CN106121259A - The hanging apparatus of embedded integrated outer wall plate and hanging method thereof - Google Patents

The hanging apparatus of embedded integrated outer wall plate and hanging method thereof Download PDF

Info

Publication number
CN106121259A
CN106121259A CN201610695368.3A CN201610695368A CN106121259A CN 106121259 A CN106121259 A CN 106121259A CN 201610695368 A CN201610695368 A CN 201610695368A CN 106121259 A CN106121259 A CN 106121259A
Authority
CN
China
Prior art keywords
integrated outer
embedded integrated
wall
wall plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610695368.3A
Other languages
Chinese (zh)
Other versions
CN106121259B (en
Inventor
童根树
王彦超
徐永斌
景亭
陈杭滨
周耀彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hophornbeam Xin Ke Structural Steel Design Co Ltd
Original Assignee
Hangzhou Hophornbeam Xin Ke Structural Steel Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hophornbeam Xin Ke Structural Steel Design Co Ltd filed Critical Hangzhou Hophornbeam Xin Ke Structural Steel Design Co Ltd
Priority to CN201610695368.3A priority Critical patent/CN106121259B/en
Publication of CN106121259A publication Critical patent/CN106121259A/en
Application granted granted Critical
Publication of CN106121259B publication Critical patent/CN106121259B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses hanging apparatus and the hanging method thereof of a kind of embedded integrated outer wall plate.Girder steel lower flange lower surface is fixed with link, and steel column side wall is provided with steel column connecting plate, and embedded integrated outer wall plate top end face is provided with the hook being connected with link, and two sides are provided with the wall connecting plate being connected with steel column connecting plate;Embedded integrated outer wall plate installs to Beam-post Frame Structure by mast-up and hook is suspended on link and makes steel column connecting plate and the fixing connection of wall connecting plate, and mast-up includes mast-up base, vertical supports, fixture, lifting counterweight and hoist cable;After lifting puts in place, unclamping fixture, embedded monoblock type exterior wall rolls, and exterior wall is provided with hook and inserts the annular distance on framework girder steel, unclamp hoist cable, and body of wall both sides connector docks fixing with the connector on steel column.The present invention can effectively solve to pluck, when embedded integrated outer wall plate is installed, the problem hooking difficulty, can be widely applied in the construction of the embedded integrated outer wall plate of industrialization assembled architecture.

Description

The hanging apparatus of embedded integrated outer wall plate and hanging method thereof
Technical field
The present invention relates to the installation equipment of a kind of embedded integrated outer wall plate, especially relate to a kind of embedded monoblock type exterior wall The hanging apparatus of plate and hanging method thereof, can be widely applied in the installation of embedded integrated outer wall plate.
Background technology
In traditional architecture industry, the energy consumption that dispersion, low-level, the inefficient handicraft mode of production are brought is greatly, manually expend The problems such as many, environmental pollution are increasingly severe, by the manufacture of modernization, transport, install and the life of big industry of scientific management Product mode, replaces the mode of production of traditional architecture, is the main method of the building industrialization that country proposes, its outstanding feature Being architectural design standard, component and fitting production and construction, mechanization of building operation and organization and administration are scientific.
In the evolution of industrialized building, by colleges and universities, scientific research institutions, the unremitting research and development of enterprise, multiple different Assembled architecture progresses into construction market, including precast concrete building (PC), steel house, container-type building etc., Main performance is componentization and the assemblingization of component and fitting.Wherein, integrated outer wall plate is a very important component.
Integrated outer wall plate, at each component and fitting of factory process, factory or at the scene ground be assembled into a component, this portion Product are elongated be a post away from interior overall exterior wall, comprise the window opening on exterior wall, then integral hoisting.
Owing to integrated outer wall plate is embedded into formula more, top is connected at the bottom of the beam of a upper floor, bottom and floor coagulation Tulou plate connects, and side is embedded in the post of both sides.The lifting of integrated outer wall plate, many employing tower cranes or truck crane, hoist cable hangs over The top of wallboard, is lifted into when needing hole to be mounted, the most in place and pluck suspension hook become can the key of smooth construction, There is presently no good solution.
Summary of the invention
In order to solve the installation question of embedded integrated outer wall plate, for meeting industrialized building construction requirement, the present invention carries Go out hanging apparatus and the hanging method thereof of a kind of embedded integrated outer wall plate, can smoothly embedded integrated outer wall plate have been entered Row is installed, and meets the installation requirements of assembled architecture.The present invention can meet the embedded integrated outer wall plate dress when construction hoisting Carry, be accurately positioned and install, simple structure, power transmission clearly, convenient and quick construction.
The technical solution used in the present invention is:
One. the hanging apparatus of a kind of embedded integrated outer wall plate:
Hanging apparatus includes mast-up, link, steel column connecting plate and the hook of embedded integrated outer wall plate setting and wall Body connecting plate, girder steel lower flange lower surface is fixed with link, and steel column side wall is provided with steel column connecting plate, embedded integrated outer wall plate top End face is provided with the hook being connected with link, and two sides are provided with the wall connecting plate being connected with steel column connecting plate; Embedded integrated outer wall plate installs to Beam-post Frame Structure by mast-up and hook is suspended on link and makes steel column even Fishplate bar and the fixing connection of wall connecting plate.
Described mast-up includes mast-up base, vertical supports, fixture, lifting counterweight and hoist cable, mast-up base water Placing flat, mast-up base is fixedly arranged in the middle of vertical supports, and vertical supports upper end connects hoist cable, vertical supports wherein side upper Side wall is hinged with fixture, and fixture is rotatable, and the mast-up base of vertical supports opposite side side is equipped with lifting counterweight.
Mast-up base is horizontal positioned, and vertical supports is in vertically placement, the lower end of vertical supports and mast-up base Middle part connects, and vertical supports top is hoist cable, constitutes basic power transmission frame system.Embedded integrated outer wall plate and lifting are joined Heavily being placed on mast-up base, be positioned at mast-up vertical supports both sides, both conduct oneself with dignity holding balance so that hanging device and embedded Integrated outer wall plate can vertically lift by crane and not tilt.
Fixture clasps downwards embedded integrated outer wall plate when lifting so that wallboard is firmly solid during construction hoisting Fixed, not sliding does not misplaces.Side fascia inside top is provided with hook, is firmly hung over by Side fascia on the link of steel beam bottom, The inner side of Side fascia dual-side is provided with wall connecting plate, and the steel column connecting plate docking being arranged on steel column both sides connects, and is used for Being accurately positioned and installing of Side fascia.
Described embedded integrated outer wall plate offers window opening.
Described steel column connecting plate and wall connecting plate are bolted to connection.
Two. the hanging method of a kind of embedded integrated outer wall plate, employing following steps:
Described embedded integrated outer wall plate is placed on mast-up base and is equipped with on the opposite side of lifting counterweight, embedded entirety Formula Side fascia is blocked by fixture and makes it vertically be fixed on mast-up base, is lifted up vertical supports by embedded whole by hoist cable Body formula Side fascia lifts;
When embedded integrated outer wall plate is lifted near the frame that Beam-post Frame Structure need to be installed, unclamp fixture by embedded entirety Formula Side fascia rolls to girder steel with bottom for the point of rotation so that the hook of embedded integrated outer wall plate upper end hangs over girder steel bottom In link;
Remove mast-up, in the frame that embedded integrated outer wall plate built-in beam column framework need to be installed, finally will with bolt Steel column connecting plate on steel column and the fixing connection of the wall connecting plate on embedded integrated outer wall plate, complete embedded monoblock type exterior wall The lifting of plate.
The present invention has following feature and a beneficial effect:
(1) Side fascia and lifting counterweight are dead-weight balanced so that hanging device does not tilts, it is possible to realize exterior wall The vertical lifting of plate.
(2) Side fascia is hung over bottom beam on link, it is achieved that being accurately positioned and fast installing of Side fascia.
Accompanying drawing explanation
Fig. 1 is embedded into the positive elevational schematic view of girder steel and steel column hole before integrated outer wall plate is installed.
Fig. 2 is embedded into the axonometric drawing of integrated outer wall plate.
Fig. 3 is embedded into positive elevational schematic view inside integrated outer wall plate.
Fig. 4 is embedded into the girder steel before integrated outer wall plate is installed and steel column hole side elevation schematic diagram.
Fig. 5 is embedded into integrated outer wall plate and is placed on mast-up and starts to lift by crane side elevation schematic diagram.
Fig. 6 is to unclamp fixture, embedded integrated outer wall plate sideways, and the hook preparation of embedding integrated outer wall plate top is linked into Side elevation schematic diagram during the link of steel beam bottom.
Fig. 7 is embedded into integrated outer wall plate top-hung hook and enters steel beam bottom link, the side elevation signal after wallboard is in place Figure.
Fig. 8 is embedded into the positive elevational schematic view in inner side of integrated outer wall plate installation.
In figure: 1, steel column, 2, concrete floor, 3, girder steel, 4, embedded integral wall, 5, fixture, 6, mast-up base, 7, vertical supports, 8, hoist cable, 9, lifting counterweight, 10, hook, 11, link, 12, steel column connecting plate, 13, wall connecting plate, 41, Window in embedded integral wall.
Detailed description of the invention
Below in conjunction with the accompanying drawings and the present invention is described in further detail by specific embodiment.
As it is shown in figure 1, hanging apparatus of the present invention is to include on the Beam-post Frame Structure that girder steel 3 and steel column 1 surround beam Embedded integrated outer wall plate 4 in column framework is installed, and embedded integrated outer wall plate 4 offers window opening.Such as Fig. 2 and Tu Shown in 3, the hanging apparatus of the present invention includes that mast-up, link 11, steel column connecting plate 12 and embedded integrated outer wall plate 4 are arranged Hook and wall connecting plate 13, as shown in Figure 4, girder steel 3 lower flange lower surface is fixed with link 11, and steel column 1 sidewall is provided with steel Post connecting plate 12, embedded integrated outer wall plate 4 top end face is provided with the hook 11 being connected with link 11, and two sides are provided with The wall connecting plate 13 being connected with steel column connecting plate 12;Embedded integrated outer wall plate 4 installs to beam column frame by mast-up Structure making is linked up with 11 and is suspended on link 11 and makes steel column connecting plate 12 and wall connecting plate 13 is fixing connects.
As it is shown in figure 5, mast-up includes mast-up base 6, vertical supports 7, fixture 5, lifting counterweight 9 and hoist cable 8, lifting Frame base 6 horizontal positioned, mast-up base 6 is fixedly arranged in the middle of in the middle part of vertical supports 7, vertical supports 7 lower end and mast-up base 6 Connecting, vertical supports 7 upper end connects hoist cable 8, and the upper end sidewall of vertical supports 7 wherein side is hinged with fixture 5, and fixture 5 can turn Dynamic, the mast-up base 6 of vertical supports 7 opposite side side is equipped with lifting counterweight 9.
The present invention to be embodied as installation process as follows:
1) embedded integrated outer wall plate 4 be placed on mast-up base 6 be equipped with lifting counterweight 9 opposite side on, embedded entirety Formula Side fascia 4 is blocked by fixture 5 and makes it vertically be fixed on mast-up base 6, and being lifted up vertical supports 7 by hoist cable 8 will Embedded integrated outer wall plate 4 lifts, as shown in Figure 5;
2), when embedded integrated outer wall plate 4 is lifted near the frame that Beam-post Frame Structure need to be installed, fixture 5 is unclamped by embedded Integrated outer wall plate 4 rolls to girder steel 3 with bottom for the point of rotation, as shown in Figure 6 so that embedded integrated outer wall plate 4 upper end Hook 10 hangs in the link 11 of girder steel bottom;
3) mast-up is removed, in the frame that embedded integrated outer wall plate 4 built-in beam column framework need to be installed, as it is shown in fig. 7, Finally with bolt by the steel column connecting plate 12 on steel column 1 and the fixing connection of the wall connecting plate on embedded integrated outer wall plate 4 13, Complete the lifting of embedded integrated outer wall plate 4, ultimately form structure as shown in Figure 8.
Content described in this specification embodiment is only enumerating of the way of realization to present inventive concept, the guarantor of the present invention The scope of protecting is not construed as being only limitted to the concrete form that embodiment is stated, protection scope of the present invention is also and in this area skill Art personnel according to present inventive concept it is conceivable that equivalent technologies means.

Claims (5)

1. the hanging apparatus of an embedded integrated outer wall plate, it is characterised in that: include that mast-up, link (11), steel column connect Hook that plate (12) and embedded integrated outer wall plate (4) are arranged and wall connecting plate (13), girder steel (3) lower flange lower surface is solid Surely have link (11), steel column (1) sidewall to be provided with steel column connecting plate (12), embedded integrated outer wall plate (4) top end face be provided with The hook (11) that link (11) is connected, two sides are provided with the wall connecting plate being connected with steel column connecting plate (12) (13);Embedded integrated outer wall plate (4) installs to Beam-post Frame Structure by mast-up and makes hook (11) be suspended to link (11) Go up and make steel column connecting plate (12) and the fixing connection of wall connecting plate (13).
The hanging apparatus of a kind of embedded integrated outer wall plate the most according to claim 1, it is characterised in that: described lifting Frame includes mast-up base (6), vertical supports (7), fixture (5), lifting counterweight (9) and hoist cable (8), mast-up base (6) water Placing flat, mast-up base (6) is fixedly arranged in the middle of vertical supports (7), and vertical supports (7) upper end connects hoist cable (8), vertical supports (7) wherein the upper end sidewall of side is hinged with fixture (5), and fixture (5) is rotatable, the lifting of vertical supports (7) opposite side side Lifting counterweight (9) it is equipped with on frame base (6).
The hanging apparatus of a kind of embedded integrated outer wall plate the most according to claim 1, it is characterised in that: described is embedded Integrated outer wall plate (4) offers window opening.
The hanging apparatus of a kind of embedded integrated outer wall plate the most according to claim 1, it is characterised in that: described steel column Connecting plate (12) and wall connecting plate (13) are bolted to connection.
5. the hanging method of an embedded integrated outer wall plate, it is characterised in that employing following steps:
1) the embedded integrated outer wall plate (4) described in is placed on mast-up base (6) and is equipped with on the opposite side of lifting counterweight (9), Embedded integrated outer wall plate (4) is blocked by fixture (5) and makes it vertically be fixed on mast-up base (6), by hoist cable (8) upwards Promote vertical supports (7) to be lifted by embedded integrated outer wall plate (4);
2), when embedded integrated outer wall plate (4) is lifted near the frame that Beam-post Frame Structure need to be installed, fixture (5) is unclamped by embedded Integrated outer wall plate (4) rolls to girder steel (3) with bottom for the point of rotation so that the hook of embedded integrated outer wall plate (4) upper end (10) hang in the link (11) of girder steel bottom;
3) mast-up is removed, in the frame that embedded integrated outer wall plate (4) built-in beam column framework need to be installed, finally will with bolt Steel column connecting plate (12) on steel column (1) and the fixing connection of the wall connecting plate (13) on embedded integrated outer wall plate (4), complete The lifting of embedded integrated outer wall plate (4).
CN201610695368.3A 2016-08-19 2016-08-19 The hanging apparatus and its hanging method of embedded integrated outer wall plate Active CN106121259B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610695368.3A CN106121259B (en) 2016-08-19 2016-08-19 The hanging apparatus and its hanging method of embedded integrated outer wall plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610695368.3A CN106121259B (en) 2016-08-19 2016-08-19 The hanging apparatus and its hanging method of embedded integrated outer wall plate

Publications (2)

Publication Number Publication Date
CN106121259A true CN106121259A (en) 2016-11-16
CN106121259B CN106121259B (en) 2018-05-01

Family

ID=57280273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610695368.3A Active CN106121259B (en) 2016-08-19 2016-08-19 The hanging apparatus and its hanging method of embedded integrated outer wall plate

Country Status (1)

Country Link
CN (1) CN106121259B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107762000A (en) * 2017-10-31 2018-03-06 中国二十二冶集团有限公司 Three layers of composite steel column sandwich heat preservation Side fascia method for blocking of assembling type steel structure
CN108678431A (en) * 2018-06-06 2018-10-19 北京平突科技有限公司 A kind of mounting device and its installation method for monolithic architecture module in building
CN113175222A (en) * 2021-04-02 2021-07-27 赵东昕 Installation method of embedded prefabricated external wall panel component

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11148229A (en) * 1997-11-14 1999-06-02 Hiroshi Ariyoshi Jig for executing moisture permeable waterproof sheet, and execution method using it
CN101962977A (en) * 2009-07-24 2011-02-02 B.B.博内利建筑有限公司 Prefabricated wall element
CN202767312U (en) * 2012-09-29 2013-03-06 北京江河幕墙股份有限公司 Unit curtain wall hoisting device
CN103758257A (en) * 2013-12-25 2014-04-30 北京建筑大学 Novel connection mode between prefabricated concrete wall and main structure
CN205935718U (en) * 2016-08-19 2017-02-08 杭州铁木辛柯钢结构设计有限公司 Hoist device of embedded integral side fascia

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11148229A (en) * 1997-11-14 1999-06-02 Hiroshi Ariyoshi Jig for executing moisture permeable waterproof sheet, and execution method using it
CN101962977A (en) * 2009-07-24 2011-02-02 B.B.博内利建筑有限公司 Prefabricated wall element
CN202767312U (en) * 2012-09-29 2013-03-06 北京江河幕墙股份有限公司 Unit curtain wall hoisting device
CN103758257A (en) * 2013-12-25 2014-04-30 北京建筑大学 Novel connection mode between prefabricated concrete wall and main structure
CN205935718U (en) * 2016-08-19 2017-02-08 杭州铁木辛柯钢结构设计有限公司 Hoist device of embedded integral side fascia

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107762000A (en) * 2017-10-31 2018-03-06 中国二十二冶集团有限公司 Three layers of composite steel column sandwich heat preservation Side fascia method for blocking of assembling type steel structure
CN108678431A (en) * 2018-06-06 2018-10-19 北京平突科技有限公司 A kind of mounting device and its installation method for monolithic architecture module in building
CN113175222A (en) * 2021-04-02 2021-07-27 赵东昕 Installation method of embedded prefabricated external wall panel component
CN113175222B (en) * 2021-04-02 2023-08-15 台州优匠建筑科技有限公司 Method for installing embedded prefabricated external wall panel component

Also Published As

Publication number Publication date
CN106121259B (en) 2018-05-01

Similar Documents

Publication Publication Date Title
CN101434366B (en) Hoisting tool and hoisting method for column component
CN103526949A (en) Lifting and slipping device for wall-attached vertical structure and construction method thereof
CN101966965A (en) Special hanger with guide cover wheel hub and turning and hanging method
CN109231023B (en) Method for installing jib system of portal crane
CN106121259A (en) The hanging apparatus of embedded integrated outer wall plate and hanging method thereof
CN109440985A (en) Super high-rise building super large curtain wall unit hydraulic synchronizing lifting system and its construction method
CN206720558U (en) A kind of adjustable steel-reinforcement cage hanger
CN205935718U (en) Hoist device of embedded integral side fascia
CN200971610Y (en) Guide lifting platform device for chimney
CN210316214U (en) Assembled steel construction building dysmorphism post
CN210064895U (en) Installation hoist of prefabricated unit in space
CN109531802B (en) T-beam combined steel template mounting and dismounting structure and method
CN103979442B (en) The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors
CN114835003A (en) Device and hoisting method suitable for balanced hoisting of large and medium-sized space prefabricated unit parts
CN205653104U (en) Movable crane for installing unit plate curtain wall
CN203878957U (en) Protective screen module unit
CN209556401U (en) A kind of super high-rise building super large curtain wall unit hydraulic synchronizing lifting system
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN103058083B (en) Bolt sphere truss gig
CN215402564U (en) Gallows structure for engineering construction
CN210457366U (en) High-rise ALC wallboard corollary equipment
CN220317074U (en) Top lifting device for shallow round bin construction
CN220686791U (en) House lifting construction structure
CN217808268U (en) Integrated multi-functional hoist of building of timber structure
CN112282649B (en) Device and method for simultaneously setting multiple drilling casings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant