CN215984644U CN202121441106.7U CN202121441106U CN215984644U CN 215984644 U CN215984644 U CN 215984644U CN 202121441106 U CN202121441106 U CN 202121441106U CN 215984644 U CN215984644 U CN 215984644U
Authority
CN
China
Prior art keywords
construction site
cavity
plate
installation
detection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121441106.7U
Other languages
Chinese (zh)
Inventor
张文静
王志力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Institute of Technology
Original Assignee
Shenyang Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Institute of Technology filed Critical Shenyang Institute of Technology
Priority to CN202121441106.7U priority Critical patent/CN215984644U/en
Application granted granted Critical
Publication of CN215984644U publication Critical patent/CN215984644U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses an intelligent air detection device for a building construction site, which comprises two symmetrically arranged installation components for installation and a detection component fixedly arranged between the two installation components for monitoring air, wherein the detection component comprises a protective box and a dust detector, the protective box is internally provided with a cavity, the dust detector is fixedly arranged at the top in the cavity, a through groove for a probe of the dust detector to pass through is arranged in the middle of the top end of one side, away from the installation components, of the protective box, a wind speed detector is arranged in the middle of the top end of the protective box, and a controller is arranged in the middle of one side, away from the installation components, in the cavity. This air intellectual detection system device for construction site can carry out real-time supervision to the wind speed, has avoided the appearance of detection error, can be timely control the raise dust, avoids the air to receive the raise dust pollution, still can adjust the detection angle, has enlarged the scope to detecting in the place, and the practicality is stronger.

Description

Air intelligent detection device for construction site
Technical Field
The utility model belongs to the technical field of air detection equipment in a building construction site, and particularly relates to an intelligent air detection device for the building construction site.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. At present, as a construction unit mainly based on house construction projects, the construction period of each project is within one year or longer. In the dry and hot period, the vehicles come and go at the construction site, dust is raised in the air, and the environment is polluted;
most all are provided with in the construction site at present with air intellectual detection system complex spraying dust fall equipment, detect the content of dust in the air through air intellectual detection system, reach the default and then start spraying dust fall equipment and control the raise dust in the air.
Most of air intelligent detection devices in the prior art are simple in structure, are usually installed at the tops of upright posts to detect the content of dust in air, and are not provided with a wind speed detection function, so that raised dust in a construction site is swept away when the wind speed is too high, the content of dust in the air is reduced, errors occur in detection of the air intelligent detection devices, the raised dust is difficult to control in time, and the air is polluted by the raised dust; and its installation back of present air intellectual detection system can't adjust for it can only detect one side in the place after the installation, and the practicality is lower.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an intelligent air detection device for a building construction site, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: an intelligent air detection device for a building construction site comprises two symmetrically arranged installation components for installation and a detection component fixedly arranged between the two installation components for monitoring air;
the detection assembly comprises a protection box with a cavity formed inside and a dust detector fixedly mounted at the top in the cavity, a through groove for a probe of the dust detector to pass through is formed in the middle of the top end of the protection box, which is far away from the mounting assembly, and a wind speed detector is arranged in the middle of the top end of the protection box;
the one side of keeping away from the installation component in the cavity is provided with the controller that is used for controlling electron device and transmission signal between two parties, and bottom fixed mounting has the battery that is used for providing the electric energy for electron device in the cavity.
Preferably, the installation component comprises an arc-shaped fixing plate with two ends abutted against each other, a first extending plate and a second extending plate are respectively constructed at two ends of the arc-shaped fixing plate abutted against each other, two through holes for the movable setting of the fixing piece are symmetrically formed in one side of the second extending plate, and the fixing piece penetrates through one end of the through hole and is connected in the first extending plate in a threaded mode.
Preferably, the top that the extension board one side was kept away from to the arc fixed plate is constructed between two parties and is had the otic placode, and seted up the circular slot in the otic placode between two parties.
Preferably, a motor is arranged in the cavity towards one side of the mounting assembly in the center, and one end, extending out of the cavity, of a motor shaft of the motor is connected with a gear commutator fixedly arranged on one side of the protection box.
Preferably, two output ends of the gear commutator are fixedly connected with transmission rods, the two transmission rods are fixedly installed in the two lug plates respectively, and supporting plates constructed on one side of the protective box are sleeved on outer edge surfaces of the two transmission rods.
Preferably, the bottom of the protection box, which is far away from one side of the installation assembly, is provided with a rectangular groove in the middle, and a waterproof display is fixedly installed in the rectangular groove.
Preferably, the bottom of both sides of the protection box is provided with a connecting plate, one end of the connecting plate far away from the protection box is fixedly connected with a frame arranged on the protection box, and a solar power generation plate for auxiliary power supply of electronic devices in the device is fixedly arranged in the frame.
The utility model has the technical effects and advantages that: the intelligent air detection device for the building construction site benefits from a protective box, a flying dust detector, a wind speed detector, a controller, a storage battery and two solar panels, wherein solar energy is converted into electric energy through the two solar panels and is processed, the electric energy is stored in the storage battery, the storage battery is used for supplying power to the flying dust detector, the wind speed detector and the controller, the dust content in air is monitored through the flying dust detector, the wind speed is monitored through the wind speed detector, when the wind speed is too high or the dust content in the air is too high, external spraying dust falling equipment is started through the controller, flying dust in the construction site is controlled, errors in monitoring are avoided, the flying dust can be timely controlled, and air pollution caused by the flying dust is avoided;
benefiting from the setting of two otic placodes, motor, gear commutator and two transfer lines, the starter motor makes the motor drive two transfer lines through the gear commutator and rotates, because two transfer lines are fixed in two otic placodes respectively for the guard box who installs the motor uses two transfer lines to swing as the axle center, accomplishes the adjustment to detecting the angle, has enlarged the scope to detecting in the place, and the practicality is stronger.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of a detecting assembly according to the present invention;
FIG. 3 is a cross-sectional view taken at A-A of FIG. 2 in accordance with the present invention;
fig. 4 is a schematic structural view of the mounting assembly of the present invention.
In the figure: 1. mounting the component; 101. a detection component; 2. a protective box; 201. a raise dust detector; 202. a wind speed detector; 3. a controller; 301. a storage battery; 4. an arc-shaped fixing plate; 5. a first extension plate; 501. a second extension plate; 6. an ear plate; 7. an electric motor; 701. a gear commutator; 8. a transmission rod; 801. a support plate; 9. a waterproof display; 10. a connecting plate; 11. a frame; 1101. provided is a solar power generation panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In order to avoid errors in monitoring and timely control the flying dust, as shown in fig. 1, fig. 2 and fig. 3, the intelligent air detection device for the building construction site comprises two symmetrically arranged installation components 1 for installation and a detection component 101 fixedly arranged between the two installation components 1 for monitoring air, wherein the detection component 101 comprises a protection box 2 with a cavity formed inside and a flying dust detector 201 fixedly arranged at the top in the cavity (the model of the flying dust detector 201 is YR-FD100, the model is not limited to the model in specific implementation, and a user can optionally select and match the model), a through groove for a probe of the flying dust detector 201 to pass through is formed in the center of the top end of one side of the protection box 2, which is far away from the installation components 1, and an air speed detector 202 is arranged in the center of the top end of the protection box 2 (the model of the air speed detector 202 is evfgevrw 200, the model is not limited to the model in specific implementation, a user can select and match the air automatically according to the situation), a rectangular groove is formed in the middle of the bottom of one side, away from the installation component 1, of the protection box 2, a waterproof display 9 is fixedly installed in the rectangular groove (the type of the waterproof display 9 is ZD010, the type is not limited during specific implementation, and the user can select and match the air automatically according to the situation), and the waterproof display 9 is used for displaying the dust concentration and the air speed information in the air;
a controller 3 (the controller 3 is selected from S7-1200, the type is not limited to the type in specific implementation, and a user can select and match the controller according to circumstances) for controlling an electronic device and transmitting signals is arranged in the center of one side, far away from the mounting assembly 1, in the cavity, a storage battery 301 for providing electric energy for the electronic device is fixedly mounted at the bottom in the cavity, and the dust raising detector 201, the wind speed detector 202 and the waterproof display 9 are all electrically connected to the controller 3 and the storage battery 301;
connecting plates 10 are respectively constructed at the bottoms of two side faces of the protective box 2, one end, far away from the protective box 2, of each connecting plate 10 is fixedly connected with a frame 11 arranged on the protective box 2, a solar power generation plate 1101 used for assisting power supply of electronic devices in the device is fixedly arranged in each frame 11, solar energy is converted into electric energy through the two solar power generation plates 1101 and is stored in a storage battery 301 after being processed, the BDM-300 with an inverter inside is selected for the solar power generation plates 1101, and the BDM-300 can be selected during specific implementation and is not limited to the model.
In order to avoid errors during monitoring and timely control dust emission, as shown in fig. 1, fig. 2, fig. 3 and fig. 4, the air intelligent detection device for the building construction site comprises an installation assembly 1 and an installation assembly 4, wherein two ends of the installation assembly are abutted against each other, two ends of the arc-shaped fixed plate 4, which are abutted against each other, are respectively provided with a first extension plate 5 and a second extension plate 501, one side of the second extension plate 501 is symmetrically provided with two through holes for the movable arrangement of a fixing piece, one end of the fixing piece, which penetrates through the through holes, is in threaded connection with the first extension plate 5, the fixing piece can be selected from, but is not limited to, a bolt during specific implementation, and the device can be fixedly installed on a vertical rod at a detection position by penetrating the two fixing pieces through the second extension plate 501 and screwing the two fixing pieces into the first extension plate 5;
an ear plate 6 is centrally constructed at the top of one side face of the arc-shaped fixing plate 4 far away from the extension plate I5, a circular groove is centrally formed in the ear plate 6, a motor 7 is centrally installed in one side of the cavity facing the installation component 1, one end of a motor shaft of the motor 7 extending out of the cavity is connected with a gear commutator 701 fixedly installed on one side of the protection box 2, two output ends of the gear commutator 701 are fixedly connected with transmission rods 8, the two transmission rods 8 are respectively and fixedly installed in the two ear plates 6, a supporting plate 801 constructed on one side of the protection box 2 is sleeved on the outer edge faces of the two transmission rods 8, the motor 7 is started to enable the motor 7 to drive the two transmission rods 8 to rotate through the gear commutator 701, and the protection box 2 provided with the motor 7 swings by taking the two transmission rods 8 as axes due to the fact that the two transmission rods 8 are respectively fixed in the two ear plates 6, the adjustment of the detection angle is completed, the detection range in the field is expanded, and the practicability is strong.
The working principle is as follows: the intelligent air detection device for the building construction site is used, two arc-shaped fixing plates 4 are respectively and fixedly installed on a vertical rod of a detection position through a fixing piece, so that the installation of the device can be completed, solar energy is converted into electric energy through two solar power generation plates 1101 and is stored in a storage battery 301, the storage battery 301 is used for supplying power to a dust raising detector 201, a wind speed detector 202 and a controller 3, the dust raising detector 201 is used for monitoring dust content in air, the wind speed detector 202 is used for monitoring wind speed, when the wind speed is too fast or the dust content in air is too high, an external spraying dust falling device is started through the controller 3, so that dust raising can be timely controlled, when a detection angle needs to be adjusted, the motor 7 can be started through the controller 3, so that the motor 7 drives two transmission rods 8 to rotate through a gear commutator 701, because the two transmission rods 8 are respectively fixed in the two ear plates 6, the protective box 2 provided with the motor 7 swings by taking the two transmission rods 8 as axes, the detection angle is adjusted, and the use is convenient.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the utility model.

Claims (6)

1. An intelligent air detection device for a building construction site comprises two symmetrically arranged installation components (1) for installation and a detection component (101) fixedly arranged between the two installation components (1) for monitoring air;
the method is characterized in that: the detection assembly (101) comprises a protection box (2) with a cavity formed inside and a dust detector (201) fixedly installed at the top in the cavity, a through groove for a probe of the dust detector (201) to pass through is formed in the middle of the top end of one side, far away from the installation assembly (1), of the protection box (2), and a wind speed detector (202) is arranged in the middle of the top end of the protection box (2);
one side of keeping away from installation component (1) is provided with controller (3) between two parties in the cavity for controlling electron device and transmission signal, and bottom fixed mounting has battery (301) that is used for providing the electric energy for electron device in the cavity.
2. The intelligent air detection device for the construction site as claimed in claim 1, wherein: the installation component (1) comprises an arc-shaped fixing plate (4) with two ends abutted against each other, the two ends of the arc-shaped fixing plate (4) abutted against each other are respectively provided with a first extending plate (5) and a second extending plate (501), two through holes for the movable setting of the fixing piece are symmetrically arranged on one side of the second extending plate (501), and the fixing piece penetrates through one end of the through hole and is connected in the first extending plate (5) in a threaded mode.
3. The intelligent air detection device for the construction site as claimed in claim 2, wherein: the top of a side face of the arc-shaped fixing plate (4) far away from the first extension plate (5) is provided with an ear plate (6) in the middle, and a circular groove is formed in the ear plate (6) in the middle.
4. The intelligent air detection device for the construction site as claimed in claim 3, wherein: install motor (7) between two parties towards one side of installation component (1) in the cavity, and the motor shaft of motor (7) extends the one end of cavity and is connected with gear commutator (701) fixedly mounted in protection box (2) one side.
5. The intelligent air detection device for the construction site as claimed in claim 4, wherein: two output ends of the gear commutator (701) are fixedly connected with transmission rods (8), and the two transmission rods (8) are fixedly arranged in the two ear plates (6) respectively.
6. The intelligent air detection device for the construction site as claimed in claim 1, wherein: the solar power generation device is characterized in that connecting plates (10) are constructed at the bottoms of two side faces of the protective box (2), one end, far away from the protective box (2), of each connecting plate (10) is fixedly connected with a frame (11) installed on the protective box (2), and a solar power generation plate (1101) used for assisting power supply of electronic devices in the device is fixedly installed in each frame (11).
CN202121441106.7U 2021-06-28 2021-06-28 Air intelligent detection device for construction site Expired - Fee Related CN215984644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121441106.7U CN215984644U (en) 2021-06-28 2021-06-28 Air intelligent detection device for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121441106.7U CN215984644U (en) 2021-06-28 2021-06-28 Air intelligent detection device for construction site

Publications (1)

Publication Number Publication Date
CN215984644U true CN215984644U (en) 2022-03-08

Family

ID=80517763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121441106.7U Expired - Fee Related CN215984644U (en) 2021-06-28 2021-06-28 Air intelligent detection device for construction site

Country Status (1)

Country Link
CN (1) CN215984644U (en)

Similar Documents

Publication Publication Date Title
WO2021077864A1 (en) Solar cradle head monitoring camera
CN107947710A (en) A kind of intelligent solar power supply unit and its control method
CN215984644U (en) Air intelligent detection device for construction site
CN208128177U (en) A kind of intelligent solar power supply unit
CN219063045U (en) Monitoring device for wind power engineering
CN210288919U (en) Energy-saving steel structure roof with solar cell panel
CN217932139U (en) Meteorological disaster monitoring early warning device
CN110131544B (en) Wind power monitoring equipment
CN213094135U (en) Intelligent monitoring solar tracking device for photovoltaic power generation on roof
CN210578386U (en) Photovoltaic power generation equipment based on thing networking regulation and control
CN212458444U (en) Unattended water and soil conservation dynamic online real-time monitoring device
CN216056887U (en) Device of adjustable photovoltaic board angle
CN220119050U (en) Power grid real-time monitoring device with rotating structure
CN218416242U (en) Multi-functional energy storage system of wisdom building
CN216432906U (en) Integrated displacement monitoring equipment for steel chimney
CN214930627U (en) Patrol operation unmanned aerial vehicle system for power grid planning
CN216866528U (en) Intelligent photovoltaic sun-shading system
CN219477914U (en) Photovoltaic module mounting structure convenient to upset photovoltaic module
CN211956714U (en) Laser radar vehicle detection device capable of rotating
CN219492485U (en) Wind power monitoring device based on multidimensional sensor
CN218449982U (en) A photovoltaic sunshading board support for green building
CN212361328U (en) Agricultural environmental protection monitoring devices
CN221238407U (en) Environment monitor and solar energy environment monitoring device
CN217466861U (en) Remote continuous real-time atmospheric parameter monitoring device
CN215340399U (en) Hardware remote control device for collecting regional automatic meteorological station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220308

CF01 Termination of patent right due to non-payment of annual fee