CN201212811Y - Novel control point marking pier for construction and measurement - Google Patents

Novel control point marking pier for construction and measurement Download PDF

Info

Publication number
CN201212811Y
CN201212811Y CNU200820067632XU CN200820067632U CN201212811Y CN 201212811 Y CN201212811 Y CN 201212811Y CN U200820067632X U CNU200820067632X U CN U200820067632XU CN 200820067632 U CN200820067632 U CN 200820067632U CN 201212811 Y CN201212811 Y CN 201212811Y
Authority
CN
China
Prior art keywords
pier
mark
pier body
connecting pipe
control point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820067632XU
Other languages
Chinese (zh)
Inventor
彭何生
晏春波
邱章云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Machinery and Ship Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CNU200820067632XU priority Critical patent/CN201212811Y/en
Application granted granted Critical
Publication of CN201212811Y publication Critical patent/CN201212811Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a novel mark pier for control points in construction survey, which comprises a pier body, vertical ribs and transversal ribs, wherein the vertical ribs and the transversal ribs are connected and arranged in the pier body, a connecting pipe is arranged at the upper part of the pier body and is connected with a mark disk on which a mark center is mounted. In the utility model, a structure of the vertical ribs and the transversal ribs connected with the vertical ribs is arranged in the pier body to be matched with poured concrete so as to ensure the stability of the mark pier, and the mark center, the mark disk, and the like on the pier body are tightly connected with the pier body through the connecting pipe so as to prevent the mark disk and the mark center from losing and ensure survey work to be smoothly carried out.

Description

Novel construction Survey Control point mark pier
Technical field
The utility model relates to the design of Hydraulic and Hydro-Power Engineering construction Survey Control point mark pier structure.
Background technology
The construction survey First Control site of Hydraulic and Hydro-Power Engineering generally is to be provided by the owner, and the construction contractor is suitably encrypted according to the First Control site.The mark pier of First Control site is generally reinforced concrete mark pier, and the bidding quotation majority is a stainless steel, and the mark heart is for forcing centering.Also the First Control site that provides of the owner of some engineering is a terrestrial reference, and this encrypts for the control net and use brings great inconvenience, has also increased the error of centralization of instrument virtually.The mark pier external form of above-mentioned network point is multifarious, and four directions, hexagonal pyramid body or cylinder are arranged.Sign board or flag-rod must be manually set up in orientation by backsight and direction inspection.Flag-rod is fixed on mark loses easily again in the heart, send people's orientation by backsight during use again, bring inconvenience.
Summary of the invention
The purpose of this utility model is to provide a kind of stability good, and the sighting target bar is not easy to lose in the construction survey process, the novel construction Survey Control point mark pier that makes things convenient for orientation by backsight, direction to check.
The purpose of this utility model is achieved in that a kind of novel construction Survey Control point mark pier, comprises the pier body, is provided with perpendicular muscle and the horizontal bar that is connected with perpendicular muscle in the pier body, is provided with connecting pipe on the top of pier body, and bidding quotation is connected with connecting pipe, and the mark heart is housed on the bidding quotation.
The novel construction Survey Control point mark pier that the utility model provides by perpendicular muscle and the horizontal bar structure that is connected with perpendicular muscle are set in the pier body, matches with the concrete of being built, and has guaranteed the stability of mark pier; The mark heart on the pier body, bidding quotation etc. closely are connected with the pier body by connecting pipe, are difficult for causing losing of bidding quotation, the mark heart, have guaranteed carrying out smoothly of surveying work.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is a structural representation of the present utility model.
Embodiment
Structure of the present utility model as shown in Figure 1, a kind of novel construction Survey Control point mark pier comprises pier body 1, be provided with perpendicular muscle 2 and the horizontal bar 3 that is connected with perpendicular muscle 2 in the pier body 1, be provided with connecting pipe 4 on the top of pier body 1, bidding quotation 5 is connected with connecting pipe 4, and the mark heart 6 is housed on the bidding quotation 5.
During the utility model pier body 1 basic engineering, SURVEYING CONTROL NETWORK point should be considered the soil property situation below the position simultaneously when reconnaissance, should be selected on the solid old soil layer, avoids being selected on the new soil layer of backfill, this is the stable most important condition of mark pier, if can be selected on the scar best.Second stable condition of mark pier is to select the foundation structure pattern, the big good stability of basic in theory overall dimensions, but excessive expense is then high.Generally dig 20cm under the basis, dig 60cm to 100cm (look the solid situation of soil property and determine the degree of depth) under center 80cm * 80cm basis, slightly taper, the about 60cm * 60cm of bottommost size at 140cm * 140cm.Concreting is spread reinforcement foundation during apart from ground 10cm, inserts 4 perpendicular muscle 2 again, and when watering to ground level, formwork erection waters to exceeding ground level 10cm.Also should upwards respectively reserve hole for inserting umbrella when building in east, the west on basis.Treat after the concrete setting that formwork erection waters the pier body 1 on underpin top again.Horizontal bar 3 and perpendicular muscle 2 colligations when pier body 1 is built, carry out concreting by the template of making,, insert connecting pipe 4 and the bidding quotation 5 that is connected with connecting pipe 4 and mark the heart 6 when concrete casting during to the template top, guarantee the verticality coincidence measurement requirement of connecting pipe, the work of setting up of mark pier is finished.

