CN215857344U CN202121131433.2U CN202121131433U CN215857344U CN 215857344 U CN215857344 U CN 215857344U CN 202121131433 U CN202121131433 U CN 202121131433U CN 215857344 U CN215857344 U CN 215857344U
Authority
CN
China
Prior art keywords
base
trapezoidal
pile body
land planning
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121131433.2U
Other languages
Chinese (zh)
Inventor
单国勇
赵东伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121131433.2U priority Critical patent/CN215857344U/en
Application granted granted Critical
Publication of CN215857344U publication Critical patent/CN215857344U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of region identification for land planning and discloses a positioning boundary pile for land planning, which comprises a pile body and a base, wherein a trapezoidal groove is formed in the upper surface of the base, sliding grooves are formed in two sides of the trapezoidal groove in the upper surface of the base, a trapezoidal block is fixedly connected to the bottom of the pile body and is arranged in the trapezoidal groove, a trapezoidal hole is formed in the bottom of the sliding groove, a stop block is arranged in the sliding groove, a nut is fixedly connected to the lower surface of the stop block, and one end, far away from the stop block, of the nut penetrates through the trapezoidal hole. According to the utility model, the trapezoidal groove, the trapezoidal block, the sliding groove, the stop block, the anchor block and the ground anchor are matched for use, when the pile body is damaged, the pile body can be directly detached and replaced, and when the pile body is installed, the stop block and the ground anchor are matched for use, so that the pile body can be limited, the base can be fixed more stably, and the problem that the base and the pile body are easy to incline after soil below the base is corroded by rainwater and the like is solved.

Description

Land planning is with location boundary pile
Technical Field
The utility model relates to the technical field of region identification for land planning, in particular to a positioning boundary pile for land planning.
Background
The boundary pile is a pile erected at a boundary place and used as a boundary sign, and can be divided into reinforced concrete, granite, stone piles, metal materials and the like according to the materials according to different building materials.
The setting is being strikeed badly by scraping easily past vehicle pedestrian etc. by boundary pile on the roadside, just need carry away original boundary pile after the boundary pile damages, again on original boundary pile more renew the boundary pile, traditional boundary pile is integrative mostly, consequently need change whole boundary pile after the boundary pile damages, and traditional boundary pile stands when earth last time overlength, earth when the boundary pile below receives the erosion back such as rainwater, the boundary pile inclines easily.
Therefore, a positioning boundary pile for land planning is provided to solve the problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems in the prior art and provides a positioning boundary pile for land planning.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a land planning is with location boundary stake, includes pile body and base, the dovetail groove has been seted up to the upper surface of base, and the both sides in base upper surface dovetail groove have seted up the spout, the bottom fixedly connected with dovetail block of pile body, and the dovetail block is located the inside setting of dovetail groove, the trapezoidal hole has been seted up to the bottom of spout, and is provided with the dog in the spout, the lower fixed surface of dog is connected with the pudding, and the pudding one end of keeping away from the dog passes trapezoidal hole setting.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the trapezoidal groove, the trapezoidal block, the sliding groove, the stop block, the anchor block and the ground anchor are matched for use, when the pile body is damaged, the pile body can be directly detached and replaced, and when the pile body is installed, the stop block and the ground anchor are matched for use, so that the pile body can be limited, the base can be fixed more stably, and the problem that the base and the pile body are easy to incline after soil below the base is corroded by rainwater and the like is solved.
2. According to the utility model, the pin is arranged, so that after the base and the pile body sink, one end of the stop block protrudes out of the base, the mark characters on the pile body can be prevented from being eroded by rainwater, wind and sand and the like by arranging the protective sleeve, and the problem that the corydalis is easy to corrode due to long-time contact with soil is avoided by arranging the anti-corrosion material.
Drawings
Fig. 1 is a schematic front view of a positioning boundary pile for land planning according to the present invention;
fig. 2 is a schematic side view of a positioning boundary pile for land planning according to the present invention;
fig. 3 is a schematic structural diagram of a base of a positioning boundary pile for land planning according to the present invention.
In the figure: 1. a pile body; 2. a base; 3. a trapezoidal groove; 4. a chute; 5. a trapezoidal block; 6. a stopper; 7. corydalis tuber; 8. a pin; 9. and (6) a protective sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Referring to fig. 1-3, a land planning is with location boundary stake, including pile body 1 and base 2, trapezoidal groove 3 has been seted up to the upper surface of base 2, and 2 both sides of upper surface trapezoidal groove 3 of base have seted up spout 4, the bottom fixedly connected with trapezoidal piece 5 of pile body 1, and trapezoidal piece 5 is located the inside setting of trapezoidal groove 3, the trapezoidal hole has been seted up to the bottom of spout 4, and be provided with dog 6 in the spout 4, the lower fixed surface of dog 6 is connected with ground butyl 7, and the one end that dog 6 was kept away from to ground butyl 7 passes trapezoidal hole setting.
Further, referring to fig. 1, a clamping groove is formed in one side wall of the bungee corydalis herb 7, a pin 8 is arranged on one side wall of the base 2, one end, close to the base 2, of the pin 8 penetrates through the base 2 and the inner portion of the clamping groove, and after the base 2 and the pile body 1 are prevented from sinking, one end of the stop block 6 protrudes out of the base 2 through the pin 8.
Further, referring to fig. 1 and 2, the outer wall cover of pile body 1 is equipped with protective sheath 9, and protective sheath 9 is the silica gel material, through setting up protective sheath 9, can avoid the sign word on the pile body 1, receives erosion such as rainwater sand blown by the wind.
Further, referring to fig. 1 and 2, the outer wall of the bunge corydalis herb 7 is coated with an anti-corrosion material, and by arranging the anti-corrosion material, the problem that the bunge corydalis herb 7 is easily corroded due to long-time contact with soil is avoided.
In the utility model, during installation, a shallow pit is dug at a position where a boundary is connected, then the base 2 is placed in the pit, the trapezoidal block 5 below the pile body 1 slides into the trapezoidal groove 3, then the bungee 7 penetrates through the trapezoidal hole and is tied underground, the trapezoidal block 5 is limited by the cooperation of the bungee 7 and the stop block 6, the trapezoidal block 5 is prevented from sliding in the trapezoidal groove 3, the stability of the base 2 can be improved by tying the bungee 7 underground, the bungee 7 is limited by the pin 8, then soil is backfilled, the backfilled soil needs to be higher than the position of the pin 8, and the pin 8 can be prevented from sliding out of the clamping groove at will.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (5)

1. The utility model provides a land planning is with location boundary stake, includes pile body (1) and base (2), its characterized in that, trapezoidal groove (3) have been seted up to the upper surface of base (2), and the both sides of base (2) upper surface trapezoidal groove (3) have seted up spout (4), the bottom fixedly connected with trapezoidal piece (5) of pile body (1), and trapezoidal piece (5) are located inside setting of trapezoidal groove (3), the trapezoidal hole has been seted up to the bottom of spout (4), and is provided with dog (6) in spout (4), the lower fixed surface of dog (6) is connected with ground butyl (7), and the one end that dog (6) were kept away from in ground butyl (7) passes trapezoidal hole setting.
2. A positioning boundary pillar for land planning according to claim 1, characterized in that a clamping groove is formed in one side wall of the Chinese violet (7), a pin (8) is arranged on one side wall of the base (2), and one end of the pin (8) close to the base (2) penetrates through the base (2) and is arranged in the clamping groove.
3. A positioning boundary pillar for land planning according to claim 1 or 2, characterized in that the outer wall of the pile body (1) is sleeved with a protective sleeve (9), and the protective sleeve (9) is made of silica gel.
4. A land planning positioning boundary pillar according to claim 1 or 2, characterized in that the outer wall of the bungee corydalis (7) is sprayed with an anti-corrosion material.
5. A land planning positioning boundary pillar according to claim 3, characterized in that the exterior wall of the Chinese violet (7) is coated with an anti-corrosion material.
CN202121131433.2U 2021-05-25 2021-05-25 Land planning is with location boundary pile Active CN215857344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121131433.2U CN215857344U (en) 2021-05-25 2021-05-25 Land planning is with location boundary pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121131433.2U CN215857344U (en) 2021-05-25 2021-05-25 Land planning is with location boundary pile

Publications (1)

Publication Number Publication Date
CN215857344U true CN215857344U (en) 2022-02-18

Family

ID=80317242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121131433.2U Active CN215857344U (en) 2021-05-25 2021-05-25 Land planning is with location boundary pile

Country Status (1)

Country Link
CN (1) CN215857344U (en)

Similar Documents

Publication Publication Date Title
CN207987960U (en) A kind of highway hard rock Steep Slope Embankment anchor rod foundation Anti-slide Pile Retaining Structure
CN215857344U (en) Land planning is with location boundary pile
CN210368986U (en) Foundation pit supporting pile supporting structure
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN208685678U (en) A kind of float Structure of subway station
CN111501782A (en) Foundation pit supporting and construction road integrated structure and construction method
CN105986578A (en) Ejecting pipe construction method of roadside tubular underground garage
CN109371961B (en) Steel pipe column for subway station and construction process thereof
CN110685284A (en) Foundation pit seepage-proofing structure and construction method thereof
CN211696413U (en) Marking device
CN202706049U (en) Reinforced concrete basin open caisson
CN107191055A (en) A kind of electric pole
CN211058437U (en) Intelligent electric pole inclination prevention device
CN201212811Y (en) Novel control point marking pier for construction and measurement
CN208792943U (en) A kind of excavating device of Quick-moving type electric pole foundation pit
CN208899475U (en) A kind of anti-corrosion device of saltmarsh area pile foundation
CN212270962U (en) Foundation pit supporting and construction road integrated structure
CN207779735U (en) A kind of corning machine with graduated scale
CN111256672A (en) Marking device
CN206553980U (en) A kind of new post delineator
CN205388843U (en) Standardization training frock is used in theodolite training teaching
CN106049461B (en) The construction method of bored concrete pile
CN213632114U (en) Forced reference pile measurement control device and system
CN210917442U (en) Mounting structure for mounting charging bow on ground screw pile foundation
KR102391544B1 (en) Pillar fixing apparatus using method of construction direct hitting of pillar and the fixing Method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant