CN213869194U - Bearing support for construction - Google Patents

Bearing support for construction Download PDF

Info

Publication number
CN213869194U
CN213869194U CN202021125381.3U CN202021125381U CN213869194U CN 213869194 U CN213869194 U CN 213869194U CN 202021125381 U CN202021125381 U CN 202021125381U CN 213869194 U CN213869194 U CN 213869194U
Authority
CN
China
Prior art keywords
main upright
plate
buckling
upright post
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021125381.3U
Other languages
Chinese (zh)
Inventor
张红旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Yonggu Construction Co ltd
Original Assignee
Nantong Yonggu Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Yonggu Construction Co ltd filed Critical Nantong Yonggu Construction Co ltd
Priority to CN202021125381.3U priority Critical patent/CN213869194U/en
Application granted granted Critical
Publication of CN213869194U publication Critical patent/CN213869194U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a bearing bracket for building construction, which comprises a grounding plate and a main upright post; the top of the grounding plate is provided with a main upright post; the side surface of the main upright post is provided with a rectangular first opening, the bottom end surface of the main upright post is welded with an end surface plate, the bottom of the end surface plate is provided with a first threaded hole, and the end surface plate is fixedly connected with the grounding plate through a screw; a plurality of second openings are formed in the main upright column, a middle mounting plate is arranged in the middle of each second opening, and the middle mounting plate is welded and connected with the inner wall of the main upright column; the middle mounting plate is sleeved with a mounting platform; the utility model adopts the phi 60mm steel pipe as the upright column to ensure the integral stability of the bearing bracket system, and the foundation adopts reinforced concrete to enlarge the foundation, thereby having wide application range and wide application range; the utility model discloses a plurality of parts form through the screw combination, and transportation and installation are all very convenient, have solved the inconvenient problem of traditional bearing support transportation, make things convenient for staff's operation.

Description

Bearing support for construction
Technical Field
The utility model relates to a civil engineering is equipped with the field, specifically is a bearing support for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
The traditional bearing support only bears vertical load, and the lateral swing is large when an earthquake occurs, so that a close facility is extremely easy to damage, the electromechanical engineering system of the building is damaged, and the later maintenance difficulty is increased. .
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bearing support for construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a bearing support for building construction comprises a ground plate and a main upright post; the top of the grounding plate is provided with a main upright post;
the side surface of the main upright post is provided with a rectangular first opening, the bottom end surface of the main upright post is welded with an end surface plate, the bottom of the end surface plate is provided with a first threaded hole, and the end surface plate is fixedly connected with the grounding plate through a screw;
a plurality of second openings are formed in the main upright column, a middle mounting plate is arranged in the middle of each second opening, and the middle mounting plate is welded and connected with the inner wall of the main upright column; the middle mounting plate is sleeved with a mounting platform,
the mounting table comprises a bearing sleeve, and a bearing disc is integrally formed at the top of the bearing sleeve;
the bearing disc is sleeved on the main upright post and is not fixedly connected with the main upright post, the bearing sleeve comprises two semi-annular buckling rings which are mutually buckled, one end of each semi-annular buckling ring is provided with a buckling groove, the other end of each semi-annular buckling ring is provided with a buckling block, the buckling blocks are matched with the buckling grooves, and the buckling blocks are fixedly connected with the buckling grooves through bolts after being buckled with the buckling grooves; the inner side of the semi-annular buckling rings is also provided with an inserting block, the lower end of the inserting block is provided with an inserting groove, the inserting groove is matched with the middle mounting plate, and the inserting groove can be just inserted on the middle mounting plate after the two semi-annular buckling rings are buckled;
the bottom of the lowest end of the main upright post is sleeved with the stabilizing sleeve, the grounding disc is integrally formed at the bottom of the stabilizing sleeve, four reinforcing ribs are integrally formed between the side part of the stabilizing sleeve and the grounding disc, and a second threaded hole is formed in the grounding disc.
Further, the grounding plate can be pre-embedded in the cement ground, and can also be fixed with the pre-embedded part through technical means such as bolts or welding.
Furthermore, the main upright post is a stainless steel pipe with the diameter of 60mm, and the bearing support adopts a stainless steel pipe main stress pile.
Further, the bearing plate can be fixed with the cross beam through bolts or other connection modes.
Furthermore, threaded holes or through holes are formed in the buckling blocks and the buckling grooves.
Further, the bearing disc is placed on the bearing sleeve and fixed with the bearing sleeve through bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
in the scheme, the phi 60mm steel pipe is used as the upright column, so that the integral stability of the bearing support system is ensured, and the foundation is enlarged by adopting reinforced concrete, so that the application range is wide and the application range is wide;
the utility model discloses a plurality of parts form through the screw combination, and transportation and installation are all very convenient, have solved the inconvenient problem of traditional bearing support transportation, make things convenient for staff's operation.
Drawings
Fig. 1 is a schematic structural view of a load-bearing support for building construction.
Fig. 2 is a schematic structural view of a mounting platform in a load-bearing support for building construction.
FIG. 3 is a schematic structural view of a semi-annular snap ring in a load-bearing support for building construction.
Fig. 4 is a schematic structural diagram of a stabilizing sleeve in a load-bearing support for building construction.
Detailed Description
The technical solution of the present patent will be described in further detail with reference to the following embodiments.
Referring to fig. 1 to 4, a load-bearing bracket for building construction includes a ground plate 100 and a main column 200;
the top of the grounding plate 100 is provided with a main upright post 200, and the grounding plate 100 can be pre-embedded in a cement ground and also can be fixed with an embedded part by technical means such as bolts or welding;
the main upright post 200 is a stainless steel pipe with the diameter of 60mm, the bearing support adopts a stainless steel pipe main stress pile,
the scheme adopts the phi 60mm steel pipe as the stand column, ensures the integral stability of the bearing support system, adopts reinforced concrete to expand the foundation, and has wide application range and wide application range.
A rectangular first opening 201 is formed in the side surface of the main upright column 200, an end plate 202 is welded on the end surface of the bottom of the main upright column 200, a first threaded hole 205 is formed in the bottom of the end plate 202, and the end plate 202 is fixedly connected with the ground plate 100 through a screw;
a plurality of second openings 203 are formed in the main upright column 200, a middle mounting plate 204 is arranged in the middle of each second opening 203, and the middle mounting plate 204 is welded and connected with the inner wall of the main upright column 200; the middle mounting plate 204 is sleeved with a mounting table 300,
the mounting table 300 comprises a bearing sleeve 310, a bearing disc 320 is integrally formed at the top of the bearing sleeve 310, and the bearing disc 320 can be fixed with the cross beam 400 through bolts or other connection modes;
the bearing disc 320 is sleeved on the main upright post 200 and is not fixedly connected with the main upright post 200, the bearing sleeve 310 comprises two semi-annular buckling rings 311 which are mutually buckled, one end of each semi-annular buckling ring 311 is provided with a buckling groove 312, the other end of each semi-annular buckling ring 311 is provided with a buckling block 313, each buckling block 313 is matched with the corresponding buckling groove 312, after the buckling blocks 313 are buckled with the corresponding buckling grooves 312, the buckling blocks are fixedly connected through bolts, and specifically, threaded holes or through holes are formed in the positions of the buckling blocks 313 and the buckling grooves 312; an insertion block 314 is further arranged on the inner side of the semi-annular buckling ring 311, an insertion groove 315 is formed in the lower end of the insertion block 314, the insertion groove 315 is matched with the middle mounting plate 204, and the two semi-annular buckling rings 311 can be just inserted into the middle mounting plate 204 through the insertion groove 315 after being buckled; the bearing plate 320 is placed on the bearing sleeve 310 and fixed with the bearing sleeve by bolts;
the stabilizing sleeve 500 is sleeved at the bottom of the lowest end of the main upright column 200, a grounding disc 510 is integrally formed at the bottom of the stabilizing sleeve 500, four reinforcing ribs 520 are integrally formed between the side part of the stabilizing sleeve 500 and the grounding disc 510, a second threaded hole 530 is formed in the grounding disc 510, a screw is connected to the second threaded hole 530 in a threaded manner, and the stabilizing sleeve 500 is used for sharing the stress of the main upright column 200 in the horizontal direction;
when the utility model is connected, the main upright post is fixed on the grounding plate 100 through the screw and the first threaded hole 205,
the utility model discloses a plurality of parts form through the screw combination, and transportation and installation are all very convenient, have solved the inconvenient problem of traditional bearing support transportation, make things convenient for staff's operation.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.

Claims (6)

1. A bearing support for building construction comprises a ground plate, a main upright post and a stabilizing sleeve; the top of the grounding plate is provided with a main upright post; the method is characterized in that:
the side surface of the main upright post is provided with a rectangular first opening, the bottom end surface of the main upright post is welded with an end surface plate, the bottom of the end surface plate is provided with a first threaded hole, and the end surface plate is fixedly connected with the grounding plate through a screw;
a plurality of second openings are formed in the main upright column, a middle mounting plate is arranged in the middle of each second opening, and the middle mounting plate is welded and connected with the inner wall of the main upright column; the middle mounting plate is sleeved with a mounting platform,
the mounting table comprises a bearing sleeve, and a bearing disc is integrally formed at the top of the bearing sleeve;
the bearing disc is sleeved on the main upright post and is not fixedly connected with the main upright post, the bearing sleeve comprises two semi-annular buckling rings which are mutually buckled, one end of each semi-annular buckling ring is provided with a buckling groove, the other end of each semi-annular buckling ring is provided with a buckling block, the buckling blocks are matched with the buckling grooves, and the buckling blocks are fixedly connected with the buckling grooves through bolts after being buckled with the buckling grooves; the inner side of the semi-annular buckling rings is also provided with an inserting block, the lower end of the inserting block is provided with an inserting groove, the inserting groove is matched with the middle mounting plate, and the inserting groove can be just inserted on the middle mounting plate after the two semi-annular buckling rings are buckled;
the bottom of the lowest end of the main upright post is sleeved with the stabilizing sleeve, the grounding disc is integrally formed at the bottom of the stabilizing sleeve, four reinforcing ribs are integrally formed between the side part of the stabilizing sleeve and the grounding disc, and a second threaded hole is formed in the grounding disc.
2. The load-bearing bracket for building construction according to claim 1, wherein the ground plate is embedded in a cement ground.
3. The load-bearing support for building construction according to claim 1, wherein the main upright is a stainless steel pipe with a diameter of 60mm, and the load-bearing support adopts a stainless steel pipe main stress pile.
4. The load-bearing support for building construction according to claim 1, wherein the receiving tray can pass through a bolt.
5. The load-bearing support for building construction according to claim 1, wherein the fastening blocks and the fastening grooves are provided with threaded holes or through holes.
6. The load-bearing support for building construction according to claim 1, wherein the receiving tray is placed on the receiving sleeve and fixed thereto by bolts.
CN202021125381.3U 2020-06-17 2020-06-17 Bearing support for construction Expired - Fee Related CN213869194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021125381.3U CN213869194U (en) 2020-06-17 2020-06-17 Bearing support for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021125381.3U CN213869194U (en) 2020-06-17 2020-06-17 Bearing support for construction

Publications (1)

Publication Number Publication Date
CN213869194U true CN213869194U (en) 2021-08-03

Family

ID=77032695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021125381.3U Expired - Fee Related CN213869194U (en) 2020-06-17 2020-06-17 Bearing support for construction

Country Status (1)

Country Link
CN (1) CN213869194U (en)

Similar Documents

Publication Publication Date Title
KR19990072014A (en) Lift-up method for building buildings from above to the ground
CN108086341B (en) Assembled adjustable foundation
CN113148893A (en) Hydraulic jacking load-bearing support and mounting method thereof
CN212053673U (en) Tower construction operation platform of dome
CN113638386B (en) Offshore wind power single pile socketed foundation construction is with assembled platform
CN204282530U (en) Adopt the industrial premises frame construction of prefabricated concrete column structure
CN213869194U (en) Bearing support for construction
CN207905104U (en) A kind of assembled architecture truss structure
CN106948367B (en) Wind power foundation assembled by quadrangular jacket column jacket and construction method thereof
CN115653373A (en) Double-spherical hinge support beam column anti-seismic structure system and construction method
CN110904986B (en) Precast pile-bearing platform assembly type foundation tenon type flange connection structure and construction method
CN212801921U (en) Steel platform leveling mechanism
CN205188982U (en) Removable system of strutting of rectangle work well
CN1206422C (en) Technology building up diagonal space brace by reverse masonry method
CN218668474U (en) Basket type overhanging bearing frame
CN211547754U (en) High slope anchor bolt support working platform
CN203904838U (en) Novel bracket structure for construction of box girders of soft soil foundation sites of high speed rail
CN112609979A (en) Wall connecting piece erecting method for connecting ultrahigh external frame of external wall
CN212201277U (en) High-support space template support system support
CN220486442U (en) Pile plane positioning device for pcmw construction method
CN219175949U (en) Open pore reinforced structure of large-span high-rise high brick wall
CN221027356U (en) Reverse hanging bracket
CN203320545U (en) Base structure of fixed type tower crane
CN220377356U (en) Basement adds armpit template installation and reinforcement construction structure
CN215484786U (en) Be used for pre-buried stop device of rag bolt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210803

CF01 Termination of patent right due to non-payment of annual fee