plate
installation
frame
installation pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210688003.3A
Other languages
Chinese (zh)
Other versions
CN114974028B (en
Inventor
朱曼露
陈伟男
陈伟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202210688003.3A priority Critical patent/CN114974028B/en
Publication of CN114974028A publication Critical patent/CN114974028A/en
Application granted granted Critical
Publication of CN114974028B publication Critical patent/CN114974028B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F15/00Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
    • G09F15/0006Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels
    • G09F15/0025Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels display surface tensioning means
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47BTABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
    • A47B63/00Cabinets, racks or shelf units, specially adapted for storing books, documents, forms, or the like
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F11/00Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position
    • G09F11/02Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position the display elements being secured to rotating members, e.g. drums, spindles
    • G09F11/08Indicating arrangements for variable information in which the complete information is permanently attached to a movable support which brings it to the display position the display elements being secured to rotating members, e.g. drums, spindles the elements being flexible sheets
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F15/00Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
    • G09F15/0006Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels
    • G09F15/0012Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels frames therefor
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F15/00Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
    • G09F15/02Bills, posters, or the like therefor

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Factory Administration (AREA)
  • Automatic Assembly (AREA)

Abstract

The invention relates to a management device, in particular to a whole-process engineering cost progress management device. The invention provides a whole-process engineering cost progress management device which not only can facilitate an operator to follow up cost information, but also can store important cost lists and data. The invention provides a whole-process engineering cost progress management device, which comprises a support frame, a box body, a hinged plate, a baffle plate, a mounting frame and the like; the upside of support frame is connected with the material and is the box of metal material, and the lower part slidingtype of box runs through has three to turn right the push-and-pull frame that the interval evenly set up from a left side, and the upside rotary type of push-and-pull frame is equipped with the guide rail plate that is used for the direction. The progress of engineering cost just can conveniently be known to the position according to the second clamp plate in the third installation pipe to the work of conveniently managing the engineering cost progress management is carried out to convenient management, stores the data through storing the box, takes out the use with this convenience in the operating personnel when needing.

Description

Overall process engineering cost progress management device
Technical Field
The invention relates to a management device, in particular to a whole-process engineering cost progress management device.
Background
The project cost is the sum of the estimated or actual expenditure construction cost for completing a project construction, and the accuracy of the sum is directly related to whether the project can be normally carried out. The engineering cost statistics work needs related supervise personnel to supervise and manage the work of the cost statistics work personnel, the mode is complicated, the timeliness of supervision and management can not be guaranteed, the supervision and management efficiency is low, the waste of human resources is caused, and therefore a special progress management device needs to be used for assisting progress management.
For example, a construction cost progress management device disclosed in patent publication No. CN214123434U and publication No. 20210903 includes a support column, a display board is disposed on the support column, and a progress paper for recording the construction cost progress is disposed on the display board. Although this engineering cost progress management device can assist the operating personnel to manage engineering cost's progress, simple structure, the function singleness can't make things convenient for the operating personnel to follow-up to cost information, can bring the trouble for the degree of advance management to also can't deposit important cost manifest and data, have the limitation.
According to the defects in the prior art, the whole-process engineering cost progress management device which can overcome the defects in the prior art, not only can be convenient for an operator to follow up cost information, but also can store important cost lists and data is designed.
Disclosure of Invention
The invention aims to overcome the defects that the prior art is simple in structure and single in function, an operator cannot conveniently follow up construction cost information, the trouble is brought to progress management, and important construction cost lists and data cannot be stored, so that the construction cost progress management device has limitation.
In order to solve the technical problems, the invention provides a whole-process engineering cost progress management device which comprises a support frame, a box body, hinged plates, baffles, a mounting frame, a guide rail plate, a push-pull frame, a follow-up mechanism, a storage mechanism and a zero clearing mechanism, wherein the upper side of the support frame is connected with the box body made of metal, the lower part of the box body is provided with three push-pull frames which are arranged at equal intervals from left to right in a sliding mode, the upper side of the push-pull frame is rotatably provided with the guide rail plate for guiding, the front side of the guide rail plate is connected with the mounting frame for displaying cost information, the front lower part of the box body is provided with the baffles which are used for protecting the mounting frame and made of metal in a sliding mode, the hinged plates which are provided with magnetism and can adsorb the baffles in a rotating mode at the front upper part of the box body, the follow-up mechanism for following up the cost progress and the storage mechanism for storing lists and data are arranged on the mounting frame, and a zero clearing mechanism for clearing the progress is arranged on the follow-up mechanism.
Preferably, the follow-up mechanism comprises a first mounting pipe, a first return spring, a piston block, a conveying pipe, a check valve, a second mounting pipe, a second return spring, a plugging block, a third mounting pipe, a second pressing plate and a first elastic part, wherein the upper side of the front part of the mounting frame is connected with the third mounting pipe made of transparent materials, the inner side of the left part of the third mounting pipe is provided with the second pressing plate in a sliding manner, a first elastic part which is used for resetting and is positioned in the third mounting pipe is connected between the right side of the second pressing plate and the right inner side of the third mounting pipe, the first elastic part is a rubber spring, the upper middle part of the mounting frame is penetrated with the first mounting pipe, the front part of the first mounting pipe is provided with the piston block in a sliding manner, a first return spring wound on the outer side of the piston block is connected between the piston block and the first mounting pipe, the rear part of the first mounting pipe is provided with the check valve, the upper side of the rear part of the first mounting pipe is communicated with the conveying pipe on the rear part of the left part of the third mounting pipe, a second mounting pipe is communicated between the two conveying pipes, and a blocking block used for blocking the conveying pipes and contacted with the conveying pipes on the first mounting pipe is connected to the inside of the second mounting pipe through a second return spring.
Preferably, the storage mechanism comprises a storage box, a rack and a straight gear, two storage boxes which are used for storing lists and data and are symmetrically arranged in a front-back mode are slidably arranged on the upper side of the guide rail plate, the rack is connected to the inner bottom side of the box body, and the straight gear which is meshed with the rack and connected with the guide rail plate is rotatably sleeved on the upper portion of the push-pull frame.
Preferably, the zero clearing mechanism comprises a first pressing plate, a third reset spring, an inserting rod and wedge blocks, the inserting rod penetrates through the left portion of the third installation pipe in a non-contact mode, the left side of the inserting rod is connected with the first pressing plate, the third reset spring wound outside the inserting rod is connected between the first pressing plate and the third installation pipe, and the rear side of the hinged plate is evenly connected with the three wedge blocks used for extruding the inserting rod and contacting with the inserting rod in a left-right interval mode.
Preferably, still including being used for striking warning mechanism of suggestion, warning mechanism is including instructing piece and flexible cloth, and the left side of second clamp plate is connected with the red instruction piece of colour, is connected with between the right side of second clamp plate and the right side inboard of third installation pipe and is connected with the flexible cloth that the colour is green and around in first elastic component.
Preferably, the clamping mechanism is used for clamping data, two groups of clamping mechanisms which are arranged in an up-down symmetrical mode are arranged on the installation frame, a guide rod, a second elastic piece and a clamping plate are arranged in one group of clamping mechanisms, the front side of the installation frame is connected with two guide rods which are used for guiding and are arranged in a left-right symmetrical mode, the clamping plate which is used for clamping data is sleeved between the middle parts of the two symmetrical guide rods in a sliding mode, and the two second elastic pieces which are arranged on the outer side of the guide rod in a winding mode are connected between the clamping plate and the installation frame.
Preferably, the box body further comprises an installation mechanism used for installing objects, the installation mechanism comprises an installation plate, guide pipes and pull ropes, the guide pipes used for guiding are connected to the left side and the right side of the front lower portion of the box body, the installation plate used for installing the objects is rotatably arranged in the front middle of the box body, and the pull ropes which slidably penetrate through the guide pipes are connected between the baffle and the installation plate.
Preferably, the device also comprises a torsion spring, and the torsion spring for resetting is connected between the mounting plate and the box body.
On the basis of overcoming the defects of the prior art, the invention can also achieve the following beneficial effects:
1. the progress of engineering cost just can conveniently be known to the position according to the second clamp plate in the third installation pipe to the work of conveniently managing the engineering cost progress management is carried out to convenient management, stores the data through storing the box, takes out the use with this convenience in the operating personnel when needing.
2. When the device is closed, the wedge block can rotate reversely to extrude the first pressing plate, the first pressing plate can drive the inserted bar to move rightwards and not block the third installation pipe, and gas in the third installation pipe can be discharged from a gap between the third installation pipe and the inserted bar, so that next recording is conveniently prepared.
3. The second pressing plate moves rightwards to extrude the flexible cloth to shrink and drive the indicating block to move rightwards, and the color of the indicating block is red, and the color of the flexible cloth is green, so that managers can know the progress of the construction cost more conveniently and clearly through the color difference between the indicating block and the flexible cloth.
4. The splint move backwards to clamp the information meter on the mounting frame under the reset action of the second elastic piece, so that an operator does not need to paste the engineering cost information meter on the front side of the mounting frame, and the information meter is convenient to replace.
5. Paste the information table or announce the table on the mounting panel, when opening this device, make the mounting panel can drive the information table or announce the table rotation ninety degrees that have pasted on it through the stay cord to this convenience obtains the information in the administrator, has also improved the synchronism of this device simultaneously.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
FIG. 2 is a schematic view of a first partial body structure according to the present invention.
Fig. 3 is a cross-sectional view of a second partial body structure of the present invention.
Fig. 4 is a cross-sectional view of a first partially integral structure of the follower mechanism of the present invention.
Fig. 5 is a cross-sectional view of a second partial body construction of the inventive follower mechanism.
Fig. 6 is a schematic perspective view of a part of the storage mechanism of the present invention.
Fig. 7 is a perspective view of a third embodiment of the present invention.
Fig. 8 is a partial perspective sectional view of the zero clearing mechanism of the present invention.
FIG. 9 is a partial perspective sectional view of the zero clearing mechanism and the following mechanism of the present invention.
Fig. 10 is a schematic perspective view of a portion of the following mechanism and the warning mechanism of the present invention.
FIG. 11 is a perspective view of a third portion of the follower mechanism of the present invention.
FIG. 12 is a schematic view of a first partially assembled body construction of the mounting mechanism of the present invention.
FIG. 13 is a schematic view of a second partially assembled body construction of the mounting mechanism of the present invention.
The symbols in the drawings are: 1-support frame, 2-box body, 21-hinged plate, 22-baffle plate, 3-mounting frame, 31-guide rail plate, 32-push-pull frame, 4-follow-up mechanism, 41-first mounting tube, 42-first return spring, 43-piston block, 44-conveying tube, 45-one-way valve, 46-second mounting tube, 47-second return spring, 48-blocking block, 410-third mounting tube, 71-second pressure plate, 73-first elastic element, 5-storage mechanism, 51-storage box, 52-rack, 53-straight gear, 6-zero clearing mechanism, 61-first pressure plate, 62-third return spring, 63-inserted bar, 64-wedge-shaped block, 7-warning mechanism and 49-indicating block, 72-flexible cloth, 8-clamping mechanism, 81-guide rod, 82-second elastic piece, 83-clamping plate, 9-mounting mechanism, 91-mounting plate, 93-guide tube, 94-pull rope and 92-torsion spring.
Detailed Description
The invention is further described below with reference to the figures and examples.
Example 1
A whole-process engineering cost progress management device is shown in figures 1-6 and comprises a support frame 1, a box body 2, hinged plates 21, baffles 22, a mounting frame 3, guide rail plates 31, push-pull frames 32, a follow-up mechanism 4, a storage mechanism 5 and a zero clearing mechanism 6, wherein the upper side of the support frame 1 is bolted with the box body 2 made of metal, the lower part of the box body 2 is slidably penetrated with three push-pull frames 32 which are uniformly arranged from left to right at intervals, the upper side of each push-pull frame 32 is rotatably provided with the guide rail plate 31 used for guiding, the front side of each guide rail plate 31 is bolted with the mounting frame 3 used for displaying cost information, the front lower part of the box body 2 is slidably penetrated with the baffles 22 which are used for protecting the mounting frame 3 and made of metal, the hinged plates 21 which are provided with magnetic materials and can adsorb the baffles 22 in a rotating manner are arranged at the front upper part of the box body 2, the follow-up mechanism 4 used for following the cost and the storage mechanism 5 used for storing lists and data are arranged on the mounting frame 3, the follow-up mechanism 4 is provided with a zero clearing mechanism 6 for clearing the progress.
As shown in fig. 5, 9, 10 and 11, the following mechanism 4 includes a first mounting tube 41, a first return spring 42, a piston block 43, a conveying tube 44, a check valve 45, a second mounting tube 46, a second return spring 47, a blocking block 48, a third mounting tube 410, a second pressing plate 71 and a first elastic member 73, the third mounting tube 410 made of transparent material is bolted on the front upper side of the mounting frame 3, the second pressing plate 71 is slidably disposed on the left inner side of the third mounting tube 410, the first elastic member 73 for returning and located inside the third mounting tube 410 is connected between the right side of the second pressing plate 71 and the right inner side of the third mounting tube 410, the first elastic member 73 is a rubber spring, the first mounting tube 41 penetrates through the upper middle portion of the mounting frame 3, the piston block 43 is slidably disposed on the front portion of the first mounting tube 41, the first return spring 42 wound on the outer side of the piston block 43 is connected between the piston block 43 and the first mounting tube 41, the check valve 45 is installed through the mode of screwed connection at the rear portion of first installation pipe 41, and the rear portion upside of first installation pipe 41 and the left part rear side of third installation pipe 410 all communicate there is conveyer pipe 44, and the intercommunication has second installation pipe 46 between two conveyer pipes 44, and the inside of second installation pipe 46 is connected with through second reset spring 47 and is used for plugging up conveyer pipe 44 and the jam 48 of the conveyer pipe 44 contact on the first installation pipe 41.
As shown in fig. 5 and 6, the storage mechanism 5 includes a storage box 51, a rack 52 and a spur gear 53, two storage boxes 51 for storing lists and data are slidably disposed on the upper side of the guide rail plate 31 and are symmetrically disposed in front and rear directions, the rack 52 is bolted to the inner bottom side of the case 2, and the spur gear 53 engaged with the rack 52 and connected to the guide rail plate 31 is rotatably connected to the upper portion of the push-pull frame 32 by a key connection.
As shown in fig. 7-10, the zero clearing mechanism 6 includes a first pressing plate 61, a third return spring 62, an insertion rod 63 and a wedge block 64, the insertion rod 63 penetrates through the left portion of the third mounting pipe 410 in a non-contact manner, the first pressing plate 61 is welded to the left side of the insertion rod 63, the third return spring 62 wound on the outer side of the insertion rod 63 is connected between the first pressing plate 61 and the third mounting pipe 410, and the three wedge blocks 64 used for extruding the insertion rod 63 and contacting with the insertion rod 63 are uniformly connected to the rear side of the hinge plate 21 from left to right at intervals.
An operator can apply the corresponding technical scheme in the device to the technology of the engineering cost progress management device according to specific conditions, initially, the hinged plate 21 magnetically adsorbs the baffle plate 22, the wedge block 64 extrudes the first pressing plate 61, the third return spring 62 is in a compressed state, the device is in a retracted state, when the operator needs to use the device to assist in the operation of the engineering cost progress management, firstly, the operator needs to open the device firstly, namely, the operator rotates the hinged plate 21 upwards, the hinged plate 21 loosens the baffle plate 22 in the rotating process, the baffle plate 22 moves downwards under the action of self gravity, the hinged plate 21 continuously rotates and is magnetically adsorbed on the box body 2, so as to open the device, the hinged plate 21 can shield rainwater at the moment, the rainwater is prevented from dropping into the box body 2, unnecessary troubles are prevented from being caused to the operator, and in addition, the hinged plate 21 can drive the wedge block 64 to rotate to loosen the first pressure plate 61 in the rotating process, the third return spring 62 is reset, the first pressure plate 61 can drive the inserting rod 63 to move leftwards under the reset action of the third return spring 62, the inserting rod 63 can be clamped into the left inner side of the third mounting pipe 410 in the leftward moving process to block the third mounting pipe 410, after the device is opened, an operator can stick the engineering cost information table to the front side of the mounting frame 3 to facilitate the administrator to know the engineering cost information, through the arrangement of the three mounting frames 3, the administrator can conveniently know different engineering cost information at the same time, when the operator needs to record the engineering cost progress, the operator presses the piston block 43 backwards, the first return spring 42 is compressed, the internal pressure of the first mounting pipe 41 is increased, the initial one-way valve 45 is in the closed state, air in the first mounting pipe 41 can flow into the conveying pipe 44, the pressure inside the delivery pipe 44 is increased, the blocking block 48 is forced to move leftwards, the second return spring 47 is compressed, the initial blocking block 48 blocks the delivery pipe 44, the left movement of the blocking block 48 can loosen the delivery pipe 44, air can flow into the third installation pipe 410 through the second installation pipe 46 and the delivery pipe 44, the pressure inside the third installation pipe 410 can be increased due to the blocking of the third installation pipe 410 by the inserted link 63, the second pressing plate 71 is forced to move rightwards, the first elastic member 73 is compressed, then a manager can conveniently know the engineering cost progress according to the position of the second pressing plate 71 in the third installation pipe 410, so that the work of managing the engineering cost progress is facilitated, then the operator loosens the piston block 43, the first return spring 42 is reset, the piston block 43 can move forwards under the reset action of the first return spring 42, the one-way valve 45 is opened, the outside air will flow into the first installation pipe 41 through the check valve 45, the pressure inside the first installation pipe 41 and the conveying pipe 44 is restored, the second return spring 47 is reset, the blocking block 48 will move rightwards under the action of the reset of the second return spring 47 to block the conveying pipe 44 again, so as to avoid air leakage, the operator presses the piston block 43 backwards again, the second pressing plate 71 is forced to move rightwards again, so as to perform recording operation of the engineering cost progress, the operator pulls the push-pull frame 32 forwards, the push-pull frame 32 will drive the guide rail plate 31 to move forwards, the guide rail plate 31 will drive all the parts arranged thereon to move forwards, the push-pull frame 32 will also drive the spur gear 53 to move forwards to be engaged with the rack 52, the spur gear 53 will drive the guide rail plate 31 to rotate one hundred eighty degrees, the guide rail plate 31 will drive all the parts arranged thereon to rotate one hundred eighty degrees, the storage box 51 rotates one hundred eighty degrees immediately, after the storage box 51 rotates one hundred eighty degrees, the operator pulls the two symmetrical storage boxes 51 in the direction away from each other to expand the storage boxes 51, after the storage boxes 51 are expanded, the operator puts data into the storage boxes 51 and pushes the two symmetrical storage boxes 51 in the direction approaching each other to retract the storage boxes 51, then the operator pushes the push-pull frame 32 backwards, the push-pull frame 32 drives the straight gear 53 and the guide rail plate 31 to move backwards, the straight gear 53 moves backwards to be meshed with the gear again, so that the storage boxes 51 move backwards to reset and rotate one hundred eighty degrees to reset, and then the data are stored through the storage boxes 51, so that the operator can take out and use the data when needed, and finally, when the device is not needed, the operator rotates the hinge plate 21 reversely to separate the hinge plate 21 from the box body 2, the reverse rotation of the hinged plate 21 can drive the wedge block 64 to rotate in the reverse direction, the wedge block 64 can extrude the first pressing plate 61 to move rightwards in the reverse rotation process, the third return spring 62 is compressed, the first pressing plate 61 moves rightwards to drive the plug rod 63 to move rightwards to not block the third mounting pipe 410, gas in the third mounting pipe 410 can be discharged out through a gap between the third mounting pipe 410 and the plug rod 63, the first elastic element 73 resets, the second pressing plate 71 moves leftwards to reset under the reset action of the first elastic element 73, so that the recorded schedule is cleared, after the hinged plate 21 rotates in the reverse direction to reset, an operator pulls the baffle plate 22 upwards to enable the baffle plate 22 to be in contact with the hinged plate 21, the hinged plate 21 magnetically adsorbs the baffle plate 22 again, the device is closed, and the use of the device is finished.
Example 2
Based on embodiment 1, as shown in fig. 9 and 10, the portable electronic device further includes a warning mechanism 7 for providing a striking prompt, the warning mechanism 7 includes an indication block 49 and a flexible cloth 72, the indication block 49 with a red color is bolted to the left side of the second pressing plate 71, and the flexible cloth 72 with a green color and surrounding the first elastic member 73 is connected between the right side of the second pressing plate 71 and the right inner side of the third mounting tube 410.
The second pressing plate 71 moving rightwards can press the flexible cloth 72 to contract and drive the indicating block 49 to move rightwards, the color of the indicating block 49 is red, the color of the flexible cloth 72 is green, so that a manager can know the progress of the construction cost more conveniently and clearly through the color difference between the indicating block 49 and the flexible cloth 72, and then the second pressing plate 71 moving leftwards and resetting can pull the flexible cloth 72 to expand and drive the indicating block 49 to move leftwards and reset.
Example 3
On the basis of embodiment 2, as shown in fig. 1 and 4, the device further includes a clamping mechanism 8 for clamping data, two groups of clamping mechanisms 8 are disposed on the mounting frame 3 and are disposed in an up-down symmetrical manner, a group of clamping mechanisms 8 includes a guide rod 81, a second elastic member 82 and a clamping plate 83, two guide rods 81 for guiding and disposed in a left-right symmetrical manner are bolted to the front side of the mounting frame 3, the clamping plate 83 for clamping data is slidably sleeved between the middle portions of the two symmetrical guide rods 81, and two second elastic members 82 wound around the outer sides of the guide rods 81 are connected between the clamping plate 83 and the mounting frame 3.
The operator pulls the clamping plate 83 forwards, the second elastic piece 82 stretches, then the engineering cost information table is placed in the gap between the clamping plate 83 and the mounting frame 3, then the clamping plate 83 is loosened, the second elastic piece 82 resets, the clamping plate 83 can move backwards under the reset effect of the second elastic piece 82 to clamp the information table on the mounting frame 3, therefore, the operator does not need to paste the engineering cost information table on the front side of the mounting frame 3, and the operator can replace the information table conveniently.
Example 4
On the basis of embodiment 3, as shown in fig. 1, 12 and 13, the device further comprises an installation mechanism 9 for installing an article, the installation mechanism 9 comprises an installation plate 91, guide pipes 93 and pull ropes 94, the guide pipes 93 for guiding are welded on the left and right sides of the front lower portion of the box body 2, the installation plate 91 for installing the article is rotatably arranged in the front middle portion of the box body 2, and the pull ropes 94 which slidably penetrate through the guide pipes 93 are connected between the baffle plate 22 and the installation plate 91.
As shown in fig. 13, the device further includes a torsion spring 92, and a torsion spring 92 for returning is connected between the mounting plate 91 and the box body 2.
The operating personnel pastes information table or notice table on mounting panel 91, when opening this device, baffle 22 moves down and can pass through the ninety degrees of stay cord 94 pulling mounting panel 91 rotation, torsional spring 92 deformation, mounting panel 91 can drive the information table or notice table rotation ninety degrees that paste on it, so that conveniently acquire the information in the administrator, the synchronism of this device has also been improved simultaneously, baffle 22 moves up afterwards and can loosen stay cord 94, torsional spring 92 resets, mounting panel 91 can reset at reverse rotation under the effect that torsional spring 92 resets, pack up mounting panel 91 with this.
The above examples are merely representative of preferred embodiments of the present invention, and the description thereof is more specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that various changes, modifications and substitutions may be made by those skilled in the art without departing from the spirit of the invention, and all are intended to be included within the scope of the invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (8)

1. The utility model provides an overall process engineering cost progress management device, including support frame (1), box (2), articulated slab (21), baffle (22), installing frame (3), guide rail plate (31) and push-and-pull frame (32), the upside of support frame (1) is connected with box (2), three push-and-pull frame (32) have been run through to the lower part slidingtype of box (2), the upside rotary type of push-and-pull frame (32) is equipped with guide rail plate (31) that are used for the direction, the front side of guide rail plate (31) is connected with installing frame (3) that are used for demonstrateing the cost information, the preceding lower part slidingtype of box (2) is run through has baffle (22) that are used for protecting installing frame (3), the preceding upper portion rotary type of box (2) is equipped with articulated slab (21), a serial communication port, the device is characterized in that, still including follow-up mechanism (4), store mechanism (5) and zero clearing mechanism (6), be provided with follow-up mechanism (4) that are used for following the cost and store the storage of inventory and data on installing frame (3) And the follow-up mechanism (4) is provided with a zero clearing mechanism (6) for clearing the progress.
2. The overall process engineering cost progress management device according to claim 1, wherein the follow-up mechanism (4) comprises a first installation pipe (41), a first return spring (42), a piston block (43), a delivery pipe (44), a one-way valve (45), a second installation pipe (46), a second return spring (47), a blocking block (48), a third installation pipe (410), a second pressing plate (71) and a first elastic piece (73), the upper side of the front part of the installation frame (3) is connected with the third installation pipe (410) made of transparent materials, the inner side of the left part of the third installation pipe (410) is provided with the second pressing plate (71) in a sliding manner, the first elastic piece (73) used for resetting is connected between the right side of the second pressing plate (71) and the inner side of the right part of the third installation pipe (410), the upper middle part of the installation frame (3) penetrates through the first installation pipe (41), the front part of the first installation pipe (41) is provided with the piston block (43) in a sliding manner, be connected with first reset spring (42) between piston piece (43) and first installation pipe (41), check valve (45) are installed to the rear portion of first installation pipe (41), the rear portion upside of first installation pipe (41) and the left part rear side of third installation pipe (410) all communicate delivery pipe (44), it has second installation pipe (46) to communicate between two delivery pipes (44), the inside of second installation pipe (46) is connected with through second reset spring (47) and is used for blockking up delivery pipe (44) and with delivery pipe (44) contact's on first installation pipe (41) jam piece (48).
3. The overall construction cost schedule management apparatus according to claim 2, wherein the storage mechanism (5) comprises a storage box (51), a rack (52) and a spur gear (53), two storage boxes (51) for storing lists and data are slidably provided on an upper side of the guide rail plate (31), the rack (52) is connected to an inner bottom side of the box body (2), and the spur gear (53) engaged with the rack (52) and connected to the guide rail plate (31) is rotatably sleeved on an upper portion of the push-pull frame (32).
4. The overall process engineering cost progress management device according to claim 3, characterized in that the zero clearing mechanism (6) comprises a first pressing plate (61), a third return spring (62), an insertion rod (63) and a wedge block (64), the insertion rod (63) penetrates through the left portion of the third installation pipe (410) in a non-contact mode, the left side of the insertion rod (63) is connected with the first pressing plate (61), the third return spring (62) is connected between the first pressing plate (61) and the third installation pipe (410), and the wedge block (64) used for extruding the insertion rod (63) is connected to the rear side of the hinged plate (21).
5. The overall process engineering cost progress management device according to claim 4, characterized by further comprising a warning mechanism (7) for a striking prompt, wherein the warning mechanism (7) comprises an indication block (49) and a flexible cloth (72), the indication block (49) is connected to the left side of the second pressing plate (71), and the flexible cloth (72) is connected between the right side of the second pressing plate (71) and the right inner side of the third installation pipe (410).
6. The overall process engineering cost progress management device according to claim 5, characterized by further comprising clamping mechanisms (8) for clamping data, wherein two groups of clamping mechanisms (8) are arranged on the installation frame (3) in an up-and-down symmetrical manner, a guide rod (81), a second elastic part (82) and a clamping plate (83) are arranged in one group of clamping mechanisms (8), the guide rod (81) for guiding is connected to the front side of the installation frame (3), the clamping plate (83) for clamping data is slidably sleeved in the middle of the guide rod (81), and the second elastic part (82) is connected between the clamping plate (83) and the installation frame (3).
7. The overall process engineering cost progress management device according to claim 6, characterized by further comprising an installation mechanism (9) for installing objects, wherein the installation mechanism (9) comprises an installation plate (91), guide pipes (93) and pull ropes (94), the guide pipes (93) for guiding are connected to the left and right sides of the front lower portion of the box body (2), the installation plate (91) for installing objects is rotatably arranged in the front middle of the box body (2), and the pull ropes (94) which slidably penetrate through the guide pipes (93) are connected between the baffle (22) and the installation plate (91).
8. The overall process construction cost progress management device according to claim 7, further comprising a torsion spring (92), wherein the torsion spring (92) for resetting is connected between the mounting plate (91) and the box body (2).
CN202210688003.3A 2022-06-17 2022-06-17 Whole process engineering cost progress management device Active CN114974028B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210688003.3A CN114974028B (en) 2022-06-17 2022-06-17 Whole process engineering cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210688003.3A CN114974028B (en) 2022-06-17 2022-06-17 Whole process engineering cost progress management device

Publications (2)

Publication Number Publication Date
CN114974028A true CN114974028A (en) 2022-08-30
CN114974028B CN114974028B (en) 2024-03-22

Family

ID=82963746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210688003.3A Active CN114974028B (en) 2022-06-17 2022-06-17 Whole process engineering cost progress management device

Country Status (1)

Country Link
CN (1) CN114974028B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08329145A (en) * 1995-06-06 1996-12-13 Hitachi Ltd Schedule managing device
JP2001306123A (en) * 2000-04-21 2001-11-02 Honda Motor Co Ltd Planning system for carrying in parts for knock-down production to shipping base
US20120041591A1 (en) * 2008-03-03 2012-02-16 The Saranow Group, Llc Inventory Security Management For A Hair Dye Storage System
US20130026747A1 (en) * 2011-07-26 2013-01-31 Key Stephen M Progress tracking aid labeling for medication containers
CN111552388A (en) * 2020-05-06 2020-08-18 重庆中宏建设监理有限公司 Engineering cost progress management system
CN111933054A (en) * 2020-07-10 2020-11-13 厦门城市职业学院(厦门市广播电视大学) Scientific research project management progress tracking display board
CN212032601U (en) * 2020-05-28 2020-11-27 上海上咨工程造价咨询有限公司 Engineering cost progress management device
CN112201143A (en) * 2020-11-02 2021-01-08 龚小钧 Progress management system for construction cost
CN213370909U (en) * 2020-09-27 2021-06-08 郭洪童 Building construction cost progress management device
CN113101622A (en) * 2021-05-21 2021-07-13 常州机电职业技术学院 Multifunctional tennis racket storage rack
CN216311282U (en) * 2021-11-19 2022-04-15 周延光 Engineering cost progress management device
CN216348805U (en) * 2021-10-25 2022-04-19 广西建设职业技术学院 Multifunctional building engineering detection device
CN216562401U (en) * 2021-11-19 2022-05-17 广州市创筑工程造价咨询有限公司 Investment progress display device for engineering cost

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08329145A (en) * 1995-06-06 1996-12-13 Hitachi Ltd Schedule managing device
JP2001306123A (en) * 2000-04-21 2001-11-02 Honda Motor Co Ltd Planning system for carrying in parts for knock-down production to shipping base
US20120041591A1 (en) * 2008-03-03 2012-02-16 The Saranow Group, Llc Inventory Security Management For A Hair Dye Storage System
US20130026747A1 (en) * 2011-07-26 2013-01-31 Key Stephen M Progress tracking aid labeling for medication containers
CN111552388A (en) * 2020-05-06 2020-08-18 重庆中宏建设监理有限公司 Engineering cost progress management system
CN212032601U (en) * 2020-05-28 2020-11-27 上海上咨工程造价咨询有限公司 Engineering cost progress management device
CN111933054A (en) * 2020-07-10 2020-11-13 厦门城市职业学院(厦门市广播电视大学) Scientific research project management progress tracking display board
CN213370909U (en) * 2020-09-27 2021-06-08 郭洪童 Building construction cost progress management device
CN112201143A (en) * 2020-11-02 2021-01-08 龚小钧 Progress management system for construction cost
CN113101622A (en) * 2021-05-21 2021-07-13 常州机电职业技术学院 Multifunctional tennis racket storage rack
CN216348805U (en) * 2021-10-25 2022-04-19 广西建设职业技术学院 Multifunctional building engineering detection device
CN216311282U (en) * 2021-11-19 2022-04-15 周延光 Engineering cost progress management device
CN216562401U (en) * 2021-11-19 2022-05-17 广州市创筑工程造价咨询有限公司 Investment progress display device for engineering cost

Also Published As

Publication number Publication date
CN114974028B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
DE3311669A1 (en) FILM WELDING MACHINE
CN114974028A (en) Overall process engineering cost progress management device
CN216811632U (en) Hydraulic control device of blowout preventer of electric pump well
CN110566530A (en) Oil leakage prevention device for electro-hydraulic servo valve
CN211616952U (en) Automatic printing machine with parallel screen printing plates
CN210262802U (en) Portable warning frame for road construction
CN210738166U (en) Connecting mechanism for quickly building exhibition stand
CN218458509U (en) Cabinet type heptafluoropropane gas fire extinguishing device
EP0995848A2 (en) Intake device for sucking up loose material, particularly waste, mud, faeces or the like
CN211033285U (en) Box pressing device with safety door
CN221298070U (en) Combined fire-fighting water tank
CN212973955U (en) Rotatable storing frame for fire engine
CN221283585U (en) Permanent magnet synchronous door machine controller convenient to installation
CN218206125U (en) Elevator shaft door protection device
CN209002003U (en) A kind of Internet of Things interchanger being convenient for various combination installation
CN113788349B (en) Plastic packaging machine
CN217627252U (en) Unattended intelligent crane
CN209047072U (en) Bundling apparatus is used in a kind of grafting of manaca
CN215674111U (en) Novel water delivery pipeline
CN216865301U (en) Hopper door fixing device for robot dumping hopper
CN114711588B (en) Bank financial service project display equipment
CN113319777B (en) Rapid maintenance method for subway containment fence
CN221458482U (en) Anti-falling kit
CN216862515U (en) Desilting robot pours hopper fast
CN221092105U (en) Container with openable top

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant