CN212248305U - Supplementary foundation ditch falls drain pipe fixed bolster - Google Patents

Supplementary foundation ditch falls drain pipe fixed bolster Download PDF

Info

Publication number
CN212248305U
CN212248305U CN202020302590.4U CN202020302590U CN212248305U CN 212248305 U CN212248305 U CN 212248305U CN 202020302590 U CN202020302590 U CN 202020302590U CN 212248305 U CN212248305 U CN 212248305U
Authority
CN
China
Prior art keywords
foundation pit
operating platform
clamping plates
drain pipe
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020302590.4U
Other languages
Chinese (zh)
Inventor
娄在明
宋卫强
刘文丽
李涛
门俊
余孟孟
张国强
贾任君
李云辰
滕安康
张君诚
严楚良
张瑜
贾梦军
陈志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stecol Corp
Original Assignee
Stecol Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Stecol Corp filed Critical Stecol Corp
Priority to CN202020302590.4U priority Critical patent/CN212248305U/en
Application granted granted Critical
Publication of CN212248305U publication Critical patent/CN212248305U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a fixing bracket for an auxiliary foundation pit drainage pipe, which comprises an operating platform arranged on a supporting beam between two side walls of the foundation pit, wherein 2 fixing units with the same structure are arranged on the operating platform; the fixing unit comprises a portal frame and 2 clamping plates, wherein the operating platform is provided with mounting holes, the clamping plates are all covered above the mounting holes, the clamping plates are respectively hinged to two sides of an orifice of the mounting holes, the clamping plates are arranged in a mirror image mode, pipe grooves are all formed in the clamping plates, the portal frame is fixed on the operating platform, and a lifting assembly is arranged below the portal frame; the lifting assembly comprises a support, a pulley and a lifting ring, the support is fixed below the gantry, the pulley and the lifting ring are both fixed on the support, and a lifting rope is installed on the lifting ring. Supplementary foundation ditch falls drain pipe fixed bolster, simple structure, the manufacturing of being convenient for can form at job site temporary welding equipment, it is also comparatively convenient to use, can solve and fall the drain pipe and install about the foundation ditch and waste time and energy the scheduling problem when promoting.

Description

Supplementary foundation ditch falls drain pipe fixed bolster
Technical Field
The utility model belongs to foundation ditch drainage equipment field especially relates to an auxiliary foundation ditch falls drain pipe fixed bolster.
Background
Along with the rapid development of municipal works, especially when underground deep buried foundation pit construction and underground structure construction, deep foundation pit uses more and more generally, and the foundation pit falls the drainage and plays the key role in foundation pit construction, has guaranteed the safety of whole foundation pit construction. When the drainage construction is fallen in the foundation ditch, the arrangement of drain pipe is especially crucial, satisfies promptly and accomplishes the perpendicular normal drainage of foundation ditch smoothly, accomplishes pleasing to the eye that whole construction site and equipment arranged again.
In actual construction, the common arrangement of the drainage pipe is as follows: the hose is followed the suction pump and is connect out the back, and it is perpendicular upwards along the foundation ditch limit, and the foundation ditch top adopts the iron wire to fix in guardrail department. The hose adopted in the method is easy to damage, and the whole hose needs to be replaced after being damaged, so that the method is time-consuming and labor-consuming, the drainage of the foundation pit is delayed, a large safety accident is caused, in addition, the arrangement of the drainage pipe is irregular, and the standardized construction cannot be realized.
Disclosure of Invention
In view of this, the utility model aims at providing an auxiliary foundation ditch falls drain pipe fixed bolster to fall the drain pipe fixed bolster through auxiliary foundation ditch and solve drain pipe fragile and drain pipe and lay irregular problem.
In order to achieve the above purpose, the technical scheme of the utility model is realized like this:
a fixing support for assisting a foundation pit drainage pipe comprises an operating platform arranged on a supporting beam between two side walls of a foundation pit, wherein 2 fixing units with the same structure are arranged on the operating platform, and the fixing units are arranged at two ends of the operating platform in a mirror image manner;
the fixing unit comprises a gantry and 2 clamping plates, the operating platform is provided with mounting holes, the clamping plates are all covered above the mounting holes, the clamping plates are respectively hinged to two sides of an orifice of the mounting hole, the clamping plates are arranged in a mirror image mode, pipe grooves are all formed in the clamping plates, the gantry is fixed on the operating platform, a lifting assembly is arranged below the gantry, and the lifting assembly is located right above the mounting holes;
the lifting assembly comprises a support, a pulley and a lifting ring, the support is fixed below the gantry, the pulley and the lifting ring are fixed on the support, the pulley is located above the lifting ring, and a lifting rope is installed on the lifting ring.
Furthermore, a plurality of fixed supporting legs are installed at the bottom of the operating platform and are fixedly connected with supporting beams between two side walls of the foundation pit through bolts respectively.
Furthermore, a sliding groove for penetrating a bolt is formed in the fixed supporting leg.
Further, the fixing unit further comprises a guardrail, and the guardrail is installed at the edge of the operating platform.
Further, a handle is arranged on the clamping plate.
Further, the circular pipeline through hole is formed in the pipe groove between the clamping plates after the clamping plates are closed.
Furthermore, a drain pipe is hung below the lifting rope, and one end of the drain pipe penetrates through the pipeline through hole and then is located in the foundation pit.
Furthermore, the outside cover of drain pipe has the pipe strap, and the pipe strap joint is in the top of pipeline through-hole.
Compared with the prior art, supplementary foundation ditch fall drain pipe fixed bolster have following advantage:
(1) supplementary foundation ditch drop drain pipe fixed bolster, simple structure, the manufacturing of being convenient for can form at job site temporary welding equipment, it is also comparatively convenient to use, can solve and fall the drain pipe and install about the foundation ditch and waste time and energy the scheduling problem when promoting, solved the problem that the drain pipe was arranged in a jumble, civilized construction is poor.
(2) The utility model discloses an auxiliary foundation ditch falls drain pipe fixed bolster, whole support body can directly be located on foundation ditch supporting body system, not only practices thrift the place space but also reaches pleasing to the eye effect; the fixed supporting legs are provided with sliding grooves for penetrating bolts, and the bolts can freely move up and down in the sliding grooves and are fixed so as to adapt to the supporting beams with different heights.
(3) Supplementary foundation ditch drop drain pipe fixed bolster, the lifting rope can make portal and water piping connection and fixed, the cardboard further holds the pipe strap and undertakes drain pipe weight, lifting rope and cardboard dual fail-safe avoid the drain pipe slippage.
Drawings
The accompanying drawings, which form a part hereof, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without undue limitation. In the drawings:
fig. 1 is a front view of a fixing bracket according to an embodiment of the present invention;
fig. 2 is a side view of a fixing bracket according to an embodiment of the present invention;
fig. 3 is a top view of the operation platform according to the embodiment of the present invention.
Description of reference numerals:
1. an operating platform; 11. mounting holes; 12. fixing the supporting legs; 121. a chute; 2. a gantry; 3. clamping a plate; 31. a pipe groove; 311. a conduit through hole; 32. a handle; 4. a lifting assembly; 41. a support; 42. a pulley; 43. a hoisting ring; 431. a lifting rope; 5. a guardrail; 6. a drain pipe; 61. a pipe clamp; 7. and supporting the beam.
Detailed Description
It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
As shown in fig. 1-3, a fixing bracket for a drainage pipe of an auxiliary foundation pit comprises an operating platform 1 arranged on a supporting beam 7 between two side walls of the foundation pit, wherein 2 fixing units with the same structure are arranged on the operating platform 1, and the fixing units are arranged at two ends of the operating platform 1 in a mirror image manner; be equipped with a supporting beam 7 between the relative both sides wall of foundation ditch, the fixed bolster is installed promptly supporting beam 7 is last, need not to set up special fixed establishment, has practiced thrift the place space. The fixing support is made of I-shaped steel, steel plates and steel pipes, is simple in structure and convenient to manufacture, and can be formed by temporary welding and assembling on a construction site.
The fixing unit comprises a portal 2 and 2 clamping plates 3, the operating platform 1 is provided with mounting holes 11, the clamping plates 3 are all covered above the mounting holes 11, the clamping plates 3 are respectively hinged to two sides of an orifice of the mounting hole 11, the clamping plates 3 are arranged in a mirror image mode, pipe grooves 31 are all formed in the clamping plates 3, the portal 2 is fixed on the operating platform 1, a lifting assembly 4 is installed below the portal 2, and the lifting assembly 4 is located right above the mounting holes 11;
the lifting assembly 4 comprises a support 41, a pulley 42 and a hanging ring 43, wherein the support 41 is fixed below the gantry 2, the pulley 42 and the hanging ring 43 are both fixed on the support 41, the pulley 42 is positioned above the hanging ring 43, and a lifting rope 431 is arranged on the hanging ring 43. The lifting rope 431 can enable the door frame 2 to be connected with the drain pipe 6 and fixed, the clamping plate 3 further supports the pipe clamp 61 to bear the weight of the drain pipe 6, and the lifting rope 431 and the clamping plate 3 are double-insurance, so that the drain pipe 6 is prevented from slipping. The pulley 42 can be used for conveying and lifting the drain pipe 6, and the stay cord is used for bypassing the pulley 42 to convey or lift the drain pipe 6, so that the time and the labor are saved.
The bottom of the operating platform 1 is provided with a plurality of fixed supporting legs 12, and the fixed supporting legs 12 are respectively and fixedly connected with the supporting beams 7 between the two side walls of the foundation pit through bolts. The fixed supporting legs 12 are arranged at the bottom of the operating platform 1, and the fixed supporting legs 12 are fastened around the supporting beam 7 through bolts, so that the effect of stabilizing the whole support is achieved.
The fixed leg 12 is provided with a sliding groove 121 for passing a bolt.
The fixing unit further comprises a guardrail 5, the guardrail 5 being mounted at the edge of the operation platform 1. The guardrail 5 is used for playing a safety protection role in the construction and later maintenance of the drain pipe 6.
The card 3 is provided with a handle 32. Handle 32 facilitates opening and closing of card 3.
The pipe slots 31 between the cards 3 form circular pipe through holes 311 after the cards 3 are closed.
The drain pipe 6 is hung below the lifting rope 431, and one end of the drain pipe 6 penetrates through the pipeline through hole 311 and then is located in the foundation pit.
The outside cover of drain pipe 6 has pipe strap 61, and pipe strap 61 joint is in the top of pipeline through-hole 311. The external diameter of pipe strap 61 is greater than the internal diameter of pipeline through-hole 311, and then makes pipe strap 61 can the joint in the top of pipeline through-hole 311, makes cardboard 3 hold pipe strap 61 and undertake drain pipe 6 weight.
The central line of the lifting rope 431, the central line of the drain pipe 6 and the central line of the pipeline through hole 311 are all located on the same plumb line, so that the drain pipe 6 is convenient to convey and lift, and pipeline abrasion is avoided.
The working principle is as follows:
the operation platform 1 is located on the supporting beam 7, the 4 fixed supporting legs 12 are symmetrically clamped on two sides of the supporting beam 7, then 2 bolts penetrate through the sliding grooves 121 of the corresponding fixed supporting legs 12 respectively, the bolts are enabled to clamp the bottom of the supporting beam 7 along the moving positions of the sliding grooves 121, nuts at two ends of the bolts are tightened, and the operation platform 1 is fixed on the supporting beam 7. Then, one end of the drain pipe 6 is fixed below the hanging ring 43 through the hanging rope 431, the other end of the drain pipe 6 penetrates through the mounting hole 11 and then is conveyed into the foundation pit, then the clamping plate 3 is closed through the handle 32, the drain pipe 6 is located in the pipeline through hole 311, the fastening bolt of the pipe clamp 61 is loosened, the position of the pipe clamp 61 is adjusted, the pipe clamp 61 is clamped above the pipeline through hole 311 and fastened through the fastening bolt, the closed clamping plate 3 supports the pipe clamp 61, namely, the vertical installation of the drain pipe 6 is completed, and then the horizontal drain pipeline is connected.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides an auxiliary foundation ditch falls drain pipe fixed bolster which characterized in that: the device comprises an operating platform arranged on a supporting beam between two side walls of a foundation pit, wherein 2 fixing units with the same structure are arranged on the operating platform, and the fixing units are arranged at two ends of the operating platform in a mirror image manner;
the fixing unit comprises a gantry and 2 clamping plates, the operating platform is provided with mounting holes, the clamping plates are all covered above the mounting holes, the clamping plates are respectively hinged to two sides of an orifice of the mounting hole, the clamping plates are arranged in a mirror image mode, pipe grooves are all formed in the clamping plates, the gantry is fixed on the operating platform, a lifting assembly is arranged below the gantry, and the lifting assembly is located right above the mounting holes;
the lifting assembly comprises a support, a pulley and a lifting ring, the support is fixed below the gantry, the pulley and the lifting ring are fixed on the support, the pulley is located above the lifting ring, and a lifting rope is installed on the lifting ring.
2. The auxiliary foundation pit drainage pipe fixing support as claimed in claim 1, wherein: a plurality of fixed supporting legs are installed at the bottom of the operating platform and are fixedly connected with supporting beams between two side walls of the foundation pit through bolts respectively.
3. The auxiliary foundation pit drainage pipe fixing support as claimed in claim 2, wherein: the fixed supporting leg is provided with a sliding groove for penetrating a bolt.
4. The auxiliary foundation pit drainage pipe fixing support as claimed in claim 1, wherein: the fixing unit further comprises a guardrail, and the guardrail is installed at the edge of the operating platform.
5. The auxiliary foundation pit drainage pipe fixing support as claimed in claim 1, wherein: the clamping plate is provided with a handle.
6. The auxiliary foundation pit drainage pipe fixing support as claimed in claim 1, wherein: the pipe chase between the cardboard forms circular pipeline through-hole after the cardboard is closed.
7. The auxiliary foundation pit drainage pipe fixing support as claimed in claim 6, wherein: the drain pipe is hung below the lifting rope, and one end of the drain pipe penetrates through the pipeline through hole and then is located in the foundation pit.
8. The auxiliary foundation pit drainage pipe fixing support as claimed in claim 7, wherein: the outside cover of drain pipe has the pipe strap, and the pipe strap joint is in the top of pipeline through-hole.
CN202020302590.4U 2020-03-12 2020-03-12 Supplementary foundation ditch falls drain pipe fixed bolster Active CN212248305U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020302590.4U CN212248305U (en) 2020-03-12 2020-03-12 Supplementary foundation ditch falls drain pipe fixed bolster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020302590.4U CN212248305U (en) 2020-03-12 2020-03-12 Supplementary foundation ditch falls drain pipe fixed bolster

Publications (1)

Publication Number Publication Date
CN212248305U true CN212248305U (en) 2020-12-29

Family

ID=73991333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020302590.4U Active CN212248305U (en) 2020-03-12 2020-03-12 Supplementary foundation ditch falls drain pipe fixed bolster

Country Status (1)

Country Link
CN (1) CN212248305U (en)

Similar Documents

Publication Publication Date Title
US9879441B2 (en) Modular monopole tower foundation
CN101966965A (en) Special hanger with guide cover wheel hub and turning and hanging method
CN103243926A (en) Construction method for hoisting pipe well vertical pipe in high-rise building engineering
RU144483U1 (en) DUAL PURPOSE SUPPORT
CN212248305U (en) Supplementary foundation ditch falls drain pipe fixed bolster
CN106144832A (en) A kind of special extended type wall-attached frame and preparation method thereof
CN209853542U (en) Lifting appliance for lifting pipe gallery
CN209194589U (en) A kind of half covers digging subway station bracing members and supports erecting structure
CN108390291B (en) Special gallows of outdoor voltage transformer overhauls
CN216766397U (en) Building curtain wall mounting structure
CN110359674A (en) A kind of vertical duct well casing pipeline construction method of skyscraper small space
CN207960977U (en) A kind of sliding submerged pump system of deep water
CN212562551U (en) Pull rod type rear support section steel overhanging discharging platform
CN209799408U (en) rail-mounted vertical transportation mechanism for unit plate
CN104627849A (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN210398821U (en) Lamp mounting structure free of erecting scaffold
CN203820360U (en) Lifting appliance for installing existing railway sound barrier plate
CN211009152U (en) Underwater fire pump
CN206903180U (en) Upper suspension centre supporting structure
CN220312209U (en) Frame type high pile construction operation platform
CN212337340U (en) Highway tunnel construction ventilation structure
CN218025108U (en) Wall-attached frame protection frame for crane
CN220245474U (en) Double-pipe lifting device for suspended ceiling pipeline
CN220082970U (en) Folding type lamp bracket mounted on outer column
CN216785494U (en) Rail mounted transportation and lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant