CN214575482U - Civil engineering construction support - Google Patents

Civil engineering construction support Download PDF

Info

Publication number
CN214575482U
CN214575482U CN202120523512.1U CN202120523512U CN214575482U CN 214575482 U CN214575482 U CN 214575482U CN 202120523512 U CN202120523512 U CN 202120523512U CN 214575482 U CN214575482 U CN 214575482U
Authority
CN
China
Prior art keywords
hole
construction support
connecting rod
shell
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120523512.1U
Other languages
Chinese (zh)
Inventor
马学沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Huaxia University of Technology
Original Assignee
Wuhan Huaxia University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Huaxia University of Technology filed Critical Wuhan Huaxia University of Technology
Priority to CN202120523512.1U priority Critical patent/CN214575482U/en
Application granted granted Critical
Publication of CN214575482U publication Critical patent/CN214575482U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to the technical field of civil construction equipment, and discloses a civil engineering construction support, which comprises a construction support body, wherein a shell is installed at the bottom of the construction support body, a groove is formed in the side surface of the shell, handles are installed on the front surface and the back surface of the shell, a through hole is formed in the front surface of the shell, the through hole comprises a first hole and a second hole, and a fixing column penetrates through the through hole; the fixing rod is fixedly installed in the groove, the surface of the fixing rod is sleeved with the rotating shaft, the bottom of the rotating shaft is provided with the connecting rod, the bottom of the connecting rod is provided with the pulley, and the surface of the connecting rod is provided with the third hole. This civil engineering building construction support through seting up first hole, second hole and third hole, is fixed the connecting rod by the fixed column, can make the construction support body can carry out convenient removal when needs remove, makes the construction support body fix when need not remove, has reached the beneficial effect that improves work efficiency.

Description

Civil engineering construction support
Technical Field
The utility model relates to a civil construction equipment technical field specifically is a civil engineering construction support.
Background
Civil and architectural engineering refers to the applied materials, equipment, the technical activities of surveying, designing, constructing, maintaining, repairing and the like, and the objects of engineering construction, namely, various engineering facilities which are constructed on the ground or underground, on land or in water and directly or indirectly serve human life, production, military and scientific research, such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, harbors, power stations, airports, ocean platforms, water supply and drainage, protection engineering and the like.
The construction support in the existing market is often difficult to fix when possessing portable removal, or both have but the cost is too high difficult popularization concurrently.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a civil engineering construction support possesses improvement work efficiency, and advantages such as low cost facilitate promotion have solved above-mentioned technical problem.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a civil engineering building construction support comprises a construction support body, wherein a shell is installed at the bottom of the construction support body, a groove is formed in the side face of the shell, handles are installed on the front face and the back face of the shell, a through hole is formed in the front face of the shell and comprises a first hole and a second hole, and a fixing column penetrates through the through hole;
a fixed rod is fixedly arranged in the groove, the surface of the fixed rod is sleeved with a rotating shaft, the bottom of the rotating shaft is provided with a connecting rod, the bottom of the connecting rod is provided with a pulley, and the surface of the connecting rod is provided with a third hole;
the bearing disc is installed at the top of the shell, the supporting rod is installed at the top of the bearing disc, the supporting block is installed at the top of the supporting rod, and the backing plate is installed at the top of the supporting block.
Preferably, the casing is installed in construction support body bottom, the recess is seted up in the casing side and is run through the casing, the handle symmetry just is installed respectively at the casing front and back.
Through above-mentioned technical scheme, through seting up the recess in the side of casing, and the recess runs through the casing, can install the structure that needs in the recess, install the front and the back at the casing through the handle symmetry, can carry out convenient removal to the construction support body.
Preferably, the through-hole is seted up at the casing openly, the through-hole includes first hole and second hole, first hole is vertical form and arranges, the second hole is horizontal form and arranges, first hole and second hole all run through the casing, the fixed column is installed in the through-hole, the fixed column runs through the through-hole, the quantity of fixed column is six at least.
Through above-mentioned technical scheme, fix when vertical removal of connecting rod is carried out through the first hole of seting up the vertical form, fix when horizontal to the connecting rod through the second hole of seting up horizontal form, thereby fix the construction support body that needs go on fixing, and the size through first hole and second hole is unanimous, can make the fixed column nimble between the two insert, fixed column quantity is six at least simultaneously, thereby can effectually run through sufficient through-hole and make the construction support body deal with different situations.
Preferably, the fixing rod is fixedly installed at the top inside the groove, the rotating shaft is sleeved on the surface of the fixing rod, the connecting rod is welded at the bottom of the rotating shaft, and the pulley is installed at the bottom of the connecting rod.
Through above-mentioned technical scheme, through the inside top of installation dead lever welding in the recess, the pivot cup joints in the dead lever surface simultaneously, can make the rotation of pivot nimble in the recess, just at connecting rod bottom installation pulley through pivot bottom welded connection pole, can be removed by the pulley drive construction support body.
Preferably, the third hole is opened and is established on the connecting rod surface and run through the connecting rod, the third hole is corresponding with first hole position when vertical, the third hole is corresponding with second hole position when horizontal.
Through above-mentioned technical scheme, through set up the third hole that runs through the connecting rod on the connecting rod surface, when needs remove construction support body, the fixed column passes first hole and third hole and fixes the connecting rod, thereby carry on spacingly to the pulley of connecting rod bottom, when needs fixed construction support body, rotate the connecting rod through the pivot earlier, the position that makes the second hole is corresponding with the position of third hole, the fixed column passes second hole and third hole and fixes the connecting rod afterwards, thereby make the pulley keep away from ground and reach the effect fixed to construction support body.
Preferably, the bearing discs are fixedly installed at four corners of the top of the shell, the supporting rods are fixedly installed at the centers of the tops of the bearing discs, the supporting blocks are movably installed at the tops of the supporting rods, and the backing plates are fixedly installed at the tops of the supporting blocks.
Through above-mentioned technical scheme, bear the dish through the installation and support the branch of bearing the installation of dish top center department, support the supporting shoe of branch top installation through the branch, support the backing plate of supporting shoe top installation through the installation supporting shoe, through the installation backing plate, can place the instrument that needs use at the backing plate top, perhaps make the staff stand at the backing plate top.
Compared with the prior art, the utility model provides a civil engineering construction support possesses following beneficial effect:
1. this civil engineering building construction support through seting up first hole, second hole and third hole, is fixed the connecting rod by the fixed column, can make the construction support body can carry out convenient removal when needs remove, makes the construction support body fix when need not remove, has reached the beneficial effect that improves work efficiency.
2. This civil engineering construction support, through adopting the dead lever to run through the mode of through-hole and third hole to carry on spacingly and fixed to the connecting rod, do not adopt motor and electronic component to make the cost compare in traditional construction support greatly reduced on the market, reached low cost facilitate promotion's beneficial effect.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a perspective view of the present invention;
FIG. 3 is a perspective view of the present invention;
fig. 4 is a schematic side view of the structure of the present invention.
Wherein: 1. constructing a support body; 2. a housing; 3. a groove; 301. fixing the rod; 4. a grip; 5. a through hole; 6. a first hole; 7. a second hole; 8. fixing a column; 9. a rotating shaft; 10. a connecting rod; 11. a pulley; 12. a third hole; 13. a carrier tray; 14. a strut; 15. a support block; 16. a backing plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a civil engineering construction support comprises a construction support body 1, a casing 2 is installed at the bottom of the construction support body 1, a groove 3 is formed in the side surface of the casing 2, handles 4 are installed on the front surface and the back surface of the casing 2, a through hole 5 is formed in the front surface of the casing 2, the through hole 5 comprises a first hole 6 and a second hole 7, and a fixing column 8 penetrates through the through hole 5;
a fixing rod 301 is fixedly installed in the groove 3, the surface of the fixing rod 301 is sleeved with a rotating shaft 9, a connecting rod 10 is installed at the bottom of the rotating shaft 9, a pulley 11 is installed at the bottom of the connecting rod 10, and a third hole 12 is formed in the surface of the connecting rod 10;
the top of the shell 2 is provided with a bearing disc 13, the top of the bearing disc 13 is provided with a support rod 14, the top of the support rod 14 is provided with a support block 15, and the top of the support block 15 is provided with a backing plate 16.
Specifically, casing 2 is installed in 1 bottom of construction support body, and recess 3 is seted up in 2 sides of casing and is run through casing 2, and handle 4 symmetry just is installed respectively at 2 openly and backs of casing, and the advantage is through seting up the side of recess 3 at casing 2, and recess 3 runs through casing 2, can install the structure that needs in recess 3, installs the front and the back at casing 2 through handle 4 symmetry, can carry out convenient removal to construction support body 1.
Specifically, the through hole 5 is arranged on the front surface of the shell 2, the through hole 5 comprises a first hole 6 and a second hole 7, the first hole 6 is arranged vertically, the second hole 7 is arranged horizontally, both the first hole 6 and the second hole 7 penetrate through the shell 2, the fixing column 8 is arranged in the through hole 5, the fixing column 8 penetrates through the through hole 5, the number of the fixing column 8 is at least six, the advantages that the connecting rod 10 is fixed when vertically moving through the vertical first hole 6, the connecting rod 10 is fixed when horizontally moving through the horizontal second hole 7, thereby fixing the construction bracket body 1 which needs to be fixed, and the fixing column 8 can be flexibly inserted between the first hole 6 and the second hole 7 through the consistent size of the two holes, meanwhile, the number of the fixing columns 8 is at least six, and the fixing columns can effectively penetrate through enough through holes 5, so that the construction support body 1 can be used for different conditions.
Specifically, dead lever 301 fixed mounting is at the inside top of recess 3, pivot 9 cup joints in dead lever 301 surface, the welding of pivot 9 bottom has connecting rod 10, connecting rod 10 bottom installation pulley 11, the advantage is the top of welding in recess 3 inside through installation dead lever 301, pivot 9 cup joints in dead lever 301 surface simultaneously, can make the rotation of pivot 9 nimble in recess 3, just install pulley 11 bottom connecting rod 10 at connecting rod 10 through pivot 9 bottom welding connecting rod, can drive construction support body 1 by pulley 11 and remove.
Specifically, the third hole 12 is formed on the surface of the connecting rod 10 and penetrates through the connecting rod 10, the third hole 12 corresponds to the first hole 6 when being vertical, and the third hole 12 corresponds to the second hole 7 when being horizontal, which is advantageous in that by forming the third hole 12 penetrating through the connecting rod 10 on the surface of the connecting rod 10, when the construction bracket body 1 needs to be moved, the fixing column 8 passes through the first hole 6 and the third hole 12 to fix the connecting rod 10, thereby limiting the pulley 11 at the bottom of the connecting rod 10, when the construction bracket body 1 needs to be fixed, rotate connecting rod 10 through pivot 9 earlier, make the position of second hole 7 and the position of third hole 12 corresponding, fixed column 8 passes second hole 7 and third hole 12 afterwards and fixes connecting rod 10 to make pulley 11 keep away from ground and reach the effect fixed to construction support body 1.
Specifically, bear set 13 fixed mounting in 2 top four corners of casing, branch 14 fixed mounting bears set 13 top center department, supporting shoe 15 movable mounting is at branch 14 top, backing plate 16 fixed mounting is at supporting shoe 15 top, the advantage bears set 13 through the installation and supports the branch 14 of bearing the installation of set 13 top center department, support block 15 through branch 14 to the installation of branch 14 top, support backing plate 16 through installation supporting shoe 15 to the installation of supporting shoe 15 top, through installation backing plate 16, can place the instrument that needs to use at backing plate 16 top, or make the staff stand at backing plate 16 top.
When the fixing device is used, when the fixing device needs to be moved, the fixing column 8 is inserted into the first hole 6 and penetrates through the third hole 12, the connecting rod 10 is limited, after the fixing column 8 reaches a specified place, the fixing column 8 is pulled out of the first hole 6, the connecting rod 10 is shifted by a hand to enable the position of the third hole 12 to correspond to the position of the second hole 7, and the fixing column 8 is detached from the second hole 7 and penetrates through the third hole 12 to fix the connecting rod 10.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a civil engineering construction support, includes construction support body (1), its characterized in that: a shell (2) is installed at the bottom of the construction support body (1), a groove (3) is formed in the side face of the shell (2), grips (4) are installed on the front face and the back face of the shell (2), a through hole (5) is formed in the front face of the shell (2), the through hole (5) comprises a first hole (6) and a second hole (7), and a fixing column (8) penetrates through the through hole (5);
a fixing rod (301) is fixedly installed in the groove (3), the surface of the fixing rod (301) is sleeved with a rotating shaft (9), a connecting rod (10) is installed at the bottom of the rotating shaft (9), a pulley (11) is installed at the bottom of the connecting rod (10), and a third hole (12) is formed in the surface of the connecting rod (10);
the bearing disc (13) is installed at the top of the shell (2), the supporting rod (14) is installed at the top of the bearing disc (13), the supporting block (15) is installed at the top of the supporting rod (14), and the backing plate (16) is installed at the top of the supporting block (15).
2. The civil engineering construction support of claim 1, wherein: the construction support is characterized in that the shell (2) is installed at the bottom of the construction support body (1), the grooves (3) are formed in the side face of the shell (2) and penetrate through the shell (2), and the handles (4) are symmetrically installed on the front face and the back face of the shell (2) respectively.
3. The civil engineering construction support of claim 1, wherein: through-hole (5) are seted up at casing (2) openly, through-hole (5) include first hole (6) and second hole (7), first hole (6) are perpendicular form and arrange, second hole (7) are horizontal form and arrange, casing (2) are all run through in first hole (6) and second hole (7), install in through-hole (5) fixed column (8), fixed column (8) run through-hole (5), the quantity of fixed column (8) is six at least.
4. The civil engineering construction support of claim 1, wherein: dead lever (301) fixed mounting is at the inside top of recess (3), pivot (9) cup joint in dead lever (301) surface, the welding of pivot (9) bottom has connecting rod (10), connecting rod (10) bottom installation pulley (11).
5. A civil engineering construction support according to claim 3, wherein: the third hole (12) is formed in the surface of the connecting rod (10) and penetrates through the connecting rod (10), the third hole (12) corresponds to the first hole (6) in position when vertical, and the third hole (12) corresponds to the second hole (7) in position when horizontal.
6. The civil engineering construction support of claim 1, wherein: bear dish (13) fixed mounting in casing (2) top four corners, branch (14) fixed mounting bears dish (13) top center department, supporting shoe (15) movable mounting is at branch (14) top, backing plate (16) fixed mounting is at supporting shoe (15) top.
CN202120523512.1U 2021-03-12 2021-03-12 Civil engineering construction support Expired - Fee Related CN214575482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120523512.1U CN214575482U (en) 2021-03-12 2021-03-12 Civil engineering construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120523512.1U CN214575482U (en) 2021-03-12 2021-03-12 Civil engineering construction support

Publications (1)

Publication Number Publication Date
CN214575482U true CN214575482U (en) 2021-11-02

Family

ID=78353925

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120523512.1U Expired - Fee Related CN214575482U (en) 2021-03-12 2021-03-12 Civil engineering construction support

Country Status (1)

Country Link
CN (1) CN214575482U (en)

Similar Documents

Publication Publication Date Title
CN209802359U (en) Land reclamation engineering is investigation device on spot
CN214575482U (en) Civil engineering construction support
CN212689511U (en) Civil engineering construction support
CN217620541U (en) Pipe fitting storage rack for civil engineering
CN216641339U (en) Civil engineering construction support
CN212562371U (en) Civil engineering construction support
CN215811001U (en) Civil engineering building monitoring devices
CN214743772U (en) A positioning support that arranges for municipal drainage engineering's pipeline
CN215760686U (en) Support is used in civil engineering construction
CN213654154U (en) Lifting type construction platform for house building engineering
CN212054040U (en) Novel environment-friendly energy-saving coffin chamber
CN210800249U (en) Multifunctional pulley bracket for laying pipeline by adopting non-excavation technology
CN216887901U (en) Pipe fitting placer for building civil engineering
CN210860477U (en) Electric temporary supporting device for civil engineering construction
CN210979223U (en) Bridge engineering bridge reconnaissance support for equipment
CN213568819U (en) Civil engineering building unwrapping wire equipment
CN211173220U (en) Strutting arrangement for civil engineering
CN210667524U (en) Warning sign is used in construction of building gardens
CN211850785U (en) Civil engineering is with construction template
CN211229796U (en) Protective net for constructional engineering
CN219113981U (en) Detachable operation table
CN213650539U (en) Large-scale engineering pipe fitting rack of building
CN219241535U (en) Protective fence for constructional engineering
CN213858926U (en) Positioning equipment for detecting drive axle of loader
CN215562678U (en) Civil engineering bank protection protector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211102