Prior art keywords
bottom plate
interior pole
civil engineering
support
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021323775.XU
Other languages
Chinese (zh)
Inventor
辛宇
曹静
朱丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021323775.XU priority Critical patent/CN212689511U/en
Application granted granted Critical
Publication of CN212689511U publication Critical patent/CN212689511U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a civil engineering building construction support, comprising a base plate, two spouts have been seted up to bottom plate bottom both ends symmetry, and the inside bilateral symmetry of spout is fixed with two dead levers, has cup jointed interior pole on the dead lever, and the sleeve pipe has been cup jointed at the bottom of the interior pole, and the sleeve pipe bottom is fixed with the stabilizer blade, and the arc is set to the stabilizer blade cross-section, and a plurality of upper and lower evenly distributed's first round hole has been seted up to interior pole front end, and the sleeve pipe front end runs through to peg graft has first inserted bar, and first inserted bar and first round hole are pegged. The utility model discloses in, the position of avris is changeed to interior pole of both sides for form the obtuse angle between interior pole and the bottom plate, hold up the bottom plate, can support on unevenness ground, it is further, respectively according to the ground topography that four stabilizer blades locate, the position of pole in the cover pipe in the regulation, peg graft the rigidity with interior pole through first inserted bar and first round hole, make the bottom plate be in the horizontality, thereby reach the effect that can carry out stable support on unevenness ground.

Description

Civil engineering construction support
Technical Field
The utility model relates to a construction support technical field especially relates to a civil engineering building construction support.
Background
Civil and architectural engineering refers to the applied materials, equipment, the technical activities of surveying, designing, constructing, maintaining, repairing and the like, and the objects of engineering construction, namely, various engineering facilities which are constructed on the ground or underground, on land or in water and directly or indirectly serve human life, production, military and scientific research, such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, harbors, power stations, airports, ocean platforms, water supply and drainage, protection engineering and the like.
In order to guarantee the progress of civil engineering construction, generally need use the construction support, and traditional civil engineering construction support structure is single, can only be used for ground level place to support, and in civil engineering construction, the ground on most construction sites is the unevenness, and consequently the direct limitation of current construction is great, consequently, makes corresponding improvement to this problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the civil engineering construction support that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a civil engineering construction support, includes the bottom plate, the bottom plate top is provided with supporting mechanism, two spouts have been seted up to bottom plate bottom both ends symmetry, the inside bilateral symmetry of spout has two dead levers through the bolt fastening, pole in having cup jointed on the dead lever, the arc wall with interior pole matching has all been seted up to the spout both sides, the sleeve pipe has been cup jointed to the inner rod bottom, the sleeve pipe bottom has the stabilizer blade through the bolt fastening, the stabilizer blade cross-section sets the arc, interior pole front end is seted up a plurality of first round holes that evenly distributed from top to bottom, the sleeve pipe front end runs through to peg graft and has first inserted bar, first inserted bar and first round hole are.
Preferably, a plurality of recesses have been seted up at bottom plate top bilateral symmetry to supporting mechanism, have all pegged graft in a plurality of recesses and have been had the bracing piece, all cup jointed on a plurality of bracing pieces and are fixed with the lantern ring, and the inboard welding of lantern ring has the connecting rod, has same backup pad through the bolt fastening between a plurality of connecting rods.
Preferably, a plurality of upright posts are symmetrically fixed on two sides of the bottom plate through bolts, and rollers are fixed on the bottoms of the upright posts through bolts.
Preferably, the bottom of the support leg is fixed with a reinforcing plate through a bolt, and the reinforcing plate is arranged to incline downwards from inside to outside.
Preferably, the sliding groove is internally and slidably connected with two sliding blocks, and the two ends of the bottom of each sliding block are bonded with the same rubber sleeve.
Preferably, the lantern ring is arranged to be in sliding connection with the supporting rod, a plurality of second round holes which are uniformly distributed up and down are formed in the supporting rod, a second inserting rod is inserted into the lantern ring, and the second inserting rod is inserted into the second round holes.
The utility model has the advantages that:
1. the device is provided with an inner rod, the inner rod on two sides is turned to the positions of the two sides, an obtuse angle is formed between the inner rod and the bottom plate, the bottom plate is supported, the bottom plate can be supported on uneven ground, and further the positions of the inner rod in the sleeve are adjusted according to the ground terrains where the four support legs are located, the position of the inner rod is fixed through the insertion of the first insertion rod and the first round hole, the bottom plate can be in a horizontal state, and the effect of stable support on uneven ground is achieved.
2. Be provided with the gusset plate among the device, the gusset plate slope sets up downwards, and gusset plate and stabilizer blade constitute and stabilize the triangle-shaped structure, can make the device when supporting, and the bottom stress point increases to strengthen the support stability of device.
3. Be provided with the rubber sleeve among the device, can rotate a plurality of interior poles to the bottom plate top when the device does not use, through the position of sliding slide block, then use the rubber sleeve to entangle interior pole, utilize the gyro wheel to carry out the device the removal can to make the device be convenient for deposit and remove.
4. The supporting plate can be moved by arranging the lantern ring to be in sliding connection with the supporting rod, the connecting rod and the lantern ring are driven to move, after the lantern ring is moved to a proper position, the lantern ring and the supporting plate are connected in an inserting mode through the second inserting rod and the second round hole, and the position of the lantern ring and the position of the supporting plate are fixed, so that the supporting height of the device can be properly adjusted, and the practicability of the device is enhanced.
Drawings
Fig. 1 is a schematic view of the overall structure of a civil engineering construction support provided by the utility model;
fig. 2 is a bottom structure schematic diagram of a bottom plate of the civil engineering construction support provided by the utility model;
fig. 3 is the utility model discloses embodiment 2 provides a civil engineering building construction support's supporting mechanism schematic diagram.
In the figure: the device comprises a base plate 1, a sliding groove 2, a fixing rod 3, an inner rod 4, an arc-shaped groove 5, a sleeve 6, a supporting leg 7, a reinforcing plate 8, a first round hole 9, a first inserted rod 10, a stand column 11, a roller 12, a sliding block 13, a rubber sleeve 14, a supporting rod 15, a lantern ring 16, a connecting rod 17, a supporting plate 18, a second round hole 19 and a second inserted rod 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
Referring to fig. 1-2, a civil engineering building construction support, including bottom plate 1, 1 top of bottom plate is provided with supporting mechanism, two spouts 2 have been seted up to 1 bottom both ends symmetry of bottom plate, 2 inside bilateral symmetry of spout has two dead levers 3 through the bolt fastening, interior pole 4 has been cup jointed on the dead lever 3, the arc wall 5 that matches with interior pole 4 has all been seted up to spout 2 both sides, interior pole 4 bottom has been cup jointed sleeve pipe 6, 6 bottoms of sleeve pipe have stabilizer blade 7 through the bolt fastening, 7 cross-sections of stabilizer blade set the arc, interior pole 4 front end is seted up a plurality of evenly distributed's about the first round hole 9, 6 front ends of sleeve pipe run through to peg graft and have first inserted bar 10, first inserted bar 10 pegs graft with first round hole 9.
The utility model discloses in, a plurality of recesses have been seted up at 1 top bilateral symmetry of bottom plate to supporting mechanism, it has bracing piece 15 all to peg graft in a plurality of recesses, all cup joint on a plurality of bracing pieces 15 and be fixed with the lantern ring 16, 16 inboard welding of lantern ring have connecting rod 17, there is same backup pad 18 through the bolt fastening between a plurality of connecting rod 17, 1 bottom bilateral symmetry of bottom plate has a plurality of stands 11 through the bolt fastening, there is gyro wheel 12 stand 11 bottom through the bolt fastening, 7 bottoms of stabilizer blade have gusset plate 8 through the bolt fastening, gusset plate 8 sets up by interior and the tilt is downward, sliding connection has two sliders 13 in 2 spouts, slider 13 bottom both ends bond has same rubber sleeve 14.
The working principle is as follows: during the use, all turn to the position of avris with two interior poles 4 of both sides, make and form the obtuse angle between interior pole 4 and the bottom plate 1, thereby hold up bottom plate 1, can support on uneven ground, it is further, respectively according to the ground topography that four stabilizer blades 7 locate, adjust interior pole 4 position in sleeve pipe 6, and peg graft through first inserted bar 10 and first round hole 9 with the rigidity of interior pole 4, can make bottom plate 1 be in the horizontality, thereby can carry out the outrigger on uneven ground, when the device does not use, rotate a plurality of interior poles 4 to bottom plate 1 top, position through sliding block 13, then use rubber sleeve 14 to entangle interior pole 4, utilize gyro wheel 12 to carry out the device's removal can, thereby make the device be convenient for deposit and remove.
Example 2
Referring to fig. 1-3, a civil engineering construction support, lantern ring 16 is set up to be connected with bracing piece 15 sliding, and the bracing piece 15 is equipped with a plurality of second round holes 19 that evenly distribute from top to bottom, and the lantern ring 16 is inserted and connected with second inserted bar 20, and second inserted bar 20 is inserted and connected with second round hole 19.
The working principle is as follows: during the use, can remove backup pad 18, drive connecting rod 17 and the lantern ring 16 and remove, remove to suitable position after, peg graft through second inserted bar 20 and second round hole 19, with the rigidity of lantern ring 16 and backup pad 18 to make the supporting height of the device can suitably adjust, thereby strengthen the practicality of the device.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a civil engineering construction support, includes bottom plate (1), bottom plate (1) top is provided with supporting mechanism, a serial communication port, two spout (2) have been seted up to bottom plate (1) bottom both ends symmetry, spout (2) inside bilateral symmetry has two dead lever (3) through the bolt fastening, pole (4) in having cup jointed on dead lever (3), arc wall (5) that match with interior pole (4) have all been seted up to spout (2) both sides, interior pole (4) bottom has cup jointed sleeve pipe (6), sleeve pipe (6) bottom has stabilizer blade (7) through the bolt fastening, stabilizer blade (7) cross-section sets to the arc, interior pole (4) front end sets up a plurality of first round hole (9) of evenly distributed from top to bottom, sleeve pipe (6) front end runs through and pegs graft and has first inserted bar (10), first inserted bar (10) and first round hole (9) are pegged graft.
2. The civil engineering building construction support according to claim 1, wherein the support mechanism is symmetrically provided with a plurality of grooves at two sides of the top of the bottom plate (1), the support rods (15) are inserted into the grooves, the support rods (15) are sleeved and fixed with lantern rings (16), the connecting rods (17) are welded at the inner sides of the lantern rings (16), and the same support plate (18) is fixed among the connecting rods (17) through bolts.
3. The civil engineering construction support according to claim 2, wherein a plurality of upright posts (11) are symmetrically fixed on both sides of the bottom plate (1) through bolts, and rollers (12) are fixed on the bottoms of the upright posts (11) through bolts.
4. A civil engineering construction support according to claim 3, characterised in that the bottom of the legs (7) are bolted with reinforcing plates (8), the reinforcing plates (8) being arranged to slope downwards from inside to outside.
5. The civil engineering construction support according to claim 4, wherein the sliding groove (2) is connected with two sliding blocks (13) in a sliding way, and the two ends of the bottom of the sliding blocks (13) are adhered with the same rubber sleeve (14).
6. The civil engineering construction support according to claim 4 or 5, wherein the lantern ring (16) is arranged to be in sliding connection with the support rod (15), the support rod (15) is provided with a plurality of second round holes (19) which are uniformly distributed up and down, the lantern ring (16) is inserted with a second insertion rod (20), and the second insertion rod (20) is inserted with the second round holes (19).
CN202021323775.XU 2020-07-08 2020-07-08 Civil engineering construction support Active CN212689511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021323775.XU CN212689511U (en) 2020-07-08 2020-07-08 Civil engineering construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021323775.XU CN212689511U (en) 2020-07-08 2020-07-08 Civil engineering construction support

Publications (1)

Publication Number Publication Date
CN212689511U true CN212689511U (en) 2021-03-12

Family

ID=74896310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021323775.XU Active CN212689511U (en) 2020-07-08 2020-07-08 Civil engineering construction support

Country Status (1)

Country Link
CN (1) CN212689511U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107171A (en) * 2021-03-19 2021-07-13 浙江东鹰装饰工程有限公司 Indoor furred ceiling board installation device
CN114809557A (en) * 2022-03-24 2022-07-29 安徽理工大学 Be applied to prefabricated building construction support

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113107171A (en) * 2021-03-19 2021-07-13 浙江东鹰装饰工程有限公司 Indoor furred ceiling board installation device
CN114809557A (en) * 2022-03-24 2022-07-29 安徽理工大学 Be applied to prefabricated building construction support
CN114809557B (en) * 2022-03-24 2024-02-23 安徽理工大学 Be applied to assembled building construction support

Similar Documents

Publication Publication Date Title
CN212689511U (en) Civil engineering construction support
CN211873950U (en) Combined supporting pile for civil engineering
CN207700821U (en) A kind of upright bar stringer
CN210482316U (en) Assembled foundation pit supporting structure device
CN105672136B (en) Erecting construction process for large-span steel-concrete combination beam
CN114673178B (en) Miniature anti-slide pile combined structure for ecological protection of side slope and construction method thereof
CN206158322U (en) Pole ware is held up to portable components of a whole that can function independently hydraulic pressure
CN214302749U (en) Civil engineering construction support
CN213571884U (en) Foundation tamping equipment for civil engineering
CN216040719U (en) Template support cantilever bearing structure
CN210177919U (en) Civil engineering construction support
CN211173220U (en) Strutting arrangement for civil engineering
CN215168103U (en) Building templates connects steelframe for civil engineering
CN208105828U (en) A kind of civil construction operation frame
CN212002145U (en) Civil engineering construction support
CN211682054U (en) Support is used in civil engineering construction
CN216505037U (en) Pipe fitting rack for civil engineering
CN214383916U (en) Civil engineering stake structure
CN211923654U (en) Civil engineering support of stable in structure
CN215442992U (en) Portable building construction platform
CN220248125U (en) Tunnel supporting structure with firm holding power
CN214006457U (en) Combined scaffold for civil engineering
CN211473299U (en) Novel scaffold
CN215761730U (en) Adjustable tunnel supporting structure
CN213181501U (en) Civil engineering building monitoring facilities

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant