CN216303057U - Hoist device of prefabricated assembled concrete side fascia - Google Patents

Hoist device of prefabricated assembled concrete side fascia Download PDF

Info

Publication number
CN216303057U
CN216303057U CN202122350090.5U CN202122350090U CN216303057U CN 216303057 U CN216303057 U CN 216303057U CN 202122350090 U CN202122350090 U CN 202122350090U CN 216303057 U CN216303057 U CN 216303057U
Authority
CN
China
Prior art keywords
plate
fixed connection
fixedly connected
wall panel
external wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122350090.5U
Other languages
Chinese (zh)
Inventor
肖莹莹
顾金林
周勇军
蒋吕祯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xinyu Construction Engineering Co ltd
Original Assignee
Guangdong Xinyu Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Xinyu Construction Engineering Co ltd filed Critical Guangdong Xinyu Construction Engineering Co ltd
Priority to CN202122350090.5U priority Critical patent/CN216303057U/en
Application granted granted Critical
Publication of CN216303057U publication Critical patent/CN216303057U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a hoisting device for a prefabricated concrete external wall panel, which comprises a supporting plate, wherein one end of the upper side of the supporting plate is fixedly connected with a vertical plate, the other end of the upper side of the vertical plate is fixedly connected with an inclined plate, the inclined plate and the upper end of the vertical plate are fixedly connected with a transverse plate, the upper end of the transverse plate is fixedly connected with a lifting lug, one side of the inclined plate, which is far away from the vertical plate, is provided with a sinking groove, the bottom of the sinking groove is provided with a through hole, the vertical plate is fixedly connected with a first air cylinder, a telescopic rod of the first air cylinder penetrates through the through hole and is fixedly connected with a push plate, the push plate is positioned in the sinking groove, the inclined plate is provided with a clamping device, and the clamping device is used for clamping and fixing the wall panel. The wall plate is pushed to the mounting surface through the push plate without arranging a hoisting hole on the wall plate, so that the wall plate is convenient to mount.

Description

Hoist device of prefabricated assembled concrete side fascia
Technical Field
The utility model relates to the technical field of wallboard hoisting equipment, in particular to a hoisting device for a prefabricated assembled concrete external wallboard.
Background
At present, the energy-saving design of the building outer wall mostly adopts the way that a composite heat-insulation integrated plate is additionally arranged on the surface of the building wall to serve as a heat-insulation plate. In the construction process, the composite heat-insulation integrated plate is used as an outer template of the wall, concrete is poured on the inner side of the composite heat-insulation integrated plate, and the composite heat-insulation integrated plate and the concrete are firmly connected together through an anchoring part to form a heat-insulation structure system.
Need set up the hole for hoist on the current prefabricated wallboard, cause the degree of difficulty that the wallboard was made to increase on the one hand, the hoist and mount point structural strength of on the other hand wallboard is not enough, causes easily to drop, forms the potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art, and provides a hoisting device for a prefabricated concrete external wall panel, so that the problems in the prior art are solved.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a hoist device of prefabricated assembled concrete side fascia, includes the layer board, layer board upside one end fixed connection riser, riser upside other end fixed connection swash plate, the common fixed connection diaphragm in upper end of swash plate and riser, diaphragm upper end fixed connection lug, the swash plate is kept away from one side of riser is equipped with heavy groove, the tank bottom of heavy groove is equipped with the through-hole, the first cylinder of riser fixed connection, the telescopic link of first cylinder passes and the fixed connection push pedal by the through-hole, the push pedal is located heavy inslot, the swash plate is equipped with clamping device, clamping device is used for the fixed wallboard of centre gripping.
Preferably, one end of the supporting plate, which is far away from the vertical plate, is fixedly connected with a rubber pad.
Preferably, the upper side of the supporting plate is fixedly connected with a balancing weight, and the balancing weight is located right below the lifting lug.
Preferably, the swash plate lower extreme is equipped with the first groove of dodging, the layer board upside is close to the one end of swash plate is equipped with the second and dodges the groove, the groove internal rotation is dodged to the second and the right angle bracket is connected, be equipped with the torsional spring in the pivot of right angle bracket.
Preferably, the inner side surface of the right-angle bracket is fixedly connected with a rubber layer pad.
Preferably, clamping device includes two curb plates, every curb plate one side fixed connection centre gripping cylinder, every centre gripping cylinder's telescopic link end fixed connection branch, branch is equipped with splint, two the equal symmetrical formula fixed connection two baffles of one side that splint are relative, two the one end interval that splint were kept away from to the baffle is greater than two baffle other end intervals.
Preferably, one side of the clamping plate, which is far away from the baffle plate, is fixedly connected with a square rod, the supporting rod is provided with a square sliding hole, the square rod penetrates through the square sliding hole and is in sliding connection with the square sliding hole, and a buffer spring is arranged between the clamping plate and the supporting rod.
The utility model has the advantages that: according to the hoisting device for the prefabricated assembled concrete external wall panel, the lower end of the wall panel is placed on the right-angle bracket, so that the corner of the wall panel is prevented from being damaged, the wall panel is poured onto the inclined plate in a proper manner, after the wall panel is clamped by the clamping device, the wall panel is hoisted by using the conventional hoisting machine, after the hoisting machine hoists the support plate to the surface to be installed, the rubber pad of the support plate abuts against the lower wall panel to be installed, after the clamping device is loosened, the push plate pushes the wall panel to the installation surface, and no hoisting hole is required to be formed in the wall panel, so that the wall panel is convenient to install.
Drawings
FIG. 1 is a schematic diagram of the basic structure of the present invention;
FIG. 2 is a sectional view A-A of FIG. 1;
fig. 3 is a partially enlarged view of fig. 1 at E.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Example 1
As shown in figures 1-3, the utility model provides a lifting device for a prefabricated concrete external wall panel, which comprises a supporting plate 1, wherein one end of the upper side of the supporting plate 1 is fixedly connected with a vertical plate 2, the other end of the upper side of the vertical plate 2 is fixedly connected with an inclined plate 3, the inclined plate 3 and the upper end of the vertical plate 2 are jointly and fixedly connected with a transverse plate 4, the upper end of the transverse plate 4 is fixedly connected with a lifting lug 5, one end of the supporting plate 1, which is far away from the vertical plate 2, is fixedly connected with a rubber pad 11, the upper side of the supporting plate 1 is fixedly connected with a balancing weight 12, the balancing weight 12 is positioned under the lifting lug 5, so that the device cannot topple to one side when being lifted, the lower end of the inclined plate 3 is provided with a first avoidance groove 13, one end of the upper side of the supporting plate 1, which is close to the inclined plate 3, is provided with a second avoidance groove 14, the second avoidance groove 14 is rotatably connected with a right-angle bracket 15, a torsion spring is arranged on a rotating shaft of the right-angle bracket 15, the inner side of the right-angle bracket 15 is fixedly connected with a rubber pad, one side of the inclined plate 3, which is far away from the vertical plate 2, a through hole 32 is formed in the bottom of the sinking groove, the vertical plate 2 is fixedly connected with a first air cylinder 33, a telescopic rod of the first air cylinder 33 penetrates through the through hole 32 and is fixedly connected with a push plate 34, the push plate 34 is located in the sinking groove, the inclined plate 3 is provided with a clamping device 6, and the clamping device 6 is used for clamping and fixing the wall plate 100; the lower extreme of wallboard 100 is taken on right angle bracket 15, avoids wallboard 100's corner to damage, topples over wallboard 100 on swash plate 3 with the trend afterwards, cliies the back through clamping device 6, lifts by crane with current crane, and after crane lifted layer board 1 and waited to install the face, the rubber pad 11 of layer board 1 supported the below wallboard with the installation, and clamping device 6 loosens the back, and push pedal 34 pushes away wallboard 100 on the installation face, the installation of wallboard 100 of being convenient for.
The clamping device 6 comprises two side plates 61, one side of each side plate 61 is fixedly connected with a clamping cylinder 62, the end of a telescopic rod of each clamping cylinder 62 is fixedly connected with a supporting rod 63, the supporting rod 63 is provided with a clamping plate 64, one side of each clamping plate 64 opposite to the other side is symmetrically and fixedly connected with two baffle plates 65, the distance between one ends of the two baffle plates 65 far away from the clamping plate 64 is larger than the distance between the other ends of the two baffle plates 65, one side of each clamping plate 64 far away from the baffle plate 65 is fixedly connected with a square rod 66, the supporting rod 63 is provided with a square sliding hole, the square rod 66 penetrates through the square sliding hole and is in sliding connection with the square sliding hole, and a buffer spring 67 is arranged between the clamping plate 64 and the supporting rod 63; two splint 64 are close to each other, and the baffle 65 of slope is convenient for wallboard 100 to get into between two baffles 65, and at the in-process of centre gripping, buffer spring 67 plays the effect that the buffering was supported, avoids causing wallboard 100 edge breakage because direct extrusion, influences the installation quality.
Theory of operation, wallboard 100's lower extreme is taken on right angle bracket 15, avoids wallboard 100's corner to damage, later with wallboard 100 in the same place empty on swash plate 3, clip the back through clamping device 6, lift by crane with current crane, after crane lifted layer board 1 and waited to install the face, the rubber pad 11 of layer board 1 supports the below wallboard with the installation, clamping device 6 loosens the back, push pedal 34 pushes away wallboard 100 on the installation face, thereby be convenient for wallboard 100's installation.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a hoist device of prefabricated assembled concrete side fascia, includes layer board (1), layer board (1) upside one end fixed connection riser (2), riser (2) upside other end fixed connection swash plate (3), swash plate (3) and common fixed connection diaphragm (4) in the upper end of riser (2), diaphragm (4) upper end fixed connection lug (5), its characterized in that: keep away from swash plate (3) one side of riser (2) is equipped with heavy groove, the tank bottom in heavy groove is equipped with through-hole (32), riser (2) the first cylinder of fixed connection (33), the telescopic link of first cylinder (33) is passed and fixed connection push pedal (34) by through-hole (32), push pedal (34) are located heavy inslot, swash plate (3) are equipped with clamping device (6), clamping device (6) are used for the fixed wallboard of centre gripping (100).
2. The hoisting device for the prefabricated concrete external wall panel according to claim 1, wherein: one end of the supporting plate (1) far away from the vertical plate (2) is fixedly connected with a rubber pad (11).
3. The hoisting device for the prefabricated concrete external wall panel according to claim 1, wherein: the upper side of the supporting plate (1) is fixedly connected with a balancing weight (12), and the balancing weight (12) is located under the lifting lug (5).
4. The hoisting device for the prefabricated concrete external wall panel according to claim 1, wherein: swash plate (3) lower extreme is equipped with the first groove of dodging (13), layer board (1) upside is close to the one end of swash plate (3) is equipped with the second and dodges groove (14), the second dodges groove (14) internal rotation and connects right angle bracket (15), be equipped with the torsional spring in the pivot of right angle bracket (15).
5. The hoisting device for the prefabricated concrete external wall panel according to claim 4, wherein: the inner side surface of the right-angle bracket (15) is fixedly connected with a rubber layer pad.
6. The hoisting device for the prefabricated concrete external wall panel according to claim 1, wherein: clamping device (6) include two curb plates (61), every curb plate (61) one side fixed connection centre gripping cylinder (62), telescopic link end fixed connection branch (63) of every centre gripping cylinder (62), branch (63) are equipped with splint (64), two baffle (65) of the equal symmetrical formula fixed connection in one side that splint (64) are relative, two the one end interval that splint (64) were kept away from in baffle (65) is greater than two baffle (65) other end intervals.
7. The hoisting device for the prefabricated concrete external wall panel according to claim 6, wherein: keep away from splint (64) one side fixed connection square pole (66) of baffle (65), branch (63) are equipped with square slide opening, square pole (66) are passed and sliding connection by square slide opening, be equipped with buffer spring (67) between splint (64) and branch (63).
CN202122350090.5U 2021-09-27 2021-09-27 Hoist device of prefabricated assembled concrete side fascia Active CN216303057U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122350090.5U CN216303057U (en) 2021-09-27 2021-09-27 Hoist device of prefabricated assembled concrete side fascia

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122350090.5U CN216303057U (en) 2021-09-27 2021-09-27 Hoist device of prefabricated assembled concrete side fascia

Publications (1)

Publication Number Publication Date
CN216303057U true CN216303057U (en) 2022-04-15

Family

ID=81111934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122350090.5U Active CN216303057U (en) 2021-09-27 2021-09-27 Hoist device of prefabricated assembled concrete side fascia

Country Status (1)

Country Link
CN (1) CN216303057U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114851063A (en) * 2022-05-31 2022-08-05 浙江金立方门业有限公司 Polishing equipment is used in timber production of adaptation in different thickness timber processing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114851063A (en) * 2022-05-31 2022-08-05 浙江金立方门业有限公司 Polishing equipment is used in timber production of adaptation in different thickness timber processing

Similar Documents

Publication Publication Date Title
CN216303057U (en) Hoist device of prefabricated assembled concrete side fascia
CN111285241A (en) Assembled hoisting frame for building construction
CN201952153U (en) Portable detachable hoisting equipment
CN212245882U (en) Hoist device of prefabricated stair board of assembled
CN110512766B (en) Fabricated structure system of steel plate concrete shear wall and construction method thereof
CN205953378U (en) Tower crane counter weight is from dismouting to put
CN106121259A (en) The hanging apparatus of embedded integrated outer wall plate and hanging method thereof
CN208345622U (en) A kind of assembled architecture metope hanging apparatus
CN214359803U (en) Steel box girder lifting appliance for highway construction
CN211871149U (en) Assembled hoisting frame for building construction
CN214527632U (en) Special lifting appliance for hoisting prefabricated plate of factory building overhead layer
CN209940251U (en) Floating plate hoisting device
CN221396853U (en) Auxiliary hoisting lifting device for building stone gate building
CN216190316U (en) Mobile device of wastewater treatment equipment
CN214697189U (en) Microwave communication signal tower adjusting base
CN218754637U (en) Tilting building keel hoist and mount pulley gear
CN220317074U (en) Top lifting device for shallow round bin construction
CN211056554U (en) Small-size lifting device is used in big glass construction of high-rise building exterior window
CN215047975U (en) Assembled building is hoisting frame for assembly
CN218893357U (en) Gypsum mould hoist
CN219279261U (en) Assembled building hoisting accessory
CN215402564U (en) Gallows structure for engineering construction
CN218613829U (en) A installation device for loop wheel machine round pin axle
CN216303038U (en) Multifunctional shoulder pole
CN211569862U (en) Prefabricated hoist and mount piece of building convenient to dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant