CN212613623U - Building external climbing type building construction operation platform - Google Patents

Building external climbing type building construction operation platform Download PDF

Info

Publication number
CN212613623U
CN212613623U CN202020828135.8U CN202020828135U CN212613623U CN 212613623 U CN212613623 U CN 212613623U CN 202020828135 U CN202020828135 U CN 202020828135U CN 212613623 U CN212613623 U CN 212613623U
Authority
CN
China
Prior art keywords
operation platform
box
installation box
building construction
construction operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020828135.8U
Other languages
Chinese (zh)
Inventor
董奎立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020828135.8U priority Critical patent/CN212613623U/en
Application granted granted Critical
Publication of CN212613623U publication Critical patent/CN212613623U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model relates to the technical field of building equipment, in particular to an external climbing type building construction operation platform, which comprises an installation box and an operation platform, wherein the front end and the rear end of the top of the installation box are respectively provided with a cross frame, the left side and the right side of the installation box are respectively provided with a support frame, the left side of the inner bottom of the installation box is fixedly provided with a battery box, the inner bottom of the battery box is fixedly provided with a storage battery, the front end and the rear end of the installation box are respectively fixedly provided with a solar cell panel, the surfaces of two lead screws are provided with a mounting plate, the left center of the operation platform is provided with a water flowing groove, the utility model converts solar energy into electric energy through the solar cell panels by the storage battery and the solar cell panel, thereby storing the electric energy into the storage battery, and further improving sufficient electric energy for two micro positive and negative, when the device is used, sufficient electric energy can be provided, and resource waste is reduced.

Description

Building external climbing type building construction operation platform
Technical Field
The utility model relates to a construction equipment technical field specifically is a building outside formula construction operation platform that climbs.
Background
In order to meet the requirements of engineering building decoration and hydropower installation construction, a movable operation platform is adopted for construction, the movable operation platform is flexible to disassemble and convenient to move, a frame body is stable, the up-down extension of the movable operation platform can be freely adjusted, the safety performance is good, the movable operation platform belongs to a self-standard type, and used materials are purchased through a material department and provided by qualified suppliers; the layer can be added and degraded, the upper layer assembly piece is only needed to be disassembled for one layer (step), the platform plate is placed to the lower layer (step), and the layer adding operation is the same on the contrary; the handrail is a folding handrail, when the upper part of the handrail touches an obstacle during moving, the handrail can be put down, the handrail is vertically fixed when the platform moves over the obstacle, and the floor-lowering operation can be carried out after the upper-layer operation is finished.
The existing building construction operation platform has a plurality of types, one of the building construction operation platforms is a climbing construction operation platform outside the building, but when the existing building climbing construction operation platform is used, dust on the operation platform used for a long time and fixed objects stuck and twisted on the operation platform are too many, manual cleaning is required to be regularly carried out, time and labor are wasted, and therefore the current situation is changed by the climbing construction operation platform outside the building.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an outside formula of climbing construction operation platform that rises of building to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a building external climbing type building construction operation platform comprises an installation box and an operation platform, wherein cross frames are arranged at the front end and the rear end of the top of the installation box, support frames are arranged at the left side and the right side of the installation box, a driving chassis is arranged at the bottom of the installation box, a battery box is fixedly arranged at the left side of the inner bottom of the installation box, a storage battery is fixedly arranged at the inner bottom of the battery box, a waterproof box is arranged at the front end of the right side of the inner bottom wall of the installation box, a water suction pump is fixedly arranged at the inner bottom wall of the waterproof box, a water storage box is arranged at the rear end of the right side of the inner bottom wall of the installation box, solar panels are fixedly arranged at the front end and the rear end of the installation box, motor boxes are fixedly arranged at the left side and the right side of the front end of the operation platform, miniature forward and reverse rotation motors are fixedly, the automatic cleaning device is characterized in that a bearing seat is arranged at one end, away from a micro forward and reverse motor, of each of the two lead screws, a mounting plate is arranged on the surface of each of the two lead screws, a plurality of spray heads are uniformly distributed on the left side of the inner top wall of the mounting plate, a scraper plate is arranged at the center of the inner top wall of the mounting plate, a cleaning brush is arranged on the right side of the inner top wall of the mounting plate, a water flowing groove is formed in the center of the left side of the operating.
Preferably, one end of the cross frame, which is far away from the installation box, is fixedly connected with the bottom of the operation platform, and the bottoms of the two bearing seats are respectively fixedly connected with the upper surface and the lower surface of the left side of the top of the operation platform.
Preferably, two equal fixedly connected with fixed block in cross frame left side, two connecting rod swing joint is passed through to the adjacent one end on cross frame's right side, the right side of install bin is provided with the dodge gate, the top center department of install bin is provided with electric telescopic handle, electric telescopic handle's output and the center department fixed connection of connecting rod.
Preferably, the top of operation platform is provided with the rail, the surface of rail is provided with the control box, the front of control box is provided with control panel, operation platform's top left side is provided with the dodge gate.
Preferably, the left side and the right side of the front end and the rear end of the driving chassis are both provided with driving wheels.
Preferably, the top of suction pump is provided with the outlet pipe, the one end that the suction pump was kept away from to the outlet pipe is provided with the shunt tubes, the one end that the outlet pipe was kept away from to the shunt tubes respectively with the top fixed connection of a plurality of shower nozzles, the rear end fixed surface of suction pump is connected with the inlet tube, the one end that the suction pump was kept away from to the inlet tube communicates with the positive fixed surface of water storage box.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses in, shower nozzle through setting up, the scraper blade, cleaning brush and miniature positive reverse motor, when dust or other foul dirt that accumulate on operation platform are too much, the electrical property starts two miniature positive reverse motors, it is rotatory to drive two lead screws through the rotation of two miniature positive reverse motors, thereby it removes to drive the mounting panel, start the water pump and take out the water of the inside of water storage box when the mounting panel removes, spray the top at operation platform through the shower nozzle, after the shower nozzle has spouted water, the cement piece that solidifies on the scraper blade will operation platform is shoveled, then scrub operation platform's surface through the cleaning brush, wash back sewage and pass through the tye and flow in the sewage collection case, and convenient for operation, reduce artifical clearance, when making equipment use, can clean operation platform's top fast, and reduce the human labor.
2. The utility model discloses in, through the battery and the solar cell panel that set up, change solar energy into the electric energy through solar cell panel to save inside the battery, thereby for two miniature positive and negative motor, suction pump, electrical apparatus such as electric telescopic handle improve sufficient electric energy, when making equipment use, can provide sufficient electric energy, reduce the wasting of resources.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an internal structure view of the present invention;
FIG. 3 is a top structure view of the operation platform of the present invention;
in the figure: 1-an operation platform, 2-a motor box, 3-a cross frame, 4-a wastewater collection box, 5-a solar panel, 6-an installation box, 7-a driving chassis, 8-a support frame, 9-a battery box, 10-a storage battery, 11-a water storage box, 12-a waterproof box, 13-a water pump, 14-a flume, 15-a screw rod, 16-an installation plate, 17-a micro positive and negative rotation motor, 18-a cleaning brush, 19-a scraper, 20-a spray head and 21-a bearing seat.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution:
a climbing type building construction operation platform outside a building comprises an installation box 6 and an operation platform 1, wherein cross frames 3 are arranged at the front end and the rear end of the top of the installation box 6, fixed blocks are fixedly connected to the left sides of the two cross frames 3, the adjacent ends of the right sides of the two cross frames 3 are movably connected through a connecting rod, a movable door is arranged on the right side of the installation box 6, an electric telescopic rod is arranged at the center of the top of the installation box 6, the output end of the electric telescopic rod is fixedly connected with the center of the connecting rod, one ends of the two cross frames 3, which are far away from the installation box 6, are fixedly connected with the bottom of the operation platform 1, the bottoms of two bearing seats 21 are respectively fixedly connected with the upper surface and the lower surface of the left side of the top of the operation platform 1, support frames 8 are arranged on the left side and the right side of the installation box, the bottom inside the battery box 9 is fixedly provided with a storage battery 10, solar energy is converted into electric energy through the storage battery 10 and the solar panel 5, and the electric energy is stored in the storage battery 10, so that the electric energy is sufficiently improved for two micro positive and negative rotating motors 17, a water suction pump 13, an electric telescopic rod and other electric appliances, when the device is used, sufficient electric energy can be provided, and resource waste is reduced, the front end of the right side of the bottom wall inside the installation box 6 is provided with a waterproof box 12, the bottom wall inside the waterproof box 12 is fixedly provided with the water suction pump 13, the top of the water suction pump 13 is provided with a water outlet pipe, one end of the water outlet pipe, far away from the water suction pump 13, is provided with a shunt pipe, one end of the shunt pipe, far away from the water outlet pipe, is fixedly connected with the tops of the plurality, one end of a water inlet pipe far away from a water suction pump 13 is fixedly communicated with the front lower surface of a water storage tank 11, the water storage tank 11 is arranged at the rear end of the right side of the inner bottom wall of a mounting box 6, solar panels 5 are fixedly arranged at the front and rear ends of the mounting box 6, motor boxes 2 are fixedly arranged at the left and right sides of the front end of an operating platform 1, miniature forward and reverse rotating motors 17 are fixedly arranged in the two motor boxes 2, the output ends of the two miniature forward and reverse rotating motors 17 are fixedly connected with screw rods 15, bearing seats 21 are arranged at one ends of the two screw rods 15 far away from the miniature forward and reverse rotating motors 17, mounting plates 16 are arranged on the surfaces of the two screw rods 15, a plurality of spray heads 20 are uniformly distributed at the left side of the inner top wall of the mounting plate 16, and through the arranged spray heads 20, scraping plates 19, cleaning brushes 18 and the miniature forward and reverse rotating motors 17, when, the two micro positive and negative rotation motors 17 rotate to drive the two screw rods 15 to rotate, so as to drive the mounting plate 16 to move, the water pump 13 is started to pump out water in the water storage tank 11 while the mounting plate 16 moves, the water is sprayed on the top of the operating platform 1 through the spray head 20, after the spray head 20 finishes spraying water, the scraper 19 shovels away the solidified cement blocks on the operating platform 1, then the surface of the operating platform 1 is scrubbed through the cleaning brush 18, the cleaned sewage flows into the sewage collecting tank through the water flowing groove 14, the operation is convenient, manual cleaning is reduced, so that when the equipment is used, the top of the operating platform 1 can be quickly cleaned, and the manual labor is reduced, the scraper 19 is arranged at the center of the inner top wall of the mounting plate 16, the cleaning brush 18 is arranged at the right side of the inner top wall of the mounting plate 16, the water flowing groove 14 is arranged at the center of the left side of the, the top of operation platform 1 is provided with the rail, and the surface of rail is provided with the control box, and the front of control box is provided with control panel, and the top left side of operation platform 1 is provided with the dodge gate.
The utility model discloses work flow: when the water storage tank is used, when the driving chassis 7 drives the operating platform 1 to a designated position through the driving wheels, when a worker stands on the operating platform 1, the electric telescopic rod is electrically started, two ends of the cross frame 3 are close to each other through electric telescopic retraction, so that the cross frame 3 pushes the operating platform 1 upwards, the worker can adjust the height of the operating platform 1 according to specific use conditions, when the dust or other dirt accumulated on the operating platform 1 is excessive, the two micro forward and reverse rotating motors 17 are electrically started, the two screw rods 15 are driven to rotate through the rotation of the two micro forward and reverse rotating motors 17, so that the mounting plate 16 is driven to move, the water suction pump 13 is started to pump out the water in the water storage tank 11 while the mounting plate 16 moves, the water is sprayed on the top of the operating platform 1 through the spray nozzles 20, and the scraper 19 scrapes off the cement blocks solidified on the operating platform 1 after the water is sprayed by the spray nozzles 20, then, the surface of the operation platform 1 is brushed by the cleaning brush 18, and the cleaned sewage flows into the sewage collection tank through the water flowing groove 14.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a formula of climbing building construction operation platform outside building, includes install bin (6) and operation platform (1), its characterized in that: the solar water heater is characterized in that cross frames (3) are arranged at the front end and the rear end of the top of the installation box (6), support frames (8) are arranged on the left side and the right side of the installation box (6), a driving chassis (7) is arranged at the bottom of the installation box (6), a battery box (9) is fixedly installed on the left side of the inner bottom of the installation box (6), a storage battery (10) is fixedly installed at the inner bottom of the battery box (9), a waterproof box (12) is arranged at the front end of the right side of the inner bottom wall of the installation box (6), a water suction pump (13) is fixedly installed at the inner bottom wall of the waterproof box (12), a water storage box (11) is arranged at the rear end of the right side of the inner bottom wall of the installation box (6), a solar cell panel (5) is fixedly installed at the front end and rear ends of the installation box (6, two the inside fixed mounting of motor case (2) has miniature positive and negative motor (17), two the equal fixedly connected with lead screw (15) of output of miniature positive and negative motor (17), two the one end that miniature positive and negative motor (17) were kept away from in lead screw (15) is provided with bearing frame (21), two the surface of lead screw (15) is provided with mounting panel (16) the inside roof left side evenly distributed of mounting panel (16) has a plurality of shower nozzles (20), the inside roof center department of mounting panel (16) is provided with scraper blade (19), the inside roof right side of mounting panel (16) is provided with cleaning brush (18), gutter (14) have been seted up at the left side center department of operation platform (1), the bottom left side fixed mounting of operation platform (1) has wastewater collection box (4).
2. The external climbing building construction operation platform according to claim 1, wherein: one end of the cross frame (3) far away from the installation box (6) is fixedly connected with the bottom of the operation platform (1), and the bottoms of the two bearing seats (21) are fixedly connected with the upper surface and the lower surface of the left side of the top of the operation platform (1) respectively.
3. The external climbing building construction operation platform according to claim 1, wherein: two equal fixedly connected with fixed block in cross frame (3) left side, two connecting rod swing joint is passed through to the adjacent one end on the right side of cross frame (3), the right side of install bin (6) is provided with the dodge gate, the top center department of install bin (6) is provided with electric telescopic handle, electric telescopic handle's output and the center department fixed connection of connecting rod.
4. The external climbing building construction operation platform according to claim 1, wherein: the top of operation platform (1) is provided with the rail, the surface of rail is provided with the control box, the front of control box is provided with control panel, the top left side of operation platform (1) is provided with the dodge gate.
5. The external climbing building construction operation platform according to claim 1, wherein: and driving wheels are arranged on the left side and the right side of the front end and the rear end of the driving chassis (7).
6. The external climbing building construction operation platform according to claim 1, wherein: the top of suction pump (13) is provided with the outlet pipe, the one end that suction pump (13) were kept away from to the outlet pipe is provided with the shunt tubes, the one end that the outlet pipe was kept away from to the shunt tubes respectively with the top fixed connection of a plurality of shower nozzles (20), the rear end fixed surface of suction pump (13) is connected with the inlet tube, the one end that suction pump (13) were kept away from to the inlet tube communicates with the positive fixed surface of water storage box (11).
CN202020828135.8U 2020-05-18 2020-05-18 Building external climbing type building construction operation platform Expired - Fee Related CN212613623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020828135.8U CN212613623U (en) 2020-05-18 2020-05-18 Building external climbing type building construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020828135.8U CN212613623U (en) 2020-05-18 2020-05-18 Building external climbing type building construction operation platform

Publications (1)

Publication Number Publication Date
CN212613623U true CN212613623U (en) 2021-02-26

Family

ID=74723183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020828135.8U Expired - Fee Related CN212613623U (en) 2020-05-18 2020-05-18 Building external climbing type building construction operation platform

Country Status (1)

Country Link
CN (1) CN212613623U (en)

Similar Documents

Publication Publication Date Title
CN108078507A (en) A kind of family expenses crank block type floor tile cleaning device
CN107007217A (en) A kind of home-use floor-cleaning mop
CN209966256U (en) Self-cleaning glass window
CN115475801A (en) Photovoltaic board surface accumulated dust cleaning device for solar power generation
CN109865683A (en) A kind of photovoltaic panel cleaning apparatus for self
CN212613623U (en) Building external climbing type building construction operation platform
CN213255856U (en) Electric power construction photovoltaic board cleaning device
CN213693607U (en) Photovoltaic module panel convenient to it is clean
CN210899064U (en) Solar cell panel capable of preventing dust accumulation
CN218103069U (en) Semi-automatic cleaning device for solar photovoltaic panel
CN218079222U (en) Semi-automatic cleaning device for solar photovoltaic panel
CN108095653B (en) Intelligent household cup cleaning equipment
CN116436395A (en) Automatic cleaning device for maintenance of photovoltaic module and use method
CN114472280B (en) Surface cleaning system for photovoltaic panel and cleaning method thereof
CN213783230U (en) Outdoor multi-functional photovoltaic power generation station
CN108149823B (en) Glass curtain wall with automatic cleaning machine
CN209985832U (en) Photovoltaic module belt cleaning device
CN201602718U (en) Water injection cleaner of wall surface cleaning robot
CN220365394U (en) Protective fence
CN112448672A (en) Solar cell panel with self-cleaning device
CN218387407U (en) Photovoltaic module with automatically cleaning for new energy automobile
CN221354254U (en) High-efficient photovoltaic power generation device suitable for high-rise building
CN215687476U (en) Improved multifunctional new-energy pure electric sweeping machine
CN215842776U (en) Mixer with self-cleaning device
CN218108570U (en) Photovoltaic board belt cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210226