CN211848959U - Stand disjunctor formula operation platform - Google Patents

Stand disjunctor formula operation platform Download PDF

Info

Publication number
CN211848959U
CN211848959U CN201922357863.5U CN201922357863U CN211848959U CN 211848959 U CN211848959 U CN 211848959U CN 201922357863 U CN201922357863 U CN 201922357863U CN 211848959 U CN211848959 U CN 211848959U
Authority
CN
China
Prior art keywords
stand
guardrail
supporting
supporting beam
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922357863.5U
Other languages
Chinese (zh)
Inventor
宋嘉伟
李旭
佘志勇
邓子仪
张磊
冯乐乐
范伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201922357863.5U priority Critical patent/CN211848959U/en
Application granted granted Critical
Publication of CN211848959U publication Critical patent/CN211848959U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a stand disjunctor formula operation platform, set up the support longeron in two stand both sides including the symmetry, every supports the longeron and is greater than the radius of stand apart from the vertical distance at stand center, the length of supporting the longeron is greater than the interacvity of two stands, and the interval is laid the welding and is had a plurality of supporting beam on two support longerons, supporting beam's length is greater than the diameter of stand, the peripheral welding of supporting beam upper surface has the guardrail, hang dense mesh net, mark the sign on the guardrail, the bamboo offset plate has been laid at the guardrail inside to the supporting beam upper surface, supporting beam pass through bolt and the template bolt hole fixed connection on the stand. The utility model solves the problems that the construction of the left and right upright posts needs to climb up and down and the construction operation is inconvenient; the problems that objects are easy to fall and the safety risk is high are solved; economic benefits is high, and the dismouting is simple and convenient, helps accelerating the construction progress under the prerequisite of guaranteeing safety.

Description

Stand disjunctor formula operation platform
Technical Field
The utility model relates to a technical field of highway lower part stand construction especially relates to a stand disjunctor formula operation platform.
Background
The expressway used as a modern traffic sign is called an expressway for short and is a highway specially used for high-speed driving of automobiles. The development of the expressway influences the spatial structure evolution of urban groups, attracts a large number of industries to select sites along the line, and builds plants and bases; the moving range of people is expanded, economic and cultural communication between satellite town formation and urban and rural areas is promoted, traffic pressure is relieved, and urban layout is adjusted; the third industry is prosperous and developed by promoting the industrial development, the employment opportunities and income are increased, the automobile consumption is increased, and the life quality of people is improved; the transportation structure is improved, the port collecting and distributing capacity is improved, the railway pressure is divided, and a comprehensive transportation network system is formed.
The highway circuit is longer, therefore the quantity of substructure stand will be more, and at present stage, stand construction efficiency is not high usually, and machinery machine shift is extravagant, causes holistic time limit for a project to prolong.
Disclosure of Invention
The utility model aims at solving the defects of the prior art and providing a stand disjunctor formula operation platform.
The utility model discloses a realize above-mentioned purpose, adopt following technical scheme:
the utility model provides a stand disjunctor formula operation platform, sets up the support longeron in two stand both sides including the symmetry, and every supports the longeron and is greater than the radius of stand apart from the perpendicular distance at stand center, the length of supporting the longeron is greater than the interacvity of two stands, and the interval is laid the welding on two support longerons and is had a plurality of supporting beam, supporting beam's length is greater than the diameter of stand, the peripheral welding of supporting beam upper surface has the guardrail, hang dense mesh net on the guardrail, mark the sign, the bamboo plywood has been laid at the guardrail inside to the supporting beam upper surface, supporting beam pass through bolt and stand on template bolt hole fixed connection.
The vertical distance between the support longitudinal beam and the center of the upright post is 5cm larger than the radius of the upright post, and the length of the support longitudinal beam is 3m larger than the center distance between the two upright posts; the length of each supporting beam is 1m greater than the diameter of the upright.
The guardrail is a frame formed by steel pipes with the height of 1.2m, the distance between the steel pipes adjacent to the guardrail is 1.5m, and a reinforcing cross rod is arranged at the position with the height of 0.6m of the guardrail.
The supporting longitudinal beam is a 16# channel steel, and the supporting cross beam is a 10# channel steel.
The utility model has the advantages that: the utility model solves the problems that the construction of the left and right upright posts needs to climb up and down and the construction operation is inconvenient; the problems that objects are easy to fall and the safety risk is high are solved; economic benefits is high, and the dismouting is simple and convenient, helps accelerating the construction progress under the prerequisite of guaranteeing safety.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a right side view of the present invention;
fig. 3 is a top view of the present invention;
in the figure: 1-upright column; 2-supporting the longitudinal beam; 3-supporting the beam; 4-guard bar; 5-dense mesh net; 6-bamboo plywood;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention will be further explained with reference to the following figures and examples:
as shown in fig. 1 to 3, a stand disjunctor formula operation platform, including the symmetry set up the support longeron 2 in two stand 1 both sides, every support longeron 2 is greater than stand 1 radius apart from the vertical distance at stand 1 center, the length of supporting longeron 2 is greater than two stand 1 centre intervals, and the interval is laid the welding on two support longerons 2 and is had a plurality of supporting beam 3, the length of supporting beam 3 is greater than stand 1 diameter, 3 upper surface periphery welding of supporting beam has guardrail 4, the close mesh net 5 of suspension, sign on the guardrail 4, the bamboo offset plate 6 has been laid in 4 insides of guardrail to the 3 upper surface of supporting beam, supporting beam 2, supporting beam 3 pass through bolt and stand 1 on the template bolt hole fixed connection.
The vertical distance between the support longitudinal beam 2 and the center of the upright post 1 is 5cm larger than the radius of the upright post 1, and the length of the support longitudinal beam 2 is 3m larger than the center distance between the two upright posts 1; the length of each supporting beam 3 is 1m greater than the diameter of the upright 1.
The guardrail 4 is the frame that comprises the steel pipe that 1.2m is high, the distance between the adjacent steel pipe of guardrail 4 is 1.5m, guardrail 4 sets up one and consolidates the horizontal pole in the place that highly is 0.6 m.
The supporting longitudinal beam 2 is a 16# channel steel, and the supporting transverse beam 3 is a 10# channel steel.
The utility model discloses concrete operation method during construction:
distance lofting of two columns 1: pile position lofting is carried out by a tape measure, and then the position which is 10cm larger than the diameter of the two upright posts 1 is determined;
welding longitudinal and transverse beams and laying bamboo plywood: two 16 channel steels are longitudinally paved to serve as a support longitudinal beam 2, the length of the channel steels is 3 meters longer than the distance between columns, 10 channel steels are transversely paved to serve as a support cross beam 3, the distance is 50cm, the length of the channel steels is 1m longer than the diameter of the columns, and the support longitudinal beam 2 and the support cross beam 3 are connected in a welding mode; laying a bamboo plywood 6 on the supporting beam 3;
the guardrail 4 is welded, the dense mesh net 5 and the marking label plate are hung: guard bar 4 adopts
Figure BDA0002335292220000031
The steel pipes are welded, the distance between the steel pipes is 1.5m, the height is 1.2m, a reinforcing cross bar is arranged at the position of 60cm, and the guardrail 4 is hung with the dense mesh net 5 and the marking label.
Hoisting in place: and hoisting by adopting a crane, checking whether a desoldering part exists after hoisting is finished, and timely welding the desoldering part.
Fixing: and after the hoisting of the integrated operation platform is finished, the integrated operation platform is fixed with the upright post template bolt hole.
The specific embodiment is as follows: the highway engineering from Yunfuoding to Maoyin (Yue Gui boundary) is located in Guangdong Xinyi city, the design speed is 100km/h, two-way four lanes are adopted, the standard width of a roadbed is 26m, and the project has 417 upright columns in common.
The stand column integrated operating platform is applied to the Yuanmao high-speed project, the two stand columns 1 are integrally connected, the stability of the operating platform is improved, the integrated operation provides a construction channel between the stand columns, unnecessary operations such as up-down climbing during construction of the left stand column 1 and the right stand column 1 are reduced, the safe production condition is improved, and the using effect is good.
The construction efficiency and the economic benefit are improved: the stand column integrated operation platform is adopted, so that the economic benefit is high, the disassembly and the assembly are simple and convenient, and the construction progress is accelerated. 2 workers are saved for every two columns, the total number is 400 yuan, and 83400 yuan is saved according to calculation of 417 columns.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above embodiments, and various improvements made by the method concept and technical solution of the present invention or directly applied to other occasions without improvement are all within the protection scope of the present invention.

Claims (4)

1. An upright column integrated operating platform is characterized by comprising support longitudinal beams (2) symmetrically arranged at two sides of two upright columns (1), wherein the vertical distance between each support longitudinal beam (2) and the center of the upright column (1) is larger than the radius of the upright column (1), the length of the supporting longitudinal beams (2) is larger than the center distance between the two upright posts (1), a plurality of supporting cross beams (3) are paved and welded on the two supporting longitudinal beams (2) at intervals, the length of the supporting beam (3) is larger than the diameter of the upright post (1), the periphery of the upper surface of the supporting beam (3) is welded with a guardrail (4), a dense mesh net (5) and a marking label are hung on the guardrail (4), a bamboo rubber plate (6) is laid on the upper surface of the supporting beam (3) in the guardrail (4), the support longitudinal beam (2) and the support cross beam (3) are fixedly connected with the template bolt holes on the upright posts (1) through bolts.
2. The stand-integrated operating platform according to claim 1, wherein the vertical distance between the supporting longitudinal beams (2) and the center of the stand (1) is 5cm larger than the radius of the stand (1), and the length of the supporting longitudinal beams (2) is 3m larger than the distance between the centers of the two stands (1); the length of each supporting beam (3) is 1m greater than the diameter of the upright column (1).
3. A column integrated operation platform according to claim 2, wherein the guardrail (4) is a frame formed by steel pipes with a height of 1.2m, the distance between the adjacent steel pipes of the guardrail (4) is 1.5m, and the guardrail (4) is provided with a reinforcing cross bar at the position with the height of 0.6 m.
4. A column integrated operation platform according to claim 3, characterized in that the support longitudinal beam (2) is 16# channel steel, and the support cross beam (3) is 10# channel steel.
CN201922357863.5U 2019-12-25 2019-12-25 Stand disjunctor formula operation platform Active CN211848959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922357863.5U CN211848959U (en) 2019-12-25 2019-12-25 Stand disjunctor formula operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922357863.5U CN211848959U (en) 2019-12-25 2019-12-25 Stand disjunctor formula operation platform

Publications (1)

Publication Number Publication Date
CN211848959U true CN211848959U (en) 2020-11-03

Family

ID=73217945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922357863.5U Active CN211848959U (en) 2019-12-25 2019-12-25 Stand disjunctor formula operation platform

Country Status (1)

Country Link
CN (1) CN211848959U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309008A (en) * 2021-07-05 2021-08-27 中建八局第四建设有限公司 Steel case roof beam temporary support construction safety work platform
CN114808807A (en) * 2022-04-22 2022-07-29 湖南省通和工程有限公司 Visual adjusting system for guaranteeing construction quality control of waveform guardrail stand column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309008A (en) * 2021-07-05 2021-08-27 中建八局第四建设有限公司 Steel case roof beam temporary support construction safety work platform
CN114808807A (en) * 2022-04-22 2022-07-29 湖南省通和工程有限公司 Visual adjusting system for guaranteeing construction quality control of waveform guardrail stand column
CN114808807B (en) * 2022-04-22 2023-08-22 湖南省通和工程有限公司 Visual governing system of guarantee wave form guardrail stand construction quality control

Similar Documents

Publication Publication Date Title
CN211848959U (en) Stand disjunctor formula operation platform
CN105386412A (en) Movable portal used in construction of bent cap of large cantilever and construction method of movable portal
CN201046889Y (en) Bailey truss assembling door frame
CN208329596U (en) A kind of semi-machine rail type subway station side wall template construction equipment
CN203452009U (en) Self-walking device for mounting steel beam
CN208995936U (en) S type steel box girder of cable stayed bridge on across ground rail traffic slides mounting bracket
CN102206934B (en) Method for block-by-block casting of concrete continuous beam bridge by using military truss shift mould
CN205205687U (en) Removal portal in big cantilever bent cap construction
CN2131978Y (en) Lining-building platform car for tunnel construction
CN207392768U (en) A kind of Multi-section slippage device in irregular large-span space structure of constructing
CN204589817U (en) A kind of reinforcing mat posture fence operation integrated apparatus
CN214089431U (en) Trestle structure for pier construction
CN215052133U (en) Steel case roof beam is alternately construction supporting structure from top to bottom
CN115288036A (en) Installation device and construction method for swivel steel structure bridge support
CN214365427U (en) Subway operation interzone construction site protection isolation structure
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN114961338A (en) Temporary support method for top plate of PC (polycarbonate) assembly type engineering basement
CN211498488U (en) Highway and railway dual-purpose bridge movable railway hard protection platform
CN110626943B (en) Special chassis of inverted gantry crane for single-line T-beam bridge and mounting method
CN112726426A (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN112796232A (en) Reinforced structure for existing railway underpass frame bridge construction
CN103144639B (en) Continuous multi-stage large-span cable-stayed arch air electrified railway
CN208039266U (en) It is a kind of to exempt to set up the vertical stability structure of stanchion suitable for foundation pit
CN112523087A (en) A beam lifting station for beam slab erects
CN114822316B (en) Construction method and application of mounting billboard without affecting normal traffic of vehicle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant