CN212251443U - Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device - Google Patents

Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device Download PDF

Info

Publication number
CN212251443U
CN212251443U CN202021146809.2U CN202021146809U CN212251443U CN 212251443 U CN212251443 U CN 212251443U CN 202021146809 U CN202021146809 U CN 202021146809U CN 212251443 U CN212251443 U CN 212251443U
Authority
CN
China
Prior art keywords
pipeline
dust removal
factory building
trolley
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021146809.2U
Other languages
Chinese (zh)
Inventor
马松宝
孙树成
王凤杰
于国成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202021146809.2U priority Critical patent/CN212251443U/en
Application granted granted Critical
Publication of CN212251443U publication Critical patent/CN212251443U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model relates to a special pipeline moving and hoisting device for the reconstruction and installation of a dust removal pipeline of an old factory building, which comprises a pipeline trolley for transporting a dust removal pipe and a movable portal frame for lifting the dust removal pipe, wherein the pipeline trolley comprises a supporting plate and rollers, the two sides and the front end of the supporting plate are provided with binding belt fixed points, and the rear end of the supporting plate is provided with a handrail; the movable portal frame comprises four upright posts, the bottoms of the four upright posts are respectively provided with a roller, and the four upright posts are respectively arranged around the pipeline trolley; the top of the upright post is provided with a top frame, the middle of the top frame is also provided with a supporting beam, and the supporting beam is provided with a chain block and a chain block; the device can be used for installing pipelines at the top of an old factory building and can also be used in construction environments with narrow actual space and limited hoisting of a crane, and the method has strong applicability and high construction safety.

Description

Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
Technical Field
The utility model belongs to dust removal pipeline installation construction method, concretely relates to pipeline removes hoist device in old factory building dust removal pipeline transformation engineering.
Background
The span of the industrial factory building is large, the hoisting moment is long, and the longitudinal depth is large. The dust removal pipeline installation during the industrial factory building construction, consequently there is sufficient construction space, and the new-built factory building alternates with the installation pipeline of factory building and is under construction in step, adopts large-scale crane to hoist the pipeline and targets in place.
When the dust removal pipeline needs to be technically transformed or the dust removal pipe is additionally arranged for an completed factory building or an old factory building, only hoisting equipment can be arranged outside the factory building, but even if a large crane is used, the hoisting moment cannot meet the requirement of a large-span factory building. In addition, the space of the old factory building is small, and the pipeline cannot be directly hoisted into the factory building by the crane.
Therefore, when meeting the engineering that some factory buildings need technical transformation because of environmental protection and not meeting requirements, insisting on the difficulty of installing pipelines by adopting a large crane or a tower crane and installing the pipelines by assembly, the engineering can hardly be implemented, and the construction of the dust removal pipeline transformation of the old factory buildings becomes the technical problem in the field.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a solve the problem that old factory building dust removal pipe transformation installation was implemented the difficulty among the prior art, provide a dust removal pipeline installation method to old factory building or completed factory building.
In order to achieve the above object, the utility model provides a technical scheme specifically is:
the special pipeline moving and hoisting device for the reconstruction and installation of the dust removal pipeline of the old factory building comprises a pipeline trolley for transporting the dust removal pipe and a moving portal frame for lifting the dust removal pipe, wherein the pipeline trolley comprises a supporting plate and rollers, binding belt fixing points are arranged on two sides and the front end of the supporting plate, and a handrail is arranged at the rear end of the supporting plate; the movable portal frame comprises four upright posts, the bottoms of the four upright posts are respectively provided with a roller, and the four upright posts are respectively arranged around the pipeline trolley; the top of the upright post is provided with a top frame, the middle of the top frame is also provided with a supporting beam, and the supporting beam is provided with a chain block and a chain block; and two ends of the supporting beam are arranged on the top frame through a sliding structure.
The device can be used for installing pipelines at the top of an old factory building and can also be used in construction environments with narrow actual space and limited hoisting of cranes, and the method is high in applicability and high in construction safety.
Furthermore, the pipeline trolley and the movable door frame are of a movable structure which is assembled into a whole through a connecting beam.
Drawings
FIG. 1 is a view of the pipeline trolley and the movable gantry of the present invention installed at the beginning end of a steel rail;
FIG. 2 is an elevation view of the installation and construction state of the pipeline trolley and the movable portal;
FIG. 3 is a view showing the positions of the pipeline trolley and the movable gantry;
FIG. 4 is a view showing a depression angle at the installation position of the pipeline trolley and the movable gantry;
fig. 5 is a perspective view of the moving gantry.
Detailed Description
The technical solution of the present invention will be described in detail and completely with reference to the accompanying drawings.
The utility model discloses an installation chain block and chain block on removal portal roof-rack 5, removal portal 5 sets up in pipeline platform truck 6's top, among the above-mentioned mounting method, can move pipeline platform truck 6 and removal portal 5 simultaneously through hoist engine 1.
As shown in fig. 3 to 5, the pipeline trolley 6 of the present invention includes a support plate 61 and rollers, wherein the two sides and the front end of the support plate 61 are provided with fastening points for fastening a binding band, and the rear end of the support plate 61 is provided with a handrail 62. The utility model discloses a moving gantry 5 includes four stands 53, four stands 53 bottom installation gyro wheels, and four stands 53 are separated in pipeline platform truck 6 all around, and roof-rack 52 is established at four stands 53 tops, still establishes a supporting beam 51 in the middle of the roof-rack 52, and an installation chain block and chain block on a supporting beam 51, supporting beam 51 both ends can design sliding construction, realize the support position adjustment at the roof-rack through sliding construction installation.
Further, the pipeline trolley 6 and the movable portal 5 are designed into an integrated movable structure. The two can be assembled together by coupling beams.
With reference to the attached drawings 1-2, the operation steps of the device for reconstructing and installing the dust removal pipeline of the old factory building are as follows:
1) laying a pipeline trolley steel rail 3 on the roof girder 8 from outside to inside, and installing a pipeline trolley 6 on the pipeline trolley steel rail 3;
2) installing moving portal steel rails 4 on two sides of a pipeline trolley steel rail 3, and installing moving portals 5 on the moving portal steel rails 4;
3) installing a stop at the starting end of the steel rail outside the roof girder 8;
4) the end of the steel rail is provided with a winch 1 and a steel wire rope 2 on the inner side of the roof girder;
5) the dust removal pipeline 7 is hoisted to the pipeline trolley 6 and fixed;
6) the pipeline trolley 6 is pulled to a position to be installed through the winch 1; the moving gantry 5 is drawn to the position where the pipeline trolley 6 is stopped;
7) and a chain block 10 is arranged on the movable portal 5, the dust removal pipeline 7 is lifted to the designed height by adopting the chain block, and the pipeline is fixed and assembled.
Pipeline platform truck rail 3 and removal portal rail 4 can use with the specification track, the utility model discloses a platform truck and removal portal carry out the piping erection, can solve the unable station and hoist and mount of large crane, and tower crane construction period is long, problem with high costs, fine solution the construction difficult point of old factory building environmental protection transformation.
The utility model has the advantages that: (1) the problems that the site of an old factory area is narrow and small, and a large-scale crane cannot stand and lift are solved. (2) Simple construction, low cost, high safety and short construction period. (3) And a small crane can meet the construction requirements.

Claims (2)

1. The utility model provides an old factory dust removal pipeline reforms transform installation pipeline and removes hoist device, is characterized by including the pipeline trolley who is used for transporting the pipe that removes dust: the pipeline trolley comprises a supporting plate and rollers, binding belt fixing points are arranged on two sides and the front end of the supporting plate, and a handrail is arranged at the rear end of the supporting plate; the movable portal frame comprises four upright posts, the bottoms of the four upright posts are respectively provided with a roller, and the four upright posts are respectively arranged around the pipeline trolley; the top of the upright post is provided with a top frame, the middle of the top frame is also provided with a supporting beam, and the supporting beam is provided with a chain block and a chain block; and two ends of the supporting beam are arranged on the top frame through a sliding structure.
2. The special pipeline moving and hoisting device for the reconstruction and installation of the old factory building dust removal pipeline as claimed in claim 1, which is characterized in that: the pipeline trolley and the movable portal frame are of a movable structure which is assembled into a whole through a connecting beam.
CN202021146809.2U 2020-06-19 2020-06-19 Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device Active CN212251443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021146809.2U CN212251443U (en) 2020-06-19 2020-06-19 Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021146809.2U CN212251443U (en) 2020-06-19 2020-06-19 Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device

Publications (1)

Publication Number Publication Date
CN212251443U true CN212251443U (en) 2020-12-29

Family

ID=73988509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021146809.2U Active CN212251443U (en) 2020-06-19 2020-06-19 Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device

Country Status (1)

Country Link
CN (1) CN212251443U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114719081A (en) * 2022-04-08 2022-07-08 中国建筑第二工程局有限公司 Pipeline installation system of nuclear power plant and pipeline installation method of nuclear power plant
CN115370160A (en) * 2022-09-14 2022-11-22 中国建筑第七工程局有限公司 Construction method for realizing perforation hoisting of upper-layer ultra-long steel structure through lower-layer net rack

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114719081A (en) * 2022-04-08 2022-07-08 中国建筑第二工程局有限公司 Pipeline installation system of nuclear power plant and pipeline installation method of nuclear power plant
CN114719081B (en) * 2022-04-08 2023-11-14 中国建筑第二工程局有限公司 Pipeline installation system of nuclear power station and pipeline installation method of nuclear power station
CN115370160A (en) * 2022-09-14 2022-11-22 中国建筑第七工程局有限公司 Construction method for realizing perforation hoisting of upper-layer ultra-long steel structure through lower-layer net rack

Similar Documents

Publication Publication Date Title
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN109653105B (en) Main truss system of box girder bridge cantilever construction hanging basket and use method thereof
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN201417657Y (en) Installation device of indoor transformer
CN216072749U (en) Indoor track beam push type installation construction device
CN113279335A (en) Device and method for mounting large-tonnage and wide-width steel box girder across mountain ridge
CN203961317U (en) Slip list Pin and many truss structures moulding bed
CN112377672A (en) Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof
CN111287498B (en) Protective shed frame for construction of overhead bridge box girder crossing railway and erection method
JP2909413B2 (en) Suspension device for building exterior walls
CN110439292A (en) Fabrication and installation system and construction technology for large-scale closed type industrial stockyard roof truss
CN115818458A (en) Standard knot assembling and disassembling system and operation method
CN111877165B (en) Bailey beam translation device in limited space and construction method thereof
CN212687392U (en) Cable crane hoisting device for bridge erection
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
CN114232974A (en) Curtain wall engineering construction equipment of rail type hanging bracket and construction method thereof
CN110374001B (en) Bridge bottom large-span cross beam construction method
JP3822084B2 (en) Construction lifting system for high-rise buildings
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN109205475B (en) Device and method for assembling and disassembling girder type gantry crane in tunnel through connection of trusses
CN216893415U (en) Curtain wall engineering construction equipment of rail mounted gallows
CN210594968U (en) Sliding device for hoisting truss
CN110127527B (en) Bridge crane hoisting method in limited space
CN213679518U (en) Asynchronous cradle with gantry crane
CN219116989U (en) Rail sliding device for hoisting high-rise building surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant