Prestressing force mount system of independent type location, bearing reinforced concrete form Download PDF

Info

Publication number
CN214739866U
CN214739866U CN202120348146.0U CN202120348146U CN214739866U CN 214739866 U CN214739866 U CN 214739866U CN 202120348146 U CN202120348146 U CN 202120348146U CN 214739866 U CN214739866 U CN 214739866U
Authority
CN
China
Prior art keywords
prestressed
reinforced concrete
prestress
bearing
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120348146.0U
Other languages
Chinese (zh)
Inventor
张宏
吴京
罗申
孙逊
汤奕
刘东卫
石慧
丛勐
伍雁华
董文俊
田炜
张睿哲
朱郁松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Design And Research Institute Of Southeast University Co ltd
Southeast University
Original Assignee
Architectural Design And Research Institute Of Southeast University Co ltd
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design And Research Institute Of Southeast University Co ltd, Southeast University filed Critical Architectural Design And Research Institute Of Southeast University Co ltd
Priority to CN202120348146.0U priority Critical patent/CN214739866U/en
Application granted granted Critical
Publication of CN214739866U publication Critical patent/CN214739866U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a prestressing force framework system of independent type location, bearing reinforced concrete form. The adjustable steel support is arranged below the prestressed frame system and used for supporting the prestressed frame system, and a prestress loading device is installed at the top of the adjustable steel support to load a plate template at the top. The utility model discloses utilize prestressing force technique, can show in the work progress and reduce the scene and support, simplify the work progress, improve the scene and build efficiency. The utility model discloses a frame system is systematic to be realized to the location of plate mould board, bear, utilizes prestressing force technique to simplify bearing structure simultaneously to assemble and dismantle the process optimization to the plate mould board.

Description

Prestressing force mount system of independent type location, bearing reinforced concrete form
Technical Field
The utility model relates to a building engineering builds the field, particularly relates to a stand alone type location, bears prestressing force framework system of reinforced concrete form.
Background
At present, the existing reinforced concrete structure is a building form widely adopted in the field of building construction, and the reinforced concrete structure can be divided into four projects, namely a reinforced concrete project, a template project and a supporting project, and the four projects are jointly made to complete the forming, positioning, connecting and stressing of the reinforced concrete member.
In the construction process of the reinforced concrete structure, the vertical components mainly comprise components such as columns, shear walls and the like, and the horizontal components mainly comprise beam and plate components. The construction process of the reinforced concrete slab is the most complicated, the span of the reinforced concrete slab is large, a large number of supports need to be arranged in the construction process, the normal passing of constructors is influenced, the expansion of a working surface in the construction process of the reinforced concrete is blocked, the difficulty in parallel construction is caused, and the influence on the whole construction efficiency and the construction progress of the reinforced concrete structure is large.
The prestress technology is a technology capable of improving the bearing capacity of a structural member, and improves the performance of the structure during service by preloading prestress. At present, the prestress technology is mainly applied to reinforced concrete members to improve the bearing capacity of the reinforced concrete horizontal members, and is rarely applied in the construction field. If the prestress technology is applied in the field of reinforced concrete construction, the template bearing capacity of horizontal members such as beams and plates can be obviously improved, the field support is reduced, and the overall construction efficiency of reinforced concrete engineering is improved.
Although research suggests that the service performance of the structure can be improved through prestress, the external prestress technology is applied less and is applied more rarely in the construction field. The problems of how to pre-stress the structure during construction, how to pre-stress the structure during the service of the structure to fully or partially offset the tensile stress caused by the load, and how to improve the bearing capacity of the structure are not solved all the time. (whether the description herein is modified to address the problem of prestressing application during the construction of reinforced concrete structures is not solved, and the existing expression is somewhat wrong).
SUMMERY OF THE UTILITY MODEL
The utility model discloses to prior art's not enough, provide a stand alone type location, bear the prestressing force framework system of reinforced concrete form. The utility model discloses specifically adopt following technical scheme.
In order to achieve the above object, a prestressed frame system for a free-standing positioning and bearing reinforced concrete slab form is provided, which comprises: the adjustable steel support is arranged below the prestressed frame system and is used for supporting the prestressed frame system; the prestress loading device is arranged on the top of the adjustable steel support; and the plate template is installed on the prestress loading device.
Optionally, the prestressed frame system for independent positioning and bearing of the reinforced concrete slab form, wherein the prestressed loading device includes: the prestressed steel beam is positioned at the top of the prestressed loading device; the two ends of the prestress connecting device are respectively connected to the two ends of the prestress steel beam; the prestress adjusting device is arranged on the prestress connecting device and adjusts the distance between the prestress connecting device and the prestress steel beam; the plate template is installed on the prestressed steel beam.
Optionally, the prestressed frame system of the independent positioning and bearing reinforced concrete slab form includes a first section of connecting device, a second section of connecting device, and a connection adjusting device, where one end of the first section of connecting device and one end of the second section of connecting device are respectively connected to the connection adjusting device.
Optionally, the other end of the first section of connecting device and the other end of the second section of connecting device are connected to two ends of the prestressed steel beam respectively.
Optionally, the prestressed frame system for free-standing positioning and bearing of the reinforced concrete slab form is further provided, wherein the connection adjusting device is capable of shortening or lengthening a distance between one end of the first section of the connecting device and one end of the second section of the connecting device.
Optionally, the connecting adjusting device is connected to one end of the first section of connecting device and one end of the second section of connecting device in a threaded manner.
Optionally, the prestressed frame system of the independent positioning and bearing reinforced concrete slab form is provided, wherein the prestressed connecting device is made of a reinforced material.
Optionally, the prestressed framework system for independently positioning and bearing the reinforced concrete slab form further includes prestressed anchoring devices respectively disposed at two end portions of the prestressed connecting device and respectively fixed at the top of the adjustable steel supporting device disposed below the loading device.
Optionally, the prestressed frame system of the independent positioning and bearing reinforced concrete slab form includes a mounting base mounted on the prestressed connecting device and a loading rod mounted on the mounting base in a threaded connection manner, and a top end of the loading rod abuts against a bottom of the prestressed steel beam.
Optionally, the prestressed framework system of the independent positioning and bearing reinforced concrete form is a form of a steel form, an aluminum form, a wood form or a PVC form.
Advantageous effects
The utility model discloses a at the top installation prestressing force loading device of adjustable steel shotcrete, bear the board template at its top. The prestress technology can obviously reduce on-site support in the construction process, simplify the construction process and improve the on-site construction efficiency. Realize location, the bearing to the board template through the frame system, the utility model discloses can also utilize prestressing force technique to simplify original bearing structure simultaneously to early tear the mould open to the board template and optimize.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the invention.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, together with the embodiments of the invention for the purpose of explanation and not limitation of the invention. In the drawings:
FIG. 1 is a schematic view of the overall structure of a prestressed scaffolding system for a freestanding positioning and load bearing reinforced concrete form of the present invention;
FIG. 2 is a schematic diagram of the connection between the components of the prestressed frame system of the present invention;
FIG. 3 is a schematic structural view of a single prestressed frame body according to the present invention;
fig. 4 is a schematic structural view of the prestress loading device in the prestress frame of the present invention.
In the drawings, 1 denotes a plate template; 2 denotes a prestressing force loading device; 21 denotes a prestressed steel beam; 22 denotes a prestressed attachment; 23 denotes a prestress adjusting device; 231 denotes a mount; 232 denotes a load lever; 24 denotes a connection adjusting device; 25 denotes a prestressed anchoring device; and 3 denotes an adjustable steel support.
Detailed Description
In order to make the purpose and technical solution of the embodiments of the present invention clearer, the following description will clearly and completely describe the technical solution of the embodiments of the present invention by combining the drawings of the embodiments of the present invention. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. All other embodiments, which can be obtained by a person skilled in the art without any inventive work based on the described embodiments of the present invention, belong to the protection scope of the present invention.
It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. It will be further understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning that is consistent with their meaning in the context of the prior art and will not be interpreted in an idealized or overly formal sense unless expressly so defined herein.
The meaning of "and/or" in the present invention means that they exist individually or both at the same time.
The meaning of "inside and outside" in the present invention means that the direction pointing to the inside of the box body is inside, and vice versa, relative to the box body itself; and not to the specific limitations of the device mechanism of the present invention. (in this patent, there is no description of the inside or outside, whether to delete this paragraph)
The term "connected" as used herein may mean either a direct connection between elements or an indirect connection between elements through other elements.
The utility model discloses in the meaning of "upper and lower" indicate that the user is just when prestressing force framework system, the direction of supporting the directional board template by adjustable steel is promptly for last, otherwise promptly for down, and not right the utility model discloses a device mechanism's specific injecing.
The utility model provides a but independent positioning, bear prestressing force framework system of reinforced concrete form mainly is applied to among the cast-in-place reinforced concrete engineering, and it is shown with reference to figure 1 and figure 2, and it includes independent adjustable steel shotcrete 3, independent prestressing force loading device 2, 1 system of plate form, prestressing anchor device 25 and the plate form system of supporting mutually with it.
The prestressed frame system can be freely arranged according to different sizes of reinforced concrete structures, and the frame bodies are connected through inclined struts or rod pieces to ensure the stability of the whole system.
In the prestress frame system of the independent positioning and bearing reinforced concrete slab mold:
and the adjustable steel support 3 is arranged below the prestressed frame system and is used for supporting the prestressed frame system.
The prestress loading device 2 is arranged at the top of the adjustable steel support 3;
the plate template 1 is arranged on a prestress loading device 2.
As shown in fig. 3 and 4, the prestress loading device 2 includes: the prestressed steel beam comprises a prestressed steel beam 21, a prestressed connecting device 22, a prestressed adjusting device 23, a connecting adjusting device 24 and a prestressed anchoring device 25. Wherein:
the prestressed steel beam 21 is positioned at the top of the prestressed loading device 2.
A prestress connecting device 22, both ends of which are connected to both ends of the prestress steel beam 21, respectively; which specifically includes a first segment of attachment means, a second segment of attachment means, and a connection adjustment means 24. One end of the first section of connecting device and one end of the second section of connecting device are respectively connected to the connecting and adjusting device 24, and the other ends of the first section of connecting device and the second section of connecting device are respectively connected to two ends of the prestressed steel beam 21. Thus, the connection adjustment device 24 can shorten or lengthen the distance between one end of the first segment of the connection device and one end of the second segment of the connection device. In a specific implementation, the connection adjustment device 24 may be selectively connected to one end of the first segment of the connection device and one end of the second segment of the connection device by a screw thread.
The prestress adjusting device 23 is installed on the prestress connecting device 22 and is used for adjusting the distance between the prestress connecting device 22 and the prestress steel beam 21. In a more specific implementation manner, as shown in fig. 4, the method specifically includes: a mounting seat 231 mounted on the prestressed coupling device 22, and a loading rod 232 mounted on the mounting seat 231 by means of screw connection. The top end of the loading rod 232 is abutted to the bottom of the prestressed steel beam 21, so that the prestress on the prestressed connecting device 22 is adjusted. The pre-stressed attachment means 22 may, in one form, be formed from a reinforced material, and may in particular be pre-stressed steel. The prestressed reinforcement has certain bearing capacity and rigidity, and the prestressed reinforcement is adopted to enable the prestressed loading device to have certain rigidity, so that the prestressed loading device is further convenient to mount and dismount.
The plate formwork 1 is mounted on a plurality of prestressed steel beams 21, so that a complete prestressed frame system structure is realized. The structure also comprises prestressed anchoring devices 25 which are respectively arranged at the end parts of the two ends of the prestressed connecting device 22 and are respectively fixed at the top of the adjustable steel support 3 device arranged below the loading device. In this way, the top of the adjustable steel support 3 can thus be provided with the prestressed anchorage means 25 independently. The independently arranged prestressed anchoring device 25 component is connected with the prestressed steel beam 21 and the adjustable steel support 3 through bolts, loading points can be arranged according to different specific requirements, the prestressed loading points are arranged at the stress weak positions of the prestressed steel beam 21 and are fixed through the prestressed anchoring device 25, and external prestressed loading is realized through manually loading the bottom jacking device. The prestress adjusting device 23 used for manual loading may specifically include a mounting seat mounted on the prestress connecting device 22 and a loading rod mounted on the mounting seat in a threaded connection manner, a top end of the loading rod abuts against a bottom of the prestress steel beam 21, and a distance between the prestress connecting device 22 and the bottom of the prestress steel beam 21 is adjusted in a manual manner to provide prestress, so that more effective external prestress loading is realized.
The utility model discloses after prestressing steel roof beam 21 uses, can have enough to meet the need according to following mode. In the turnover process, after the plate formwork 1 is disassembled, each steel beam and the prestress loading device 2 connected with the steel beam are subjected to the following steps: the prestress loading is firstly released manually, and then the prestress connecting device 22, the prestress anchoring device 25 and the adjustable steel support 3 are disassembled in sequence so as to be circulated to other positions for recycling.
Therefore, the utility model discloses be applied to reinforced concrete slab template 1's construction field with external prestressing force device loading device, provide a prestressing force framework system who is suitable for reinforced concrete slab template 1. The prestressed frame system can be assembled quickly and can be disassembled at any time. The prestress frame system can adjust the prestress loading size according to the requirement in a manual mode so as to improve the bearing capacity of the frame. Because the utility model discloses connect with the detachable mode between the individual subassembly, each subassembly is in reinforced concrete pouring completion back, can carry out support body and template fast and demolish work, the utility model discloses the turnover type that can be used to in the work progress supports or carries out interim reinforcement to the building and use.
The utility model provides a prestressing force framework system can further combine turnover templates such as steel form, aluminum mould board, plank sheathing or PVC template to use as template 1, can carry out the template when maintenance reinforced concrete intensity reaches 50% and demolish, improves template turnover efficiency, reduces the project cost simultaneously.
The above description is only for the embodiments of the present invention, and the description is specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the spirit of the present invention, several changes and modifications can be made, which all fall within the scope of the present invention.

Claims (10)

1. The utility model provides a prestressing force mount system of stand alone type location, bearing reinforced concrete form, its characterized in that includes:
the adjustable steel support (3) is arranged below the prestressed frame system and is used for supporting the prestressed frame system;
the prestress loading device (2) is arranged at the top of the adjustable steel support (3);
the plate template (1) is arranged on the prestress loading device (2).
2. A free-standing positioning, load-bearing prestressed scaffolding system of reinforced concrete slab forms according to claim 1, characterized in that said prestressing loading means (2) comprises:
the prestressed steel beam (21) is positioned at the top of the prestressed loading device (2);
the two ends of the prestress connecting device (22) are respectively connected to the two ends of the prestress steel beam (21);
the prestress adjusting device (23) is arranged on the prestress connecting device (22) and is used for adjusting the distance between the prestress connecting device (22) and the prestress steel beam (21);
the plate template (1) is installed on the prestressed steel beam (21).
3. A freestanding, load-carrying, prestressed scaffolding system for a reinforced concrete slab form as claimed in claim 2, wherein said prestressed attachment means (22) includes first and second lengths of attachment means and attachment adjustment means (24), one end of each of the first and second lengths of attachment means being attached to the attachment adjustment means (24).
4. A freestanding, load-bearing, prestressed scaffolding system for a reinforced concrete slab form as claimed in claim 3, wherein the other ends of said first and second lengths of connecting means are connected to respective ends of prestressed steel beams (21).
5. A freestanding frame system for positioning and carrying reinforced concrete slab forms as claimed in claim 3, wherein said connection adjustment means (24) is capable of shortening or lengthening the distance between one end of the first length of connection means and one end of the second length of connection means.
6. A free standing formwork system for positioning and supporting reinforced concrete slabs according to claim 5, wherein said connection adjustment means (24) is threadedly connected to one end of the first section of connection means and one end of the second section of connection means, respectively.
7. A freestanding, load-bearing, prestressed scaffolding system for a reinforced concrete slab form as claimed in claim 1, wherein said prestressed attachment means (22) comprises a reinforcing steel material.
8. A prestressed scaffolding system for freestanding, load-bearing reinforced concrete slab forms as claimed in claim 7, further comprising prestressed anchorage means (25) respectively provided at both end portions of the prestressed attachment means (22) and respectively fixed to the top of the means of adjustable steel supports (3) provided below the loading means.
9. A freestanding, positioned, load-bearing, prestressed reinforcement concrete slab formwork system, as claimed in claim 1, wherein said prestressing adjustment means (23) comprises a mounting base (231) mounted on the prestressing attachment means (22) and a loading bar (232) threadably mounted on the mounting base (231), the top end of said loading bar (232) abutting against the bottom of the prestressed steel beam (21).
10. A freestanding, load-bearing, prestressed scaffolding system for a reinforced concrete form according to claim 1, wherein said form (1) is one of a steel form, an aluminium form, a wooden form or a PVC form.
CN202120348146.0U 2021-02-07 2021-02-07 Prestressing force mount system of independent type location, bearing reinforced concrete form Active CN214739866U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120348146.0U CN214739866U (en) 2021-02-07 2021-02-07 Prestressing force mount system of independent type location, bearing reinforced concrete form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120348146.0U CN214739866U (en) 2021-02-07 2021-02-07 Prestressing force mount system of independent type location, bearing reinforced concrete form

Publications (1)

Publication Number Publication Date
CN214739866U true CN214739866U (en) 2021-11-16

Family

ID=78644900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120348146.0U Active CN214739866U (en) 2021-02-07 2021-02-07 Prestressing force mount system of independent type location, bearing reinforced concrete form

Country Status (1)

Country Link
CN (1) CN214739866U (en)

Similar Documents

Publication Publication Date Title
CN110331668B (en) Construction method of bidirectional inclined V-shaped bridge tower of cable-stayed bridge without back cables
EP1405958B1 (en) Device for connecting a beam to pillars or similar supporting structural elements for erecting buildings
CA2687832C (en) Girder element for concrete formwork comprising a structure for automatically compensating bending strains
CN102127966B (en) Fixing device for template of cast-in-place reinforced concrete column
KR100820299B1 (en) Temporary structure and precast concrete beam of pylon setting method using the bracket
CN112609980A (en) Construction method of post-cast strip back-jacking aluminum alloy single-column
CN102251657B (en) Arching formwork erecting method for assembled framework beam plate
CN214194152U (en) Assembled bracket supporting structure of upper beam construction template of cable-stayed bridge cable tower
CN108729640B (en) Mounting method of cantilever plate of assembled building
CN111456230A (en) Assembled exempts from braced frame structure
CN214739866U (en) Prestressing force mount system of independent type location, bearing reinforced concrete form
CN214738755U (en) Independent external prestress loading device applied to metal beam
CN112878672A (en) External prestress loading device of positioning beam template system
CN113417457A (en) Prestressing force mount system of independent type location, bearing reinforced concrete form
CN212176059U (en) Assembled exempts from braced frame structure
CN211571419U (en) Supporting and reinforcing device for side beam overhanging bridge deck template
CN112878490A (en) Independent external prestress loading device applied to metal beam
KR20040102391A (en) Composite Beam Stiffened with In-Situ Concrete Panel Having Embedded Lower Flange and Constructing Method thereof
CN209907223U (en) Temporary anchoring device for bridge tower and n-shaped main beam of cable-stayed bridge
CN214785974U (en) External prestress loading device of positioning beam template system
KR102504521B1 (en) Double Beam Reinforcement System with Regulator on Grid Beams and Construction Method Thereof
CN217378581U (en) Assembling support
CN219241060U (en) Structure with adjustable support truss span
CN213766424U (en) Pretensioning prestressed concrete assembled prefabricated pedestal
CN221095872U (en) Novel precast floor plank based on precast beam component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant