CN213010046U - Building construction uses rubbish pond on site - Google Patents

Building construction uses rubbish pond on site Download PDF

Info

Publication number
CN213010046U
CN213010046U CN202020603075.XU CN202020603075U CN213010046U CN 213010046 U CN213010046 U CN 213010046U CN 202020603075 U CN202020603075 U CN 202020603075U CN 213010046 U CN213010046 U CN 213010046U
Authority
CN
China
Prior art keywords
garbage
wall body
wall
pool
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020603075.XU
Other languages
Chinese (zh)
Inventor
路平
郑建锋
阮传现
王彦飞
刘继委
杨少楠
卢伟超
王洋洋
王永玲
刘文峰
张松
马学宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Guojer Construction And Installation Co ltd
Henan Guoji Construction Group Co ltd
Original Assignee
Henan Guojer Construction And Installation Co ltd
Henan Guoji Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Guojer Construction And Installation Co ltd, Henan Guoji Construction Group Co ltd filed Critical Henan Guojer Construction And Installation Co ltd
Priority to CN202020603075.XU priority Critical patent/CN213010046U/en
Application granted granted Critical
Publication of CN213010046U publication Critical patent/CN213010046U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model discloses a garbage pool for construction site, which comprises a track laid under the front wall; the first wall body is arranged above the track in a sliding mode, the first wall body forms a front wall body, and a push shovel for forcing garbage to move is arranged on the first wall body; and the second walls form side walls. The utility model provides a building construction site uses rubbish pond, can reuse, has reduced the average cost of using each time; the first wall is moved to push all the garbage at the inlet of the garbage pool to the inner side of the garbage pool, so that the garbage at the inlet of the garbage pool is prevented from being stacked too much to occupy a place outside the garbage pool, a space for dumping the garbage is vacated at the inlet of the garbage pool, and cleaning personnel can dump the garbage in the garbage pool; the first wall body is moved, so that the inlet of the garbage pool is enlarged, a hooking space is vacated for the small hooking machine, and the garbage in the garbage pool is cleaned and transported outwards.

Description

Building construction uses rubbish pond on site
Technical Field
The utility model belongs to the construction field, concretely relates to rubbish pond is used to construction scene.
Background
In the construction process of buildings, some construction wastes and household wastes are inevitably generated, so a special garbage pool must be arranged on the construction site, special garbage cleaning personnel transport the wastes into the garbage pool, and the wastes are cleaned and transported out by a cleaning and transporting vehicle after being stored to a certain amount. Construction site's building rubbish and domestic waste often adopt artifical handheld small handcart to transport, clearance personnel often empty rubbish at will in the rubbish pond, because clearance personnel's production tool's restriction, lead to the height that rubbish was stacked lower, and often transport the entrance in rubbish pond, the clearance personnel of follow-up rubbish that needs to be transported to the side can only select the rubbish transport before next, this utilization ratio that just leads to the rubbish pond is low, the inside in rubbish pond can not exert a function, and because the continuous transport of rubbish is in the entrance, lead to the area increase that rubbish was stacked, invade the place outside the rubbish pond, as shown in figure 1. If equipment such as a small hook machine, a bulldozer and the like is adopted for stacking, the cost is high, and the road surface of a construction site is easily damaged due to the large weight of the small hook machine and the bulldozer.
SUMMERY OF THE UTILITY MODEL
To the defect that above-mentioned current rubbish pond exists, the utility model aims at providing a rubbish pond for construction site.
The purpose of the utility model is realized through the following technical scheme.
The utility model provides a building is rubbish pond for job site, rubbish pond is enclosed by the enclosure of positive wall body, side wall body and job site and forms, is provided with the entry on the positive wall body, includes:
the track is laid below the front wall body;
the first wall body is arranged above the track in a sliding mode, the first wall body forms a front wall body, and a push shovel for forcing garbage to move is arranged on the first wall body;
and the second wall bodies form a side wall body, and are fixedly connected with the enclosing wall and the first wall body of the construction site, or the second wall bodies are fixedly connected with the enclosing wall of the construction site.
The track is the I-steel, and the below of first wall body be with I-steel assorted holder, and the holder includes left holder and right holder, and left holder is the character cut in bas-relief of clockwise rotation 90 degrees, and right holder is the character cut in bas-relief of anticlockwise rotation 90 degrees, is provided with between left holder and the right holder to be used for on the track gliding gyro wheel.
The two ends of the track extend out of the two ends of the front wall body, and the distance extending out of each end is not less than the length of the first wall body.
The first wall body and the second wall body are both prefabricated wall bodies, bolt holes are formed in the first wall body and the second wall body, and adjacent wall bodies are fixedly connected through plane connecting pieces or right-angle connecting pieces.
And a wall body base is arranged below the second wall body, and the projection area of the wall body bottom is larger than that of the second wall body.
The first wall body is also provided with at least one telescopic piece for forcing the push shovel to displace, and the telescopic piece is detachably connected with the push shovel; the telescopic part is an electric push rod or an air cylinder.
The utility model has the advantages that: the utility model provides a building construction site uses the rubbish pool, adopts prefabricated wall body assembly to enclose and closes and forms, can reuse, has reduced the average cost of using each time; the first wall is provided with a push shovel and a roller and is used for pushing the garbage at the inlet of the garbage pool to the inner side of the garbage pool, and the first wall is moved to push all the garbage at the inlet of the garbage pool to the inner side of the garbage pool, so that the garbage at the inlet of the garbage pool is prevented from being stacked too much to occupy the field outside the garbage pool, a space for dumping the garbage is vacated at the inlet of the garbage pool, and cleaning personnel can dump the garbage in the garbage pool; when clearing away the fortune rubbish, can open the right angle connecting piece, remove first wall body, make rubbish pond entry increase, vacate for colluding the machine for a short time and collude and get the space for the clearance outward transportation of rubbish in the rubbish pond.
Drawings
Fig. 1 is a schematic view of a conventional garbage pond after garbage is dumped.
Fig. 2 is a schematic view of the garbage pool of the present invention.
Fig. 3 is an enlarged schematic view of a in fig. 2.
Fig. 4 is an enlarged schematic view of B in fig. 2.
Fig. 5 is a schematic view of the first wall and the track of the present invention.
Fig. 6 is an enlarged schematic view of C in fig. 5.
Fig. 7 is a schematic view of a second wall according to the present invention.
Fig. 8 is a schematic view of the right angle connector of the present invention.
Fig. 9 is a schematic view of the garbage pool of the present invention during operation.
Fig. 10 is a schematic view of the garbage pool after the first wall is moved.
Figure 11 is the schematic view of the garbage pond when the garbage pond is to be cleaned and transported.
In the figure, 10 is a garbage pool, 20 is a first wall, 21 is a push shovel, 22 is an expansion piece, 23 is a clamping piece, 24 is a roller, 25 is a protective cover, 30 is a second wall, 31 is a wall base, 40 is a track, 50 is a fence, 60 is garbage, 70 is a plane connecting piece, 71 is a right-angle connecting piece, and 72 is a bolt.
Detailed Description
As shown in fig. 2 to 11, it should be noted that fig. 2 to 4 are top plan views, fig. 5 to 7 are side plan views, fig. 8 is a perspective view, and fig. 9 to 11 are top plan views, and the above schematic views are only preferred schematic views of the present invention, and are not limitations to the structure of the present invention.
A garbage pool for a building construction site is generally arranged at an entrance of a gate of the construction site, a cleaning and transporting vehicle is convenient to clean and transport, the garbage pool 10 is surrounded by a front wall body, a side wall body and a fence 50 of the construction site, the fence 50 of the construction site is fully utilized, the manufacturing cost of the garbage pool 10 is reduced, and an inlet is arranged on the front wall body and not shown in the figure and is used for cleaning personnel to dump garbage 60 and a small hook machine to hook the garbage 60 in the garbage pool 10 into the cleaning and transporting vehicle.
A track 40 is laid below the front wall of the garbage pool 10, at least one first wall 20 is arranged on the track 40 in a sliding mode, the first wall 20 forms the front wall, and the length of the front wall is equal to the sum of the length of the first wall 20 and the width of an inlet; the number of the first walls 20 is determined according to the size of the garbage pool 10, for some small garbage pools, one first wall 20 is arranged, for large garbage pools, two or more first walls 20 can be arranged, and in the large garbage pools, the two or more first walls 20 also have the function of preventing the garbage 60 from flowing out of the garbage pool 10, so that all the garbage 60 are in the garbage pool 10. The first wall 20 is provided with a push shovel 21 for forcing the garbage 60 to displace, the push shovel 21 is preferably an arc-shaped steel plate and is similar to a push shovel on a bulldozer in shape, and the push shovel 21 is used for pushing the garbage 60 at the inlet to move towards the inner side of the garbage pool 10, so that the position of the inlet is vacated, and a cleaning worker can conveniently dump subsequent garbage 60 at the inlet. The first wall 20 is further provided with at least one telescopic member 22 for forcing the pushing shovel 21 to displace, the telescopic member 22 is detachably connected with the pushing shovel 21, and the telescopic member 22 and the pushing shovel 21 are assembled on site. It should be noted that when the pushing shovel 21 is used to push the garbage 60, the gravity of the garbage 60 is not overcome, but the friction force between the garbage 60 is overcome, when the telescopic member 22 is selected, an electric push rod or an air cylinder can be selected, the electric push rod or the air cylinder can generate thousands of newtons of pushing force, the electric push rod has a certain extension length, and the electric push rod is preferably an JIN-1601 electric push rod produced by jinge hardware electro-mechanical limited company in zhongshan city.
The way of installing the telescopic member 22 on the first wall 20 is as follows: when prefabricating first wall body 20, reserve the hole that supplies extensible member 22 to run through on first wall body 20, pass through one or more fixing bases and first wall body 20 fixed connection with the non-telescopic one end of extensible member 22, the preferred outside that sets up at first wall body 20 of non-telescopic one end of extensible member 22, the fixing base earlier with extensible member 22 fixed connection, with this fixing base and first wall body 20 outside fixed connection can, when fixing base and the non-telescopic one end setting of extensible member 22 are in the outside of first wall body 20, set up the protection casing 25 in this department, the protection casing 25 is used for protecting extensible member 22 not damaged by the external world, also is used for protecting this extensible member 22 not to harm external people or thing. For example, when the cylinder is selected as the telescopic member 22, the cylinder barrel of the cylinder is fixedly connected with the first wall body 20 through the fixing seat, the end part of the piston rod of the cylinder is connected with the push shovel 21, the fixing seat only needs to meet the requirement that the cylinder barrel and the first wall body 20 can be fixedly connected, and welding and bolt connection modes can be adopted.
The side wall bodies are composed of second wall bodies 30, the side wall bodies are two sides and are arranged between the front wall body and the enclosing wall 50, at least two second wall bodies 30 are needed, and the second wall bodies 30 are fixedly connected with the enclosing wall 50 and the first wall body 20 of the construction site or the second wall bodies 30 are fixedly connected with the enclosing wall 50 of the construction site. It should be noted that, when the garbage disposal 10 is provided with only one first wall 20, the second wall 30 on one side is not fixedly connected to the first wall 20.
It should be noted that, considering the working environment and requirements of the construction site, the height of the garbage pool 10 cannot be higher than that of the enclosure wall 50, and in the construction of the existing garbage pool, the height of the garbage pool is mostly between 1.2m and 1.5m, and the height of the garbage pool 10 of the present invention also complies with the standard.
Further, a wall base 31 is arranged below the second wall 30, the projection area of the wall base 31 is larger than that of the second wall 30, bolt holes are formed in the wall base 31, the wall base 31 is fixed on the ground through bolt connection, and the wall base 31 is favorable for ensuring the stability of the second wall 30 and preventing the second wall 30 from inclining and collapsing.
Further, the track 40 sets up to the I-steel, the below of first wall body 20 be with I-steel assorted holder 23, holder 23 includes left holder and right holder, and left holder is the notch font of clockwise rotation 90 degrees, and right holder is the notch font of anticlockwise rotation 90 degrees, is provided with between left holder and the right holder to be used for gliding gyro wheel 24 on the track 40. When the rail 40 is laid, the rail 40 is fixedly laid on the ground, and then the first wall body 20 is sleeved on the rail 40 along the axial direction of the i-steel, so that the rail 40 of the i-steel is beneficial to ensuring the stable connection between the first wall body 20 and the rail 40, and the first wall body 20 is prevented from inclining and collapsing.
When the rail 40 is arranged, in order to ensure the stability between the rail 40 and the first wall body 20 and also to facilitate the subsequent hooking work to vacate a space, two ends of the rail 40 extend out of two ends of the front wall body, and the distance extending out of each end is not less than the length of the first wall body 20.
Further, the first wall body 20 and the second wall body 30 are both prefabricated wall bodies, bolt holes penetrating through the vertical surfaces of the wall bodies are formed in the first wall body 20 and the second wall body 30, and the adjacent wall bodies are fixedly connected through a plane connecting piece 70 or a right-angle connecting piece 71. The plane connector 70 and the right-angle connector 71 are each a steel plate provided with bolt holes.
The utility model discloses a working method does: as shown in fig. 9 to 11, the garbage pool 10 is formed by enclosing two first walls 20, four second walls 30 and a wall 50, the length of the track 40 is 5 times of the length of the first wall 20, the width of the entrance is equal to the length of the first wall 20, the second walls 30 are fixedly connected with the wall 50 through right-angle connectors 71, adjacent second walls 30 are fixedly connected with each other through plane connectors 70, and the second walls 30 are fixedly connected with the first wall 20 through right-angle connectors 71. The first wall 20 and the second wall 30 are 1500 × 100mm in size and about 400kg in weight, and can be hoisted by using a small crane or a small electric hoist when being installed on a construction site.
When a cleaning person pours the garbage 60 by holding the trolley, the cleaning person can pour the garbage 60 into the middle of the garbage pool 10 close to the inner side at first, considering the occupational literacy of the cleaning person, when the cleaning person pours the garbage 60 at first, the cleaning person is willing to pour the garbage 60 into the inner side of the garbage pool 10 as far as possible, but as the garbage 60 increases gradually, the production tools of the cleaning person are limited, the cleaning person can approach the inlet gradually when pouring the garbage 60 until the garbage is fully piled at the inlet, considering that the quantity of the garbage 60 is not a lot of reasons in nature, the height of the poured garbage 60 is low, the cleaning person can hardly think that the garbage 60 is continuously piled up when pouring, and the height of the trolley is limited and is about 500-plus 600mm at most, so that the garbage 60 is not likely to be continuously piled up; when the entrance is full of garbage, as shown in fig. 9, at this time, a garbage pool manager or a cleaning person starts the telescopic member 22 on the left first wall 20 to extend the telescopic member 22, push the pushing shovel 21 to move forward, and the pushing shovel 21 forces the garbage 60 in front of the pushing shovel 21 to move under the thrust of the telescopic member 22, and move toward the inner side of the garbage pool 10, so as to push the garbage 60 to the inner side of the garbage pool 10; then, the telescopic member 22 is started again, so that the telescopic member 22 is retracted to the original position; the right-angle connecting piece 71 and the bolt 72 between the first wall body 20 and the second wall body 30 are disassembled, the first wall body 20 is pushed after the disassembling, the roller 24 is arranged below the first wall body 20, so the friction force between the first wall body 20 and the track 40 is not large, the first wall body 20 can be pushed by one person or at most two persons, the first wall body 20 is pushed to the first wall body 20 at the right side, for insurance, the plane connecting piece 70 is used for connecting the first wall bodies 20 at the left side and the right side, the telescopic piece 22 on the first wall body 20 at the left side is started again, the telescopic piece 22 drives the push shovel 21 to push the garbage 60 at the position to the inner side of the garbage pool 10, and then the telescopic piece 22 is started to enable the telescopic piece 22 to be retracted to the original position. The telescopic member 22 on the right first wall 20 is activated to make the right first wall 20 repeat the action of the left first wall 20, and after the action is finished, the garbage 60 at the inlet of the garbage pool 10 is pushed to the inner side of the garbage pool 10, as shown in fig. 11 by the garbage 60. Meanwhile, the position of the left first wall 20 originally becomes the entrance of the new garbage pool 10, and the cleaning personnel can continuously dump the garbage from the entrance.
When the garbage 60 in the garbage pool 10 is stored to a certain amount and needs attention, the position of the first wall in fig. 9 is used for explaining that the garbage 60 in the garbage pool 10 needs to be cleaned and transported out by the cooperation of the hook machine and the cleaning and transporting vehicle. The manager or the clearing personnel of the garbage pool 10 removes the right-angle connector 71 and the bolt 72 between the left first wall body 20 and the second wall body 30 and the right-angle connector 71 and the bolt 72 between the right first wall body 20 and the second wall body 30, respectively pushes the left first wall body 20 to the left extension section of the track 40 along the axial direction of the track 40, and pushes the right first wall body 20 to the right extension section of the track 40, at the moment, the inlet shown in figure 11 is changed into three times of the inlet shown in figure 9, and the hooking machine can hook the garbage 60 in the garbage pool 10 to the clearing vehicle through the new inlet; when the garbage 60 in the garbage pool 10 needs to be hooked, the hooking machine can also move forward in the direction of the inner side of the garbage pool 10 without being limited by the inlet of the garbage pool 10. By pushing the first wall 20 to the two sides of the rail 40 respectively, the width of the inlet of the garbage pool 10 is increased, so that the efficiency of hooking the garbage 60 by the hook machine is increased, and the garbage 60 is cleaned and transported outwards.
After the garbage cleaning outward transportation work is finished, the left and right first walls 20 are pushed back to the positions shown in fig. 9, the second wall 30 and the first wall 20 are fixedly connected again through the right-angle connecting piece 71 and the bolt 72, and the garbage cleaning outward transportation work can be reused after the second wall 30 and the first wall 20 are fixedly connected.
The above description is only a preferred embodiment of the present invention, and is not a limitation to the technical solution of the present invention, it should be noted that, further improvements and changes can be made by those skilled in the art on the premise of the technical solution of the present invention, and all such improvements and changes should be covered in the protection scope of the present invention.

Claims (6)

1. The utility model provides a building construction uses rubbish pond in scene, rubbish pond (10) surround by front wall body, side wall body and job site's enclosure (50) and form, are provided with the entry on the front wall body, its characterized in that includes:
the rail (40) is laid below the front wall body;
the first wall body (20) is arranged above the track (40) in a sliding mode, the first wall body (20) forms a front wall body, and a push shovel (21) forcing the garbage (60) to move is arranged on the first wall body (20);
and at least two second walls (30), wherein the second walls (30) form side walls, and the second walls (30) are fixedly connected with the enclosing wall (50) and the first wall (20) of the construction site, or the second walls (30) are fixedly connected with the enclosing wall (50) of the construction site.
2. The garbage pool for the building construction site according to claim 1, wherein the rail (40) is an I-steel, the clamping member (23) matched with the I-steel is arranged below the first wall body (20), the clamping member (23) comprises a left clamping member and a right clamping member, the left clamping member is in a concave shape rotated 90 degrees clockwise, the right clamping member is in a concave shape rotated 90 degrees anticlockwise, and a roller (24) used for sliding on the rail (40) is arranged between the left clamping member and the right clamping member.
3. The trash receptacle for construction sites according to claim 1, wherein both ends of the rail (40) extend out of both ends of the front wall, and each end extends out by a distance not less than the length of the first wall (20).
4. The garbage pond for the construction site according to claim 1, wherein the first wall body (20) and the second wall body (30) are prefabricated wall bodies, bolt holes are formed in the first wall body (20) and the second wall body (30), and adjacent wall bodies are fixedly connected through a plane connecting piece (70) or a right-angle connecting piece (71).
5. The garbage pond for the construction site according to claim 1, wherein a wall base (31) is provided under the second wall (30), and a projected area of the wall base (31) is larger than that of the second wall (30).
6. The garbage pool for the construction site according to claim 1, wherein the first wall body (20) is further provided with at least one telescopic member (22) for forcing the push shovel (21) to displace, and the telescopic member (22) is detachably connected with the push shovel (21); the telescopic piece (22) is an electric push rod or an air cylinder.
CN202020603075.XU 2020-04-21 2020-04-21 Building construction uses rubbish pond on site Expired - Fee Related CN213010046U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020603075.XU CN213010046U (en) 2020-04-21 2020-04-21 Building construction uses rubbish pond on site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020603075.XU CN213010046U (en) 2020-04-21 2020-04-21 Building construction uses rubbish pond on site

Publications (1)

Publication Number Publication Date
CN213010046U true CN213010046U (en) 2021-04-20

Family

ID=75443240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020603075.XU Expired - Fee Related CN213010046U (en) 2020-04-21 2020-04-21 Building construction uses rubbish pond on site

Country Status (1)

Country Link
CN (1) CN213010046U (en)

Similar Documents

Publication Publication Date Title
CN213010046U (en) Building construction uses rubbish pond on site
CN204040479U (en) Building waste clears device
US20090242553A1 (en) Construction waste removal container
KR20210053497A (en) Fileless-up wall demolition method
CN212359048U (en) Telescopic movable bearing type construction operation platform
CN216425585U (en) Building construction uses rubbish pond on scene
CN215928620U (en) High-rise pump line reinforcing apparatus
CN212685666U (en) Handling device for municipal works
CN215287675U (en) Hoisting tool for steel reinforcement cage
CN210164190U (en) Building site floor rubbish clearance passageway
CN210557135U (en) Sliding type vertical compression garbage transfer station
CN210150040U (en) Garbage clearing device for building construction
CN207512746U (en) A kind of earth excavation conversion platform
CN218260084U (en) Construction waste collection device
CN215476699U (en) TRD replacement soil storage device
CN112023571A (en) A high-efficient conveyer that is used for coal mining to have dust fall mechanism
CN218400643U (en) Waste residue transfer car (buggy) for civil engineering
CN218112707U (en) Handcart convenient to artifical transportation and dump waste material
CN219569032U (en) Full-automatic slag discharging device for deep foundation pit
CN219807260U (en) Building rubbish warehousing and transportation device
CN213169705U (en) House cover sliding open type garbage station
CN215167700U (en) Automatic wall plastering machine
CN214192108U (en) Small-size prefabricated assembled electronic bulk bin
CN212079614U (en) Folding protective cover
CN210502713U (en) Portable submersible pump trolley applied to transformer substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210420