 and sleeve 11 and move in step, thereby drive connecting block 13 and move, the left side fixed mounting of connecting block 13 has rotating motor 14, fixedly connected with drill bit 15 on the output shaft of rotating motor 14, through starting rotating motor 14, thereby can drive drill bit 15 and rotate, thereby realize piling pile the road surface, the top welding of mounting panel 5 has connecting plate 16, the bottom movable mounting of connecting plate 16 has pulley 17, pulley 17's quantity is no less than two, pulley 17 roll connection is in the inboard of spout, when mounting panel 5 removed, can drive connecting plate 16 and pulley 17 and move in step, thereby the stationarity that mounting panel 5 removed has been improved, performance has been improved.
The working principle of the above embodiment is as follows:
this traffic engineering road surface pile equipment, it rotates to drive drill bit 15 through starting rotation motor 14, start cylinder 4 simultaneously and drive mounting panel 5 and remove, adjust the position of pile, start driving motor 6 afterwards and drive first gear 7 and rotate, thereby drive second gear 8 and screw rod 9 and rotate, and drive guide block 10 and sleeve 11 downstream, from this through connecting block 13 just can drive drill bit 15 downstream, pile to the road surface from this, the efficiency of pile has been improved greatly, manpower consumption has been reduced.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a traffic engineering road surface pile equipment, includes base (1), mobile jib (2) and crossbeam (3), its characterized in that: piling equipment is arranged between the main rod (2) and the cross beam (3);
the piling equipment comprises a cylinder (4), a mounting plate (5) is fixedly connected to the output end of the cylinder (4), a driving motor (6) is fixedly connected to the right side of the mounting plate (5), a first gear (7) is fixedly connected to the output shaft of the driving motor (6), a second gear (8) is meshed to the left side of the first gear (7), a screw rod (9) is fixedly connected to the bottom of the second gear (8), a guide block (10) is in threaded connection with the outer side of the screw rod (9), a sleeve (11) is welded to the left side of the guide block (10), a sliding rod (12) is inserted into the sleeve (11), a connecting block (13) is fixedly installed on the left side of the sleeve (11), a rotating motor (14) is fixedly installed on the left side of the connecting block (13), and a drill bit (15) is fixedly connected to the output shaft of the rotating motor (14), the top welding of mounting panel (5) has connecting plate (16), the bottom movable mounting of connecting plate (16) has pulley (17).
2. Traffic engineering road surface piling device according to claim 1, characterized in that: the top fixed mounting of mobile jib (2) has signal lamp (18), the top fixed mounting of base (1) has quick-witted case.
3. Traffic engineering road surface piling device according to claim 1, characterized in that: the main rod (2) is fixedly installed at the top of the base (1), and the cross beam (3) and the air cylinder (4) are fixedly installed on the left side of the main rod (2).
4. Traffic engineering road surface piling device according to claim 1, characterized in that: the meshing angle of the first gear (7) and the second gear (8) is ninety degrees, and the screw (9) is movably connected to the inside of the mounting plate (5).
5. Traffic engineering road surface piling device according to claim 1, characterized in that: the sliding rod (12) is fixedly arranged in the mounting plate (5), and the number of the pulleys (17) is not less than two.
6. Traffic engineering road surface piling device according to claim 1, characterized in that: the inner side of the top of the cross beam (3) is provided with a sliding groove, and the pulley (17) is connected to the inner side of the sliding groove in a rolling manner.
7. Traffic engineering road surface piling device according to claim 1, characterized in that: the bottom movable mounting of base (1) has the gyro wheel, the quantity of gyro wheel is no less than four, the right side fixedly connected with handrail of base (1).
CN202123311943.0U 2021-12-27 2021-12-27 Traffic engineering road surface pile equipment Active CN216553764U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123311943.0U CN216553764U (en) 2021-12-27 2021-12-27 Traffic engineering road surface pile equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123311943.0U CN216553764U (en) 2021-12-27 2021-12-27 Traffic engineering road surface pile equipment

Publications (1)

Publication Number Publication Date
CN216553764U true CN216553764U (en) 2022-05-17

Family

ID=81556146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123311943.0U Active CN216553764U (en) 2021-12-27 2021-12-27 Traffic engineering road surface pile equipment

Country Status (1)

Country Link
CN (1) CN216553764U (en)

Similar Documents

Publication Publication Date Title
CN110374500B (en) Grouped drilling and pile planting construction method
CN108222221B (en) Maintenance process for municipal sewage pipe
CN110965937A (en) Double-power whole-course pump suction reverse circulation punching equipment and construction process
CN107288171B (en) Bore and prop integral type shaft pore-forming device
CN113006042B (en) Construction process for reinforcing foundation of large hydraulic structure on construction waste land layer
CN110331936B (en) Combined drilling bottom-expanding pile-planting construction method
CN209457865U (en) A kind of square pile rotary drilling device for realizing rectangular pore-forming
CN103195357A (en) Full-casing type special drilling machine
CN216553764U (en) Traffic engineering road surface pile equipment
CN210530738U (en) Pile system is planted in drilling in groups
CN203188899U (en) Full sleeve special-type drilling machine
CN112324327A (en) Bored concrete pile drilling equipment is used in road bridge roof beam construction
CN210195659U (en) Engineering construction is with earthwork excavation and backfill device
CN109610431B (en) Rammer for straight road section of low-grade highway
CN116950412A (en) Automatic track-seeking vibrating device for square open caisson bottom sealing concrete
CN217681568U (en) Slag discharging equipment
CN110952920A (en) Drilling device for square hole
CN207142776U (en) A kind of artificial digging pile is unearthed lifting device
CN214738194U (en) Sunk well screw anchor pressurization deviation correcting device
CN212054481U (en) Drilling device for square hole
CN115681613A (en) Pipe jacking construction method for silt silty clay layer construction
CN211874383U (en) Double dynamical whole journey pump suction reverse circulation punching equipment
CN107459001A (en) A kind of artificial digging pile is unearthed lifting device
CN210105746U (en) Thread fit type composite drilling tool and profile pile
CN109371978B (en) Civil engineering foundation ditch is safe supporting construction for support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant