CN203961317U - Slip list Pin and many truss structures moulding bed - Google Patents

Slip list Pin and many truss structures moulding bed Download PDF

Info

Publication number
CN203961317U
CN203961317U CN201320834619.3U CN201320834619U CN203961317U CN 203961317 U CN203961317 U CN 203961317U CN 201320834619 U CN201320834619 U CN 201320834619U CN 203961317 U CN203961317 U CN 203961317U
Authority
CN
China
Prior art keywords
moulding bed
truss
pulling mechanism
track
truss structures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320834619.3U
Other languages
Chinese (zh)
Inventor
孙善馥
杨深强
王晨亮
唐英琦
张彬
曹金玉
王公磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Original Assignee
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd, China Construction Eighth Engineering Division Co Ltd Dalian Branch filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201320834619.3U priority Critical patent/CN203961317U/en
Application granted granted Critical
Publication of CN203961317U publication Critical patent/CN203961317U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to Building class, particularly relates to the slip moulding bed of single Pin and many truss structures assembling use.Slip list Pin and many truss structures moulding bed, comprise track, moulding bed, truss, pulling mechanism, and track is provided with moulding bed, takes dress truss on moulding bed, and on track, opposite side is also provided with pulling mechanism, and pulling mechanism connects moulding bed by wire rope.The utility model can be according to place need designed path shift position, other position assembling truss outside truss installation site, by pulling mechanism, pull truss to move to truss installation site again, the utility model can rationally utilize space, place, avoids truss installation site to carry out the drawback of truss assembling inconvenience; By slippage equipment is set, crane hoisting equipment is hoisted in position not, can reduce the lifting capacity of lifting appliance, cost-saving.

Description

Slip list Pin and many truss structures moulding bed
Technical field
The utility model relates to Building class, particularly relates to the slip moulding bed of single Pin and many truss structures assembling use.
Background technology
In order to meet large scale structure and the equipment engineering phase construction requirement when newly-built or the overhaul, to solve the problems such as production site restriction simultaneously, adopt modular construction technology to become construction necessary.When the truss especially adopting in super-huge building is installed and builds, plane object stream is most important.Sometimes because place insufficient space can not directly lift on truss position, design a kind of movably planar system and seem very important.
Summary of the invention
For addressing the above problem, the utility model provides a kind of slip list Pin and many truss structures moulding bed, and no longer assemble truss installation site, in plane site, assembles, then slippage is installed to truss position, can effectively solve the problem of truss installing space deficiency.
For achieving the above object, the utility model provides a kind of slip list Pin and many truss structures moulding bed, it comprises track, moulding bed, truss, pulling mechanism, described track is provided with moulding bed, on moulding bed, take dress truss, on described track, opposite side is also provided with pulling mechanism, and described pulling mechanism connects moulding bed by wire rope.
Described pulling mechanism comprises Lever Blocks or hoist engine.
The crab-bolt of mating formation under described track plate, crab-bolt plate and ground are chemical species anchorings, moulding bed and interorbital arrange tetrafluoroethene plate.
Described moulding bed comprises the moulding bed of horizontal direction, the moulding bed of vertical direction, and the moulding bed of vertical direction and the moulding bed of horizontal direction support by oblique ribs.
Described oblique ribs angle is 45-60 degree.
Use the utility model effect remarkable: what the utility model can be according to place needs designed path shift position, other position assembling truss outside truss installation site, by pulling mechanism, pull truss to move to truss installation site again, the utility model can rationally utilize space, place, avoids truss installation site to carry out the drawback of truss assembling inconvenience.By slippage equipment is set, crane gear lifting is hoisted in position not, can reduce the lifting capacity of lifting appliance, cost-saving.
Accompanying drawing explanation
Fig. 1 is moulding bed and the truss schematic diagram of slip list Pin and many truss structures moulding bed;
Fig. 2 is the structural representation of slip list Pin and many truss structures moulding bed.
1-track in figure, 2-moulding bed, 3-truss, 4-pulling mechanism.
The specific embodiment
embodiment 1
Slip list Pin and many truss structures 3, moulding bed 2, it comprises track 1, moulding bed 2, truss 3, pulling mechanism 4, and track 1 is provided with moulding bed 2, takes dress truss 3 on moulding bed 2, and on track 1, opposite side is also provided with pulling mechanism 4, and pulling mechanism 4 connects moulding bed 2 by wire rope.
General assembling track 1, moulding bed 2, truss 3 pass through following steps:
The first step: track 1 is laid: in consolidation shed ground basis, treat orientation and the size of slippage main couple 3, pre-designed slippage circuit, and utilize apparatus measures unwrapping wire on base plate to indicate.According to related request spacing, on base plate, accomplish fluently chemical anchor bolts, i-beam track is laid in crab-bolt plate top, track 1 adopts billet leveling, both sides horizontal slide rail axis is answered keeping parallelism, misalignment of axe is not more than 4mm, and the whole discrepancy in elevation is not more than 5mm, and amount of deflection is not more than 2mm, and with plate firm welding, between i-beam track, welded H section steel is firm across a certain distance mutually.
Second step: moulding bed setting: square box moulding bed 2 on the i-beam track laying in advance, this moulding bed 2 is double does assembled and slippage.And padded in advance tetrafluoroethene plate with i-beam track 1 contact node district below horizontal box moulding bed 2.
The 3rd step: truss lower edge is assembled, correction: utilize QUY260 crawler crane truss 3 lower chord members to be winched to above the moulding bed 2 laying in advance outside the venue, before QUY260 crawler crane pine hook, truss 3 members are proofreaied and correct and put in place, and oblique support is set in both sides in time after loose hook fixes, guarantee that truss 3 members are reliable and stable on moulding bed 1.
The 4th step: the large component assembly of lower edge and welding: after lower-chord panel point lifting puts in place, then lift another large-scale lower chord member, and weld after assembled correction.And in truss 3 both sides, front and back, support system is set and guarantees truss 3 stability and safety.
The 5th step: the assembled correction of middle web member: after truss 3 lower edge rod members are all installed and welded, start the middle web member of lifting and welding, when assembled web member, reliable support must be set, especially diagonal web member, guarantee that Stability Analysis of Structures is reliable on the one hand, another aspect guarantees that its diagonal web member is not out of shape because amount of deflection is excessive.
The 6th step: the assembled correction of winding up: truss 3 web members carry out the installation of corresponding moulding bed 2 after all installing and having welded in time, and in centre, be symmetrical arranged four vertical casing moulding bed bracing frame systems, reliable and stable during the component assembly of guaranteeing to wind up welding.
The 7th step: wind up and install and welding: chord member on assembled residue truss 3 on moulding bed 2, install after firm welding, must the reliable diagonal brace of multiple tracks be set in truss 3 both sides and fix, guarantee that truss does not topple.
The 8th step: truss welding and slippage: single Pin main couple 3 welds and detects a flaw after acceptance(check) above ground moulding bed 2, in the middle of being about to, four vertical casing moulding bed bracing frame systems are removed, before removing, reliable oblique ribs is set above both sides box moulding bed 2, and before and after truss 3 glide directions, both sides arrange reliable pulling device, while guaranteeing truss 3 slippage, stablize and do not topple.
Article two, on track 1, relevant position arranges assembly pulley and traction cucurbit, and track 1 end face is polished smooth, surface roughness reaches 1.6, and spread butter, sufficient lubrication, two arranged outside postive stop baffles below box moulding bed, the upper tetrafluoroethene plate of pad in baffle plate, track 1 welding in two of inner sides arranges two cover side direction pulleys.Guarantee truss 3 smooth slippage and safety.Before truss 3 slippages, towing point is set, each, two tracks, adopt Lever Blocks or hoist engine to draw, and are equipped with four door guide roller groups, and hauling speed should not be greater than 0.3m/min; During slippage, the asynchronous value in two ends should not be greater than 30mm.
embodiment 2
The setting of the present embodiment explanation slippage place setting and sliding rail 1.
1, slippage place arranges
This engineering B truss is taked A near axis list Pin main couple 3 assembled completing, and single truss structure 3 horizontal slidings, to the upright projection region of specified design installation position, amount to two truss structures 3 between slippage B axle and A ~ B axle.
The main assembled place of moulding bed 2 and slippage place are positioned between (2/7 axle ~ 1/8 axle)/A ~ B axle, in this region and part north and south expanded scope, must will in place, clean out, and remove the obstructions such as relevant civil engineering, guarantee that levelling of the land totally reaches truss slippage requirement.
2, the setting of sliding rail
B truss slippage need be laid four Pin I50c GB i iron altogether, from A axis to B axis laying length, is about 20m.Slippage is symmetrical two tracks 1, and between two i iron of every track 1, spacing 1m arranges H200*150*4.5*6 shaped steel and is welded and fixed.
Sliding rail below arranges expansion bolt on civil engineering concrete floor, along orbital direction spacing 500mm, arranges, and expansion bolt buried plate top and i-beam track 1 firm welding, specification plane should be greater than 300mm*300mm.
This engineering B three Pin main couple sizes are different, integral body is distributed in echelon by B axle to A axle, track 1 must be measured setting-out before laying in advance, according to the upright projection at design and installation position, position laying, after the first truss structure 3 slippages, during slippage the 2nd Pin, must re-start measurement setting-out, according to the location of main couple 3, sliding rail 1 be finely tuned, retighten and lay firmly.Guarantee that as far as possible it is upright projection in place and that install below that truss 3 slippages put in place, reduces the work of readjusting orientation.

Claims (5)

1. slip list Pin and many truss structures moulding bed, it is characterized in that: it comprises track, moulding bed, truss, pulling mechanism, described track is provided with moulding bed, takes dress truss on moulding bed, on described track, opposite side is also provided with pulling mechanism, and described pulling mechanism connects moulding bed by wire rope.
2. slip list Pin according to claim 1 and many truss structures moulding bed, is characterized in that: described pulling mechanism comprises Lever Blocks or hoist engine.
3. slip list Pin according to claim 1 and many truss structures moulding bed, is characterized in that: the crab-bolt of mating formation under described track plate, and crab-bolt plate and ground are chemical species anchorings, moulding bed and interorbital arrange tetrafluoroethene plate.
4. slip list Pin according to claim 1 and many truss structures moulding bed, is characterized in that: described moulding bed comprises the moulding bed of horizontal direction, the moulding bed of vertical direction, and the moulding bed of vertical direction and the moulding bed of horizontal direction support by oblique ribs.
5. slip list Pin according to claim 4 and many truss structures moulding bed, is characterized in that: described oblique ribs angle is 45-60 degree.
CN201320834619.3U 2013-12-18 2013-12-18 Slip list Pin and many truss structures moulding bed Expired - Fee Related CN203961317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320834619.3U CN203961317U (en) 2013-12-18 2013-12-18 Slip list Pin and many truss structures moulding bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320834619.3U CN203961317U (en) 2013-12-18 2013-12-18 Slip list Pin and many truss structures moulding bed

Publications (1)

Publication Number Publication Date
CN203961317U true CN203961317U (en) 2014-11-26

Family

ID=51921918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320834619.3U Expired - Fee Related CN203961317U (en) 2013-12-18 2013-12-18 Slip list Pin and many truss structures moulding bed

Country Status (1)

Country Link
CN (1) CN203961317U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863374A (en) * 2015-04-27 2015-08-26 中国建筑第八工程局有限公司 Slip mechanism of long-span steel structure and slip method of same
CN111042539A (en) * 2019-12-02 2020-04-21 中建钢构有限公司 Single-point support installation construction method for large-span steel structure truss
CN111379424A (en) * 2020-03-05 2020-07-07 广州建筑股份有限公司 Anti-overturning device and method for planar structure sliding construction
CN115405115A (en) * 2022-09-30 2022-11-29 中建八局第二建设有限公司 Slidable assembled jig frame and application method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863374A (en) * 2015-04-27 2015-08-26 中国建筑第八工程局有限公司 Slip mechanism of long-span steel structure and slip method of same
CN104863374B (en) * 2015-04-27 2017-03-29 中国建筑第八工程局有限公司 Large-span steel slipping mechanism and its gliding method
CN111042539A (en) * 2019-12-02 2020-04-21 中建钢构有限公司 Single-point support installation construction method for large-span steel structure truss
CN111042539B (en) * 2019-12-02 2022-06-24 中建钢构工程有限公司 Single-point support installation construction method for large-span steel structure truss
CN111379424A (en) * 2020-03-05 2020-07-07 广州建筑股份有限公司 Anti-overturning device and method for planar structure sliding construction
CN115405115A (en) * 2022-09-30 2022-11-29 中建八局第二建设有限公司 Slidable assembled jig frame and application method

Similar Documents

Publication Publication Date Title
CN104088449B (en) Safe and fast double-track construction platform of super high-rise curtain wall
CN101899905B (en) Hoisting slide devices and hoisting slide equipment
CN104060844A (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN103821087B (en) Prefabricated bridge Steel Space pipe concrete truss combination beams and construction method
CN105000482B (en) Tower crane with walking mechanism
CN203821720U (en) High-altitude large roof panel installing tool trolley
CN203961317U (en) Slip list Pin and many truss structures moulding bed
CN202416882U (en) Track for slippage installation of large-span pipe truss
CN111038940A (en) Rail mounted is used for hoist and mount traction system of transportation
CN102190249B (en) Method for hoisting equipment positioned at bottom of multilayer frame platform
CN105019664A (en) High-altitude sliding installation method for box room type electric room
CN208995928U (en) A kind of multi-functional erection crane suitable for composite beam construction
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN201850076U (en) Gate-shaped stand rod hoist of contact network
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
CN104895336A (en) Method for installing steel beam of stiff hybrid structure in place
CN202482772U (en) Collapse-proof stop block mounting system for railway bridge
CN201857761U (en) Hoisting and sliding device and hoisting and sliding equipment
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN211711873U (en) Rail mounted is used for hoist and mount traction system of transportation
CN202705923U (en) Assembling platform installed close to bridge abutment roadbed
CN102535277B (en) Device for completely moving railway turnout
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN210682999U (en) Hoisting and transferring device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126

Termination date: 20181218