CN216205401U - Condensing equipment is used in industrial gas production - Google Patents

Condensing equipment is used in industrial gas production Download PDF

Info

Publication number
CN216205401U
CN216205401U CN202122237378.1U CN202122237378U CN216205401U CN 216205401 U CN216205401 U CN 216205401U CN 202122237378 U CN202122237378 U CN 202122237378U CN 216205401 U CN216205401 U CN 216205401U
Authority
CN
China
Prior art keywords
box
condensing
fixedly connected
cooling
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122237378.1U
Other languages
Chinese (zh)
Inventor
范婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heshuo Nanhua Chemical Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122237378.1U priority Critical patent/CN216205401U/en
Application granted granted Critical
Publication of CN216205401U publication Critical patent/CN216205401U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Semiconductors Or Solid State Devices (AREA)

Abstract

The utility model discloses a condensing device for industrial gas production, which comprises a working box, wherein a blower is fixedly arranged at the middle end of the top of the outer surface of the working box, an air guide box is fixedly arranged between the output end of the blower and the top of an inner cavity of the working box through a pipeline, the bottom of the air guide box is fixedly connected with three condensing pipes, and a collecting box is fixedly connected to the bottom of each condensing pipe. The air blower, the air guide box, the condenser pipe, the collecting box, the circulating pump, the cooling box, the water guide pipe, the condenser box, the semiconductor refrigeration sheet and the first heat conduction plate are matched with each other, so that the cooling and condensing effects of the device on air flow are greatly improved, the stability of condensing processing is effectively guaranteed, and the problem that the existing condensing device mostly adopts an air cooling mode to cool and condense substances in high-temperature air flow, and the condensing processing effect is seriously influenced due to the poor air cooling effect is solved.

Description

Condensing equipment is used in industrial gas production
Technical Field
The utility model relates to the technical field of industrial production, in particular to a condensing device for industrial gas production.
Background
The industry mainly refers to the industry or engineering of raw material collection and product processing and manufacturing, the industry is the only department for producing modern labor means, the industry determines the speed, the scale and the level of the modernization of national economy, the industry plays a leading role in the national economy of all countries in the world, the industry also provides raw materials, fuel and power for the industry and other departments of the national economy, industrial consumer goods are provided for the material culture life of people, and in the industrial production process, a condensing device is often needed to be used for condensing and processing the materials in high-temperature airflow.
However, most of the existing condensing devices adopt an air cooling mode to cool and condense substances in high-temperature air flow, and the cooling effect of air cooling is poor, so that the effect of condensation processing is seriously influenced, and the processing requirement of industrial production cannot be met.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a condensing device for industrial gas production, which has the advantage of good condensing effect and solves the problem that the existing condensing device mostly adopts an air cooling mode to cool and condense substances in high-temperature airflow, and the condensing processing effect is seriously influenced due to the poor air cooling effect.
In order to achieve the purpose, the utility model provides the following technical scheme: a condensing device for industrial gas production comprises a working box, wherein an air blower is fixedly mounted at the middle end of the top of the outer surface of the working box, air guide boxes are fixedly mounted at the output ends of the air blower between the top of an inner cavity of the working box and a pipeline, condensing tubes are fixedly connected to the bottoms of the air guide boxes, the number of the condensing tubes is three, a collecting box is fixedly connected to the bottoms of the condensing tubes, condensing boxes are fixedly connected between the tops of the outer surface of the collecting boxes and the bottom of the outer surface of the air guide boxes and positioned at the outer sides of the condensing tubes, the number of the condensing boxes is three, a cooling box is fixedly connected to the lower end of the right side of the cooling box between the pipeline and the bottom of the inner cavity of the working box, semiconductor refrigerating sheets are fixedly mounted at the middle end of the bottom of the cooling box, and a first heat conducting plate is fixedly mounted between the tops of the semiconductor refrigerating sheets and the middle end of the bottom of the inner cavity of the cooling box, the left end of the cooling box bottom is fixedly provided with a circulating pump through a pipeline, a water guide pipe is fixedly connected between the output end of the circulating pump and the upper end of the right side of the condensing box through a pipeline, and the top of the water guide pipe is fixedly connected to the bottom of the outer surface of the air guide box.
Preferably, all around of work box surface bottom all fixedly connected with supporting legs, the bottom fixedly connected with supporting baseplate of supporting leg.
Preferably, the middle end of the front surface of the working box is movably provided with a movable door through a hinge, and the middle end of the movable door is fixedly connected with a transparent glass plate.
Preferably, the upper end on the right side of the collecting box is fixedly connected with an exhaust pipe, the lower end on the right side of the collecting box is fixedly connected with a discharge pipe, and the right end of the discharge pipe is fixedly provided with a discharge valve.
Preferably, the bottom of the semiconductor refrigeration piece is fixedly provided with a second heat conduction plate, and a heat dissipation fan is fixedly arranged between two ends of the bottom of the second heat conduction plate.
Preferably, the left end of the top of the cooling box is fixedly connected with a filling pipe, and the top of the filling pipe is in threaded connection with a sealing cover.
Compared with the prior art, the utility model has the following beneficial effects:
1. the utility model can drive the air flow generated in the industrial production process to be conveyed to the inside of the air guide box through the pipeline by starting the air blower to work, then the air flow flows into the inside of the collecting box through the air guide box and the condensing tube, and simultaneously the cooling water body in the cooling box can be driven to be conveyed to the inside of the condensing box through the pipeline and the water guide tube by starting the circulating pump to flow into the inside of the cooling box for centralized collection, thereby achieving the effect of circulating the cooling water body, and the cooling water body can rapidly cool the high-temperature air flow flowing through the inside of the condensing tube while flowing through the inside of the condensing box, so that the substances in the air flow can be condensed on the inner wall of the condensing tube under the cooling effect, and then the substances in the air flow fall into the inside of the collecting box for centralized collection, thereby achieving the effect of condensing and processing of the substances in the air flow, and the low temperature can be prepared by starting the semiconductor refrigerating sheet to work, simultaneously through the quick inside conduction to the cooler bin of first heat-conducting plate, make the inside cooling water of cooler bin can obtain effective and quick cooling, make the cooling water after the cooling can carry out more effectual cooling to the inside air current of flowing through of condenser bin in the circulation flow, and then the effectual effect that carries out the condensation processing to the air current that has improved, under whole complex effect, very big improvement this device carries out the effect of cooling condensation to the air current, the effectual stability of guaranteeing the condensation processing, solved the material that current condensing equipment adopted air-cooled mode mostly to high temperature air current and cooled the condensation, because air-cooled cooling effect is relatively poor, and seriously influence the problem of condensation processing effect.
2. The supporting legs and the supporting bottom plate are arranged, so that the purpose of supporting the whole body is achieved, the movable door and the transparent glass plate are arranged, a user can conveniently maintain the inside of the working box, the user can conveniently observe the inside of the working box, the second heat conduction plate and the heat dissipation fan are arranged, heat dissipation of high temperature generated at the bottom of the semiconductor refrigeration piece during working is facilitated, and the working stability of the semiconductor refrigeration piece is improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic cross-sectional view of the work box of the present invention;
FIG. 3 is a schematic sectional view of the condenser box of the present invention.
In the figure: 1. a work box; 2. supporting legs; 3. a second heat-conducting plate; 4. a heat dissipation fan; 5. a semiconductor refrigeration sheet; 6. a discharge pipe; 7. an exhaust pipe; 8. a movable door; 9. a blower; 10. a wind guide box; 11. a water conduit; 12. a condenser tank; 13. a collection box; 14. a filling pipe; 15. a circulation pump; 16. a first heat-conducting plate; 17. a cooling tank; 18. a condenser tube.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description herein, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings to facilitate the description of the patent and to simplify the description, but do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus are not to be considered limiting of the patent. In the description of the present application, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can, for example, be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Referring to fig. 1-3, a condensing unit for industrial gas production comprises a working box 1, wherein the periphery of the bottom of the outer surface of the working box 1 is fixedly connected with supporting legs 2, the bottom of the supporting legs 2 is fixedly connected with a supporting base plate, the purpose of supporting the whole body is achieved by the arrangement of the supporting legs 2 and the supporting base plate, the middle end of the front surface of the working box 1 is movably provided with a movable door 8 through hinges, the middle end of the movable door 8 is fixedly connected with a transparent glass plate, the arrangement of the movable door 8 and the transparent glass plate is convenient for a user to maintain the inside of the working box 1, the user can observe the inside of the working box 1, the middle end of the top of the outer surface of the working box 1 is fixedly provided with an air blower 9, the output end of the air blower 9 is fixedly provided with an air guide box 10 between the pipeline and the top of the inner cavity of the working box 1, and the bottom of the air guide box 10 is fixedly connected with a condensing pipe 18, the number of the condensation pipes 18 is three, the bottom of each condensation pipe 18 is fixedly connected with a collection box 13, the upper end of the right side of each collection box 13 is fixedly connected with an exhaust pipe 7, the lower end of the right side of each collection box 13 is fixedly connected with a discharge pipe 6, the right end of each discharge pipe 6 is fixedly provided with a discharge valve, a condensation box 12 is fixedly connected between the top of the outer surface of each collection box 13 and the bottom of the outer surface of each air guide box 10 and positioned on the outer side of each condensation pipe 18, the number of the condensation boxes 12 is three, a cooling box 17 is fixedly connected between the lower end of the right side of each condensation box 12 and the bottom of the inner cavity of the working box 1 through a pipeline, the left end of the top of the cooling box 17 is fixedly connected with a filling pipe 14, the top of the filling pipe 14 is in threaded connection with a sealing cover, a semiconductor refrigeration sheet 5 is fixedly arranged at the middle end of the bottom of the cooling box 17, a second heat conduction plate 3 is fixedly arranged at the bottom of the semiconductor refrigeration sheet 5, and a heat dissipation fan 4 is fixedly arranged between the two ends of the bottom of the second heat conduction plate 3, through the setting of second heat-conducting plate 3 and heat dissipation fan 4, be convenient for dispel the heat to the produced high temperature in semiconductor refrigeration piece 5 during operation bottom, the stability of semiconductor refrigeration piece 5 work is improved, fixed mounting has first heat-conducting plate 16 between the top of semiconductor refrigeration piece 5 and the middle-end of cooler bin 17 inner chamber bottom, there is circulating pump 15 left end of cooler bin 17 bottom through pipeline fixed mounting, through pipeline fixed connection aqueduct 11 between the output of circulating pump 15 and the upper end on condenser bin 12 right side, top fixed connection in the bottom of leading the surface of bellows 10 of aqueduct 11, through starting work of air-blower 9, can drive the inside of industrial production in-process produced air current through pipe transport to wind-guiding box 10, again flow into the inside of collecting box 13 through wind-guiding box 10 and condenser tube 18, simultaneously can drive the inside cooling water of cooler bin 17 through starting work of circulating pump 15 and carry to the inside back of condenser bin 12 through pipeline and aqueduct 11 The cooling water flows into the cooling box 17 for centralized collection, thereby achieving the effect of circulating the cooling water, and the cooling water can rapidly cool the high-temperature air flowing through the inside of the condenser tube 18 while flowing through the inside of the condenser box 12, so that the substances in the air can be condensed on the inner wall of the condenser tube 18 under the cooling effect, and then flow down to the inside of the collection box 13 for centralized collection, thereby achieving the effect of condensing the substances in the air, and the semiconductor refrigeration sheet 5 can be started to work to prepare low temperature, and simultaneously the low temperature can be rapidly conducted to the inside of the cooling box 17 through the first heat conduction plate 16, so that the cooling water inside the cooling box 17 can be effectively and rapidly cooled, and the cooled cooling water can more effectively cool the air flowing through the inside of the condenser tube 18 while circulating the cooling water, and then the effectual improvement carries out the effect of condensation processing to the air current, under whole complex effect, very big improvement this device to the air current effect of cooling down the condensation, the effectual stability of guaranteeing the condensation processing has solved the most material that adopts air-cooled mode to high temperature air current of current condensing equipment and has cooled down the condensation, because air-cooled cooling effect is relatively poor, and seriously influence the problem of condensation processing effect.
All the components in the utility model are universal standard components or components known by those skilled in the art, the structure and principle of the components can be known by technical manuals or conventional experimental methods, meanwhile, the standard components used in the application document can be purchased from the market, the components in the application document can be customized according to the description of the specification and the accompanying drawings, the specific connection mode of each component adopts the conventional means of mature bolts, rivets, welding and the like in the prior art, the machinery, the components and equipment adopt the conventional models in the prior art, the control mode is automatically controlled through a controller, the control circuit of the controller can be realized through simple programming of those skilled in the art, the components belong to the common knowledge in the art, and the application document is mainly used for protecting mechanical devices, so the detailed explanation of the control mode and circuit connection is omitted, no specific description will be made herein.
When the cooling device is used, the blower 9 is started to work, air flow generated in the industrial production process can be driven to be conveyed to the inside of the air guide box 10 through a pipeline, then flows into the inside of the collection box 13 through the air guide box 10 and the condenser pipe 18, meanwhile, the circulating pump 15 is started to work, cooling water in the cooling box 17 can be driven to be conveyed to the inside of the condenser box 12 through the pipeline and the water guide pipe 11, then flows into the inside of the cooling box 17 to be collected in a centralized mode, the effect of circulating and flowing the cooling water is further achieved, high-temperature air flow flowing through the inside of the condenser pipe 18 can be rapidly cooled while the cooling water flows through the inside of the condenser box 12, substances in the air flow can be condensed on the inner wall of the condenser pipe 18 under the cooling effect, then flow into the inside of the collection box 13 to be collected in a centralized mode, and the effect of condensing and processing of the substances in the air flow is further achieved, and can prepare low temperature through starting 5 work of semiconductor refrigeration piece, simultaneously through the quick inside conduction to cooler bin 17 of first heat-conducting plate 16, make the inside cooling water of cooler bin 17 can obtain effective and quick cooling, make the cooling water after the cooling can carry out more effectual cooling to the inside air current of flowing through of condenser pipe 18 in the circulation flow, and then the effectual effect that carries out condensation processing to the air current that has improved, under whole complex effect, very big improvement this device carries out the effect of cooling condensation to the air current, the effectual stability of guaranteeing condensation processing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a condensing equipment for industrial gas production, includes work box (1), its characterized in that: the air blower (9) is fixedly installed at the middle end of the top of the outer surface of the working box (1), the output end of the air blower (9) is fixedly installed between the pipeline and the top of the inner cavity of the working box (1), the condensing tube (18) is fixedly connected to the bottom of the air guide box (10), the number of the condensing tube (18) is three, the collecting box (13) is fixedly connected to the bottom of the condensing tube (18), the condensing box (12) is fixedly connected to the outer side of the condensing tube (18) and between the top of the outer surface of the collecting box (13) and the bottom of the outer surface of the air guide box (10), the number of the condensing box (12) is three, the cooling box (17) is fixedly connected to the lower end of the right side of the condensing box (12) through the pipeline and the bottom of the inner cavity of the working box (1), and the semiconductor refrigerating sheet (5) is fixedly installed at the middle end of the bottom of the cooling box (17), fixed mounting has first heat-conducting plate (16) between the top of semiconductor refrigeration piece (5) and the middle-end of cooler bin (17) inner chamber bottom, there is circulating pump (15) left end of cooler bin (17) bottom through pipeline fixed mounting, through pipeline fixedly connected with aqueduct (11) between the output of circulating pump (15) and the upper end on condenser bin (12) right side, the top fixed connection of aqueduct (11) is in the bottom of leading bellows (10) surface.
2. A condensing unit for industrial gas production according to claim 1, characterized in that: the supporting legs (2) are fixedly connected to the periphery of the bottom of the outer surface of the working box (1), and the supporting bottom plate is fixedly connected to the bottom of each supporting leg (2).
3. A condensing unit for industrial gas production according to claim 1, characterized in that: the middle end of the front surface of the working box (1) is movably provided with a movable door (8) through a hinge, and the middle end of the movable door (8) is fixedly connected with a transparent glass plate.
4. A condensing unit for industrial gas production according to claim 1, characterized in that: the upper end fixedly connected with blast pipe (7) on collecting box (13) right side, the lower extreme fixedly connected with delivery pipe (6) on collecting box (13) right side, the right-hand member fixed mounting of delivery pipe (6) has the bleeder.
5. A condensing unit for industrial gas production according to claim 1, characterized in that: the bottom fixed mounting of semiconductor refrigeration piece (5) has second heat-conducting plate (3), fixed mounting has heat dissipation fan (4) between the both ends of second heat-conducting plate (3) bottom.
6. A condensing unit for industrial gas production according to claim 1, characterized in that: the left end of the top of the cooling box (17) is fixedly connected with a filling pipe (14), and the top of the filling pipe (14) is in threaded connection with a sealing cover.
CN202122237378.1U 2021-09-15 2021-09-15 Condensing equipment is used in industrial gas production Active CN216205401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122237378.1U CN216205401U (en) 2021-09-15 2021-09-15 Condensing equipment is used in industrial gas production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122237378.1U CN216205401U (en) 2021-09-15 2021-09-15 Condensing equipment is used in industrial gas production

Publications (1)

Publication Number Publication Date
CN216205401U true CN216205401U (en) 2022-04-05

Family

ID=80918630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122237378.1U Active CN216205401U (en) 2021-09-15 2021-09-15 Condensing equipment is used in industrial gas production

Country Status (1)

Country Link
CN (1) CN216205401U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114933931A (en) * 2022-05-11 2022-08-23 临泉县正润农产品开发有限公司 Garlic enrichment facility is used in garlic oil production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114933931A (en) * 2022-05-11 2022-08-23 临泉县正润农产品开发有限公司 Garlic enrichment facility is used in garlic oil production

Similar Documents

Publication Publication Date Title
CN205305334U (en) Heat dissipation type regulator cubicle
CN216205401U (en) Condensing equipment is used in industrial gas production
CN111748664B (en) Blast furnace ironmaking slag heat utilization system
CN107979951A (en) A kind of power equipment high-efficiency cooling device
CN208675101U (en) A kind of ventilation cooling system applied on frequency converter
CN209374065U (en) A kind of nuclear reactor cooling mechanism of good cooling effect
CN207719627U (en) A kind of low-voltage distribution reactive compensation cabinet
CN209407343U (en) A kind of fast dewaxing device
CN208154661U (en) A kind of mobile air conditioner of industry
CN215040032U (en) Forming mold for fan blades of ventilating fan with self-cooling function
CN208980756U (en) A kind of RECOVERY OF CONVERTER GAS monitor controller
CN114165915A (en) Precooling apparatus and refrigeration plant
CN208765190U (en) A kind of double cold source airconditioning control cabinets
CN216668028U (en) Water condenser that work efficiency is high
CN214794992U (en) High-precision power tester for LED energy-saving lamp
CN209113496U (en) A kind of cooling device applied to Activated Carbon Production
CN220803406U (en) Cool rice storehouse of rice production and processing
CN216342815U (en) Screw vacuum pump for efficiently cooling pump cavity by utilizing exhaust
CN115325759B (en) Machining cooling device
CN220153297U (en) DMC production is with high-efficient condensing equipment
CN219176515U (en) Heat dissipation energy-saving device of air compressor
CN215572121U (en) Secondary roasting high-temperature dust collecting device for zinc ingot processing
CN208387796U (en) A kind of spicy beef processing cooling slot
CN212774768U (en) Comprehensive ventilation cooling system for air compressor room
CN217392009U (en) Air supply drying equipment for chemical production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220517

Address after: 841000 multimodal transport industrial logistics park, Heshuo County, Bayingolin Mongolian Autonomous Prefecture, Xinjiang Uygur Autonomous Region

Patentee after: Heshuo Nanhua Chemical Co.,Ltd.

Address before: 138000 No. 3155, Wulan street, Ningjiang district, Songyuan City, Jilin Province

Patentee before: Fan Ting

TR01 Transfer of patent right