Claims (1)

1, a kind of novel construction Survey Control point mark pier, comprise pier body (1), it is characterized in that: be provided with perpendicular muscle (2) and the horizontal bar (3) that is connected with perpendicular muscle (2) in the pier body (1), be provided with connecting pipe (4) on the top of pier body (1), bidding quotation (5) is connected with connecting pipe (4), and the mark heart (6) is housed on the bidding quotation (5).
CNU200820067632XU 2008-06-05 2008-06-05 Novel control point marking pier for construction and measurement Expired - Fee Related CN201212811Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820067632XU CN201212811Y (en) 2008-06-05 2008-06-05 Novel control point marking pier for construction and measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820067632XU CN201212811Y (en) 2008-06-05 2008-06-05 Novel control point marking pier for construction and measurement

Publications (1)

Publication Number Publication Date
CN201212811Y true CN201212811Y (en) 2009-03-25

Family

ID=40496986

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820067632XU Expired - Fee Related CN201212811Y (en) 2008-06-05 2008-06-05 Novel control point marking pier for construction and measurement

Country Status (1)

Country Link
CN (1) CN201212811Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966254A (en) * 2012-12-13 2013-03-13 中铁二局股份有限公司 Measuring tower used for construction of stub matching method and arrangement thereof
CN104897143A (en) * 2014-03-05 2015-09-09 中国葛洲坝集团股份有限公司 Cylinder forced centering observation pillar and embedment method thereof
RU198055U1 (en) * 2019-11-29 2020-06-16 Федеральное государственное бюджетное образовательное учреждение высшего образования "Сибирский государственный университет геосистем и технологий" (СГУГиТ) Universal geodetic point

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966254A (en) * 2012-12-13 2013-03-13 中铁二局股份有限公司 Measuring tower used for construction of stub matching method and arrangement thereof
CN102966254B (en) * 2012-12-13 2015-01-28 中铁二局股份有限公司 Arrangement method for measuring tower used for construction of stub matching method
CN104897143A (en) * 2014-03-05 2015-09-09 中国葛洲坝集团股份有限公司 Cylinder forced centering observation pillar and embedment method thereof
CN104897143B (en) * 2014-03-05 2017-09-05 中国葛洲坝集团股份有限公司 A kind of cylinder forced centering observation pier and its method for embedding
RU198055U1 (en) * 2019-11-29 2020-06-16 Федеральное государственное бюджетное образовательное учреждение высшего образования "Сибирский государственный университет геосистем и технологий" (СГУГиТ) Universal geodetic point

Similar Documents

Publication Publication Date Title
CN102635120B (en) Circular deep foundation ditch is without Construction of Supporting structure and construction method
CN102031790A (en) Construction process for rock enlarged toe anchor pile foundation of overhead power transmission line
CN203174619U (en) Reverse raft concrete terrace
CN105421470A (en) Construction method for assembled type anchor rod and arch framework combined type ecological slope protection
CN109183838B (en) A kind of high anti-floating cracking resistance basement floor constructions and its design method
CN104897143A (en) Cylinder forced centering observation pillar and embedment method thereof
CN107964979A (en) A kind of transmission line of electricity combining structure assembled cushion cap anchor rod foundation
CN201212811Y (en) Novel control point marking pier for construction and measurement
CN104499501A (en) Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line
CN202041208U (en) Stable direct-buried GPS (global positioning system) observation sign
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN207714358U (en) A kind of transmission line of electricity composite structure assembled cushion cap anchor rod foundation
CN110331735A (en) A kind of tower crane mounting structure for coastal region soft layer
CN110439092A (en) Mortar flag stone drains ditch construction method and groove slope trimming measurement and positioning tool
CN107063178B (en) Concrete leveling markstone with displacement sensor and elevation observation and calculation method thereof
CN106545018B (en) Excavation slope excavation construction process and excavation slope
CN101818495A (en) Construction method for retaining and protecting foundation excavation and supporting structure thereof
CN209399990U (en) A kind of field surface observation pier structure
CN204590241U (en) The fast-assembling steel structure basis of barracks is built in a kind of hillside fields
CN203878630U (en) Inclination and straightness alternated pile group-bearing platform-upper structure similar model manufacturing template
CN211642544U (en) Rock stratum foundation lifting type shore mark structure
CN207109806U (en) The artificial friction pile of noiseless no airborne dust and short time limit
CN206772297U (en) A kind of simple observation pier of GPS for high-precision distortion measurement
CN205875876U (en) Triangle angle steel communication steel tower mast prevent wind fixing base
CN106049461B (en) The construction method of bored concrete pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA GEZHOUBA GROUP MECHANICAL SHIP CO., LTD.

Free format text: FORMER OWNER: CHINA GEZHOUBA GROUP CO.

Effective date: 20090703

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090703

Address after: No. 18, Hubei city in Yichang province Xiao Ting Road zip code: 443007

Patentee after: Machinery & Ship Co., Ltd., China Gezhouba Group

Address before: Hubei province Yichang City Qing Road No. 1, zip code: 443002

Patentee before: China Gezhouba Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090325

Termination date: 20150605

EXPY Termination of patent right or utility model