CN214005461U - Highway is bridge construction bridge face concrete health preserving device for engineering - Google Patents

Highway is bridge construction bridge face concrete health preserving device for engineering Download PDF

Info

Publication number
CN214005461U
CN214005461U CN202022911973.4U CN202022911973U CN214005461U CN 214005461 U CN214005461 U CN 214005461U CN 202022911973 U CN202022911973 U CN 202022911973U CN 214005461 U CN214005461 U CN 214005461U
Authority
CN
China
Prior art keywords
adjusting plate
mounting bracket
bridge construction
bridge
highway engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022911973.4U
Other languages
Chinese (zh)
Inventor
吴华太
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022911973.4U priority Critical patent/CN214005461U/en
Application granted granted Critical
Publication of CN214005461U publication Critical patent/CN214005461U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a bridge construction bridge face concrete health preserving device for highway engineering, including adjustment mechanism, maintenance mechanism, adjustment mechanism includes fixed column, regulating plate, inserts the post, install on the fixed column the regulating plate, be provided with on the regulating plate insert the post, the regulating plate side is provided with the mount, the terminal surface is installed with the universal wheel under the mount; maintenance mechanism includes the loading board, removes subassembly, mounting bracket, the loading board up end is installed remove the subassembly, remove the subassembly up end and install the mounting bracket, the motor is installed to the mounting bracket inboard, the mounting bracket up end is provided with the swivel mount. The utility model discloses simple structure, reasonable in design, low in production cost has not only enlarged the area of spraying, has improved work efficiency, has practiced thrift the water resource, can adjust according to the width on road surface simultaneously, and the practicality is high.

Description

Highway is bridge construction bridge face concrete health preserving device for engineering
Technical Field
The utility model relates to a highway engineering technical field especially relates to bridge construction bridge floor concrete health preserving device for highway engineering.
Background
In the construction of highway engineering bridges, the importance of good and bad quality of bridge deck concrete is undoubted. The quality of the bridge deck concrete directly determines the durability of the asphalt layer attached to the bridge deck, thereby affecting driving safety and driving comfort. The timely and correct bridge deck concrete curing can ensure the requirement of cement gel on water in the hardening process, and meanwhile, the generation of shrinkage cracks is prevented, so that the quality influence on the bridge deck concrete is very important.
The bridge deck concrete curing is carried out 8-12 hours after the bridge deck concrete is poured and before the concrete is finally set. General construction site all adopts geotechnological cloth to cover to artifical with cask or the handheld for the water pipe water pump flood irrigation of staff or the eminence establish the form that the water tank relies on gravity to flow and keep the moist of geotechnological cloth, reach the purpose of health preserving, can cause the waste of water resource like this, some health preserving devices have realized automatic water spray, but can not adjust the scope of water spray according to the width on road surface, lead to the spray pipe longer, the practicality is lower.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a bridge construction bridge face concrete health preserving device for highway engineering in order to solve above-mentioned problem.
The utility model discloses a following technical scheme realizes above-mentioned purpose:
the bridge construction bridge surface concrete curing device for the highway engineering comprises an adjusting mechanism and a curing mechanism, wherein the adjusting mechanism comprises a fixed column, an adjusting plate and an inserting column, the adjusting plate is mounted on the fixed column, the inserting column is arranged on the adjusting plate, a fixing frame is arranged on the side surface of the adjusting plate, and universal wheels are mounted on the lower end surface of the fixing frame; maintenance mechanism includes the loading board, removes subassembly, mounting bracket, install the loading board up end remove the subassembly, remove the subassembly up end and install the mounting bracket, the motor is installed to the mounting bracket inboard, the mounting bracket up end is provided with the swivel mount, install the spray tube on the swivel mount, the mounting bracket rear portion is provided with the water tank, the water pump is installed to the water tank up end, be provided with the connecting pipe on the water pump.
As a further aspect of the present invention, the moving assembly includes a slide rail and an electric slider, and the slide rail is provided with the electric slider.
As a further scheme of the utility model, it includes slide rail, slip table, electronic flexible post to remove the subassembly, slidable mounting has on the slide rail the slip table, install through the bolt the slip table side electronic flexible post.
As a further aspect of the present invention, the adjusting plate is slidably connected to the fixing column, and the adjusting plate is provided with the same round hole on the fixing column.
As a further proposal, the adjusting plate is welded on the side of the adjusting plate, the universal wheel is installed on the lower end face of the fixing frame through bolts.
As a further scheme of the utility model, the motor with the swivel mount passes through the coupling joint, the spray tube passes through the bolt and installs on the swivel mount.
As a further aspect of the present invention, the connecting pipe is connected at both ends thereof to the water pump through pipe hoops.
Compared with the prior art, the beneficial effects of the utility model are that:
the adjusting mechanism is arranged to work in cooperation with the maintenance mechanism, so that the device not only enlarges the spraying area, improves the working efficiency and saves water resources; meanwhile, the width of the road surface can be adjusted, and the practicability is high.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
FIG. 1 is a perspective view of a concrete curing device for a bridge deck of a bridge construction for highway engineering according to an embodiment 1 of the present invention;
FIG. 2 is a front view of a concrete curing device for a bridge deck of a bridge construction for highway engineering according to an embodiment 1 of the present invention;
FIG. 3 is a top view of an embodiment 1 of the concrete curing device for bridge deck of bridge construction for highway engineering of the present invention;
FIG. 4 is a left side view of an embodiment 1 of a bridge construction bridge deck concrete curing device for highway engineering according to the present invention;
FIG. 5 is a front view of the maintenance mechanism of embodiment 2 of the bridge construction bridge deck concrete health preserving device for highway engineering.
The reference numerals are explained below:
1. an adjustment mechanism; 2. a maintenance mechanism; 101. fixing a column; 102. an adjusting plate; 103. inserting a column; 104. a fixed mount; 105. a universal wheel; 201. a carrier plate; 202. a slide rail; 203. an electric slider; 204. a mounting frame; 205. a motor; 206. rotating; 207. a nozzle; 208. a water tank; 209. a water pump; 210. a connecting pipe; 211. a sliding table; 212. electric telescopic column.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The present invention will be further explained with reference to the accompanying drawings.
Example 1
As shown in fig. 1, fig. 2, fig. 3 and fig. 4, the utility model provides a technical solution: a bridge construction bridge surface concrete curing device for highway engineering comprises an adjusting mechanism 1 and a maintenance mechanism 2, wherein the adjusting mechanism 1 comprises a fixed column 101, an adjusting plate 102 and an inserting column 103, the adjusting plate 102 is installed on the fixed column 101, the adjusting plate 102 is used for adjusting according to needs, the inserting column 103 is arranged on the adjusting plate 102 and used for fixing, a fixing frame 104 is arranged on the side surface of the adjusting plate 102, a universal wheel 105 is installed on the lower end surface of the fixing frame 104, the universal wheel 105 is used for facilitating movement, the maintenance mechanism 2 comprises a bearing plate 201, a moving assembly and a mounting frame 204, the moving assembly is installed on the upper end surface of the bearing plate 201, the mounting frame 204 is installed on the upper end surface of the moving assembly, a motor 205 is installed on the inner side of the mounting frame 204, a rotary seat 206 is arranged on the upper end surface of the mounting frame 204, the rotary seat 206 is used for swinging the spray pipe 207, the spray pipe 207 is installed on the rotary seat 206, and a water tank 208 is arranged at the rear part of the mounting frame 204, the water pump 209 is installed on the upper end face of the water tank 208, and the connecting pipe 210 is arranged on the water pump 209.
On the basis of the above-described embodiment: the moving assembly comprises a slide rail 202 and an electric slider 203, and the electric slider 203 is slidably mounted on the slide rail 202; the adjusting plate 102 is connected with the fixing column 101 in a sliding mode, and the same round holes are formed in the adjusting plate 102 and the fixing column 101; the adjusting plate 102 is welded on the side surface of the adjusting plate 102, and the universal wheel 105 is installed on the lower end surface of the fixing frame 104 through a bolt; the motor 205 is connected with the rotary seat 206 through a coupling, and the spray pipe 207 is installed on the rotary seat 206 through a bolt; the two ends of the connecting pipe 210 are connected with the water pump 209 and the spray pipe 207 through pipe hoops.
The working principle is as follows: the fixing frames 104 of the device are arranged on two sides of a road surface, the water tank 208 is arranged right above the road surface, according to the width of the road surface, the adjusting plates 102 on two sides are made to be drawn in the fixing columns 101, the distance between the two fixing frames 104 is adjusted, then the inserting columns 103 are inserted into holes formed in the adjusting plates 102 and the fixing columns 101 to be fixed, then the water in the water tank 208 is pumped out by the water pump 209, the water is sprayed to the road surface below from the spraying pipe 207 through the connecting pipe 210 to be maintained, meanwhile, the motor 205 drives the rotary seat 206 to rotate, the spraying pipe 207 is made to swing left and right, the electric sliding block 203 drives the spraying pipe 207 to reciprocate left and right along the sliding rail 202, the spraying area is enlarged, the device can be moved through the universal wheels 105, and the maintenance of the whole road surface is completed.
Example 2
As shown in fig. 5, embodiment 2 differs from embodiment 1 in that the moving assembly includes a slide rail 202, a slide table 211, and an electric telescopic column 212, the slide rail 202 has the slide table 211 slidably mounted thereon, and the electric telescopic column 212 is mounted on a side surface of the slide table 211 through a bolt.
The electric sliding block 203 moves along the sliding rail 202, and is replaced by the electric telescopic column 212 to stretch and retract, so as to drive the sliding table 211 to move along the sliding rail 202.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (7)

1. Highway is bridge construction bridge face concrete health preserving device for engineering, its characterized in that: the maintenance device comprises an adjusting mechanism (1) and a maintenance mechanism (2), wherein the adjusting mechanism (1) comprises a fixing column (101), an adjusting plate (102) and an inserting column (103), the adjusting plate (102) is installed on the fixing column (101), the inserting column (103) is arranged on the adjusting plate (102), a fixing frame (104) is arranged on the side surface of the adjusting plate (102), and a universal wheel (105) is installed on the lower end surface of the fixing frame (104); maintenance mechanism (2) include loading board (201), remove subassembly, mounting bracket (204), install loading board (201) up end remove the subassembly, remove the subassembly up end and install mounting bracket (204), motor (205) are installed to mounting bracket (204) inboard, mounting bracket (204) up end is provided with swivel mount (206), install spray tube (207) on swivel mount (206), mounting bracket (204) rear portion is provided with water tank (208), water pump (209) are installed to water tank (208) up end, be provided with connecting pipe (210) on water pump (209).
2. The bridge construction bridge deck concrete curing device for highway engineering according to claim 1, wherein: the moving assembly comprises a sliding rail (202) and an electric sliding block (203), wherein the electric sliding block (203) is installed on the sliding rail (202) in a sliding mode.
3. The bridge construction bridge deck concrete curing device for highway engineering according to claim 1, wherein: the movable assembly comprises a sliding rail (202), a sliding table (211) and an electric telescopic column (212), the sliding table (211) is arranged on the sliding rail (202) in a sliding mode, and the electric telescopic column (212) is arranged on the side face of the sliding table (211) through a bolt.
4. The bridge construction bridge deck concrete curing device for highway engineering according to claim 1, wherein: the adjusting plate (102) is connected with the fixing column (101) in a sliding mode, and the adjusting plate (102) and the fixing column (101) are provided with the same round holes.
5. The bridge construction bridge deck concrete curing device for highway engineering according to claim 1, wherein: the adjusting plate (102) is welded on the side surface of the adjusting plate (102), and the universal wheel (105) is installed on the lower end surface of the fixing frame (104) through a bolt.
6. The bridge construction bridge deck concrete curing device for highway engineering according to claim 1, wherein: the motor (205) is connected with the rotary seat (206) through a coupling, and the spray pipe (207) is installed on the rotary seat (206) through a bolt.
7. The bridge construction bridge deck concrete curing device for highway engineering according to claim 1, wherein: and two ends of the connecting pipe (210) are connected with the water pump (209) and the spray pipe (207) through pipe hoops.
CN202022911973.4U 2020-12-08 2020-12-08 Highway is bridge construction bridge face concrete health preserving device for engineering Active CN214005461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022911973.4U CN214005461U (en) 2020-12-08 2020-12-08 Highway is bridge construction bridge face concrete health preserving device for engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022911973.4U CN214005461U (en) 2020-12-08 2020-12-08 Highway is bridge construction bridge face concrete health preserving device for engineering

Publications (1)

Publication Number Publication Date
CN214005461U true CN214005461U (en) 2021-08-20

Family

ID=77309793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022911973.4U Active CN214005461U (en) 2020-12-08 2020-12-08 Highway is bridge construction bridge face concrete health preserving device for engineering

Country Status (1)

Country Link
CN (1) CN214005461U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434230A (en) * 2022-10-26 2022-12-06 焦建立 Road marking working vehicle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115434230A (en) * 2022-10-26 2022-12-06 焦建立 Road marking working vehicle
CN115434230B (en) * 2022-10-26 2023-10-13 焦建立 Road marking construction work vehicle

Similar Documents

Publication Publication Date Title
CN214005461U (en) Highway is bridge construction bridge face concrete health preserving device for engineering
CN209260518U (en) A kind of highway maintenance equipment
CN117226974A (en) Precast box girder curing means
CN113202024A (en) Sand box body for unloading steel structure net and truss
CN217751973U (en) Building concrete pipe pile curing means
CN212153045U (en) Be used for civil engineering watering device
CN216663837U (en) Pier concrete placement's heat sink
CN212375695U (en) Template system suitable for hollow high pier
CN211547202U (en) Highway engineering uses quick levelling device that shakes
CN215814753U (en) Road bed water flow scouring simulation device for highway design
CN213867229U (en) Road surface is repaired with floating device
CN213233759U (en) Pipe wall repairing robot
CN218518885U (en) Concrete people prevents curing means for door
CN220701072U (en) Rail vehicle belt cleaning device
CN213967210U (en) Portable building site dust fall spray set
CN218090573U (en) Highway bridge crack reinforcing apparatus
CN220667007U (en) Steel construction wind tower platform mounting bracket
CN220184478U (en) Slope section concrete placement blocking device
CN218542149U (en) Drilling equipment is used in road bridge municipal construction
CN212801368U (en) Highway construction and maintenance device
CN216688944U (en) Maintenance equipment that road and bridge were used
CN107395111A (en) One kind floating photovoltaic plant O&M car system
CN219157567U (en) Water conservancy dykes and dams strengthening equipment
CN211947754U (en) Road and bridge crack reinforced structure
CN221031302U (en) Civil engineering construction support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant