CN2128653Y - Multi-function mutual rise and fall framing scaffold - Google Patents

Multi-function mutual rise and fall framing scaffold Download PDF

Info

Publication number
CN2128653Y
CN2128653Y CN 92215913 CN92215913U CN2128653Y CN 2128653 Y CN2128653 Y CN 2128653Y CN 92215913 CN92215913 CN 92215913 CN 92215913 U CN92215913 U CN 92215913U CN 2128653 Y CN2128653 Y CN 2128653Y
Authority
CN
China
Prior art keywords
door frame
lifting
utility
model
joint door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 92215913
Other languages
Chinese (zh)
Inventor
应惠清
李辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoyang Dawn Building Hardware Factory
Tongji University
Original Assignee
Liaoyang Dawn Building Hardware Factory
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoyang Dawn Building Hardware Factory, Tongji University filed Critical Liaoyang Dawn Building Hardware Factory
Priority to CN 92215913 priority Critical patent/CN2128653Y/en
Application granted granted Critical
Publication of CN2128653Y publication Critical patent/CN2128653Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a multifunctional scaffold used for civil engineering and building engineering, which is composed of a standard joint door frame, an adjustment joint door frame, a connecting rod, a bracket attached to a wall, a spacing slide bar, an operating platform, etc. The utility model has the elevation function and the combination function and can be suitable for the construction of high-rise or multi-story buildings and towering buildings. The utility model is lifted generally along with the structure in the construction stage and falls generally in the decoration construction stage. The basic members of the multifunctional scaffold can be assembled and disassembled conveniently, rises and falls flexibly and is safe and reliable. The standard joint door frame and the adjustment joint door frame can be also combined into various conventional internal and external scaffolds, floor template support systems, climbing movable platforms, etc. The utility model has versatility.

Description

Multi-function mutual rise and fall framing scaffold
The utility model is a kind of ascend operation equipment that is applicable to highrise building, towering structure and general building and civil engineering structures and decoration construction.
The scaffold of at present general high level or multistory building, towering structure, the pattern that the full Feng Miman hall of more employing is set up, its high material consumption, to take a lot of work, set up the cycle long, and operating expenses is also higher.There are some attached wall raise scaffolds to come out in the recent period, as bushing type lifting false work, suspended wall rail mounted scaffold, but it exists significantly not enough, be that both all belong to from the lifting system: the operator is positioned on the scaffold that will promote (or decline), scaffold to the supporting he or she carries out lifting, and this has just brought insecurity.In addition, because structural property is levied, its heave amplitude and scaffold span are all restricted, and function is comparatively single.
The purpose of this utility model is to provide a kind of basic building block assembling, convenient disassembly, and the ascend operation equipment that lifting is flexible, safe and reliable, widely applicable, multiple functional is to overcome the deficiency of prior art.
The utility model constitutes as follows, adopts the standard knot door frame that is made of straight-bar, cross bar and diagonal brace and is combined into plane framework by adjustment joint door frame and connecting rod that straight-bar, cross bar or straight-bar, cross bar and diagonal brace constitute.The straight-bar of standard knot door frame is longer than the straight-bar of adjusting the joint door frame, and its length can be decided or by a full-length according to the structure of building building.Two plate plane frameworks and scaffolding steel pipe commonly used, scaffold floor is combined into a lifting sections that can have in the mutual lifting false work several layers operating platform, that have certain rigidity.On two plate plane frameworks of each lifting sections, two attached wall supports are housed, the attached wall support is fixing on the wall by key screw lifting sections, between two attached wall supports, also be provided with spacing bar alive, spacing slide bar vertically slides in fixing spacing ring on the wall, with verticality and the balance of guaranteeing dropping section.The mutual lifting false work that several lifting sections are formed replaces the lifting that the lifting sections is finished whole scaffold by the lifting supporting-point that is located on each lifting sections with bottle gouard moved by hands or electric block.
Basic building block standard knot door frame of the present utility model is adjusted joint door frame and connecting rod and also can be carried out new combination as required, constitutes the composite member with new function.
The utility model has the advantages that significant.
1, when high level or multistory building and towering structure construction, needn't set up the full hall of sealed type scaffold, thereby can significantly reduce operating expenses and accelerate speed of application;
2, adopt the mutual lifting form of attached wall, lifting is flexible, and is safe and reliable;
3, good integrity, heave amplitude and scaffold span are unrestricted;
4, operating surface is big, and 3-5 layer operation platform generally can be set, and can satisfy the space multistory construction requirement;
5, basic building block assembling of the present utility model, convenient disassembly, highly versatile, not only applicable tall and slender structure construction, and the working group's component that can be assembled into the scaffold of various common versions or have other function.
Accompanying drawing is the utility model embodiment, wherein
Fig. 1 plane framework assembling schematic diagram;
Fig. 2 lifting sections schematic diagram;
The mutual lifting false work schematic diagram of Fig. 3;
Fig. 4 lifting schematic diagram;
The spacing slide bar work of Fig. 5 schematic diagram.
Other function composite member schematic diagrames of Fig. 6.
The utility model will be further described in conjunction with the accompanying drawings.
Plane framework to be adjusted joint door frame 2 and connecting rod 3 and is combined, in order to be used with common scaffolding steel pipe by standard knot door frame 1, standard knot door frame 1, adjust the cross bar of joint door frame 2, diagonal brace adopts common foot rest steel tube section, and is that straight-bar can be made tubular or rectangle.Two plate plane frameworks and the tight snapping of common scaffold round steel pipe are combined into the lifting sections of operating platform 7.Attached wall bearing 4 is fixedly mounted on the upper and lower of plane framework by wall one side according to giving 9 the spacing of boxing out on the body of wall.Spacing slide bar 6 was gone here and there fixing spacing ring 5 on the wall and was fixedly mounted on the plane framework between the upper and lower attached wall bearing 4.Attached wall bearing 4 boxes out 9 by giving on the wall, by bolt 8 whole lifting sections is fixed on the body of wall.Several lifting sections are arranged side by side and are fixed on the body of wall, have constituted mutual lifting false work, for corner or on-right angle planform are arranged, can do some change to operating platform 7 ends and just can adapt to (Fig. 3).
When multi-functional mutual lifting false work is highly worked finishing certain, when promoting a height (Fig. 4-a), on operating personnel withdraw and are fixed on lifting sections second on the body of wall to the lifting sections first both sides that are raised, by the supporting-point on the lifting sections 10 suspension hook manual or electric block control is hooked the lifting sections first that is raised, and unclamp bolt 8 on the attached wall bearing 4, gradually lifting sections first is brought up to the height that spacing slide bar 6 limits, lifting sections first is fixed on the body of wall (Fig. 4-b), (Fig. 4-c) by bolt 8 subsequently.Operating personnel are promoted to lifting sections second and lifting sections first sustained height in the same way, and are fixed to lifting sections first then, so mutual lifting false work (Fig. 4-d) that can work in new altitude range.
In lifting process, spacing slide bar 6 vertically slides in spacing ring 5 all the time, and each lifting sections has two spacing slide bars 6, as the twice slide rail, has determined the lifting track, has guaranteed the verticality and the stationarity of lifting sections.After the lifting sections rises to a new height, spacing ring 5 is also promoted and is fixed on giving on the corresponding body of wall and box out in 9, so that next lifting process (Fig. 5).
After construction is all finished, when scaffold need descend, only need to press the said process antikinesis and get final product.
Standard knot door frame 1 of the present utility model, adjust joint door frame 2 and connecting rod 3 or scaffolding steel pipe and also can be reassembled into composite member as required with other functions, 4 of examples only among Fig. 6: common exterior wall scaffold (Fig. 6-a), workbench (Fig. 6-b), the floor template support (Fig. 6-c), the truck work platform (Fig. 6-c).

Claims (3)

1, a kind of multi-functional mutual lifting false work, comprise standard knot door frame (1), adjust joint door frame (2), connecting rod (3), attached wall support (4), spacing ring (5), spacing slide bar (6) is characterized in that: standard knot door frame (1), and adjust joint door frame (2) and connect to form plane framework by connecting rod (3), fixedly mount attached wall support (4), spacing slide bar (6) at plane framework by wall one side; Two plate plane frameworks and the tight snapping of scaffolding steel pipe are combined into the lifting sections of several layers operating platform (7), and several lifting sections are arranged side by side into mutual lifting false work.
2, scaffold according to claim 1 is characterized in that: in the spacing ring (5) of spacing slide bar (6) string on being fixed on body of wall, vertically slide to guarantee the verticality of scaffold in spacing ring during lifting.
3, scaffold according to claim 1 is characterized in that: standard knot door frame (1), adjust joint door frame (2), and connecting rod (3) also can reconfigure as required, constitutes the composite member with new function.
CN 92215913 1992-07-24 1992-07-24 Multi-function mutual rise and fall framing scaffold Expired - Lifetime CN2128653Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92215913 CN2128653Y (en) 1992-07-24 1992-07-24 Multi-function mutual rise and fall framing scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92215913 CN2128653Y (en) 1992-07-24 1992-07-24 Multi-function mutual rise and fall framing scaffold

Publications (1)

Publication Number Publication Date
CN2128653Y true CN2128653Y (en) 1993-03-24

Family

ID=33764283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92215913 Expired - Lifetime CN2128653Y (en) 1992-07-24 1992-07-24 Multi-function mutual rise and fall framing scaffold

Country Status (1)

Country Link
CN (1) CN2128653Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101696566B (en) * 2009-09-21 2011-01-05 中冶建工有限公司 Construction method of mutilevel overpass scaffold
CN101974973A (en) * 2010-11-08 2011-02-16 四川华山建筑有限公司 Two-way stress base section of attached lifting scaffold
CN102454302A (en) * 2010-10-14 2012-05-16 康索斯韦克有限公司 Cage for construction work with extendable function
WO2013175156A1 (en) 2012-05-21 2013-11-28 Inderjit Singh Dhillon High rise building elevation concept
CN103741939A (en) * 2013-12-25 2014-04-23 山东省建筑科学研究院 Climbing type building construction operating platform on outer portion of building and installing method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101696566B (en) * 2009-09-21 2011-01-05 中冶建工有限公司 Construction method of mutilevel overpass scaffold
CN102454302A (en) * 2010-10-14 2012-05-16 康索斯韦克有限公司 Cage for construction work with extendable function
CN101974973A (en) * 2010-11-08 2011-02-16 四川华山建筑有限公司 Two-way stress base section of attached lifting scaffold
WO2013175156A1 (en) 2012-05-21 2013-11-28 Inderjit Singh Dhillon High rise building elevation concept
CN103741939A (en) * 2013-12-25 2014-04-23 山东省建筑科学研究院 Climbing type building construction operating platform on outer portion of building and installing method
CN103741939B (en) * 2013-12-25 2015-10-21 山东省建筑科学研究院 The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method

Similar Documents

Publication Publication Date Title
CN1912314A (en) Automatic hydraulic climbing shuttering
CN109399432B (en) A kind of hoistway job platform that climbs certainly
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN2128653Y (en) Multi-function mutual rise and fall framing scaffold
CN204876578U (en) Building construction system
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN1020645C (en) Integral elevating system for out-mould scaffold of super-high buildings
CN214995818U (en) Climbing type construction operation platform outside building
CN105019657A (en) Building construction system
CN86203954U (en) Wall bearing self-lifting scaffold
CN111997345B (en) Lifting scaffold hangs hoist system upside down
CN109941933A (en) A kind of hoisting frame for workshop Pipe installing
CN204876579U (en) Building construction system
CN204754150U (en) Dish -type node formula scaffold
CN2276046Y (en) Divided multistage automatic climbing external scaffold
CN105003075A (en) Building construction system
CN2263161Y (en) Self-lifting scaffold
CN105178602A (en) Building construction system
CN204876576U (en) Building construction system
CN2177059Y (en) Top lifting adhesive double stretching arm outer scaffold
CN2613553Y (en) Multi-function automatic controlled integral electric driven lifting/lowering scaffold
CN217921272U (en) Superelevation steel column cow leg board promotes installation device
CN2126861Y (en) Reverse hanging type sliding bush lifting scaffold
CN214605199U (en) Auxiliary device for punching high beam plate
CN220013417U (en) Safe operation platform of cast-in-situ box Liang Xuantiao of continuous rigid frame hanging basket cantilever

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term