CN213370909U - Building construction cost progress management device - Google Patents

Building construction cost progress management device Download PDF

Info

Publication number
CN213370909U
CN213370909U CN202022153087.XU CN202022153087U CN213370909U CN 213370909 U CN213370909 U CN 213370909U CN 202022153087 U CN202022153087 U CN 202022153087U CN 213370909 U CN213370909 U CN 213370909U
Authority
CN
China
Prior art keywords
slot
fixed mounting
construction cost
building construction
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022153087.XU
Other languages
Chinese (zh)
Inventor
郭洪童
王立东
杨良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022153087.XU priority Critical patent/CN213370909U/en
Application granted granted Critical
Publication of CN213370909U publication Critical patent/CN213370909U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building construction cost progress management device, which comprises a device main body; the height of the tool plate can be adjusted through the telescopic action of the electric telescopic rod, so that people with different heights can operate on the tool plate conveniently; the motor drives the speed reducer to rotate, the speed reducer drives the second rotating shaft to rotate, and the second rotating shaft can drive the tool plate to rotate, so that the angle of the tool plate can be adjusted, and people sitting in different directions can see the contents on the tool plate; the sliding block can slide in the sliding groove by rotating the screw rod, so that the position of the pointer is adjusted; after the insert block is placed into the third slot and taken out of the third slot, the signal sensed by the pressure sensor changes, so that the indicator lamp can change, and the worker can know the completion condition of a certain work timely.

Description

Building construction cost progress management device
Technical Field
The utility model belongs to the technical field of the building, particularly, relate to a building engineering cost progress management device.
Background
The project cost is defined from the aspect of a contract and issue, namely the construction price of a project, namely the total sum of all expected or actually required expenses for completing the construction of the project, and the project cost is the price of a building installation project and the total price of the construction project, which are formed by the expected or actual trading modes such as bidding and the like on the markets such as land, equipment, technical labor and contract and the like for constructing the project; the current cost flow carries out cost calculation work of different stages according to the progress of the project for the information that the staff provided according to the owner to and the information that oneself obtained to the on-the-spot investigation to the project of accepting, can manage its progress at the in-process of engineering cost to completion cost calculation work on time, but current engineering cost progress management device simple structure, the function singleness, the practicality is low.
Consequently in order to solve above problem, the utility model provides a construction cost progress management device is built in room.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building construction cost progress management device to solve the problem of proposing among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a house construction project cost progress management device comprises a device main body, a bottom plate is fixedly arranged at the bottom end of the device main body, the top end of the bottom plate is fixedly provided with an electric telescopic rod, the top end of the electric telescopic rod is fixedly provided with a lifting plate, a motor box is fixedly arranged at the top end of the lifting plate, a motor is arranged in the motor box, the top end of the motor is fixedly provided with a speed reducer, the top end of the speed reducer is provided with a second rotating shaft, a tool plate is fixedly arranged at the top end of the second rotating shaft, a sliding groove is arranged at one side of the tool plate, a screw rod is arranged in the chute, a slide block is arranged on the screw rod in a penetrating connection way, a pointer is fixedly arranged on one side of the slide block, one side fixed mounting of instrument board has the third slot, the inside bottom fixed mounting of third slot has pressure sensor, one side fixed mounting of instrument board has the pilot lamp.
Furthermore, telescopic pillars are fixedly mounted on two sides of the top end of the bottom plate, and the top ends of the telescopic pillars are fixedly connected with the bottom end of the lifting plate.
Further, the equal fixed mounting in bottom both sides of bottom plate has the supporting leg, the bottom fixed mounting of supporting leg has the base, the wheel mounting panel is all installed to the bottom both sides of base, the wheel is installed to the bottom of wheel mounting panel, wheel through connection installs first pivot.
Further, the inside bottom fixed mounting of motor case has first fixing base, the top fixed mounting of first fixing base has the motor, the output of motor inner rotating shaft pass through the shaft coupling with the receiving terminal of speed reducer inner rotating shaft is connected, the output of speed reducer inner rotating shaft pass through the shaft coupling with the bottom of second pivot is connected.
Further, a second fixing seat is fixedly mounted on one side inside the sliding groove, one end of the screw rod is connected with the second fixing seat, the other end of the screw rod is in penetrating connection with one side of the tool plate, and a rotating hand is fixedly mounted on the other end of the screw rod.
Furthermore, one side of the tool plate is fixedly provided with a first slot and a second slot, and the first slot and the second slot are respectively arranged on two sides of the sliding groove.
Furthermore, an insertion block is inserted into and connected with the third slot.
Furthermore, a controller is fixedly mounted on one side of the tool plate, the pressure sensor is connected with the controller through a signal line, and the controller is connected with the indicator light through a signal line.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses in, can come the height adjustment to the instrument board through electric telescopic handle's flexible effect to the people of being convenient for different heights operate on the instrument board.
2. The utility model discloses in, drive the speed reducer through the motor and rotate, the speed reducer drives the second pivot and rotates, and the second pivot can drive the instrument board and rotate to the realization is adjusted the angle of instrument board, makes the people sitting in different positions can both see the content on the instrument board.
3. The utility model discloses in, through rotating the lead screw for the slider can slide in the spout, and then makes the position of pointer obtain the adjustment.
4. The utility model discloses in, through will inserting the piece place in the third slot and will insert the piece and take out the back from the third slot, the signal that pressure sensor experienced all can change, and then makes the pilot lamp can change, the completion condition of knowing certain work that the staff of being convenient for can be timely.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a front view of the present invention;
FIG. 3 is a schematic view of the internal structure of the motor case of the present invention;
fig. 4 is a schematic view of the internal structure of the sliding chute of the present invention.
Reference numerals:
1. a device main body; 2. a base plate; 201. an electric telescopic rod; 202. a telescopic strut; 203. a lifting plate; 3. supporting legs; 301. a base; 302. a wheel mounting plate; 303. a wheel; 304. a first rotating shaft; 4. a motor case; 401. a first fixed seat; 402. a motor; 403. a speed reducer; 404. a second rotating shaft; 5. a tool plate; 501. a chute; 502. a screw rod; 503. a slider; 504. a pointer; 505. a second fixed seat; 506. turning the hand; 6. a first slot; 7. a second slot; 8. a third slot; 801. a pressure sensor; 802. inserting a block; 9. an indicator light; 10. and a controller.
Detailed Description
The following, with reference to the drawings and the detailed description, further description of the present invention is made:
referring to fig. 1-4, a building construction cost schedule management device according to an embodiment of the present invention includes a device main body 1, a bottom plate 2 is fixedly installed at a bottom end of the device main body 1, an electric telescopic rod 201 is fixedly installed at a top end of the bottom plate 2, a lifting plate 203 is fixedly installed at a top end of the electric telescopic rod 201, a motor box 4 is fixedly installed at a top end of the lifting plate 203, a motor 402 is installed inside the motor box 4, a speed reducer 403 is fixedly installed at a top end of the motor 402, a second rotating shaft 404 is installed at a top end of the speed reducer 403, a tool plate 5 is fixedly installed at a top end of the second rotating shaft 404, a chute 501 is arranged at one side of the tool plate 5, a lead screw 502 is installed inside the chute 501, a slider 503 is installed on the lead screw 502 in a penetrating manner, a pointer 504 is fixedly installed, one side fixed mounting of instrument board 5 has third slot 8, the inside bottom fixed mounting of third slot 8 has pressure sensor 801, one side fixed mounting of instrument board 5 has pilot lamp 9.
Through the above scheme of the present invention, both sides of the top end of the bottom plate 2 are fixedly installed with the telescopic pillars 202, and the top ends of the telescopic pillars 202 are fixedly connected with the bottom ends of the lifting plates 203; the two sides of the bottom end of the bottom plate 2 are fixedly provided with supporting legs 3, the bottom end of each supporting leg 3 is fixedly provided with a base 301, two sides of the bottom end of each base 301 are respectively provided with a wheel mounting plate 302, the bottom end of each wheel mounting plate 302 is provided with a wheel 303, and each wheel 303 is provided with a first rotating shaft 304 in a penetrating and connecting manner; a first fixed seat 401 is fixedly installed at the bottom end inside the motor box 4, the motor 402 is fixedly installed at the top end of the first fixed seat 401, the output end of a rotating shaft in the motor 402 is connected with the receiving end of a rotating shaft in the speed reducer 403 through a coupler, and the output end of the rotating shaft in the speed reducer 403 is connected with the bottom end of the second rotating shaft 404 through a coupler; a second fixed seat 505 is fixedly installed on one side inside the sliding groove 501, one end of the screw rod 502 is connected with the second fixed seat 505, the other end of the screw rod 502 is connected with one side of the tool plate 5 in a penetrating manner, and a rotating handle 506 is fixedly installed on the other end; a first slot 6 and a second slot 7 are further fixedly mounted on one side of the tool plate 5, and the first slot 6 and the second slot 7 are respectively arranged on two sides of the sliding groove 501; an insert block 802 is inserted into the third slot 8; a controller 10 is fixedly mounted on one side of the tool plate 5, the pressure sensor 801 is connected with the controller 10 through a signal line, and the controller 10 is connected with the indicator light 9 through a signal line.
In a specific application, the wheel 303 is convenient for moving the device, the height of the tool plate 5 can be adjusted by the telescopic action of the electric telescopic rod 201, when the height of the tool plate 5 is adjusted to a proper position, a worker inserts progress cards into the first slot 6 and the second slot 7, then inserts the insert block 802 into the third slot 8, at the moment, the pressure sensor 801 detects that the pressure changes, the pressure sensor 801 transmits a signal to the controller 10, the controller 10 transmits the signal to the indicator light 9, the indicator light 9 is turned on in red to indicate that a certain work is not completed, after the work is completed, the insert block 802 is taken out from the third slot 8, at the moment, the pressure value sensed by the pressure sensor 801 changes again, the signal is transmitted to the controller 10, the controller 10 transmits the signal to the indicator light 9, indicator 9 lights green light, it has accomplished to show this work, then lead screw 502 rotates, make slider 503's position can be adjusted, and then make the position of pointer 504 can be adjusted, thereby the staff of being convenient for can know which work should be accomplished now, then the work of repeated pressure sensor 801 and indicator 9, can drive speed reducer 403 through motor 402 and rotate, speed reducer 403 can drive second pivot 404 and rotate, second pivot 404 can drive instrument panel 5 and rotate, thereby make the angle of instrument panel 5 can be adjusted.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a building construction cost progress management device, its characterized in that, includes device main part (1), the bottom fixed mounting of device main part (1) has bottom plate (2), the top fixed mounting of bottom plate (2) has electric telescopic handle (201), the top fixed mounting of electric telescopic handle (201) has lifter plate (203), the top fixed mounting of lifter plate (203) has motor case (4), the internally mounted of motor case (4) has motor (402), the top fixed mounting of motor (402) has speed reducer (403), second pivot (404) are installed on the top of speed reducer (403), the top fixed mounting of second pivot (404) has instrument panel (5), one side of instrument panel (5) is equipped with spout (501), the internally mounted of spout (501) has lead screw (502), through connection installs slider (503) on lead screw (502), one side fixed mounting of slider (503) has pointer (504), one side fixed mounting of instrument board (5) has third slot (8), the inside bottom fixed mounting of third slot (8) has pressure sensor (801), one side fixed mounting of instrument board (5) has pilot lamp (9).
2. The building construction cost schedule management device according to claim 1, characterized in that, telescopic pillars (202) are fixedly installed on both sides of the top end of the bottom plate (2), and the top ends of the telescopic pillars (202) are fixedly connected with the bottom end of the lifting plate (203).
3. The building construction cost progress management device according to claim 1, characterized in that both sides of the bottom end of the bottom plate (2) are fixedly provided with supporting legs (3), the bottom end of the supporting legs (3) is fixedly provided with a base (301), both sides of the bottom end of the base (301) are provided with wheel mounting plates (302), the bottom end of the wheel mounting plates (302) is provided with wheels (303), and the wheels (303) are provided with a first rotating shaft (304) in a penetrating connection mode.
4. The building construction cost progress management device according to claim 1, characterized in that a first fixing seat (401) is fixedly installed at the bottom end of the inside of the motor box (4), the motor (402) is fixedly installed at the top end of the first fixing seat (401), the output end of the inner rotating shaft of the motor (402) is connected with the receiving end of the inner rotating shaft of the speed reducer (403) through a coupler, and the output end of the inner rotating shaft of the speed reducer (403) is connected with the bottom end of the second rotating shaft (404) through a coupler.
5. The building construction cost progress management device according to claim 1, characterized in that a second fixing seat (505) is fixedly installed on one side of the inside of the sliding groove (501), one end of the screw rod (502) is connected with the second fixing seat (505), the other end of the screw rod (502) is connected with one side of the tool plate (5) in a penetrating manner, and a rotating handle (506) is fixedly installed on the other end.
6. The building construction cost progress management device according to claim 1, wherein a first slot (6) and a second slot (7) are further fixedly installed on one side of the tool plate (5), and the first slot (6) and the second slot (7) are respectively arranged on two sides of the sliding groove (501).
7. The building construction cost schedule management apparatus according to claim 1, wherein an insert block (802) is inserted and connected in the third slot (8).
8. The building construction cost progress management device according to claim 1, wherein a controller (10) is fixedly installed on one side of the tool plate (5), the pressure sensor (801) is connected with the controller (10) through a signal line, and the controller (10) is connected with the indicator light (9) through a signal line.
CN202022153087.XU 2020-09-27 2020-09-27 Building construction cost progress management device Expired - Fee Related CN213370909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022153087.XU CN213370909U (en) 2020-09-27 2020-09-27 Building construction cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022153087.XU CN213370909U (en) 2020-09-27 2020-09-27 Building construction cost progress management device

Publications (1)

Publication Number Publication Date
CN213370909U true CN213370909U (en) 2021-06-08

Family

ID=76183368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022153087.XU Expired - Fee Related CN213370909U (en) 2020-09-27 2020-09-27 Building construction cost progress management device

Country Status (1)

Country Link
CN (1) CN213370909U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114974028A (en) * 2022-06-17 2022-08-30 朱曼露 Overall process engineering cost progress management device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114974028A (en) * 2022-06-17 2022-08-30 朱曼露 Overall process engineering cost progress management device
CN114974028B (en) * 2022-06-17 2024-03-22 朱曼露 Whole process engineering cost progress management device

Similar Documents

Publication Publication Date Title
CN213370909U (en) Building construction cost progress management device
CN109655135A (en) A kind of liquid level sensor calibration equipment and method of calibration
CN206818204U (en) A kind of special plotting board of construction engineering cost
CN206360313U (en) A kind of meter reading aids in scaffold
CN206802658U (en) Instrument of surveying and mapping support
CN217331233U (en) Multi-parameter building construction site environment monitoring device
CN216364130U (en) Building engineering cost platform based on BIM technique
CN217802394U (en) Labor-saving portable prefabricated wall body reinforcing bar binding device
CN110686744A (en) Intelligent water meter with convenient disassembly and NFC (near field communication) diagnosis functions
CN208860951U (en) A kind of mobile range unit of indoor design
CN207456444U (en) A kind of digitized photography auxiliary device of architectural mapping accurate positioning
CN209328368U (en) It is a kind of municipal administration road and bridge design use split-join model
CN209388511U (en) Heliogreenhouse environmental Kuznets Curves experience system
CN212617303U (en) Education software commissioning auxiliary device based on popularization
CN215000656U (en) Multifunctional geographic information surveying instrument
CN215726045U (en) Measuring tool for building engineering management
CN110164253A (en) A kind of English teaching board convenient for operation demonstration
CN2884749Y (en) Portable electronic recording register
CN206322030U (en) A kind of eminence auxiliary device for meter reading
CN210234497U (en) Drawing stop device for engineering cost
CN2497986Y (en) Drawing instrument
CN220820925U (en) House model information display stand
CN213814481U (en) Marketing's information acquisition device
CN214484038U (en) Rotary control device for multimedia display
CN215417454U (en) Staff performance appraisal is with public device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210608