CN211949524U - 3D curtain wall construction system - Google Patents
3D curtain wall construction system Download PDFInfo
- Publication number
- CN211949524U CN211949524U CN202020529023.2U CN202020529023U CN211949524U CN 211949524 U CN211949524 U CN 211949524U CN 202020529023 U CN202020529023 U CN 202020529023U CN 211949524 U CN211949524 U CN 211949524U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- base frame
- construction system
- suspension
- electric trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a 3D curtain construction system, including hanging mechanism, operation platform and hoisting machine structure suspend in midair in hanging the mechanism. The suspension mechanism comprises a base frame and a suspension girder, the base frame can transversely move on the floor, and the suspension girder is arranged on the base frame and extends out of the floor. The operation platform and the hoisting mechanism are respectively arranged on the suspension girder through the electric trolley, the electric trolley can move along the suspension girder, the operation platform is provided with a hoisting machine, the hoisting machine is connected with the corresponding electric trolley through a steel wire rope to drive the operation platform to lift, the hoisting mechanism comprises an electric hoist, and the electric hoist is connected with a lifting hook through an I-shaped steel and drives the lifting hook to lift through the corresponding electric trolley. The utility model provides a 3D curtain construction system, work platform and hoisting machine construct and can do the triaxial motion, can realize single or many curtain construction of accomplishing whole building facade wall of being under construction simultaneously, have made things convenient for building facade high altitude work greatly.
Description
Technical Field
The utility model relates to a high altitude hoist and mount operation especially relates to a 3D curtain construction system.
Background
The construction technology of the curtain wall without the scaffold is the development direction of the current building construction. At present, the construction technology of a high-rise building curtain wall without a scaffold generally adopts two modes, namely, a hanging basket is used for high-rise operation, and a window cleaning machine system installed in a building is used for construction, but the two modes have certain limitations.
In the first mode, because the hanging flower basket is only a work platform, all actions are only one direction of operation from top to bottom, do not have front and back and lateral shifting mode, simultaneously, because the loading capacity is low, hoist and mount machines need to be erect in addition in the curtain hoist and mount to the specialized tool of curtain installation, in addition, hanging flower basket aversion work volume is big, and the installation work volume that leads to the workman is huge. In the second method, the method of using the window cleaning machine has certain disadvantages, and firstly, because the window cleaning machine is a fixed device, the window cleaning machine is produced and installed for a certain period, and especially, the installation of the host machine needs to wait until the floor main structure is completed and can be used after being checked and accepted by a third-party detection department, so the cost and the time can not be controlled. The second and the common floor window cleaning machines are only provided with one floor window cleaning machine, so that the installation requirements cannot be met under the condition of short construction period, and the third and the majority of window cleaning machines are not provided with hoisting mechanisms, so that even if the hoisting load capacity of the window cleaning machine with the hoisting mechanism is not more than 350kg, the installation is limited to a certain extent.
Aiming at the problems, the advantages of the two modes are combined, and a 3D curtain wall construction system is developed through long-term construction practice and research.
SUMMERY OF THE UTILITY MODEL
The embodiment of the utility model provides a 3D curtain construction system, including hanging the mechanism, operation platform and hoisting machine construct and hang in hanging the mechanism, it includes the bed frame and hangs the girder to hang the mechanism, the movably setting of bed frame is on the floor, hang the girder setting on the bed frame and stretch out the floor, operation platform and hoisting machine construct respectively through the setting of electronic dolly on hanging the girder, electronic dolly can be followed and hang the girder motion, be provided with the lifting machine on the operation platform, the lifting machine drives the operation platform through the electronic dolly that wire rope connection corresponds and goes up and down, hoisting machine constructs including electric block, electric block passes through the I-steel and connects the lifting hook and goes up and down with the electronic dolly that corresponds. Light rail steel is laid on the floor, the base frame is driven by the electric trolley to horizontally move on the light rail steel, and the light rail steel is I-shaped. One side of keeping away from work platform on the bed frame is provided with the balancing weight, and the bed frame is inside to be provided with the stiffener, and the stiffener is triangle-shaped and sets up. The joint of the operation platform and the steel wire rope is provided with a safety lock, and a limiting block is arranged between the steel wire rope and the corresponding electric trolley.
The utility model provides a 3D curtain construction system, work platform and hoisting machine construct and can do the triaxial motion, and one or many simultaneous constructions just can accomplish the curtain construction of whole building facade wall as required, have made things convenient for building facade high altitude work greatly. It mainly has the following characteristics:
firstly, because the system is a temporary installation mechanism, one or more vertical walls can be rented according to needs, and the cost and the time are greatly saved.
And secondly, the vertical, longitudinal and transverse movement of the mounting platform and the hoisting mechanism can be realized, and the device is special equipment for mounting the curtain wall.
Thirdly, the loading capacity of the hoisting mechanism is far greater than that of hoisting machines of the window cleaning machine, so that the applicability is strong.
And fourthly, the hanging mechanism is detachable, so that the transportation and installation are convenient.
Fifthly, if the device is used for a long time, the function of the window cleaning machine can be replaced, and the curtain wall can be cleaned and replaced.
Additional aspects and advantages of embodiments of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a schematic plan structure view of a 3D curtain wall construction system according to an embodiment of the present invention;
fig. 2 is another schematic plane structure diagram of the 3D curtain wall construction system according to the embodiment of the present invention.
Detailed Description
The following disclosure provides many different embodiments or examples for implementing different features of the invention. In order to simplify the disclosure of the present invention, the components and arrangements of specific examples are described below. Of course, they are merely examples and are not intended to limit the present invention. Furthermore, the present invention may repeat reference numerals and/or reference letters in the various examples, which have been repeated for purposes of simplicity and clarity and do not in themselves dictate a relationship between the various embodiments and/or arrangements discussed. In addition, the present disclosure provides examples of various specific processes and materials, but one of ordinary skill in the art may recognize applications of other processes and/or use of other materials.
Please refer to fig. 1 and 2, the embodiment of the present invention provides a 3D curtain wall construction system, which comprises a suspension mechanism, a work platform and a lifting mechanism, wherein the work platform and the lifting mechanism are suspended on the suspension mechanism, and the suspension mechanism comprises a base frame 1 and a suspension girder 2. One side of keeping away from the operation platform on bed frame 1 is provided with balancing weight 8, guarantees that bed frame 1 can set up on the floor more steadily. The base frame 1 is internally provided with a reinforcing rod 9, and the reinforcing rod 9 is arranged in a triangular shape. Because triangle-shaped has the characteristic of stability, has further strengthened the stability of bed frame 1, prevents that bed frame 1 from toppling, brings the potential safety hazard.
The base frame 1 is movably arranged on a floor. Specifically, light rail steel 7 is laid on the floor, and the base frame 1 is driven by the electric trolley 3 to horizontally move on the light rail steel 7. The trolley has 4 trolleys, two of which are electric. The light rail steel 7 is in an I shape. The I-shaped track has simple structure, convenient processing, and is stable and reliable.
The utility model provides a 3D curtain construction system, bed frame 1 horizontal migration on the light rail steel 7 of floor, work platform and hoisting machine construct liftable respectively, simultaneously, along hanging 2 motions of girder under the drive of electric trolley 3, consequently, the utility model provides a three-axis motion can be done to work platform and hoisting machine structure in the direction of x axle, y axle and z axle, has promoted the degree of freedom of operating personnel operation greatly, and the curtain construction of building one side facade wall just can be accomplished to a 3D curtain construction system, has made things convenient for building facade high altitude work greatly.
While embodiments of the present invention have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims (5)
1.3D curtain wall construction system, which is characterized by comprising a suspension mechanism, an operation platform and a hoisting mechanism, wherein the operation platform and the hoisting mechanism are suspended on the suspension mechanism,
the suspension mechanism comprises a base frame (1) and a suspension girder (2), the base frame is arranged on the floor and can realize transverse movement, the suspension girder is arranged on the base frame and extends out of the floor,
the operation platform and the hoisting mechanism are respectively arranged on the suspension girder through an electric trolley (3), the electric trolley can move along the suspension girder, a hoisting machine (4) is arranged on the operation platform, the hoisting machine is connected with the corresponding electric trolley through a steel wire rope (5) to drive the operation platform to lift, the hoisting mechanism comprises an electric hoist (6), and the electric hoist is connected with a lifting hook through an I-steel and drives the lifting hook to lift through the corresponding electric trolley.
2. 3D curtain wall construction system according to claim 1, characterized in that the floor is laid with light rail steel (7) on which the base frame is moved horizontally by the electric trolley.
3. The 3D curtain wall construction system of claim 2, wherein the light rail steel is I-shaped.
4. The 3D curtain wall construction system according to claim 1, wherein a counterweight (8) is arranged on one side of the base frame away from the operation platform, and a reinforcing rod (9) is arranged inside the base frame and is arranged in a triangular shape.
5. The 3D curtain wall construction system according to claim 1, characterized in that a safety lock (10) is arranged at the joint of the operation platform and the steel wire rope, and a limit block (11) is arranged between the steel wire rope and the corresponding electric trolley.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020529023.2U CN211949524U (en) | 2020-04-10 | 2020-04-10 | 3D curtain wall construction system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020529023.2U CN211949524U (en) | 2020-04-10 | 2020-04-10 | 3D curtain wall construction system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211949524U true CN211949524U (en) | 2020-11-17 |
Family
ID=73161239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020529023.2U Active CN211949524U (en) | 2020-04-10 | 2020-04-10 | 3D curtain wall construction system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211949524U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114197847A (en) * | 2021-11-25 | 2022-03-18 | 中建八局第二建设有限公司 | Construction method of assembled roof cornice modeling curtain wall |
CN116657935A (en) * | 2023-08-02 | 2023-08-29 | 山西八建集团有限公司 | Curtain wall construction device |
-
2020
- 2020-04-10 CN CN202020529023.2U patent/CN211949524U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114197847A (en) * | 2021-11-25 | 2022-03-18 | 中建八局第二建设有限公司 | Construction method of assembled roof cornice modeling curtain wall |
CN116657935A (en) * | 2023-08-02 | 2023-08-29 | 山西八建集团有限公司 | Curtain wall construction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211949524U (en) | 3D curtain wall construction system | |
CN109826411B (en) | Climbing frame for building and operation method thereof | |
CN207974504U (en) | Climbing type hanging basket system for tilting decoration of exterior wall construction | |
CN215212267U (en) | Pulling-up hanging basket for construction of constructional engineering | |
CN205170209U (en) | A type gate -type hoisting apparatus | |
CN212559093U (en) | Panel lifting frame for construction | |
CN205802844U (en) | A kind of hanging apparatus | |
CN209585654U (en) | Adhesion type goes up and down discharging platform | |
CN218879223U (en) | Intelligent anti-swing control system of clean crane | |
CN215711296U (en) | High-altitude operation hanger | |
WO2023184882A1 (en) | Material lifting device | |
CN111287441B (en) | Suspended anti-shaking construction platform and construction method thereof | |
CN203257106U (en) | Multifunctional power-driven walking type walking system | |
CN214942249U (en) | Novel indoor wall construction device | |
CN209957241U (en) | Steel hanger | |
CN202201644U (en) | Installation equipment for insulator supporting column of serial compensation platform | |
JP2512196B2 (en) | Construction material hoisting device and hoisting method | |
CN109879165A (en) | A kind of steel hanger and the construction method using steel hanger manpower hoisting steel beam | |
CN210944569U (en) | Simple and convenient frame-type manual crane | |
CN205419582U (en) | Floor hoist | |
CN204490344U (en) | A kind of multi-arm fluid pressure type bearing beam and driving combined hanging device | |
CN205634695U (en) | Dolly is built by laying bricks or stones to blast furnace carbon brick | |
CN213804934U (en) | Lifting and moving tool for traveling rail of bridge girder erection machine | |
CN209323997U (en) | Integral lifting and sliding device for large-span overhanging transfinite structure | |
CN205012232U (en) | Double -line cantilever type frame bridge crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |