CN214697136U - Integrated assembled steel construction building - Google Patents

Integrated assembled steel construction building Download PDF

Info

Publication number
CN214697136U
CN214697136U CN202120535967.5U CN202120535967U CN214697136U CN 214697136 U CN214697136 U CN 214697136U CN 202120535967 U CN202120535967 U CN 202120535967U CN 214697136 U CN214697136 U CN 214697136U
Authority
CN
China
Prior art keywords
installation
mounting
groove
grooves
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120535967.5U
Other languages
Chinese (zh)
Inventor
陈婷芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kashgar Chaoxiang New Building Materials Co ltd
Original Assignee
Kashgar Chaoxiang New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kashgar Chaoxiang New Building Materials Co ltd filed Critical Kashgar Chaoxiang New Building Materials Co ltd
Priority to CN202120535967.5U priority Critical patent/CN214697136U/en
Application granted granted Critical
Publication of CN214697136U publication Critical patent/CN214697136U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an integrated assembled steel construction building, including multiunit steel construction concatenation unit, curb plate and roof, the both sides difference gomphosis of curb plate are installed in the recess of the stand of the two sets of steel construction concatenation units that link to each other, and the roof gomphosis is installed between the installation chute of the two sets of steel construction concatenation units that link to each other. The utility model discloses have the installation simple and convenient, working strength is low, beneficial effect that work efficiency is high.

Description

Integrated assembled steel construction building
Technical Field
The utility model relates to a building steel construction technical field, specific integrated assembly type steel construction building that says so.
Background
The temporary storage of goods needs to be built and sheltered from the goods to avoid rainwater or sunshine to damage the goods, and the temporary factory building among the prior art is built very complicatedly, and it is inconvenient to build, takes trouble hard.
Disclosure of Invention
To the above-mentioned weak point that exists among the prior art, the utility model aims at providing an installation is simple and convenient, and working strength is low, assembled steel construction building that work efficiency is high.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is: an integrated assembly type steel structure building comprises a plurality of groups of steel structure splicing units, side plates and a top plate;
the steel structure splicing unit comprises two groups of upright columns and a triangular top frame which are symmetrically arranged, the tops of the upright columns are arranged into an inclined plane structure, the top end of the inclined plane at the top of the upright post is provided with a mounting groove, the top of the upright post is provided with first inclined grooves at two sides of the mounting groove, grooves are respectively arranged on the two side surfaces of the upright post, which are connected with the surface provided with the mounting grooves, the two ends of the triangular top frame are fixedly connected with mounting blocks, a group of mounting blocks are respectively correspondingly embedded into the mounting grooves of a group of upright posts, and a group of bolts penetrates through the mounting groove to be in threaded connection with the mounting block, a group of second chutes are arranged on two side edges of the triangular top frame corresponding to each group of the first chutes, when the mounting block is fixedly connected in the mounting groove, the first chute is flush with the second chute, and the first chute and the second chute form a mounting chute;
the two sides of the side plates are respectively installed in grooves of the stand columns of the two groups of connected steel structure splicing units in an embedded mode, and the top plate is installed between installation chutes of the two groups of connected steel structure splicing units in an embedded mode.
The top of the upright post is communicated with the mounting groove, a mounting hole is formed in the mounting block in a corresponding mode, a screw hole is formed in the mounting hole, the mounting block is embedded in the mounting groove, and the bolt penetrates through the mounting hole and is in threaded connection with the screw hole.
The bottom of the upright post is fixedly connected with an installation base, and the installation base is provided with a fixing hole.
The angle between the two groups of side edges of the triangular top frame is 60-100 degrees.
The insides of the upright post and the triangular top frame are both provided with hollow structures.
The utility model has the advantages that: this building structure is through installing multiunit stand and multiunit triangle roof-rack and constitutes multiunit steel construction concatenation unit, later with each group steel construction concatenation unit fixed mounting on ground, and curb plate slidable mounting is in the recess of the stand of the two sets of steel construction concatenation units that link to each other, and the roof gomphosis is installed between the installation chute of the two sets of steel construction concatenation units that link to each other, thereby make to constitute building structure, can be used to realize depositing temporarily to the goods, and the integral erection is simple and convenient, the working strength is low, and the work efficiency is high.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the middle triangular roof frame of the present invention;
FIG. 3 is a schematic view of the structure of the center pillar of the present invention;
fig. 4 is the schematic view of the structure of the connection part of the middle column and the triangular top frame of the present invention.
In the figure: 1 steel structure splicing unit, 101 upright columns, 102 triangular top frame, 103 mounting grooves, 104 first inclined grooves, 105 grooves, 106 mounting blocks, 107 second inclined grooves, 108 mounting inclined grooves, 109 mounting holes, 110 screw holes, 111 mounting base, 2 side plates and 3 top plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, an integrated assembly type steel structure building includes a plurality of sets of steel structure splicing units 1, side plates 2 and a top plate 3, the steel structure splicing units 1 include two sets of symmetrically arranged upright columns 101 and a triangular top frame 102, the top of the upright column 101 is set to be an inclined plane structure, an installation groove 103 is arranged at the top end of the inclined plane at the top of the upright column 101, first inclined grooves 104 are arranged at two sides of the installation groove 103 at the top of the upright column 101, grooves 105 are arranged on two side surfaces of the upright column 101 connected with the surface provided with the installation groove 103, installation blocks 106 are fixedly connected with two ends of the triangular top frame 102, the installation blocks 106 are correspondingly embedded into the installation grooves 103 of the upright columns 101, and a set of bolts penetrates through the installation grooves 103 to be in threaded connection with the installation blocks 106, so that the triangular top frame 102 and the upright column 101 are fixedly connected, the connection is simple and convenient, and the angle between the two sets of sides of the triangular top frame 102 is 60-100 degrees, the both sides of triangle roof-rack 102 are gone up and are corresponded every first chute 104 of group and all be provided with a set of second chute 107, when installation piece 106 fixed connection is in mounting groove 103, first chute 104 flushes with second chute 107, first chute 104 constitutes installation chute 108 with second chute 107, the both sides of curb plate 2 gomphosis respectively are installed in the recess 105 of the stand 101 of two sets of steel construction concatenation units 1 that link to each other, 3 gomphosis of roof are installed between the installation chute 108 of two sets of steel construction concatenation units 1 that link to each other, just so make curb plate 2 and roof 3 simple installation convenient, do not need any fixed mode, can alleviate the step of putting up, guarantee to put up swiftly.
The utility model discloses in, the mounting hole 109 that is provided with of stand 101 top and mounting groove 103 intercommunication corresponds mounting hole 109 on the installation piece 106 and is provided with screw 110, and when installation piece 106 gomphosis was to the mounting groove 103 in, the bolt passed mounting hole 109 threaded connection in screw 110 to this realizes being connected between stand 101 and the triangle roof-rack 102.
The bottom of the upright column 101 is fixedly connected with an installation base, a fixing hole is formed in the installation base, and the upright column 101 can be fixed on the ground through the installation base.
The upright column 101 and the triangular top frame 102 are both arranged in a hollow structure, so that the weight of the upright column 101 and the triangular top frame 102 is reduced, and the carrying and building are facilitated.
The utility model discloses a thereby be connected a set of stand 101 and a set of triangle roof-rack 102 and constitute a set of steel construction concatenation unit 1, concatenation multiunit steel construction concatenation unit 1, and with the stand 101 fixed mounting of every group steel construction concatenation unit 1 subaerial, later with roof 3 sliding connection one by one in the recess 105 of the stand 101 of two sets of steel construction concatenation units 1 that link to each other, thereby seal the side, later place roof 3 gomphosis one by one between the installation chute 108 of two sets of steel construction concatenation units 1 that link to each other, thereby seal the top, such mode of buildding is simple and convenient, the working strength is low, can build fast.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. An integrated assembled steel construction building which characterized in that: the steel structure splicing device comprises a plurality of groups of steel structure splicing units (1), side plates (2) and a top plate (3);
the steel structure splicing unit (1) comprises two groups of symmetrically arranged stand columns (101) and a triangular top frame (102), the top of each stand column (101) is arranged to be of an inclined plane structure, an installation groove (103) is arranged at the top end of the inclined plane at the top of each stand column (101), first inclined grooves (104) are formed in two sides, located on the installation groove (103), of the top of each stand column (101), grooves (105) are formed in two side faces, connected with the surface provided with the installation groove (103), of each stand column (101), installation blocks (106) are fixedly connected to two ends of each triangular top frame (102), one group of installation blocks (106) are correspondingly embedded into the installation grooves (103) of one group of stand columns (101), a group of bolts are arranged to penetrate through the installation grooves (103) and the installation blocks (106) to be in threaded connection, a group of second inclined grooves (107) are formed in two side edges of each triangular top frame (102) corresponding to each group of the first inclined grooves (104), when the mounting block (106) is fixedly connected in the mounting groove (103), the first inclined groove (104) is flush with the second inclined groove (107), and the first inclined groove (104) and the second inclined groove (107) form a mounting inclined groove (108);
the two sides of the side plates (2) are respectively installed in grooves (105) of columns (101) of two groups of connected steel structure splicing units (1) in an embedded mode, and the top plate (3) is installed between installation chutes (108) of two groups of connected steel structure splicing units (1) in an embedded mode.
2. An integrally assembled steel structural building according to claim 1, wherein: the top of the upright post (101) is communicated with the mounting groove (103) to form a mounting hole (109), a screw hole (110) is formed in the mounting block (106) corresponding to the mounting hole (109), and when the mounting block (106) is embedded into the mounting groove (103), the bolt penetrates through the mounting hole (109) and is in threaded connection with the screw hole (110).
3. An integrally assembled steel structural building according to claim 1, wherein: the bottom of the upright column (101) is fixedly connected with an installation base, and the installation base is provided with a fixing hole.
4. An integrally assembled steel structural building according to claim 1, wherein: the angle between the two groups of side edges of the triangular top frame (102) is 60-100 degrees.
5. An integrally assembled steel structural building according to claim 1, wherein: the interiors of the upright columns (101) and the triangular top frame (102) are both of hollow structures.
CN202120535967.5U 2021-03-15 2021-03-15 Integrated assembled steel construction building Active CN214697136U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120535967.5U CN214697136U (en) 2021-03-15 2021-03-15 Integrated assembled steel construction building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120535967.5U CN214697136U (en) 2021-03-15 2021-03-15 Integrated assembled steel construction building

Publications (1)

Publication Number Publication Date
CN214697136U true CN214697136U (en) 2021-11-12

Family

ID=78571286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120535967.5U Active CN214697136U (en) 2021-03-15 2021-03-15 Integrated assembled steel construction building

Country Status (1)

Country Link
CN (1) CN214697136U (en)

Similar Documents

Publication Publication Date Title
US9331222B2 (en) Photovoltaic device
WO2018121778A1 (en) Photovoltaic array support system
CN210603852U (en) Full-assembly type steel structure reaction frame
CN112627335A (en) Steel structure beam column
CN214697136U (en) Integrated assembled steel construction building
CN109162351B (en) Concrete beam column connecting node assembled by high-strength bolts
CN210342722U (en) Adjustable supporting device for assembly type building
CN210918218U (en) Supporting structure is erect fast to building engineering construction template
CN111828024B (en) Adjustable receiving platform of tunnel boring equipment
CN115110632A (en) Self-resetting assembly type concrete beam column energy dissipation node and construction method
CN214615656U (en) Outdoor electric pile protection canopy that fills
CN111719911B (en) Energy-saving portable self-supporting base station
CN212506979U (en) Ancient building roof supporting beam
CN110453647B (en) Ecological slope protection unit and ecological slope protection structure formed by same
CN210658437U (en) Novel assembled antidetonation counterfort retaining wall
CN109451366B (en) Simple mobile communication base station convenient to maintain
CN213927755U (en) Light steel assembled building structure
CN214884766U (en) Wood structure module for archaizing building construction
CN216625633U (en) Photovoltaic power generation system for road
CN219710652U (en) Assembled steel plate shear wall
CN205296409U (en) Two -sided fixed anticreep steelframe connecting piece
CN211079892U (en) Safety protection blocking net for bridge
CN211735809U (en) Novel assembled industrialization steel construction house
CN217467961U (en) Assembled advertisement column
CN221346985U (en) Spliced type primary support structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An integrated prefabricated steel structure building

Granted publication date: 20211112

Pledgee: Bank of China Limited Kashgar Region Branch

Pledgor: Kashgar Chaoxiang new building materials Co.,Ltd.

Registration number: Y2024980012810

PE01 Entry into force of the registration of the contract for pledge of patent right